orblm1513301_Plan_Set_100_.pdf
PDF 11 MB Posted
- Attached to
- OR BLM ERFO 151-3301, Wells Creek Landslide
- Solicitation number
- DTFH7017B00015
About this file
Plans
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
david.l.mariman Rectangle
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material A
M
N o v e m b e r
U
S C c m y fi le s p w p r o d u c ti o n d o r b lm a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 BLM ERFO 151-3301 OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
Scottsburg
VICINITY MAP
.tS cificaP
INTERS
TATE
US Highway 101
14 miles to Reedsport, Oregon and
BEGIN PROJECT END PROJECT
yawhgiH auqpmU y a w h gi H a u q p m U
N
To In ter sta te
Hi gh wa y I -5 m ile s t o E lkt on , O re go n
Road Closed
MP 3.2
Road Closed
MP 2.1
SCALE IN MILES
0.5 0.25 0 0.5 1
A.3
STATE PROJECT
NUMBER
OR
BLM ERFO 151-3301
P
F e b r u a r y
I n t_ ft
D m y fi le s p w p r o d u c ti o n d o r b lm a c .d g n
K
H A
R R I S
O
H I N
S H
W
C h e c k e d b y
D e s ig n e d b y
STAGING AREA
20+60 TO 22+10
W e ll s
C r e e k
R d
Creek R d.
.t S cifi c a P
.dR keerC regnistuL d R k e er C y d r u P
.r r a h cr u
B
,rD nedloG k e e r
C d
R
W e a th e rl y d
R k e er C r e g ni st u
L
Um pq ua R iv er
Umpqua River
Wells
LAND MANAGEMENT
BUREAU OF
COOS BAY
dR k e er C nilknar
F
22+70.00
WELLS CREEK LANDSLIDE
OR BLM 151-3301
28+58.75
WELLS CREEK LANDSLIDE
OR BLM 151-3301
Sheet and Description
Section C Section D Section E Section F Section G
Typical Section
Plan & Profile
Horizontal Drain Array & Drill Pad
Details
Drainage & Erosion Control
Temporary Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 627 73 700
A0140 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0160 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS Existing underdrain. Remove as
EACH 2 2 directed.
A0180 20401-0000 ROADWAY EXCAVATION CUYD 4,113 437 4,550
A0200 20410-0000 SELECT BORROW Contract Quantity. Includes a
CUYD 650 650 10% allowance.
A0220 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE D SQYD 985 115 1,100
A0240 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 9 1 10
A0260 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5 CUYD 230 30 260
A0280 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2 LNFT 10 1 11
A0300 26101-0000 REINFORCED SOIL SLOPE (TYPE 1) SQFT 403 37 440
A0320 26101-0000 REINFORCED SOIL SLOPE (TYPE 2) SQFT 9,673 1,027 10,700
A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 764 36 800
A0360 60201-0600 18-INCH PIPE CULVERT LNFT 28 4 32
A0380 60201-0800 24-INCH PIPE CULVERT LNFT 72 8 80
A0400 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 474 26 500
A0420 61001-0000 HORIZONTAL DRAIN PIPE LNFT 2,500 500 3,000
A0440 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 20 20
A0460 62201-3000 HYDRAULIC EXCAVATOR HOUR 20 20
A0480 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 20 20
A0500 62201-3650 CHIPPER HOUR 8 8
A0520 62201-3750 CHAIN SAW HOUR 8 8
A0540 62301-0000 GENERAL LABOR HOUR 20 20
A0560 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH SQYD 2,506 244 2,750
A0580 62401-0700 FURNISHING AND PLACING TOPSOIL, 12-INCH DEPTH SQYD 214 26 240
A0600 62502-0000 TURF ESTABLISHMENT SQYD 2,720 270 2,990
A0620 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX SQYD 2,506 244 2,750
A0640 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
3- A pr
-2
:0
PM
c:
\m yf ile s\ pw _p ro du ct io n\ d0
Es tim at e-
_1
.x ls x] S he et
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.1BLM ERFO 151-3301OR
[3]Benching required
12" compacted depth
Select Borrow, 8' min.
4' min.
