mt-d201701_DAR2017(1)_Plans_Signoff_(Revised).pdf
PDF 9 MB Posted
- Solicitation number
- DTFH7017B00016
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Minuteman.pdf | ||
| Q&A_5-15-17.pdf | ||
| Q&A_5-11-17.pdf | ||
| A002.pdf | ||
| SF30amd_WORD.pdf | ||
| Plan_Request_form_DAR.pdf | ||
| IFB_Minuteman.pdf | ||
| PROJECT_DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material A
M
F e b r u a r y
U
S C h ig h w a y s F
H W
A m t-d
D A
R D e s ig n G e n e r a l I n fo r m a ti o n m t-d a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 DAR 2017(1) MT
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub
Ø spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
W ill ow
C o y o te
Cre ek
Cr ee k
Dr y
W olf
Creek
S a g e
C re e k
Cr ee k
N A.3
STATE PROJECT
NUMBER
MT
DAR 2017(1)
F e b
A
M ft p .1
.1
.2 s td p la n m t-d a c
C
C .d g n
U
S I n t2
D
B
T h o m p s o n h e c k e d b y
B e ll
D s ig n e d b y
1 0.5 0 1 2
SCALE IN MILES
MONTANA
MONTANA
C-02
STANFORD
WINDHAM
SAGE CREEK RD
C-03
C A
T C
O U
L E
E R
D
WILLOW CREEK RD
G R
A Y S
T O
N E R
D
MONTANA
C-02 & C-03 ROADS
VICINITY MAP
B E
N C
H L
A N
D R
D
WINDHAM BENCHLAND RD
N WINDHAM RD
LOUSE CREEK RD
M.P. 0.00
SCHEDULES A, B, & C
BEGIN C-02 ROAD WORK
M.P. 4.39
SCHEDULES A, B, & C
END C-02 ROAD WORK
M.P. 0.00
SCHEDULES A, B, & C
BEGIN C-03 ROAD WORK
M.P. 10.35
SCHEDULES A, B, & C
END C-03 ROAD WORK
W ill ow
Cre ek
S a g e
Cr ee k
S a g e
C r e e k
Lou se
Creek
N 1 0.5 0 1 2
SCALE IN MILES
MONTANA
MONTANA
WINDHAM
C
C
PINECREST RD
SUNSET RD
FIELDSTONE RD
S T
O C
K F
A R
M R
D
WINDHAM BENCHLAND RD
P H
E A
S A
N T R
D
B E
N C
H L
A N
D R
D
N O
R T
H F I S
H E
R M
A N R
D
541 200
MONTANA MONTANA
3 87
MOCCASIN
BNSF R
AILWAY
A.4
STATE PROJECT
MT DAR 2017(1)
F e b
A
M ft p .1
.1
.2 s td p la n m t-d a d
C
C .d g n
U
S I n t2
D
T h o m p s e c k e d b y
B s ig n e d b y
C-04 & C-05 ROADS
VICINITY MAP
M.P. 1.44
BNSF Crossing
N WINDHAM RD
G R
A Y S
T O
N E R
D
LOUSE CREEK RD
M.P. 4.96
SCHEDULES A, B, & C
END C-04 ROAD WORK
M.P. 0.02
SCHEDULES A, B, & C
BEGIN C-04 ROAD WORK
M.P. 0.02
SCHEDULES A, B, & C
BEGIN C-05 ROAD WORK
M.P. 1.04
END C-05 ROAD WORK
Cre ek
Sa ge
C r e e k
W a it e
C r e e k
Cour tney s Creek
KNOLL
MARYS
NATIONAL FOREST
LEWIS AND CLARK
UTICA
VILLAGE
SAPPHIRE
ACKLEY LAKE RD
A N
T E
L O
P E C
R E
E K R
D
SAGE CREEK TRS
A
G E C
R E
E K T
R
S O
U T
H F
O R
K R
D
S O
U T H F
O R
K R
D
JU
DI
TH
RI
VER
1 0.5 0 1 2
SCALE IN MILES
N
C-07
YOGO RD
ft p .1
.1
.2 s td p la n m t-d a e
C
C .d g n
U
S S u r ft
D
A.5
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y s ig n e d b
C-06
C-06 & C-07 ROADS
VICINITY MAP
M.P. 0.00
SCHEDULES A, B, & C
BEGIN C-06 ROAD WORK
M.P. 0.00
SCHEDULES A, B, & C
BEGIN C-07 ROAD WORK
M.P. 0.60
SCHEDULES A, B, & C
END C-06 ROAD WORK
M.P. 7.42
END C-07 ROAD WORK
re e k
B N S F
W o lf
C re e k
S un
C re e k
Dry Wolf
Cr
W ill ow
C o y o te
C o u le e
H o lm e s
Creek
W o lf
W o lf
C r e e k
Cr ee k
W ill ow
C r e e k
1 0.5 0 1 2
SCALE IN MILES
N ft p .1
.1
.2 s td p la n m t-d a f_
C
C .d g n
U
S S u r ft
D
A.6
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b s ig n e d b
C-
MONTANA
MONTANA
3 87 80
MONTANA
STAGECOACH RD
B R
O K
E N A
R R
O W R
D
S T
A R
L I G
H T R
D
LEHIGH ROAD
DRY WOLF RD
R U
N N
IN
G W
O L F R
D
STANFORD
C
C-08 & C-10 ROADS
VICINITY MAP
M.P. 0.01
SCHEDULES A, B, & C
BEGIN C-10 ROAD WORK
M.P. 0.00
SCHEDULES A, B, & C
BEGIN C-08 ROAD WORK
M.P. 6.73
SCHEDULES A, B, & C
END C-10 ROAD WORK
M.P. 2.13
END C-08 ROAD WORK
e k
J U
D I T
H
W ol f
Creek
C o y o te
Wolf
W o lf
C re ek
R
IV
E R
N A.7
STATE PROJECT
F e b
A
M ft p .1
.1
.2 s td p la n m t-d a g
D
D .d g n
U
S I n t2
D
T h o m p s e c k e d b y
B s ig n e d b y
1 0.5 0 1 2
SCALE IN MILES
DENTON
D
CARPENTER RD
D E
N T
O N R
D
C R
A B
T R
E E R
D
P A
C E
R C
O U
L E
E R
D
COLTON AIRPORT RD
KNOX RD
A L T
O N C
U T
O F F
B A
R K
E R R
D
BEAR SPRINGS RD
AYERS RD
MONTANA
MONTANA
D-01
CENTRAL MT RAIL
D-01 & D-08 ROADS
VICINITY MAP
M.P. 2.10 Rail Crossing Central MT
M.P. 1.73
SCHEDULES A, B, & C
END D-01 ROAD WORK
M.P. 0.00
SCHEDULES A, B, & C
BEGIN D-01 ROAD WORK
M.P. 0.00
SCHEDULES A, B, & C
BEGIN D-08 ROAD WORK
M.P. 2.71
END D-08 ROAD WORK
e k
R o s s
F o rk
R o s s
F o r kC re e k
M u d
B ig
R o c k
Creek
P o le
C re e k
Buffalo
C re e k
B ig
W e s t
F o rk
Rock
C r e e k
Little
Trout
B N
S F
N
1 0.5 0 1 2
SCALE IN MILES
N
L-02 ft p .1
.1
.2 s td p la n m t-d a h
L .d g n
U
S S u r ft
D
A.8
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b s ig n e d b
L-02 ROAD
VICINITY MAP
MONTANA
SIPPLE RD
S O
U T
H T
R O
U T C
R E
E K R
D
L O
G A
N R I D
G E R
D
NELSON RD
CRYSTAL LAKE RD
F E
R G
U S C
O
B A
S I N C
O
J U
D I T
H
STRAW RD
M il e s
T o E d d ie 's C o rn e r
M ile s T o J u d ith G a p
N O
R T
H T
R O
U T C
R E
E K R
D
B A
S I N C
O
J U
D I T
H
F E
R G
U S C
O
B N
S F R
A
IL
W A
Y
M.P. 0.02
SCHEDULES B & C
BEGIN L-02 ROAD WORK
M.P. 9.87
SCHEDULES B & C
END L-02 ROAD WORK
r e e k
C re e k
C re e k
B e a v e r
B e a v e r
C a s in o
R o c k
Beaver
B ig
B igF o rk
B N
S F
1 0.5 0 1 2
SCALE IN MILES
N
M-06 ft p .1
.1
.2 s td p la n m t-d a j_
M .d g n
U
S S u r ft
D
A.9
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b s ig n e d b
M-06 ROAD
VICINITY MAP
MONTANA
MONTANA
MONTANA
C R
Y S
T A
L L
A K
E R
D
C R
Y S
T A
L L
A K
E R
D
FARREN HILL RD
EDDIE'S CORNER
SERIGHT RD
ROCK CREEK RD
N O
R T
H T
R O
