Q&A_5-11-17.pdf
PDF 77 KB Posted
- Solicitation number
- DTFH7017B00016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Minuteman.pdf | ||
| Q&A_5-15-17.pdf | ||
| A002.pdf | ||
| SF30amd_WORD.pdf | ||
| Plan_Request_form_DAR.pdf | ||
| IFB_Minuteman.pdf | ||
| mt-d201701_DAR2017(1)_Plans_Signoff_(Revised).pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: MT DAR 2017(1) Project: Minuteman Missle Base Roads 2017
# General Technical Question Answer Date 1 X On sheet E.2 there is a detail for temporary diversion channels. Where are the temporary channels used on the project?
Sheet E.2 is a standard detail that provides a method for temporary stream diversion, if required. See Subsection 157.10.
5/9/17
2 X Is a SWPPP required for the project? No. See Section 157 5/9/17
3 X What will be the procedure for failing gradations?
See Subsection 106.01. 5/10/17
4 X
I understand that 1 sample every six hours of production; so will we have one testing period to correct without being shut down?
For process control sampling and testing, see Section 153. For acceptance sampling and testing of work required under Sections 301 and 311, See Subsection 106.05(b).
5/10/17
5 X
Will the samples be taken from the belt or stockpile?
See the ‘Point of Sampling’ column in the Sampling, Testing, and Acceptance Requirements Tables at the end of each specification Section.
5/10/17
6 X
In case of failing gradations what are the penalties?
For work required under Sections 301 and 311, see Subsection 106.05(d) Pay Factor Determination.
5/10/17
7 X
Will averages of the samples be used or is it sample specific?
For work required under Sections 301 and 311, see Subsection 106.05(c) Statistical evaluation.
5/10/17
Check General or Technical