See Detail A
Furnishing and Placing Topsoil, 4-Inch Depth
FOOTNOTE:
TYPICAL SECTION
1:
Traveled way
7'
LC
Traveled way
7'
Profile grade
1:2
C le a r in g l im it
12-inch compacted depth
Roadway Aggregate, Method 2, Existing ground
C le a r in g l im it
See Detail, Sheet F.2
Underdrain System
Turf establishment
Turf estab lishment
:1
:1
23+50 to 24+00
WELLS CREEK ROAD
1:
1:2
LC
C le a r in g l im it
C le a r in g l im it
Turf establishment
Existing ground
WELLS CREEK ROAD
Class 1, Type D
Geotextile, Separation Stabilization-
Profile grade
Traveled way
7'
Traveled way
7'
[2
1:
1.
[1] 2% Crown
Turf estab lishment
[2]
1:1.5
27+39.75 to 28+58.75
22+70 to 23+50
[2
1:
1.
[1] 2% Crown
:1
DETAIL A
12-inch compacted depth
Roadway Aggregate, Method 2, 12" compacted depth
Select Borrow, Embankment Construction
REINFORCED SOIL SLOPE (RSS) TYPE 1
[4]Bottom layer across full roadway
Geogrid Type V
Reinforcement Geotextile or
[4]Class 1, Type D
Separation Stabilization-Geotextile, [4]Select Borrow
[4]Geogrid, Type I
Reinforcement Geotextile or
Bonded Fiber Matrix
Mulching, Hydraulic Method, Subsidiary to RSS (Type 1).[4] approximately 26+20 through 27+40.
benching excavation. Anticipate bedrock in excavation between
Rock ranging in size up to 7' in dimension is expected in [3]
Construct slopes as shown in the Staking Report.[2] the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated on[1] p r il
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r b lm c a .d g n
STATE PROJECT
NUMBER
C.1 h e c k e d b y
D e s ig n e d b y
H I N
S H
H A
R R I S
[3]Benching required
4' min.
RSS (Lightweight Fill)
Typical section
Select Borrow, 6" Compacted Depth
Separation-Stabilization Geotextile, Class 1, Type D
Embankment
Construction
Furnishing and Placing Topsoil, 4-Inch Depth
Furnishing and Placing Topsoil, 4-Inch or 12-Inch Depth
See Sheet F.1
FOOTNOTE:
TYPICAL SECTION
1:
Traveled way
7'
LC
Traveled way
7'
Profile grade
1:2
C le a r in g l im it
12-inch compacted depth
Roadway Aggregate, Method 2, Existing ground
1:
1.
[1] 2% Crown
:1
12" compacted depth
Select Borrow, C le a r in g l im it
See Detail, Sheet F.2
Underdrain System
Turf establishment
Turf estab lishment
:1
:1
24+00 to 27+39.75
CL
1:
2.
01:2.0
DETAIL A
12" reinforcement layer within 12" of left side
Terminate bottom layer of each
Construct stairstep final slope so that a sufficient depth of topsoil and compost mix can be placed and remain stable as vegetation is established
Final slope with topsoil and compost mix, vegetation and Bonded Fiber Matrix
If a fire resistant geosynthetic facing is used, wrap each layer with 4' on bottom, 1' on outside and 3' on top
25+00 to 26+96.37 ditch elevations
See cross sections for
[2]
1:1.5
[2
1:
1.
1:
2.
SPECIAL DITCH
See cross sections Varies
REINFORCED SOIL SLOPE (RSS, LIGHTWEIGHT FILL) TYPE 2
WELLS CREEK ROAD
[5]Geogrid, Type V
Reinforcement Geotextile or
Top layer across full roadway
[5]Geotextile, Class 1, Type D
Separation-Stabilization
[5]Lightweight Fill
See Detail A
Reinforcement Geotextile or
Geogrid, Type I [4] [5]
Bonded Fiber Matrix
Mulching, Hydraulic Method, a r c h
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r b lm c b .d g n
STATE PROJECT
NUMBER
C.2 h e c k e d b y
D e s ig n e d b
H I N
S H
H A
R R I S
Subsidiary to RSS (Type 2).[5] required at the face.
