PROJECT_DESCRIPTION.pdf

PDF 18 KB Posted

Attached to
MT DAR 2017(1), Minuteman Missile Base Roads 2017
Solicitation number
DTFH7017B00016
Issued by

View the file

Other files

File Type Posted
BidSum_Minuteman.pdf PDF
Q&A_5-15-17.pdf PDF
Q&A_5-11-17.pdf PDF
A002.pdf PDF
SF30amd_WORD.pdf PDF
Plan_Request_form_DAR.pdf PDF
IFB_Minuteman.pdf PDF
mt-d201701_DAR2017(1)_Plans_Signoff_(Revised).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT DAR 2017(1), Minuteman Missile Base Roads 2017, Fergus and Judith Basin Counties, Montana

The work consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, grading, drainage, fencing, and other small items of work.

Project length:

Schedule A: 42.01 miles Schedule B: 51.86 miles Schedule C: 59.86 miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range:

Schedule A & B: Between $5,000,000 and $7,000,000 Schedule C: Between $7,000,000 and $10,000,000

Location: 90 miles SE of Great Falls, MT.

DESCRIPTION OF WORK in US

CUSTOMARY UNITS

FP-14

Schedule Name

A

Schedule Name

B

Schedule Name

C

DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes Yes Yes 153 Contractor Quality Control and Assurance Yes Yes Yes 154 Contractor Sampling & Testing Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll

3,000

LNFT

3,150

LNFT

3,500

LNFT

158 Watering for Dust Control 4,989

MGAL

5,874

MGAL

6,832

MGAL

DIVISION 200 – Earthwork 204 Excavation & Embankment Subexcavation Select Borrow

1,600

CUYD

3,000 TON

1,600

CUYD

3,000 TON

1,600

CUYD

3,000 TON

A

Schedule Name

B

Schedule Name

C

207 Earthwork Geosynthetics Geotextile Geogrid

2,550

SQYD

2,500

SQYD

2,550

SQYD

2,500

SQYD

2,550

SQYD

2,500

SQYD

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 2 94 CUYD 94 CUYD 94 CUYD DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate)

25,363

TON

302 Minor Crushed Aggregate 2,410 TON 2,865 TON 3,475 TON 303 Road Reconditioning 221,813

LNFT

273,821

LNFT

316,061

LNFT

311 Stabilized Aggregate Surface Course Imported In-Place Calcium Chloride

131,217

TON

0 MILE

2,339 TON

149,034

TON

4.230 MILE

2,849 TON

149,034

TON

4.230 MILE

2,849 TON

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 36-inch 48-inch 24-inch or equivalent 36-inch or equivalent 42-inch or equivalent 48-inch or equivalent 60-inch or equivalent 36-inch end section

88 LNFT

50 LNFT

44 LNFT

46 LNFT

42 LNFT

160 LNFT

86 LNFT

1 EACH

88 LNFT

50 LNFT

44 LNFT

46 LNFT

42 LNFT

160 LNFT

86 LNFT

1 EACH

148 LNFT

50 LNFT

44 LNFT

46 LNFT

42 LNFT

160 LNFT

86 LNFT

1 EACH

607 Cleaning, Relaying, & Repairing Existing Drainage Structures 34 EACH 38 EACH 44 EACH 619 Fences, Gates, Cattle Guards & Bollard Posts Remove and Reset Fence 100 LNFT 100 LNFT 100 LNFT 622 Rental Equipment Yes Yes Yes

A

Schedule Name

B

Schedule Name

C

623 General Labor (yes/no) Yes Yes Yes 635 Temporary Traffic Control – Flagger Railroad Flagger

2,920

FXHR

80 FXHR

3,420

FXHR

80 FXHR

3,880

FXHR

80 FXHR

635 Temporary Traffic Control LPSM LPSM LPSM