Q&A_6-19-17.pdf

PDF 77 KB Posted

Attached to
WA FS ERFO 2016(1)-22(1), Cowlitz Valley Road Repairs
Solicitation number
DTFH7017B00017
Issued by

About this file

Responses to Questions - June 19, 2017

View the file

Other files

File Type Posted
BidSum_Cowlitz.pdf PDF
Q&A_6-22-17.pdf PDF
Q&A_6-21-17.pdf PDF
Q&A_6-16-17.pdf PDF
A002.pdf PDF
Hydraulic_Design_Memo_Cowlitz_Valley_Road_Repairs.pdf PDF
A001.pdf PDF
Plan_Request_Form.pdf PDF
SWPPP_WA_FS_ERFO_2016(1)-22(1).pdf PDF
IFB_WA_FS_ERFO_2016(1)-22(1),_Cowlitz_Valley_Road_Repairs.pdf PDF
Site_7_FR_2322_MP_0.2_As_Builts.pdf PDF
Site_8_FR_23_MP_23.5_As_Builts.pdf PDF
Cowlitz_Plan_Set.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. WA FS ERFO 2016(1)‐22(1) Project: COWLITZ VALLEY ROAD REPAIRS

# General Technical Question Answer Date 1 x

1. There is currently no access to all but Site #1 due to snow on the alternate access road. Does the Government have pictures of the other sites that it can provide to the contractor?

There is limited vehicular access to the sites, but foot traffic may be available from areas besides the alternate access road. You may contact the local USFS office for help in directing you. We do not have photographs of the sites.

6/12/17 x

2. Does the Government have flow rate data of the various waterways on the project that it can provide to the contractor?

An amendment has been issued to add a hydraulic design memorandum to the physical data.

6/12/17 x

3. Site #1 and Site #5 both call for a permanent channel diversion to be installed on the opposite side of the waterway from the road. Will it be acceptable to drive heavy equipment through the waterway to access the channel diversion work?

Yes. Please note: an amendment has been issued to clarify 107(d)(4) use of vegetable oil requirements

6/12/17 x

Is the Government expecting the Contractor to complete the in-water work for Sites 2, 3, 4 and 6 during the 2017 in-water work period?

The Government will not expect the in‐ water work for Sites 2,3,4,6 to be complete during the 2017 in‐water work period. An amendment has been issued to address the 2017 requirement in 107.10(d)(1) and 108.01.

6/13/17

Check General or Technical x

I am being told by my surveyor that a forest service key will be needed to access a couple of the major portions of work for this project. Is there a way to check out a key, or can I get directions around the site where a locked gate will not be encountered?

We encourage you to contact the US Forest Service, Randle Ranger Station. Address:

10024 US‐12, Randle, WA 98377. Phone:

(360) 497‐1100 Hours: Monday‐Friday, 8AM–12PM, 1–4:30PM.

6/19/2017

File details come from the government source that posted it. Updated .