If Geogrid is used, a fire resistant geosynthetic facing is[4] approximately 26+20 through 27+40.
benching excavation. Anticipate bedrock in excavation between
Rock ranging in size up to 7' in dimension is expected in [3]
Construct slopes as shown in the Staking Report.[2] the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated on[1]
D.1
STATE PROJECT
NUMBER
OR BLM ERFO 151-3301
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
QUANTITIES
PLAN AND PROFILE
TABULATION OF
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b lm d a .d g n a r c h
865 870
0 1
N
23+40 to 27+50
CUYD
EXC.
CUYD
EMB.
30+0027+5025+0022+5020+00
D.2
STATE PROJECT
NUMBER
SHEET
OR BLM ERFO 151-3301
50 10002550
Scale in feet
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Edge of traveled way
CONNECTION DETAIL
PAVEMENT
B e g in S u s p e n d
R e s u m e E n d
N = 758,220.843
E = 4,050,377.863
El = 964.40'
See Sheet F.4 for details Install standard underdrain system
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b lm d b .d g n
N = 758,052.711
E = 4,049,895.472
El = 933.38'
LEGEND:
Edge of traveled way
4,082
6,508
Slope stake limits
Slope stake limits
Slope stake limits
Slope stake limits
See Sheet F.4 for details Install standard underdrain system
27+39.75 to 27+60
See Sheet E.1
Drill pad limits
CP
13108
13110
CP
CP
13111
M a r c h
MW
B16-02 si+vwp
B16-01 si+vwp
15" CMP INLET
15" CMP OUTLET
PL
ASTI
C
PL
ASTI
C
ELEV
3.
ELEV
0.
.3
8 9 .0
180' VC
K = 17
.9
100' VC
K = 8
SSD = 139'
.6
50' VC
K = 31
.4
+2.95%
.0
M a tc h E x is ti n g
.4 5%
.0
+1.38%
.0
+3.02%
M a tc h E x is ti n g
Existing rock armoring to remain
27+44 Remove
24" x 54' pipe culvert
Curve= CL-2
D
R= 380.00'
T= 176.12'
L= 329.85'
Curve= CL-3
D
R= 175.00'
T= 25.17'
L= 50.00'
Curve= CL-4
D
R= 120.00'
T= 50.57'
L= 95.72'
PC 23+00.49
P T
.3
P C
.3
P C
C
.3
PT
8+
.0 e = 4.8%
W = 1' e = 6.4%
W = 2' e = 7.4%
W = 3'
BEGIN PROJECT
END PROJECT
Existing Ground
Profile Grade surface course
Existing base course
Existing
New aggregate surface
Saw cut
See Cross Sections
Special Ditch Left
System Detail, Sheet F.4
See 12" Perforated Pipe Underdrain
Install 90° plastic pipe elbow connection
23+50.00
22+70.00
OR BLM ERFO 151-3301
28+58.75
OR BLM ERFO 151-3301
2-24" x 36' Pipe Culverts
27+70.00 Install
18" x 28' Culvert
23+35 Install
Special Ditch centerline
See Sheet F.4
90° plastic pipe elbow connection
27+46 Install
Line to be constructed
For Information Only
12" x 36' Underdrain Outlet Pipe
23+40 Install
Staging area
20+60 to 22+10
Riprap revetment protection, See Sheet E.1
See Sheet F.4
Placed Riprap, Class 2 at pipe outlets
23+35 to 23+40 Construct
See Sheet F.4 at pipe outlet
Placed Riprap, Class 2
27+70 Construct
Riprap Ditch, Class 2, see Sheet F.4
27+50 to 27+60 Construct
Lower bench
Upper bench
D.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b lm d c .d g n
OR BLM ERFO 151-3301
N
5002550
Scale in feet
Vertical Scale:
1H : 1V
FOUNDATION EXCAVATION
(BENCHING) DETAIL
NOTES:
Roadway profile grade
Slope Stake Limits
Approximately 23+40 to 25+25 or as directed
Remove where in conflict with proposed underdrain, Approximate location of existing underdrain
Existing underdrain to remain buried underdrain as directed
27+12 to 27+66 Remove existing
22+00 23+00 24+00 25+00 26+00 27+00
28+00 29+00
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y a r c h benching elevations.
