Q&A_5-15-17.pdf PDF
Q&A_5-11-17.pdf PDF
SF30amd_WORD.pdf PDF
Plan_Request_form_DAR.pdf PDF
IFB_Minuteman.pdf PDF
mt-d201701_DAR2017(1)_Plans_Signoff_(Revised).pdf PDF
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 N/A MT DAR 2017(1)

Minuteman Missile Base Roads 2017

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street` Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X DTFH7017B000016

9B. DATED (SEE ITEM 11)

04/14/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT DAR 2017(1), Minuteman Missile Base Roads 2017

This modification revises Subsection 107.05. Responsibility for Damage Claims of the SPECIAL CONTRACT REQUIREMENTS, page E-13.

Enclosures.

Page: E-13

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

05/02/2017

E-13 DIVISION 100

Special Contract Requirements Project: MT DAR 2017(1), Minuteman Missile Base Roads 2017

(h) Do not store any material, supplies, or equipment closer than 15 feet from the centerline of any railroad track.

(i) Upon completion of the work, remove all equipment and surplus material, and leave the railroad right-of-way in a neat condition satisfactory to the railroad.

107.05 Responsibility for Damage Claims. Delete Add the following to the fourth paragraph.

and substitute the following:

(d) Railroad protective public liability and property damage liability insurance. $3,000,000 each occurrence. $6,000,000 aggregate coverage. This coverage is required only while completing work at railroad crossings. 30 days prior to beginning work at railroad crossings submit “certificates of insurance” certifying when the policies will be in effect and that policies will not be changed or cancelled until written notice is had been given to the Railroad and Government.

107.08 Sanitation, Health, and Safety. Add the following after the first paragraph:

Submit an accident prevention plan for implementing safety and health standards at the Preconstruction Conference. Use the Government furnished Form WFLHD-28, Guide for Contractor's Accident Prevention Plan. For an electronic version of the form go to:

http://flh.fhwa.dot.gov/resources/construction/forms/wfl/.

107.10 Environmental Protection. Amend as follows:

(c) Dirt, plant, and foreign material. Delete the first paragraph and substitute the following:

Remove dirt, plant, and foreign material from vehicles and equipment before entry into project. Prevent introduction of noxious weeds and non-native plant species into the work site. Follow applicable Federal land management agency requirements and state requirements. Maintain cleaning and inspection records. Clean hauling vehicles before their initial entry; subsequent entries will not require cleaning unless requested. Notify the CO at least 48 hours before entry to allow for inspection.

Use biodegradable erosion control or fabric material adjacent to waters of the U.S. Do not use material that includes stabilized netting or stabilized open mesh for fiber rolls, rolled materials, and bank wraps. Erosion control blanket or fabrics that break down within 24 months are acceptable. Non-biodegradable blanket or fabric that becomes exposed within the waters of the U.S. must be removed.

(d) Clearances for Contractor-selected, noncommercial areas. Delete this Subsection and substitute the following:

(d) Other requirements.

Comply with the following requirements:

Revised by Amendment-A002