U T C
R E
E K R
D
SIPPLE RD
B E A
V E R C
R E E K R
D
R O
S S F
O R
K R
D
WILD ROSE RD
S A
N D
H I L L R
D
C O
T T
O N
W O
O D C
R E
E K R
D
M ile s
To L ew is to w n
BN
SF
R
AI
LW
AY
M.P. 0.02
BNSF CrossingM.P. 0.01
SCHEDULE C
BEGIN M-06 ROAD WORK
M.P. 8.01
SCHEDULE C
END M-06 ROAD WORK
Road Number
C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-10 D-01 D-08 ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 350 150 800 600 100 100 400 500 3,000
A0140 15801-0000 WATERING FOR DUST CONTROL MGAL 526 1,205 592 122 72 889 255 805 207 316 4,989
A0160 20402-0000 SUBEXCAVATION CUYD 925 577 98 1,600
A0180 20411-0000 SELECT BORROW TON 1,809 1,113 78 3,000
A0200 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) (SUBEXCAVATION) SQYD 1,515 973 62 2,550
A0220 20703-2000 GEOGRID, STABILIZATION SQYD 1,515 908 77 2,500
A0240 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 15 15
A0260 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (RIPRAP HEADWALL) CUYD 18 18 5 6 8 55
A0280 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (ENERGY DISSIPATOR) CUYD 13 11 24
A0300 30202-2000 ROADWAY AGGREGATE, METHOD 2
(C ROADS) TON 205 465 235 160 275 235 20 415 2,010
A0320 30202-2000 ROADWAY AGGREGATE, METHOD 2
(D ROADS) TON 85 315 400
A0340 30302-6000 ROADWAY RECONDITIONING LNFT 23,179 54,648 26,083 5,386 3,168 39,178 11,246 35,482 9,134 14,309 221,813 Contract Quantity
A0360 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (C ROADS) TON 13,918 31,251 15,662 3,234 1,902 23,524 6,753 21,305 117,549
A0380 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (D ROADS) TON 5,485 8,183 13,668
A0400 31110-0000 CALCIUM CHLORIDE TON 248 557 279 58 34 419 120 380 98 146 2,339
A0420 60201-1000 36-INCH PIPE CULVERT LNFT 88 88
A0440 60201-1200 48-INCH PIPE CULVERT LNFT 50 50
A0460 60202-0400 24-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 44 44
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
9- M ar -2
:3
A M
I:
\C on tr ac t\
C on st ru ct io n C on tr ac ts \P
R O
JE
C
TS
\M T
D A R
7(
1)
M in ut em an M is sl e B as e R oa ds
7\
PR
_L
O A _E
E\ [m t-d2
1_ Es tim at e-
_S ig no ff _S ch ed ul eA
.x ls x] Sh ee t
STATE PROJECT
B.1DAR 2017(1)MT
C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-10 D-01 D-08 ALLOWANCE Bid Schedule
A0480 60202-0600 36-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 46 46
A0500 60202-0700 42-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 42 42
A0520 60202-0800 48-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 160 160
A0540 60202-1000 60-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 46 86
A0560 60211-1000 END SECTION FOR 36-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 1 1
A0580 60704-0000 CLEANING CULVERT IN PLACE EACH 4 1 1 14 1 1 22
A0600 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 1 5 4 1 11
A0620 60705-0000 REPAIRING DRAINAGE STRUCTURE
(C-04 ROAD) EACH 1 1
A0640 61921-1000 REMOVE AND RESET FENCE LNFT 20 80 100
A0660 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 100
A0680 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 100
A0700 62201-2050 ROLLER HOUR 40
A0720 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 120
A0740 62301-0000 GENERAL LABOR HOUR 40
A0760 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0780 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 360 680 300 60 60 540 140 460 120 200 2,920
A0800 63511-0100 TEMPORARY TRAFFIC CONTROL,
RAILROAD FLAGGER CTSM ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
9- M ar -2
:3
A M
I:
\C on tr ac t\
C on st ru ct io n C on tr ac ts \P
R O
JE
C
TS
\M T
D A R
7(
1)
M in ut em an M is sl e B as e R oa ds
7\
PR
_L
O A _E
E\ [m t-d2
1_ Es tim at e-
_S ig no ff _S ch ed ul eA
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2DAR 2017(1)MT
C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-10 D-01 D-08 L-02 ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
B0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 350 150 800 600 100 100 400 500 150 3,150
B0140 15801-0000 WATERING FOR DUST CONTROL MGAL 526 1,205 592 122 72 889 255 805 207 316 885 5,874
B0160 20402-0000 SUBEXCAVATION CUYD 925 577 98 1,600
B0180 20411-0000 SELECT BORROW TON 1,809 1,113 78 3,000
B0200 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) (SUBEXCAVATION) SQYD 1,515 973 62 2,550
B0220 20703-2000 GEOGRID, STABILIZATION SQYD 1,515 908 77 2,500
B0240 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (ENERGY DISSIPATOR) CUYD 13 11 24
B0260 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (RIPRAP HEADWALL) CUYD 18 18 5 6 8 55
B0280 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 15 15
B0300 30202-2000 ROADWAY AGGREGATE, METHOD 2
(C ROADS) TON 205 465 235 160 275 235 20 415 2,010
B0320 30202-2000 ROADWAY AGGREGATE, METHOD 2
(D ROADS) TON 85 315 400
B0340 30202-2000 ROADWAY AGGREGATE, METHOD 2
(L-ROADS) TON 455 455
B0360 30302-6000 ROADWAY RECONDITIONING LNFT 23,179 54,648 26,083 5,386 3,168 39,178 11,246 35,482 9,134 14,309 52,008 273,821 Contract Quantity
B0380 31101-4000 STABILIZED AGGREGATE SURFACE Contract Quantity
COURSE, CALCIUM CHLORIDE,
IN-PLACE AGGREGATE (L-02 ROAD) MILE 4.230 4.230
B0400 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (C ROADS) TON 13,918 31,251 15,662 3,234 1,902 23,524 6,753 21,305 117,549
B0420 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (D ROADS) TON 5,485 8,183 13,668