3. See cross sections for anticipated upper and lower between approximately 26+20 through 27+40.
benching excavation. Anticipate bedrock in excavation
2. Rock ranging in size up to 7' in dimension is expected in
See cross sections for approximate benching elevations.
1. Stairstep benching may be necessary in several locations.
PL
ASTI
C
5/8"IR W/FHWA ALUM CAP
Elev 964.481
E 4050393.574
N 758216.653
CP 13110
CP
13110
CP
13110
ELEV
3.
.0
.3
.9
.6
-13.2%
-10.9% +1.9% +19.0 % +43
.8%
+9.40%
-27.0%-20.9% -39.1% -3.8% -25.1% +23.3
% -2.4% -13.8% -26.9%
-37.7%
-11.8%-4.3% +1.2%
+35 .5%
+26.
6%
+50 .1
+21.8
+0.9%
-7.25% +4.1% +16.4% -21.25% -6.9%
+10.6%
+29.
6%
-9.3% -21.4%
+23.1
-16.6%
+12.4%
-0.2%
-21.5%
.9
+40 .0
.4
P T
.3
P C
.3
P C
C
.3
PT
8+
.0
GPK FILE DATED March 2016
PROJECT COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION
13107 758341.551 4049359.741 925.414 43°42'01.206156"N 123°47'52.473156"W 847.5925 0.99989714 5/8" IR w/FHWA Alum Cap
13108 757957.388 4049787.052 930.816 43°41'57.580997"N 123°47'46.454781"W 852.9945 0.99989672 5/8" IR w/FHWA Alum Cap
13110 758216.653 4050393.574 964.481 43°42'00.375294"N 123°47'38.343343"W 886.6759 0.99989523 5/8" IR w/FHWA Alum Cap
13111 758053.556 4050518.054 968.989 43°41'58.814044"N 123°47'36.562788"W 891.1839 0.99989495 5/8" IR w/FHWA Alum Cap
NOTE:
PROJECT :Wells Creek ERFO Repair DATE OF FIELD WORK : Multiple Entrties DATE OF FINAL ADJUSTMENT : April 2013
PROJECT UNITS : INTERNATIONAL FOOT
COORDINATE SYSTEM : Oregon South SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : NAVD88 based on Geoid12A
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
STATE PROJECT
BLM ERFO 151-3301 D.4OR
c:
\m yf ile s\ pw _p ro du ct io n\ d0
W el ls C re ek _C on tr ol S he et
.x ls x] S he et
-M ar
-2
2:
P
M W
FL
H
D
G ob le
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
E.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b lm e a .d g n
OR BLM ERFO 151-3301
with roadside ditch
Secondary ditch converges ditch and platform
26+40 High point of
See cro ss sec tion s
Gra de var ies up
N
Scale: 1" = 30'
Gra de
= 1 up
1.40% down Grade = approx.
B16-02 sitvwp
B16-01 sitvwp
Pipe to be removed
NOTE:
as directed.
drains at the locations, orientations, inclinations and lengths
1. Location of drill pad and array is approximate. Install horizontal
See cross sections
Match drill pad grade collector pipe
Horizontal drain
ARRAY PLAN
REVETMENT AND DRAIN
HORIZONTAL DRAIN RIPRAP
LEGEND:
Riprap revetment protectionExisting rock armoring to remain
See cross sections
Drill pad limits
Approximate area of horizontal drain array
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Pipes to be installed
See cross sections to drain revetment bottom east to ditch, Secondary standard underdrain
27+39.75 to 27+60 Install minimum slope toward project begin
This underdrain drains at 0.5% in cross sections underdrain at 5% grade shown riprap revetment to drain east to
Grade natural slope materials under with underdrain
Secondary ditch converges
See cross sections match existing grade
Ditch and platform grades Special Ditch centerline See cross sections
Special Ditch centerline p r il
See Sheet E.2
Conserved roadway excavation or furnished riprap
Construct Placed Riprap, Class 5 revetment from
27+10 to 27+46.37
RIPRAP REVETMENT AND
HORIZONTAL DRAIN DETAILS
NOTE:
E.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b lm e b .d g n
OR BLM ERFO 151-3301
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
TYPICAL HORIZONTAL DRAIN PROFILE
HORIZONTAL DRAIN DETAIL
25'
Unslotted pipe Slotted pipe
1'2'
See table for estimated lengths
1:2.00
1:1
Slope varies
Varies
4" min. dia., 20' length
Permanent steel casing, Horizontal drain pipe seal
Watertight compression
Horizontal drain
Riprap revetment
See table for min. and max. inclination angle
See table for min. and max.
