PROJECT_DESCRIPTION_OR_WASH_2015(2),_Hagg_Lake_Perimeter_RD,_MP_2.7_Slide_Repair.pdf
PDF 20 KB Posted
- Solicitation number
- DTFH7017B00022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.Hagg_Lake.pdf | ||
| Q&A6-28-17.pdf | ||
| A001.pdf | ||
| Plan_Request_for_Hagg_Lake.pdf | ||
| CrossSection_Hagg-Lake_MP27.pdf | ||
| ShearKey-Volume_Hagg-Lake_MP27.txt | TXT text file | |
| Earthwork_MP2722.log | LOG file | |
| Plans_Hagg-Lake_MP27.pdf | ||
| IFB.pdf | ||
| ESCP_OR_WASH_2015(2)_Hagg_Lake_Perimeter_Road.pdf | ||
| Alignment-Report_Hagg-Lake_MP27.txt | TXT text file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR WASH 2015(2), Hagg Lake Perimeter Road, MP 2.7 Slide Repair, Washington Country, Oregon
The work consists of excavation, rock buttress, embankment, paving to stabilize an active landslide and reconstruct the roadway within the vicinity of the landslide at Hagg Lake.
Project length: 0.1 Miles
Tentative Fixed Completion Date: August – December 2017
Estimated Price Range: $1 million to $2 million
Location: This project is located at Henry Hagg Lake, approximately 5 miles SW of Forest Grove, Oregon.
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
BASE SCHEDULE
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll Check Dam Stabilized Construction Exit
780 LNFT
4 EACH
1 EACH
DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.5 ACRE 203 Removal of Structures & Obstructions Pipe Culvert Sawcutting Pavement
1 EACH
85 LNFT
204 Excavation & Embankment Roadway Excavation Select Borrow Embankment Construction
1,650 CUYD
1,650 TON
16,400 CUYD
207 Earthwork Geosynthetics Separation-Stabilization Geotextile, Class 1, Type D 6,700 SQYD 208 Structure Excavation 27,750 CUYD
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
BASE SCHEDULE
DIVISION 250 – Slope Reinforcement and Retaining Walls 252 Rockery, Special Rock Embankment, and Rock Buttress Rock Buttress 14,800 CUYD
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 1,050 TONS
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 450 TONS
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 18-Inch Pipe Culvert 25 LNFT 605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which) Standard Underdrain System 350 LNFT 609 Curb & Gutter (concrete – minor structures) (indicate which) Curb, Concrete 200 LNFT 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment 6,600 SQYD 633 Permanent Traffic Control Remove and Reset Sign 2 EACH 635 Temporary Traffic Control Traffic Control Supervisor Barricade Type 3 Plastic Fence (Orange) Construction Sign Flagger
LPSM
12 EACH
1,300 LNFT
150 SQFT
300 HOUR