B0440 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (L ROADS) TON 17,817 17,817
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
9- M ar -2
:3
A M
I:
\C on tr ac t\
C on st ru ct io n C on tr ac ts \P
R O
JE
C
TS
\M T
D A R
7(
1)
M in ut em an M is sl e B as e R oa ds
7\
PR
_L
O A _E
E\ [m t-d2
1_ Es tim at e-
_S ig no ff _S ch ed ul eB
.x ls x] Sh ee t
STATE PROJECT
B.3DAR 2017(1)MT
C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-10 D-01 D-08 L-02 ALLOWANCE Bid Schedule
B0460 31110-0000 CALCIUM CHLORIDE TON 248 557 279 58 34 419 120 380 98 146 510 2,849
B0480 60201-1000 36-INCH PIPE CULVERT LNFT 88 60 148
B0500 60201-1200 48-INCH PIPE CULVERT LNFT 50 50
B0520 60202-0400 24-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 44 44
B0540 60202-0600 36-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 46 46
B0560 60202-0700 42-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 42 42
B0580 60202-0800 48-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 160 160
B0600 60202-1000 60-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 46 86
B0620 60211-1000 END SECTION FOR 36-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 1 1
B0640 60704-0000 CLEANING CULVERT IN PLACE EACH 4 1 1 14 1 1 2 24
B0660 60705-0000 REPAIRING DRAINAGE STRUCTURE
(C-04 ROAD) EACH 1 1
B0680 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 1 5 4 1 2 13
B0700 61921-1000 REMOVE AND RESET FENCE LNFT 20 80 100
B0720 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 100
B0740 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 100
B0760 62201-2050 ROLLER HOUR 40
B0780 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 120
B0800 62301-0000 GENERAL LABOR HOUR 40
B0820 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
B0840 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 360 680 300 60 60 540 140 460 120 200 500 3,420
B0860 63511-0100 TEMPORARY TRAFFIC CONTROL,
RAILROAD FLAGGER CTSM ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
9- M ar -2
:3
A M
I:
\C on tr ac t\
C on st ru ct io n C on tr ac ts \P
R O
JE
C
TS
\M T
D A R
7(
1)
M in ut em an M is sl e B as e R oa ds
7\
PR
_L
O A _E
E\ [m t-d2
1_ Es tim at e-
_S ig no ff _S ch ed ul eB
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.4DAR 2017(1)MT
C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-10 D-01 D-08 L-02 M-06 ALLOWANCE Bid Schedule
C0020 15101-0000 MOBILIZATION LPSM ALL
C0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
C0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
C0080 15401-0000 CONTRACTOR TESTING LPSM ALL
C0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
C0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 350 150 800 600 100 100 400 500 150 350 3,500
C0140 15801-0000 WATERING FOR DUST CONTROL MGAL 526 1,205 592 122 72 889 255 805 207 316 885 958 6,832
C0160 20402-0000 SUBEXCAVATION CUYD 925 577 98 1,600
C0180 20411-0000 SELECT BORROW TON 1,809 1,113 78 3,000
C0200 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) (SUBEXCAVATION) SQYD 1,515 973 62 2,550
C0220 20703-2000 GEOGRID, STABILIZATION SQYD 1,515 908 77 2,500
C0240 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (ENERGY DISSIPATOR) CUYD 13 11 24
C0260 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (RIPRAP HEADWALL) CUYD 18 18 5 6 8 55
C0280 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 15 15
C0300 30110-0000 AGGREGATE SURFACE COURSE (M
ROADS) TON 25,363 25,363
C0320 30202-2000 ROADWAY AGGREGATE, METHOD 2
(C ROADS) TON 205 465 235 160 275 235 20 415 2,010
C0340 30202-2000 ROADWAY AGGREGATE, METHOD 2
(D ROADS) TON 85 315 400
C0360 30202-2000 ROADWAY AGGREGATE, METHOD 2
(L-ROADS) TON 455 455
C0380 30202-2000 ROADWAY AGGREGATE, METHOD 2
(M ROADS) TON 610 610
C0400 30302-6000 ROADWAY RECONDITIONING LNFT 23,179 54,648 26,083 5,386 3,168 39,178 11,246 35,482 9,134 14,309 52,008 42,240 316,061 Contract Quantity
C0420 31101-4000 STABILIZED AGGREGATE SURFACE Contract Quantity
COURSE, CALCIUM CHLORIDE,
IN-PLACE AGGREGATE (L-02 ROAD) MILE 4.230 4.230
C0440 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (C ROADS) TON 13,918 31,251 15,662 3,234 1,902 23,524 6,753 21,305 117,549
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
9- M ar -2
:3
A M
I:
\C on tr ac t\
C on st ru ct io n C on tr ac ts \P
R O
JE
C
TS
\M T
D A R
7(
1)
M in ut em an M is sl e B as e R oa ds
7\
PR
_L
O A _E
E\ [m t-d2
1_ Es tim at e-
_S ig no ff _S ch ed ul eC
.x ls x] Sh ee t
STATE PROJECT
B.5DAR 2017(1)MT
Schedule
C0460 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (D ROADS) TON 5,485 8,183 13,668
C0480 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (L ROADS) TON 17,817 17,817
C0500 31110-0000 CALCIUM CHLORIDE TON 248 557 279 58 34 419 120 380 98 146 510 2,849
C0520 60201-1000 36-INCH PIPE CULVERT LNFT 88 60 148
C0540 60201-1200 48-INCH PIPE CULVERT LNFT 50 50
C0560 60202-0400 24-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 44 44
C0580 60202-0600 36-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 46 46
C0600 60202-0700 42-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 42 42
C0620 60202-0800 48-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 160 160
C0640 60202-1000 60-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE
CULVERT LNFT 40 46 86
C0660 60211-1000 END SECTION FOR 36-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 1 1