collar elevation
Horizontal drain
Varies
Select Borrow, 6" compacted depth
Varies
12'
See Drill Pad Detail
CL
No Scale
12' typ.
5'
Geotextile, Class 1, Type D
Separation-Stabilization
Geotextile, Class 1, Type D
Separation-Stabilization
27+10 to 27+49.21 LT
RIPRAP REVETMENT DETAIL
26+96.37 to 27+46.37
DRILL PAD DETAIL
Select Borrow, variable compacted depth collector pipe 12" Horizontal drain riprap revetment
Existing or proposed
Cleanout wye from revetment to underdrain Furnished Topsoil, 12" depth, Construction
Embankment
Geotextile, Class 1, Type D
Separation-Stabilization with placed rock as directed Cradle horizontal drain collector pipe
Existing ground
Existing ground
Existing ground in t o e
D e p th v a r ie s cross sections at 5% slope as shown in the drain into standard underdrain Grade excavation for riprap to approved suitable material embankment must be used for drill pad
Any fill or conserved material see cross sections toe, grade to drain, Install underdrain within
27+39.75 to 27+60 be used for riprap revetment and drill pad construction.
1. Conserved suitable roadway excavation materials may collector pipes, as directed placed between and around
Protect collector pipes with rock
See cross sections for elevations 1:2 slope, 1' deep ditch, See Sheet F.4 Underdrain
5' min. thickness
Conserved from roadway excavation or furnished, Placed Riprap, Class 5, Horizontal drain manifold system
Cleanout plug
NO SCALE
E.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r b lm e c .d g n
OR BLM ERFO 151-3301
F e b r u a r y
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
CLEAN-OUT SYSTEM
COLLECTOR AND
HORIZONTAL DRAIN
CLEAN-OUT SYSTEM
HORIZONTAL DRAIN COLLECTOR AND
Drill pad surface
Steel casing riprap revetment
Existing or proposed
Existing ground
Watertight compression seal solid PVC pipe
1.5" Schedule 80
1.5" Schedule 80
PVC wye coupler above horizontal installation angle
Horizontal drain solid PVC pipe
1.5" Schedule 80
Angle varies install adjacent to riprap revetment polyethylene drain pipe, pipe - 12" corrugated
Horizontal drain collector
2' max.
1' min.
with placed rock as directed Cradle horizontal drain collector pipe
1' min.
F.1
STATE PROJECT
NUMBER
SHEET
OR BLM ERFO 151-3301
F e b r u a r y
N
5002550
Scale in feet
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fa .d g n
EROSION CONTROL
PLAN
LEGEND:
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y : Clearing limits
Slope stake limits =
Clearing limits
Slope stake limits =
Install Fiber Rolls
Install Fiber Rolls
Install Fiber Rolls native seed and bonded fiber matrix mulching
Permanent turf establishment: 4-inch topsoil and compost mix, B16-02 si+vwp
B16-01 si+vwp
MW
each 9 SQ YD in area in 3 locations as directed, Place 12-inches of topsoil
25+80 to 26+30.34 within limits of special ditch
Place 4-inches of topsoil designated for 12-inches of topsoil
Place 4-inches of topsoil in all areas not
Special ditch centerline
Special ditch centerline
No seeding in revetment area for special ditch limits edge of disturbed area except from edge of roadway through
Place 12-inches of topsoil
25+40 to 25+60 LT level portion of drill pad
Place 12-inches of topsoil on
26+30.34 to 27+49.21 LT
Staging area native seed
Permanent turf establishment: 12-inch topsoil and compost mix, PC 23+00.49
P T
.3
P C
.3
P C
C
.3
PT
8+
.0
NO SCALE
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
3.
