AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 5/17/2017 N/A OR BLM ERFO 151-3301
Wells Creek Landslide
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X DTFH7017B00015
9B. DATED (SEE ITEM 11)
04/20/2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A D OTHER (Specify type of modification and authority)
N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR BLM ERFO 151-3301, Wells Creek Landslide
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Pages F-3 through F-4, Subsections 251.03, General; 251.05, Acceptance; and 251.06, Measurement. Revises subsections.
ENCLOSURES
Pages F-3 through F-4
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
F-3
Special Contract Requirements Project: OR BLM ERFO 151-3301, WELLS CREEK LANDSLIDE
DIVISION 250
SLOPE REINFORCEMENT
AND RETAINING WALLS
Section 251. — RIPRAP
Delete the text of this Section and substitute the following:
Description
251.01 This work consists of furnishing and placing riprap for slope protection, including the riprap revetment, drainage structures, and erosion control. Riprap may be obtained from conserved roadway excavation, provided it meets the requirements in Sections 105, 204 and this Section.
Riprap acceptance methods are designated according to Table 251-1. If no acceptance method is designated, use Method A.
Riprap classes are designated according to Table 705-1.
Geotextile filters are designated according to Table 714-1.
Material
251.02 Conform to the following Subsections:
Geotextile 714.01 Riprap 705.02
Construction Requirements
251.03 General. Perform the work under Sections 108 and 209. Dress the slope to produce a smooth surface. If geotextile filter is required, place according to Section 207.
251.04 Placed Riprap. Placed riprap is rock placed on a prepared surface to form a well-graded mass.
Place riprap to its full thickness in one operation to avoid displacing the underlying material. Do not place riprap material by methods that cause segregation or damage to the prepared surface.
Place or rearrange individual rocks by mechanical or hand methods to obtain a dense uniform blanket with a reasonably smooth surface.
Revised by Amendment A001
F-4 DIVISION 250
Special Contract Requirements Project: OR BLM ERFO 151-3301, WELLS CREEK LANDSLIDE
Boulders up to 5’ in size that exceed gradation requirements may be used for the riprap revetment, provided they are placed in accordance with this Subsection.
251.05 Acceptance. See Table 251-1 for sampling, testing, and acceptance requirements.
Rock for riprap will be evaluated under Subsections 106.02 and 106.04.
Acceptance Method A riprap construction will be evaluated under Subsection 106.02.
Geotextile filters will be evaluated under Section 207.
Structure excavation and backfill will be evaluated under Section 209.
Measurement
251.06 Measure the Section 251 pay items listed in the bid schedule according to Subsection
109.02 and the following as applicable:
When measuring riprap by the cubic yard (cubic meter), measure in place.
Do not measure geotextile used in riprap construction for payment.
Payment
251.07 The accepted quantities will be paid at the contract price per unit of measurement for the Section 251 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Revised by Amendment A001