C0680 60704-0000 CLEANING CULVERT IN PLACE EACH 4 1 1 14 1 1 2 3 27
C0700 60705-0000 REPAIRING DRAINAGE STRUCTURE
(C-04 ROAD) EACH 1 1
C0720 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 1 5 4 1 2 3 16
C0740 61921-1000 REMOVE AND RESET FENCE LNFT 20 80 100
C0760 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 100
C0780 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 100
C0800 62201-2050 ROLLER HOUR 40
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
9- M ar -2
:3
A M
I:
\C on tr ac t\
C on st ru ct io n C on tr ac ts \P
R O
JE
C
TS
\M T
D A R
7(
1)
M in ut em an M is sl e B as e R oa ds
7\
PR
_L
O A _E
E\ [m t-d2
1_ Es tim at e-
_S ig no ff _S ch ed ul eC
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.6DAR 2017(1)MT
Schedule
C0820 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 120
C0840 62301-0000 GENERAL LABOR HOUR 40
C0860 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
C0880 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 360 680 300 60 60 540 140 460 120 200 500 460 3,880
C0900 63511-0100 TEMPORARY TRAFFIC CONTROL,
RAILROAD FLAGGER CTSM ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
9- M ar -2
:3
A M
I:
\C on tr ac t\
C on st ru ct io n C on tr ac ts \P
R O
JE
C
TS
\M T
D A R
7(
1)
M in ut em an M is sl e B as e R oa ds
7\
PR
_L
O A _E
E\ [m t-d2
1_ Es tim at e-
_S ig no ff _S ch ed ul eC
.x ls x] Sh ee t
(3
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.7DAR 2017(1)MT
1 4.39 1 10.35 1 4.94 1 1.02 1 0.60 1 7.42 1 2.13 1 6.72 1 1.73 1 2.71
42.01 2 4.23 1 5.62
51.86 3 8.00
59.86
[1] Quantities are based on the following:
1. 50 MGAL/mile for roadway reconditioning, dust control, and in-place aggregate stabilization.
2. 0.022 MGAL/TON for imported surface course aggregate.
[2] Quantity represents material for road approaches.
Quantities based on the following:
1. 15 TON/approach for private approaches.
2. 10 TON/approach for farm field approaches.
3. 40 TON/approach for public approaches.
4. 60 TON/approach for missile launch facility approaches.
[3] Quantities are based on 1.93 TON/CUYD.
[4] Calcium chloride quantities based on 1.85% by dry weight of item 31103-3000 for Typical Section No. 1 and 1.50% by unit weight of in-place aggregate for Typical Section No. 2.
[5] See Sheets C.3 - C.5.
TYPICAL SECTION QUANTITIES
D-08 Schedule A Total
L-02 L-02
Schedule B Total
C-08 C-10
4.230
Schedule C Total M-06
Road Number
C-02 C-03 C-04 C-05 C-06 C-07
Item 30202-2000 Roadway aggregate, method 2 (M Roads) [2] [3]
APPROACH QUANTITIES
Schedule C Total
Road Number
L-02 Schedule B Total
M-06
C-08 C-10 D-01 D-08
Schedule A Total
C-02 C-03 C-04 C-05
13,668
13,668
117,549
9,134 35,482
25,363 25,363
(TON)
(TON)
4.230
400 610
4,989 0
D-01
42,240
Item 30202-2000 Roadway aggregate, method 2
(L Roads) [2] [3]
117,549273,821
117,549 2,84917,817
17,8174.230
39,178
(TON)
0.000
Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate
(L Roads) [3]
(TON)
Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate
(D Roads) [3]
(TON)
5,485
(MGAL)
15,662 3,234
26,083 5,386
2,010
C-06 C-07
Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate
(C Roads) [3]
21,305
Item 30202-2000 Roadway aggregate, method 2
(C Roads) [2] [3]
11,246
3,168
Miles
2,8490
14,309
2,010
6,832
2,010
Typical No. [5]
5,874
(TON)
316,061
22,334
(LNFT)
29,674
Item 31110-0000 Calcium chloride [4]
(TON)
Item 30202-2000 Roadway aggregate, method 2
(D Roads) [2] [3]
6,753
31,251
23,524
13,918
Item 30302-6000 Roadway reconditioning
221,813
54,648
Item 31101-4000 Stabilized aggregate surface course, calcium chloride, in-place aggregate (L-02 Road)
(MILE)
1,902
Item 30110-0000 Aggregate surface course (M Roads) [3]
(TON)
1,205
Item 15801-0000 Watering for dust control [1]
(TON)
23,179
13,668 0 2,339
1468,183
FOOTNOTE:
17,817
STATE PROJECT
DAR 2017(1) C.1MT
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ Ty pi ca l S ec ti on s\ [m t-
-F eb
-2
2:
P
M N
B
EL
L 1/
B
TH
O
M
PS
O N
2/
D es ig ne d
C he ck ed b y:
NUMBER
TABULATION OF TYPICAL
SECTION QUANTITIES
(LNFT)
C-03 200 C-03 200 C-03 50 D-01 300
[1] Quantities are based on 1.93 TON/CUYD.
[2] See Sheet C.7.
Schedules A, B, & C Total 1,502 2,901 2,488 2,423
FOOTNOTE:
M.P. 6.59 - 6.60 101 196 149 149 M.P. 1.47 - 1.53 577 1,113 973 908
M.P. 6.45 - 6.49 412 796 683 683
(CUYD) (TON) (SQYD) (SQYD)
M.P. 6.28 - 6.32 412 796 683
SUBEXCAVATION QUANTITIES [2]
Road Number
Location Length Item 20402-0000 Subexcavation
Item 20411-0000 Select borrow [1]
Item 20701-0300 Separation-stabilization geotextile, class 1, type C (nonwoven)
(subexcavation)
Item 20703-2000 Geogrid, stabilization
STATE PROJECT
DAR 2017(1) C.2MT
F:
\h ig hw ay s\
FH
W A\
_m t-d2
1_
D A R
\D es ig n\ Ty pi ca l S ec ti on s\ [m t- 7-
Fe b-
0:
A
M N
B
EL
L 1/
B
TH
O
M
PS
O N
2/
D es ig ne d
C he ck ed b y:
NUMBER
TABULATION OF TYPICAL
SECTION QUANTITIES
C.3
STATE PROJECT
F e b
A
M ft p .1
.1
.2 s td p la n m t-d c a .d g n
U
S I n t2
D
T h o m p s e c k e d b y
B s ig n e d b y
1:3
Travel lane Travel lane
1:3
LC
Existing Slope
Existing Slope li m it s
C o n s tr u c ti o n li m it s
C o n s tr u c ti o n
Original ground
FOOTNOTE:
Roadway reconditioning
TYPICAL SECTIONS
4" compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, NO SCALE
[1] 5% Crown + 1/2% [1]5% Crown + 1/2%
NOTE:
1. See Sheet C.1 for quantities.
[2]3' [2]3' [4] [3]9' min. - 12' max. [4] [3]9' min. - 12' max.