2.
1.
FIBER ROLL
(FT)
(FT)
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber
STATE PROJECT
NUMBER
SHEET
Install fiber rolls with a 12-inch minimum diameter.
fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
F.2
STATE PROJECT
p r il
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fd .d
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
NOTE:
10.4 x 16 25101 -0200
25120 -0200
60201 -0600
60201 -0800
60501 -0000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
R
IP
R A P
D
IT
C H
M
ET
H
O D
A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T (F
IN
FO
R M
A
TI
O N
O N
LY
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
S
TA
N D
A R D
U N
D
ER
D R
IN
S
YS
TE
M
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD CUYD LNFT LNFT LNFT LNFT LNFT Lt Rt 23+35 4 14 3 28 P
23+40 7 27 36 16 P Underdrain Outlet Pipe, For Information Only
27+50 to 27+60 10 27+70 7 133 6 72 P 2 x 36' Culverts
23+40 to 27+50 N/A 149 451 P
Structural excavation does not include shoring or any other temporary excavation. For Information Only.
27+39.75 to 27+60 N/A 23 Structural excavation within riprap revetment excavation limits
PROJECT TOTAL 323 9 10 36 28 72 474
Allowable Pipe Material A Aluminum AS Aluminized steel C Concrete GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D ra in ag e.
xl sx
]S he et
-F eb
-2
2:
P
M M
H
IN
S H
A W
7/
K H
A R R
IS
O N
7/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.3
SHEET
NUMBER
BLM ERFO 151-3301OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
PLAN ELEVATION
48" (min.)
48" (min.)
RIPRAP APRON AT OUTLET
12" (min.)
m in m in
Neat line to the existing ground apron outlet flowline
Place riprap to match
Finished ground finished grade slope
Bevel culvert to match
Existing ground drainage chute
Culvert or
DRAINAGE DETAILS
6"
6" 6"
Fl ow
" mesh openings2 1" x 2
1approximately screen, No. 17 gage wire, drain pipe with galvanized wire
Cover outlet end of solid outlet end of 12" perforated pipe
Place 12" end cap on upper
12" solid outlet drain pipe
UNDERDRAIN SYSTEM DETAIL
12" PERFORATED PIPE
12" diameter perforated plastic pipe
7' to Centerline, typ.
3'-6"
FOOTNOTE:
Existing ground
Proposed finished slopes
NOTES:12-inch compacted depth
Roadway Aggregate, Method 2, 12-inch compacted depth
Select Borrow
Class 1, Type D
Separation Stabilization-Geotextile, Select Borrow
Lap on top by 12" min.
Geotextile, Class 1, Type D
Separation-Stabilization
F.4
STATE PROJECT
F e b r u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r fd .d
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
24"
Perforated, Smooth Wall
Polyethylene Pipe, 12" diameter
Embankment material per typical sections
26+70 to 27+50 LT
Alternative ditch in drill pad area, See cross sections for proposed slopes
See Note 2.
Drill pad with 6" Select Borrow top layer
Limits of Select Borrow for alternative ditch in drill pad area (depth varies) other angles as required 12" elbow, 90° or
ELEVATION
Neat line
27+50 TO 27+60
RIPRAP DITCH
1. Slope underdrain pipe a minimum of 0.5%, the minimum required in the cross sections or as directed.
2. Use Select Borrow for any material placed on top of the underdrain and through the extent of the drill pad and special ditch platform foundation as directed.
3. Minimize excavation into the existing landslide when removing material to place the underdrain.
TYPICAL SECTION
STANDARD UNDERDRAIN SYSTEM
[1]23+40 to 27+50, LT [2]27+39.75 to 27+60, LT
See cross sections for location details.[2] underdrain is near the toe of the roadway foreslope.
Vary the location of the underdrain as directed so the[1]
Finished ditch line
Finished ditch line drainage chute
Culvert or
PLAN
10'
Revetment underdrain outlet
Collector pipe
Revetment
Line to be constructed or furnished riprap
Conserved roadway excavation
Placed Riprap, Class 2 from or furnished riprap
Conserved roadway excavation
Placed Riprap, Class 2 from or furnished riprap
Conserved roadway excavation
Placed Riprap, Class 2 from
Special Ditch centerline
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
STATE PROJECT
NUMBER
SHEET
F.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 151-3301 OR
U S
C c m y fi le s p w p r o d u c ti o n d o r fe .d g n
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
1.
