PROJECT_DESCRIPTION.pdf
PDF 18 KB Posted
- Solicitation number
- DTFH7017B00016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Minuteman.pdf | ||
| Q&A_5-15-17.pdf | ||
| Q&A_5-11-17.pdf | ||
| A002.pdf | ||
| SF30amd_WORD.pdf | ||
| Plan_Request_form_DAR.pdf | ||
| IFB_Minuteman.pdf | ||
| mt-d201701_DAR2017(1)_Plans_Signoff_(Revised).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DAR 2017(1), Minuteman Missile Base Roads 2017, Fergus and Judith Basin Counties, Montana
The work consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, grading, drainage, fencing, and other small items of work.
Project length:
Schedule A: 42.01 miles Schedule B: 51.86 miles Schedule C: 59.86 miles
Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range:
Schedule A & B: Between $5,000,000 and $7,000,000 Schedule C: Between $7,000,000 and $10,000,000
Location: 90 miles SE of Great Falls, MT.
DESCRIPTION OF WORK in US
CUSTOMARY UNITS
FP-14
Schedule Name
A
Schedule Name
B
Schedule Name
C
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes Yes Yes 153 Contractor Quality Control and Assurance Yes Yes Yes 154 Contractor Sampling & Testing Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll
3,000
LNFT
3,150
LNFT
3,500
LNFT
158 Watering for Dust Control 4,989
MGAL
5,874
MGAL
6,832
MGAL
DIVISION 200 – Earthwork 204 Excavation & Embankment Subexcavation Select Borrow
1,600
CUYD
3,000 TON
1,600
CUYD
3,000 TON
1,600
CUYD
3,000 TON
A
Schedule Name
B
Schedule Name
C
207 Earthwork Geosynthetics Geotextile Geogrid
2,550
SQYD
2,500
SQYD
2,550
SQYD
2,500
SQYD
2,550
SQYD
2,500
SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 2 94 CUYD 94 CUYD 94 CUYD DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate)
25,363
TON
302 Minor Crushed Aggregate 2,410 TON 2,865 TON 3,475 TON 303 Road Reconditioning 221,813
LNFT
273,821
LNFT
316,061
LNFT
311 Stabilized Aggregate Surface Course Imported In-Place Calcium Chloride
131,217
TON
0 MILE
2,339 TON
149,034
TON
4.230 MILE
2,849 TON
149,034
TON
4.230 MILE
2,849 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 36-inch 48-inch 24-inch or equivalent 36-inch or equivalent 42-inch or equivalent 48-inch or equivalent 60-inch or equivalent 36-inch end section
88 LNFT
50 LNFT
44 LNFT
46 LNFT
42 LNFT
160 LNFT
86 LNFT
1 EACH
88 LNFT
50 LNFT
44 LNFT
46 LNFT
42 LNFT
160 LNFT
86 LNFT
1 EACH
148 LNFT
50 LNFT
44 LNFT
46 LNFT
42 LNFT
160 LNFT
86 LNFT
1 EACH
607 Cleaning, Relaying, & Repairing Existing Drainage Structures 34 EACH 38 EACH 44 EACH 619 Fences, Gates, Cattle Guards & Bollard Posts Remove and Reset Fence 100 LNFT 100 LNFT 100 LNFT 622 Rental Equipment Yes Yes Yes
A
Schedule Name
B
Schedule Name
C
623 General Labor (yes/no) Yes Yes Yes 635 Temporary Traffic Control – Flagger Railroad Flagger
2,920
FXHR
80 FXHR
3,420
FXHR
80 FXHR
3,880
FXHR
80 FXHR
635 Temporary Traffic Control LPSM LPSM LPSM