(4" AGGREGATE STABILIZATION)
TYPICAL SECTION NO. 1
allowed may require excess material removal. See Section D.
Roads with additional travel lane beyond the maximum[4]
Taper at a rate of 25:1 between widths. See Sheet C.6.
Adjust to match existing road width as approved. [3]
Ensure drainage down to existing ditch.
Remove 3 feet of foreslope vegetation and slope to drain.[2] a maximum of 8% superelevation.
Superelevate roadway on curves to a minimum of 5% and[1]
C.4
F e b
P
M ft p .1
.1
.2 s td p la n m t-d c b .d g n
U
S I n t2
D
T h o m p s e c k e d b y
B s ig n e d b y
FOOTNOTE:
TYPICAL SECTIONS
NO SCALE
NOTE:
1. See Sheet C.1 for quantities.
Travel lane Travel lane
LC
Existing Slope
Existing Slope li m it s
C o n s tr u c ti o n li m it s
C o n s tr u c ti o n
[1] 5% Crown + 1/2% [1]5% Crown + 1/2%
[2]3' [2]3'
4" compacted depth calcium chloride, in-place aggregate, Stabilized aggregate surface course, aggregate surface
Top of existing calcium chloride stabilized
Original ground
Roadway reconditioning
SCHEDULES B & C
L-02 ROAD, M.P. 0.02 - 4.25
(IN-PLACE STABILIZATION)
[4]TYPICAL SECTION NO. 2
[3]9' min. - 12' max. [3]9' min. - 12' max.
See Section 311.[4]
Taper at a rate of 25:1 between widths. See Sheet C.6.
Adjust to match existing road width as approved. [3]
Ensure drainage down to existing ditch.
Remove 3 feet of foreslope vegetation and slope to drain.[2] a maximum of 8% superelevation.
Superelevate roadway on curves to a minimum of 5% and[1]
C.5
F e b
A
M ft p .1
.1
.2 s td p la n m t-d c e .d g n
U
S I n t2
D
T h o m p s e c k e d b y
B s ig n e d b y
FOOTNOTE:
TYPICAL SECTIONS
NO SCALE
NOTE:
1. See Sheet C.1 for quantities.
allowed may require excess material removal. See Section D.
Roads with additional travel lane beyond the maximum[4]
Taper at a rate of 25:1 between widths. See Sheet C.6.
Adjust to match existing road width as approved. [3]
Ensure drainage down to existing ditch.
Remove 3 feet of foreslope vegetation and slope to drain.[2] a maximum of 8% superelevation.
Superelevate roadway on curves to a minimum of 5% and[1]
1:3
Travel lane Travel lane
1:3
LC
Existing Slope
Existing Slope li m it s
C o n s tr u c ti o n li m it s
C o n s tr u c ti o n
Roadway reconditioning
[1] 5% Crown + 1/2% [1]5% Crown + 1/2%
[2]3' [2]3' [4] [3]9' min. - 12' max. [4] [3]9' min. - 12' max.
Original ground
4" compacted depth
Aggregate surface course, SCHEDULE C
M-06 ROAD, M.P. 0.01 - 8.01
(4" AGGREGATE SURFACING)
TYPICAL SECTION NO. 3
C.6
F e b
A
M ft p .1
.1
.2 s td p la n m t-d c c .d g n
U
S I n t2
D
T h o m p s e c k e d b y
B s ig n e d b y
TYPICAL DETAILS
CONNECTION WITH NONPAVED ROADWAYS
AT THE BEGINNING AND END OF
TYPICAL TREATMENT OF GRAVEL SECTIONS
PROFILE
PROFILE
d e p th s u r fa c in g
B e g in E n d f u
25:1 Taper
25:1 Taper
TYPICAL TAPER
PLAN
LC
FOOTNOTE:
NO SCALE
or paved roadway
Existing structure e x is ti n g w id th
V a r ia b le e x is ti n g w id th
V a r ia b le
Profile grade grade line
Existing road surfacing section
Match mainline surfacing section
Match mainline
Profile grade
[2]50' min.
[2]50' min.
grade line
[1]Existing road
CATTLE GUARDS TO REMAIN IN-PLACE, AND PAVED INTERSECTIONS
TYPICAL TREATMENT AT EXISTING BRIDGES, RAILROAD CROSSINGS,
[3]Imported surface aggregate
See Sheets C.3 - C.5 for aggregate surfacing type.[3] structures and existing roadways as approved.
Adjust transition length to provide a smooth transition to[2] surfacing.
Do not measure excavation and disposal of gravel profile grade from existing grade to the depth shown.
intersecting roadway or from the structure. Taper
Excavate existing gravel surfacing from the edge of [1]
[3]Surface aggregate
NO SCALE
LC
Travel lane Travel lane
Existing centerline
FOOTNOTE:
NOTE:
Original ground
1:
21:2
B E
G I N S
U B
E X
C A
V A
T I O
N
E N
D S
U B
E X
C A
V A
T I O
N
SUBEXCAVATION PROFILE
DETAILS
SUBEXCAVATION
stabilization
Geogrid, Ex ist ing S lop e
Ex ist in g
Sl op e section
Surfacing stabilization
Geogrid, 24" compacted depth
Select borrow, 24" compacted depth
Select borrow, 24" Subexcavation depth
[1]Surfacing section
[1]Varies
Cross slope [1] Cross slope [1]
[1]Varies
1. See Sheet C.2 for approximate locations and quantities.
2. Stake locations and lengths of subexcavation in field for approval prior to starting work. Adjust or add locations and types to meet field conditions.
grade
Profile
S u b e x c a v a ti o n d e p th
[2
[2 class 1, type C (nonwoven) (subexcavation)
Separation-stabilization geotextile, class 1, type C (nonwoven) (subexcavation)
Separation-stabilization geotextile, SUBEXCAVATION DETAIL
[1] See Sheet C.3.
[2] Daylight to drain as approved. Do not excavate beyond existing ditch bottom.
C.7
STATE PROJECT
NUMBER
P e b r u a r y
I n t_ ft h ig h w a y s F
H W
A m t-d
D A
R D e s ig n T y p ic a l S e c ti o n s m t-d c d .d g
T h o m p s
B
C h e c k e d b y
D e s ig n e d b
C-03 9.08 RT
C-07 1.97 LT
C-07 5.53
[1] For scour hole embankment as approved. Quantity based on 1.93
TON/CUYD.