2.
POLYVINYL CHLORIDE (PVC) PLASTIC ROUND PIPE CULVERT
PIPE
SIZE
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 1784
SMOOTH WALL (SOLID WALL) RIBBED
PIPE
SIZE
MINIMUM
COVER
CELL CLASS.
NO. 12454
CELL CLASS.
NO. 12364
MINIMUM
COVER CELL CLASS.
NO. 12454C
CELL CLASS.
NO. 12364C
A B C D
END SECTION DIMENSIONS
PLASTIC PIPE END SECTION
SIDE
TOP
FRONT
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 3350
SMOOTH WALL (SOLID WALL) CORRUGATED RIBBED
PIPE
SIZE
PIPE
SIZE
PIPE
SIZE
CELL CLASSIFICATION
NUMBER 335434C
CELL CLASS.
NO. 435400C CELL CLASS.
NO. 335434C
MINIMUM
COVER CELL CLASS.
NO. 334433C
MINIMUM
COVER
MINIMUM
COVER
POLYETHYLENE (PE) PLASTIC ROUND PIPE CULVERT
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve.
If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
A
D
C
B
PIPE SIZE
602-5
STANDARD APPROVED FOR USE 12/1993
DRAFT: 2/2009
REVISED: 4/1994 6/2005
PLASTIC PIPE CULVERT
12 57
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)HEIGHT (FEET)
MAXIMUM FILL
INCHESINCHES
DIAMETER
MAXIMUM FILL HEIGHT (FEET)INCHESINCHES
DIAMETER 1.4771.2921.3851.1540.9230.8570.607
MINIMUM WALL THICKNESS (INCHES)
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET) INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)
MINIMUM WALL THICKNESS (INCHES)
0.358 0.438 0.358 0.438
66.5
63.5
45.5
24.5
14.5
INCHES
DIMENSIONS
INCHES
DIAMETER
STATE PROJECT
NUMBER
SHEET
F.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 151-3301 OR
U S
C c m y fi le s p w p r o d u c ti o n d o r ff .d g n
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
AND SIGN DETAILS
TRAFFIC CONTROL QUANITIES
TABULATION OF TEMPORARY
G.1
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d o r g a .d
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b
Scottsburg .tS cificaP
INTERS
TATE
US Highway 101
14 miles to Reedsport, Oregon and
BEGIN PROJECT END PROJECT
yawhgiH auqpmU y a w h gi H a u q p m U
N
To In ter sta te
Hi gh wa y I -5 m ile s t o E lkt on , O re go n
CONTROL PLAN
TEMPORARY TRAFFIC
ROAD
CLOSED
ROAD
CLOSED
3 MILE
CLOSED
ROAD
W20-3
1/2 MILE
CLOSED
ROAD
W20-3
W20-3
R11-2
Type 3 barricades with
R11-2
Type 3 barricades with
1/2 MILE
CLOSED
ROAD
0.5 0.25 0
SCALE IN MILES
0.5 1
G.2
STATE PROJECT
F e b r u a r y
I n t_ ft m y fi le s p w p r o d u c ti o n d o r g b .d
H A
R R I S
H I N
S H
C h e c k e d b y
D e s ig n e d b y
Creek R d.
h g u ol
S rettO o
T
.t S cifi c a P
.dR keerC regnistuL
.r r a h cr u
B
,rD nedloG k e e r
C d
R
FOREST
NATIONAL
SIUSLAW
W e a th e rl y d
R k e er C r e g ni st u
L
Um pq ua R iv er
Umpqua River
FOREST
STATE
ELLIOT
Wells
B u r c h a r d C r e e k R
O&C LANDS
COOS BAY BLM
W e ll s C r e e k
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
SHEET
G.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BLM ERFO 151-3301 OR
U S
C c m y fi le s p w p r o d u c ti o n d o r g c .d g n u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
File details come from the government source that posted it. Updated .