BidSum.Hagg_Lake.pdf

PDF 21 KB Posted

Attached to
OR WASH 2015(2), Hagg Lake Perimeter Road, MP 2. 7 Slide Repair
Solicitation number
DTFH7017B00022
Issued by

View the file

Other files

File Type Posted
Q&A6-28-17.pdf PDF
A001.pdf PDF
Plan_Request_for_Hagg_Lake.pdf PDF
CrossSection_Hagg-Lake_MP27.pdf PDF
ShearKey-Volume_Hagg-Lake_MP27.txt TXT text file
Earthwork_MP2722.log LOG file
Plans_Hagg-Lake_MP27.pdf PDF
IFB.pdf PDF
ESCP_OR_WASH_2015(2)_Hagg_Lake_Perimeter_Road.pdf PDF
Alignment-Report_Hagg-Lake_MP27.txt TXT text file
PROJECT_DESCRIPTION_OR_WASH_2015(2),_Hagg_Lake_Perimeter_RD,_MP_2.7_Slide_Repair.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Solicitation No. DTFH7017B00022 Bid Due Date JULY 7, 2017 Time 2:00 p.m.

Project Name/Number OR WA 2015(2), HAGG LAKE PERIMETER ROAD, MP 2.7 SLIDE REPAIR

OFFER RECEIVED

REC'D

BY

CONTRACTOR

Bid AMOUNT

DATE

TIME

1.

7/7/17

1:50

HR

WESTECH CONSTRUCTION,

INC.

PORTLAND, OR

$2,961,579.00

2.

HR STEVE MANNING

CONSTRUCTION, INC

REDDING, CA

$3,923,465.00

3.

HR LASKEY-CLIFTON CORP

REEDSPORT, OR

$3,402,786.00

4.

5.

6.

7.

8.

9.

10.

Engineer’s Estimate

$ 1,995,410.00

LOW BIDDER'S 503-777-7000

PHONE NUMBER:

Attendance: 10

Bids Opened by: Angy Liljedahl

Assistants: _Helen Radcliff/Dean Umathum_

REC'D
BY
CONTRACTOR
Bid AMOUNT

DATE

File details come from the government source that posted it. Updated .