Bud Pederson (406) 538-1301
(406) 788-9246
FOOTNOTE:
Jay Kinsey
1620 Airport Rd, Lewistown, MT 59457
Item 20411-0000 Select borrow [1]
(TON)
6932 Goddard Dr., Bldg. 165, Rm. 153, Malmstrom AFB, MT 59402
ROADWAY QUANTITIES
C-08, C-10 C-02, C-03, C-04, C-05, C-06, C-07, C-08, C-10, D-01, D-08, L-02, M-06
Phone #Contact
UTILITY CONTACT INFORMATION
(406) 670-0884
(406) 538-3465
(406) 538-1201
Road Number
(406) 394-2786
(406) 394-2751
C-02, C-03, C-04, C-05, C-06, C-07, C-08, C-10, D-01, D-08, L-02, M-06
Roy Craven
Schedule A, B, & C Total
Address
Triangle Communications
Company
Item 61921-1000 Remove and reset fence
(LNFT)
M.P.
Scott Leeds Bruce Kudrna
Jason Bales (406) 791-3300 D-08 Central Montana Rail, Inc. 100 W. Railroad Ave., Denton, MT 59430 (406) 567-2223
C-04, M-06 BNSF Railway 620 5th Ave. SW, Great Falls, MT 59404 Carla Allen
M-06 CenturyLink Communications, Inc. 1021 Chestnut St., Helena, MT 59601 Brent Bushnell
Brian Tomlinson
(406) 366-4853
(406) 441-7649 C-03, C-04, C-06, C-07, D-01, D-08, L-02, M-06 Monte Obert/Guy Johnson84423 US HWY 87, Lewistown, MT 59457Fergus Electric Cooperative, Inc.
(406) 231-2139C-10 Front Range Pipeline, LLC (CHS Inc.) 543 W. Dry Creek Rd., Buffalo, MT 59418
C-03 Express Pipeline (Spectra Energy) Suite 352, 800 Werner Ct., Casper, WY 82601
C-10 Phillips 66 Pipeline LLC
P.O. Box 1140, Havre, MT 59501
USAF - Malmstrom Cable Affairs
8 3rd Street N, Great Falls, MT 59403
(406) 731-2459
Zayo Group
C-02, C-03, C-04, C-05, C-06, C-10, D-01, D-08, L-02, M-06 Montana Department of Transportation
Road Number
302 South Dawes St., Lewistown, MT 59457
Bost Industrial Site, Bldg. 1501, Lewistown, MT 59457 JD Puckett
NorthWestern Energy Noah Davis
Matt AugerC-02, C-03, C-04, C-05, C-06, C-07, C-08, C-10, D-01, D-08, L-02, M-06
STATE PROJECT
DAR 2017(1) D.1MT
F:
\h ig hw ay s\
FH
W
A\
_m t-d2
1_ D
A R
\D es ig n\ Pl an a nd P ro fil e\ [m t-
-F eb
-2
2:
P
M N
B
EL
L 1/
B
TH
O
M
PS
O N
2/
D es ig ne d by
C he ck ed b y:
NUMBER
TABULATION OF PLAN
QUANTITIES
ft p .1
.1
.2 s td p la n m t-d la
C .d g n
I n t_ ft
D
D.2
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
E n d P r o je c t
M .P .0
M .P .0
M .P .0
M .P .0
M .P .0
P r iv a te A p p r
L T
M .P .0
F a r m F ie ld A p p r
L T
M .P .7
P r iv a te A p p r
L T
M .P .0
F a r m F ie ld A p p r
R T
M .P .6 a r m F ie ld A p p r
L T
M .P .0
P r iv a te A p p r
L T
M .P .0
P r iv a te A p p r
R T
M .P .0 r m F ie ld A p p r
L T
M .P .9
P r iv a te A p p r
L T
M .P .1
P r iv a te A p p r
R T
M .P .1 iv a te A p p r
R T
M .P .9 r m F ie ld A p p r
L T
M .P .0 fo r
C u lv e t n s tr u c t
E n e r g y D is s ip a to r L
T
M .P .5 fo r
C u lv e r t
C o n s tr u c t
E n e r g y D is s ip a to r L
T
M .P .5
M is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r
L T
M .P .3 and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
5. Remove excess travel lane or shoulder material as approved.
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
M .P .3
E n d T y p ic a l
N o
C o n s tr u c t
E n e r g y D is s ip a to r L
T
L T R
T
C o n s tr u c t
R ip r a p H e a d w a ll
D ia m e te r P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P .5
SCHEDULES A, B, & C
LINE GRAPH
C-02 ROAD
.1
.1
.2 s td p la n m t-d lb
C .d g n
I n t_ ft
D
D.3
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NOTE:
NO SCALE
C le a n C u lv e r t i n P la c e
M .P .3
R e p la c e w it h
P ip e C u lv e r t
M .P .2
C le a n C u lv e r t i n P la c e
M .P .1
C le a n C u lv e r t i n P la c e
M .P .2
M .P .0
M .P .0
M .P .0
M .P .0
M .P
R p la c e w it h
P ip e C u lv e r t
M .P .5
M .P .0
M .P .0
M .P .0
M .P .0
M .P .0
2. All culverts are existing unless otherwise noted.
existing widths and radii as approved.
1. Gravel existing approaches and turnouts to match
P u b li c A p p r
L T
M .P .5
F a r m F ie ld A p p r
L T
M .P .4
P u b li c A p p r
R T
M .P .5 r m F ie ld A p p r
L T
M .P .5
P u b li c A p p r
R T
M .P .8 b li c A p p r
L T
M .P .4
P u b li c A p p r
R T
M .P iv a te A p p r
R T
M .P .7 r m F ie ld A p p r
R T
M .P .4 iv a te A p p r
R T
M .P r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .8
F a r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
R T
M .P b li c A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .6
P u b li c A p p r
R T
M .P
T f o r
C u lv e r ts
L T R
T a n d E n e r g y D is s ip a to r
C o n s tr u c t
R ip r a p H e a d w a s
.P .4
C le a n C u lv e r t in P la c e
M .P ia m e te r P ip e A r c p la c e w it h
E q u iv a le n t
M .P .1
FOOTNOTE:
See Sheet C.7.[1]
S u b e x c a v a ti
.4
.4
S u b e x c a v a ti
.2
.3
S u b e x c a v a ti
.5
.6
D ia m e te r P ip e A r c h e s
R e p la c e w it h
E q u iv a le n t
M .P .6
D ia m e te r P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P .1 and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
5. Remove excess travel lane or shoulder material as approved.
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
B e g in P r o je c t
M .P .0
B e g in T y p ic a l N o
SCHEDULES A, B, & C
C-03 ROAD
.1
.1
.2 s td p la n m t-d lc
C .d g n
I n t_ ft
D
D.4
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
M .P .0
M .P .0
P r iv a te A p p r
L T
M .P .5
M is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r
L T
M .P .3
FOOTNOTE:
dissipator construction.
Fill scour hole with select borrow as approved prior to energy[1] and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
5. Remove excess travel lane or shoulder material as approved.
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
E n d P r o je c t
M .P .3
E n d T y p ic a l
N o
R e m o v e a n d R e s e t
F e n c e fo r
C u lv e ts n s tr u c t
E n e r g y D is s ip a to r R
T
M .P .0
SCHEDULES A, B, & C
LINE GRAPH (CONT.)
C-03 ROAD
.1
.1
.2 s td p la n m t-d ld
C .d g n
I n t_ ft
D
D.5
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NOTE:
x is ti n g R a il r o a d C r o s s in g
M .P .4
S tr u c tu r e
R e p a ir D r a in a g e
M .P .1
M .P .0
M .P .0
C le a n C u lv e r t i n P la c e
M .P .0
M .P .0
M .P .0
M .P .0
F a r m F ie ld A p p r
L T
M .P .5
F a r m F ie ld A p p r
R T
M .P b li c A p p r
L T
M .P .6
P r iv a te A p p r
R T
M .P r m F ie ld A p p r
R T
M .P b li c A p p r
R T
M .P b li c A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .5
M is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r p la c e w it h
P ip e C u lv e r t
M .P .6
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
S tr u c tu r e
C R o a d
R e p a ir D r a in a g e
M .P .9
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .9
E n d T y p ic a l
N o
SCHEDULES A, B, & C
C-04 ROAD
.1
.1
.2 s td p la n m t-d le
C .d g n
I n t_ ft
D
D.6
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
F a r m F ie ld A p p r
R T
M .P .2
.0
P u b li c A p p r
L T
M .P .0
M is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r
.0
F a r m F ie ld A p p r
R T
M .P b li c A p p r
R T
M .P
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .0
E n d T y p ic a l
N o
SCHEDULES A, B, & C
C-05 ROAD
.1
.1
.2 s td p la n m t-d lf
C .d g n
I n t_ ft
D
D.7
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
B e g in P r o je c t
NOTE:
P r iv a te A p p r
L T
M .P iv a te A p p r
L T
M .P .0
P u b li c A p p r
L T
M .P r m F ie ld A p p r
R T
M .P iv a te A p p r
L T
M .P .5
M is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r
R T
M .P .6
M .P .0
P u b li c A p p r
R T
M .P .0
P r iv a te A p p r
R T
M .P le a n C u lv e r t i n P la c e
M .P .1
P r iv a te A p p r
R T
M .P and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
5. Remove excess travel lane or shoulder material as approved.
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .6
E n d T y p ic a l
N o
SCHEDULES A, B, & C
C-06 ROAD
.1
.1
.2 s td p la n m t-d lg
C .d g n
I n t_ ft
D
D.8
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
P r iv a te A p p r
L T
M .P .0
C le a n C u lv e r t i n P la c e
M .P .0
C le a n C u lv e r t i n P la c e
M .P .8
C le a n C u lv e r t in P la c e
M .P .4
C le a n C u lv e r t i n P la c e
M .P .6
C le a n C u lv e r t i n P la c e
M .P .4
S tr u c tu r e
R e p a ir D r a in a g e
M .P .5
C le a n C u lv e r t i n P la c e
M .P .7
F a r m F ie ld A p p r
L T
M .P .8
C le a n C u lv e r t i n P la c e
M .P .1
S tr u c tu r e
R e p a ir D r a in a g e
M .P .2
C le a n C u lv e r t i n P la c e
M .P .5
F a r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .8
P r iv a te A p p r
R T
M .P .3 tr u c tu r e
R e p a ir D r a in a g e
M .P .1
F a r m F ie ld A p p r
R T
M .P
.0
C le a n C u lv e r t i n P la c e
M .P .6
C le a n C u lv e r t i n P la c e
M .P .8
C le a n C u lv e r t i n P la c e
M .P .9
M .P .0
P r iv a te A p p r
L T
M .P .6
C le a n C u lv e r t i n P la c e
M .P .8
P r iv a te A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .9
M .P .0
M .P .0
M .P .0
M .P .0
P r iv a te A p p r
R T
M .P u c tu r e
R e p a ir D r a in a g e
M .P .5
P r iv a te A p p r
L T
M .P .5
F a r m F ie ld A p p r
L T
M .P .3
P r iv a te A p p r
L T
M .P .4
C le a n C u lv e r t i n P la c e
M .P .3
C le a n C u lv e r t i n P la c e
M .P .4
F a r m F ie ld A p p r
L T
M .P .0
M .P .0
M .P .0
M .P .0
M is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r u c tu r e
R e p a ir D r a in a g e
M .P .1
FOOTNOTE:
See Sheet F.4.[1]
R e m o v e a n d R e s e t
F e n c e L
T
D ia m e te r P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P .9 and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
Reestablish ditch where approved according to Section 303.
6. C-07 Road has sections of cut slopes with minimal ditches.
and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
5. Remove excess travel lane or shoulder material as approved.
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
L T R
T
R e m o v e a n d R e s e t
F e n c e
C o n s tr u c t
R ip r a p H e a d w a ll R
T
C o n s tr u c t
R ip r a p P r o te c ti o n R
T
D ia m e te r P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .4
E n d T y p ic a l
N o
SCHEDULES A, B, & C
C-07 ROAD
.1
.1
.2 s td p la n m t-d lh
C .d g n
I n t_ ft
D
D.9
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
C le a n C u lv e r t in P la c e
M .P .0
F a r m F ie ld A p p r
L T
M .P .6
F a r m F ie ld A p p r
R T
M .P
.0
M .P .0
M .P .0 and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
Reestablish ditch where approved according to Section 303.
5. C-08 Road has sections of cut slopes with minimal ditches.
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .1
S ta b il iz e d A g g r e g a te
S ta r t o f
E x is ti n g C a C l-
E n d T y p ic a l
N o
SCHEDULES A, B, & C
C-08 ROAD
.1
.1
.2 s td p la n m t-d li
C .d g n
I n t_ ft
D
D.10
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
M .P .9
F a r m F ie ld A p p r
L T
M .P .2
F a r m F ie ld A p p r
L T
M .P .6
P u b li c A p p r
R T
M .P r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .4
F a r m F ie ld A p p r
R T
M .P b li c A p p r
R T
M .P
.0
P r iv a te A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .9
M .P .0
F a r m F ie ld A p p r
L T
M .P .0
M .P .0
P r iv a te A p p r
R T
M .P b li c A p p r
L T
M .P .9
M .P .0
M .P .0
M .P .0
P r iv a te A p p r
R T
M .P b li c A p p r
R T
M .P r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .6
P r iv a te A p p r
R T
M .P iv a te A p p r
R T
M .P is s il e L a u n c h F a c il it y C
M is s il e L a u n c h F a c il it y A p p r
L T
M .P .7
M .P .0
M .P .0
S tr u c tu r e
R e p a ir D r a in a g e
M .P .5
F a r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .7
S tr u c tu r e
R e p a ir D r a in a g e
S tr u c tu r e
R e p a ir D r a in a g e
M .P .1
L T R
T f o r
P ip e C u lv e r t
C o n s tr u c t
R ip r a p H e a d w a ll s
S tr u c tu r e
R e p a ir D r a in a g e
M .P .5
D ia m e te r P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P .4 and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
Reestablish ditch where approved according to Section 303.
6. C-10 Road has sections of cut slopes with minimal ditches.
and dispose of according to Section 203.
Remove and haul excess material off site according to Section 622
5. Remove excess travel lane or shoulder material as approved.
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .7
E n d T y p ic a l
N o
SCHEDULES A, B, & C
C-10 ROAD
.1
.1
.2 s td p la n m t-d lj
D .d g n
I n t_ ft
D
D.11
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
M is s il e L a u n c h F a c il it y D
M is s il e L a u n c h F a c il it y A p p r
.0
P r iv a te A p p r
L T
M .P .1
M .P .0
F a r m F ie ld A p p r
R T
M .P
FOOTNOTE:
See Sheet C.7.[1]
S u b e x c a v a ti
.4
.5
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .7
E n d T y p ic a l
N o
D-01 ROAD
.1
.1
.2 s td p la n m t-d lk
D .d g n
I n t_ ft
D
D.12
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
S tr u c tu r e
R e p a ir D r a in a g e
M .P .8
F a r m F ie ld A p p r
L T
M .P .6
F a r m F ie ld A p p r
R T
M .P iv a te A p p r
L T
M .P .3
P u b li c A p p r
L T
M .P .6
P u b li c A p p r
R T
M .P a n C u lv e r t i n P la c e
M .P .3
F a r m F ie ld A p p r
L T
M .P .4
P r iv a te A p p r
L T
M .P .6
P u b li c A p p r
R T
M .P x is ti n g R a il r o a d C r o s s in g
M .P .1
P r iv a te A p p r
L T
M .P .4
P u b li c A p p r
R T
M .P s il e L a u n c h F a c il it y D
M is s il e L a u n c h F a c il it y A p p r
L T
M .P .7
M .P .0
F a r m F ie ld A p p r
R T
M .P
.0
M .P .0
F a r m F ie ld A p p r
L T
M .P .0
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .7
E n d T y p ic a l
N o
L T R
T
C o n s tr u c t
R ip r a p H e a d w a ll
D ia m e te r P ip e A r c h
R e p la c e w it h
E q u iv a le n t
M .P .9
SCHEDULES A, B, & C
D-08 ROAD
.1
.1
.2 s td p la n m t-d ll
L .d g n
I n t_ ft
D
D.13
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
B e g in P r o je c t
E n d P r o je c t
NOTE:
M .P .0
M .P .0
S tr u c tu r e
R e p a ir D r a in a g e
M .P .0
M .P .0
M .P .0
M .P .0
M .P .0
C le a n C u lv e r t i n P la c e
M .P .1
C le a n C u lv e r t i n P la c e
M .P .4
M .P .0
M .P .0
M .P .0
M .P .0
M .P .0
FOOTNOTE:
M .P .0
B e g in T y p ic a l
N o
M .P .8
E n d T y p ic a l
N o
SCHEDULES B & C
LINE GRAPH
L-02 ROAD
I n s ta ll
P ip e C u lv e r t
M .P u c tu r e
R e p a ir D r a in a g e
M .P iv a te A p p r
R T
M P b li c A p p r
L T
M P .2
P u b li c A p p r
L T
M P .2
P r iv a te A p p r
R T
M P iv a te A p p r
L T
M P .4
P u b li c A p p r
R T
M P iv a te A p p r
R T
M P r m F ie ld A p p r
R T
M P r m F ie ld A p p r
L T
M P .3
F a r m F ie ld A p p r
L T
M P .9
F a r m F ie ld A p p r
L T
M P .1
P r iv a te A p p r
R T
M P b li c A p p r
L T
M .P .3
P u b li c A p p r
L T
M .P .2
P r iv a te A p p r
L T
M .P .5
P r iv a te A p p r
L T
M .P .0
F a r m F ie ld A p p r
L T
M .P .9
P r iv a te A p p r
L T
M .P .4
P r iv a te A p p r
L T
M .P .3
F a c il it y L s il e L a u n c il it y A p p r
R T
M is s il e L a u n r m F ie ld A p p r
L T
M .P .5
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
Stop Typical No. 2 prior to intersection.[2]
Align culvert with natural drainage pattern as approved.[1]
E n d T y p ic a l
N o g in T y p ic a l
N o
.1
.1
.2 s td p la n m t-d ln
M .d g n
I n t_ ft
D
D.14
STATE PROJECT
F e b
T h o m p s
B
C h e c k e d b y
D e s ig n e d b y
NO SCALE
NOTE:
S tr u c tu r e
R e p a ir D r a in a g e
M .P .0
F a r m F ie ld A p p r
L T
M .P .2
P r iv a te A p p r
L T
M .P .5
P r iv a te A p p r
L T
M .P .2
P r iv a te A p p r
R T
M .P iv a te A p p r
L T
M .P .4
P r iv a te A p p r
L T
M .P .6
P r iv a te A p p r
L T
M .P .8
F a r m F ie ld A p p r
R T
M .P
.0
F a r m F ie ld A p p r
R T
M .P r m F ie ld A p p r
L T
M .P .9
P r iv a te A p p r
R T
M .P
.0
P u b li c A p p r
L T
M .P .9
P u b li c A p p r
R T
M .P
.0
P u b li c A p p r
R T
M .P
.0
M .P .0
M .P .0
P r iv a te A p p r
L T
M .P .2
P u b li c A p p r
R T
M .P iv a te A p p r
L T
M .P .6
P r iv a te A p p r
L T
M .P .1
P r iv a te A p p r
R T
M .P
.0
M .P .0
P u b li c A p p r
R T
M .P
.0
M .P .0
P u b li c A p p r
R T
M .P a n
C u lv e r ts i n P la c e
M .P .0
E x is ti n g R a il r o a d C r o s s in g
M .P .0
S tr u c tu r e s
R e p a ir
D r a in a g e
M .P .9
4. See Sheet D.1 for utility contact information.
3. See Sheet C.1 for typical section ranges and quantities.
2. All culverts are existing unless otherwise noted.
and radii as approved.
1. Gravel existing approaches and turnouts to match existing widths
C h lo r id e S ta b il iz e d A g g r e g a te
B e g in o f
E x is ti n g C a lc iu m
M .P .9
B e g in P r o je c t
M .P .0
B e g in T y p ic a l
N o
E n d P r o je c t
M .P .0
E n d T y p ic a l
N o
SCHEDULE C
LINE GRAPH
M-06 ROAD
P r iv a te A p p r
L T
M .P .6
P r iv a te A p p r
R T
M .P iv a te A p p r
L T
M .P .4
P r iv a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .