FEDERAL HIGHWAY ADMINISTRATION
PROJECT
OR BLM ERFO 151-3301
WELLS CREEK LANDSLIDE
MAINLINE EARTHWORK
22+70.00 TO 28+60.00
BUREAU OF LAND MANAGEMENT
COOS BAY DISTRICT
DOUGLAS COUNTY, OREGON
File: c:\myfiles\pw_production\d0272836\Mainline Earthwork 95%.log 11/26/2016, 1:31:02 PM
Input File: pw:\Oregon\BLM_Coos_Bay_District\OR_BLM_ERFO_151‐3301\Development\CADD\Design\Mainline Earthwork_input unedited.inp Output File: Mainline Earthwork 95%.log
COMPUTING EARTHWORKS FOR BASELINE = CL
COMPUTING EARTHWORKS FOR JOB = 151
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
22+70.00 RDWYEXC
Excavation 47.90 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0
Fill 0.00 0 0 1.00 0 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 21.65 0 0 0.00 0 0
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 25.84 0 0 0.00 0 0
22+80.00 RDWYEXC
Excavation 44.09 17 17 1.00 17 Subsoil Exc 0.00 0 0 1.00 0
Fill 0.00 0 0 1.00 17 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 20.20 8 0 0.00 17 8
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Page: 2
Fill 24.28 9 0 0.00 17 9
23+00.49 RDWYEXC
Excavation 31.16 28 28 1.00 45 Subsoil Exc 0.00 0 0 1.00 0
Fill 0.00 0 0 1.00 45 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 17.19 14 0 0.00 45 22
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 23.76 18 0 0.00 45 27
23+16.82 RDWYEXC
Excavation 21.99 16 16 1.00 61 Subsoil Exc 0.00 0 0 1.00 0
Fill 0.00 0 0 1.00 61 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 17.50 10 0 0.00 61 32
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 23.55 14 0 0.00 61 41
23+20.00 RDWYEXC
Excavation 19.66 2 2 1.00 63
Page: 3
Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 63 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 18.50 2 0 0.00 63 34
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 21.03 3 0 0.00 63 44
23+35.00 RDWYEXC
Excavation 18.47 10 10 1.00 73 Subsoil Exc 0.00 0 0 1.00 0
Fill 0.00 0 0 1.00 73 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 17.01 10 0 0.00 73 44
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 21.03 12 0 0.00 73 56
23+40.00 RDWYEXC
Excavation 10.84 3 3 1.00 76 Subsoil Exc 0.00 0 0 1.00 0
Fill 1.92 0 0 1.00 76 0
LAYER3
Excavation 0.00 0 0 0.00 0
Page: 4
Fill 17.01 3 0 0.00 76 47
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 21.04 4 0 0.00 76 60
23+48.32 RDWYEXC
Excavation 0.00 1 1 1.00 77 Subsoil Exc 0.00 0 0 1.00 0
Fill 11.46 2 2 1.00 75 2
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 17.02 5 0 0.00 75 52
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 21.06 6 0 0.00 75 66
23+50.00 RDWYEXC
Excavation 11.43 0 0 1.00 77 Subsoil Exc 0.00 0 0 1.00 0
Fill 11.59 1 1 1.00 74 3
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 17.02 1 0 0.00 74 53
LAYER5
Page: 5
Fill 21.06 1 0 0.00 74 67
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.31 0 0 0.00 74 0
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 0 0 0.00 74 0
23+60.00 RDWYEXC
Excavation 11.00 4 4 1.00 81 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.34 6 6 1.00 72 9
SUBEXCAVATION
Excavation 35.73 7 7 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 72 0 Mass ordinate for SUBEXCAVATION = 7
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 72 59
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 72 75
SUBEXBACKFILL
Page: 6
Fill 42.89 8 0 0.00 72 8
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 72 4
23+70.00 RDWYEXC
Excavation 9.97 4 4 1.00 85 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.29 11 11 1.00 65 20
SUBEXCAVATION
Excavation 34.97 13 13 1.00 20 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 65 0 Mass ordinate for SUBEXCAVATION = 20
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 65 65
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 65 83
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 51.74 18 0 0.00 65 26
PERVIOUS
Page: 7
Fill 10.02 4 0 0.00 65 8
23+80.00 RDWYEXC
Excavation 10.00 4 4 1.00 89 Subsoil Exc 0.00 0 0 1.00 0 Fill 59.94 18 18 1.00 51 38
SUBEXCAVATION
Excavation 35.62 13 13 1.00 33 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 51 0 Mass ordinate for SUBEXCAVATION = 33
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 51 71
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 51 91
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.58 20 0 0.00 51 46
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 51 12
24+00.00 RDWYEXC
Page: 8
Excavation 9.96 7 7 1.00 96 Subsoil Exc 0.00 0 0 1.00 0 Fill 98.12 59 59 1.00 ‐1 97
SUBEXCAVATION
Excavation 35.93 26 26 1.00 59 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1 0 Mass ordinate for SUBEXCAVATION = 59
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 ‐1 84
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 ‐1 107
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.40 44 0 0.00 ‐1 90
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 ‐1 19
24+20.00 RDWYEXC
Excavation 9.55 7 7 1.00 103 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.67 47 47 1.00 ‐41 144
SUBEXCAVATION
Page: 9
Excavation 61.16 36 36 1.00 95 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐41 0 Mass ordinate for SUBEXCAVATION = 95
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 ‐41 97
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 ‐41 123
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 71.04 49 0 0.00 ‐41 139
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 ‐41 26
24+30.00 RDWYEXC
Excavation 10.67 4 4 1.00 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.76 5 5 1.00 ‐42 149
SUBEXCAVATION
Excavation 49.45 20 20 1.00 115 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐42 0 Mass ordinate for SUBEXCAVATION = 115
Page: 10
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐42 103
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐42 131
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 78.01 28 0 0.00 ‐42 167
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐42 30
24+40.00 RDWYEXC
Excavation 16.50 5 5 1.00 112 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐37 149
SUBEXCAVATION
Excavation 38.60 16 16 1.00 131 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐37 0 Mass ordinate for SUBEXCAVATION = 131
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐37 109
Page: 11
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐37 139
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 52.62 24 0 0.00 ‐37 191
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.97 4 0 0.00 ‐37 34
24+50.00 RDWYEXC
Excavation 21.58 7 7 1.00 119 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐30 149
SUBEXCAVATION
Excavation 35.59 14 14 1.00 145 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐30 0 Mass ordinate for SUBEXCAVATION = 145
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐30 115
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.19 8 0 0.00 ‐30 147
Page: 12
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 55.64 20 0 0.00 ‐30 211
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 4 0 0.00 ‐30 38
24+60.00 RDWYEXC
Excavation 17.15 7 7 1.00 126 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐23 149
SUBEXCAVATION
Excavation 41.87 14 14 1.00 159 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐23 0 Mass ordinate for SUBEXCAVATION = 159
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐23 121
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.14 8 0 0.00 ‐23 155
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 90.56 27 0 0.00 ‐23 238
Page: 13
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 4 0 0.00 ‐23 42
24+70.00 RDWYEXC
Excavation 10.01 5 5 1.00 131 Subsoil Exc 0.00 0 0 1.00 0 Fill 26.42 5 5 1.00 ‐23 154
SUBEXCAVATION
Excavation 60.04 19 19 1.00 178 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐23 0 Mass ordinate for SUBEXCAVATION = 178
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐23 127
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐23 163
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 96.41 35 0 0.00 ‐23 273
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.13 4 0 0.00 ‐23 46
Page: 14
24+80.00 RDWYEXC
Excavation 10.00 4 4 1.00 135 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.52 9 9 1.00 ‐28 163
SUBEXCAVATION
Excavation 107.19 31 31 1.00 209 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐28 0 Mass ordinate for SUBEXCAVATION = 209
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐28 133
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐28 171
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 130.44 42 0 0.00 ‐28 315
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐28 50
24+90.00 RDWYEXC
Excavation 9.98 4 4 1.00 139
Page: 15
Fill 20.95 8 8 1.00 ‐32 171
SUBEXCAVATION
Excavation 121.08 43 43 1.00 252 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐32 0 Mass ordinate for SUBEXCAVATION = 252
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐32 139
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐32 179
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 170.34 56 0 0.00 ‐32 371
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐32 54
25+00.00 RDWYEXC
Excavation 16.29 5 5 1.00 144 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 4 4 1.00 ‐31 175
SUBEXCAVATION
Excavation 96.47 40 40 1.00 292
Page: 16
Fill 0.00 0 0 1.00 ‐31 0 Mass ordinate for SUBEXCAVATION = 292
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐31 145
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐31 187
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 230.90 74 0 0.00 ‐31 445
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 4 0 0.00 ‐31 58
25+20.00 RDWYEXC
Excavation 23.16 15 15 1.00 159 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐16 175
SUBEXCAVATION
Excavation 88.36 68 68 1.00 360 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐16 0 Mass ordinate for SUBEXCAVATION = 360
LAYER2
Page: 17
Fill 3.12 1 0 0.00 ‐16 1
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 ‐16 158
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.90 16 0 0.00 ‐16 203
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 337.98 211 0 0.00 ‐16 656
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 7 0 0.00 ‐16 65
25+40.00 RDWYEXC
Excavation 30.09 20 20 1.00 179 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4 175
SUBEXCAVATION
Excavation 94.05 68 68 1.00 428 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4 0 Mass ordinate for SUBEXCAVATION = 428
LAYER2
Page: 18
Fill 5.05 3 0 0.00 4 4
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 4 171
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 4 219
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 482.92 304 0 0.00 4 960
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 7 0 0.00 4 72
25+60.00 RDWYEXC
Excavation 22.50 20 20 1.00 199 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 24 175
SUBEXCAVATION
Excavation 423.53 192 192 1.00 620 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 24 0 Mass ordinate for SUBEXCAVATION = 620
LAYER2
Page: 19
Fill 5.11 4 0 0.00 24 8
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 24 184
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 24 235
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 571.81 391 0 0.00 24 1351
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 24 79
25+80.00 RDWYEXC
Excavation 20.40 16 16 1.00 215 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 40 175
SUBEXCAVATION
Excavation 381.32 298 298 1.00 918 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 40 0 Mass ordinate for SUBEXCAVATION = 918
LAYER2
Page: 20
Fill 4.65 4 0 0.00 40 12
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 40 197
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 40 251
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 587.98 430 0 0.00 40 1781
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 40 86
26+00.00 RDWYEXC
Excavation 9.43 11 11 1.00 226 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.58 10 10 1.00 41 185
SUBEXCAVATION
Excavation 498.08 326 326 1.00 1244 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 41 0 Mass ordinate for SUBEXCAVATION = 1244
LAYER2
Page: 21
Fill 11.29 6 0 0.00 41 18
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 41 210
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 41 267
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 697.19 476 0 0.00 41 2257
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 41 93
26+20.00 RDWYEXC
Excavation 9.39 7 7 1.00 233 Subsoil Exc 0.00 0 0 1.00 0 Fill 54.99 31 31 1.00 17 216
SUBEXCAVATION
Excavation 598.40 406 406 1.00 1650 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 17 0 Mass ordinate for SUBEXCAVATION = 1650
LAYER2
Page: 22
Fill 11.47 8 0 0.00 17 26
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 17 223
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 17 283
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 889.97 588 0 0.00 17 2845
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 17 100
26+30.34 RDWYEXC
Excavation 9.45 4 4 1.00 237 Subsoil Exc 0.00 0 0 1.00 0 Fill 56.67 21 21 1.00 0 237
SUBEXCAVATION
Excavation 855.84 278 278 1.00 1928 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 1928
LAYER2
Page: 23
Fill 10.63 4 0 0.00 0 30
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 7 0 0.00 0 230
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 0 291
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 975.83 357 0 0.00 0 3202
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 0 104
26+40.00 RDWYEXC
Excavation 9.74 3 3 1.00 240 Subsoil Exc 0.00 0 0 1.00 0 Fill 55.97 20 20 1.00 ‐17 257
SUBEXCAVATION
Excavation 876.34 310 310 1.00 2238 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐17 0 Mass ordinate for SUBEXCAVATION = 2238
LAYER2
Page: 24
Fill 10.69 4 0 0.00 ‐17 34
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.16 6 0 0.00 ‐17 236
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.20 8 0 0.00 ‐17 299
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 977.51 349 0 0.00 ‐17 3551
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐17 108
26+60.00 RDWYEXC
Excavation 10.55 7 7 1.00 247 Subsoil Exc 0.00 0 0 1.00 0 Fill 65.97 45 45 1.00 ‐55 302
SUBEXCAVATION
Excavation 889.01 654 654 1.00 2892 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐55 0 Mass ordinate for SUBEXCAVATION = 2892
LAYER2
Page: 25
Fill 12.32 9 0 0.00 ‐55 43
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.47 13 0 0.00 ‐55 249
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.51 16 0 0.00 ‐55 315
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 938.44 710 0 0.00 ‐55 4261
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 ‐55 115
26+70.00 RDWYEXC
Excavation 10.73 4 4 1.00 251 Subsoil Exc 0.00 0 0 1.00 0 Fill 59.24 23 23 1.00 ‐74 325
SUBEXCAVATION
Excavation 843.76 321 321 1.00 3213 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐74 0 Mass ordinate for SUBEXCAVATION = 3213
LAYER2
Page: 26
Fill 11.72 4 0 0.00 ‐74 47
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.62 6 0 0.00 ‐74 255
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.66 8 0 0.00 ‐74 323
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 955.65 351 0 0.00 ‐74 4612
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐74 119
26+80.00 RDWYEXC
Excavation 10.71 4 4 1.00 255 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.14 21 21 1.00 ‐91 346
SUBEXCAVATION
Excavation 146.19 183 183 1.00 3396 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐91 0 Mass ordinate for SUBEXCAVATION = 3396
LAYER2
Page: 27
Fill 31.44 8 0 0.00 ‐91 55
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.77 7 0 0.00 ‐91 262
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.81 8 0 0.00 ‐91 331
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 904.98 345 0 0.00 ‐91 4957
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.25 4 0 0.00 ‐91 123
26+85.78 RDWYEXC
Excavation 11.30 2 2 1.00 257 Subsoil Exc 0.00 0 0 1.00 0 Fill 49.38 11 11 1.00 ‐100 357
SUBEXCAVATION
Excavation 138.17 30 30 1.00 3426 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐100 0 Mass ordinate for SUBEXCAVATION = 3426
LAYER2
Page: 28
Fill 30.55 7 0 0.00 ‐100 62
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.86 4 0 0.00 ‐100 266
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.90 5 0 0.00 ‐100 336
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 856.55 189 0 0.00 ‐100 5146
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 2 0 0.00 ‐100 125
26+96.37 RDWYEXC
Excavation 11.20 4 4 1.00 261 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.83 16 16 1.00 ‐112 373
SUBEXCAVATION
Excavation 646.76 154 154 1.00 3580 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐112 0 Mass ordinate for SUBEXCAVATION = 3580
LAYER2
Page: 29
Fill 24.41 11 0 0.00 ‐112 73
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.03 7 0 0.00 ‐112 273
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.09 9 0 0.00 ‐112 345
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 742.83 314 0 0.00 ‐112 5460
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐112 129
27+00.91 RDWYEXC
Excavation 12.53 2 2 1.00 263 Subsoil Exc 0.00 0 0 1.00 0 Fill 431.73 39 39 1.00 ‐149 412
SUBEXCAVATION
Excavation 46.84 58 58 1.00 3638 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐149 0 Mass ordinate for SUBEXCAVATION = 3638
LAYER2
Page: 30
Fill 24.28 4 0 0.00 ‐149 77
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.12 3 0 0.00 ‐149 276
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.19 4 0 0.00 ‐149 349
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 269.35 85 0 0.00 ‐149 5545
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 2 0 0.00 ‐149 131
27+10.00 RDWYEXC
Excavation 22.68 6 6 1.00 269 Subsoil Exc 0.00 0 0 1.00 0 Fill 280.23 120 120 1.00 ‐263 532
SUBEXCAVATION
Excavation 129.41 30 30 1.00 3668 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐263 0 Mass ordinate for SUBEXCAVATION = 3668
LAYER2
Page: 31
Fill 22.33 8 0 0.00 ‐263 85
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.31 6 0 0.00 ‐263 282
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.37 8 0 0.00 ‐263 357
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 295.81 95 0 0.00 ‐263 5640
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 3 0 0.00 ‐263 134
27+20.00 RDWYEXC
Excavation 53.09 14 14 1.00 283 Subsoil Exc 0.00 0 0 1.00 0 Fill 209.34 91 91 1.00 ‐340 623
SUBEXCAVATION
Excavation 153.60 52 52 1.00 3720 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐340 0 Mass ordinate for SUBEXCAVATION = 3720
LAYER2
Page: 32
Fill 11.26 6 0 0.00 ‐340 91
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.51 7 0 0.00 ‐340 289
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.57 8 0 0.00 ‐340 365
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 195.96 91 0 0.00 ‐340 5731
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐340 138
27+30.00 RDWYEXC
Excavation 88.38 26 26 1.00 309 Subsoil Exc 0.00 0 0 1.00 0 Fill 133.68 64 64 1.00 ‐378 687
SUBEXCAVATION
Excavation 0.00 28 28 1.00 3748 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐378 0 Mass ordinate for SUBEXCAVATION = 3748
LAYER2
Page: 33
Fill 9.73 4 0 0.00 ‐378 95
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.71 7 0 0.00 ‐378 296
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.01 8 0 0.00 ‐378 373
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 36 0 0.00 ‐378 5767
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.95 4 0 0.00 ‐378 142
27+39.75 RDWYEXC
Excavation 100.24 35 35 1.00 344 Subsoil Exc 0.00 0 0 1.00 0 Fill 57.45 35 35 1.00 ‐378 722
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.32 3 0 0.00 ‐378 98
LAYER3
Excavation 0.00 0 0 0.00 0
Page: 34
Fill 18.90 7 0 0.00 ‐378 303
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.97 8 0 0.00 ‐378 381
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.95 4 0 0.00 ‐378 146
27+46.37 RDWYEXC
Excavation 33.16 17 17 1.00 361 Subsoil Exc 0.00 0 0 1.00 0 Fill 38.44 12 12 1.00 ‐373 734
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.46 2 0 0.00 ‐373 100
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 5 0 0.00 ‐373 308
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.12 6 0 0.00 ‐373 387
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.94 2 0 0.00 ‐373 148
Page: 35
27+49.21 RDWYEXC
Excavation 32.36 4 4 1.00 365 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.89 3 3 1.00 ‐372 737
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.90 1 0 0.00 ‐372 101
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 2 0 0.00 ‐372 310
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 2 0 0.00 ‐372 389
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.94 1 0 0.00 ‐372 149
27+50.00 RDWYEXC
Excavation 22.35 0 0 1.00 365 Subsoil Exc 0.00 0 0 1.00 0 Fill 18.97 1 1 1.00 ‐373 738
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.29 0 0 0.00 ‐373 101
Page: 36
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 1 0 0.00 ‐373 311
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 1 0 0.00 ‐373 390
PERVIOUS
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐373 149
27+60.00 RDWYEXC
Excavation 19.21 8 8 1.00 373 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.73 4 4 1.00 ‐369 742
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 1 0 0.00 ‐369 102
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐369 318
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 9 0 0.00 ‐369 399
Page: 37
27+70.00 RDWYEXC
Excavation 51.47 13 13 1.00 386 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.23 0 0 1.00 ‐356 742
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.05 7 0 0.00 ‐356 325
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 9 0 0.00 ‐356 408
27+80.00 RDWYEXC
Excavation 30.23 15 15 1.00 401 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.62 1 1 1.00 ‐342 743
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐342 332
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 9 0 0.00 ‐342 417
27+90.00 RDWYEXC
Excavation 16.02 8 8 1.00 409 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.55 1 1 1.00 ‐335 744
Page: 38
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.75 7 0 0.00 ‐335 339
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.24 8 0 0.00 ‐335 425
28+00.00 RDWYEXC
Excavation 7.56 4 4 1.00 413 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.99 0 0 1.00 ‐331 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐331 346
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.34 8 0 0.00 ‐331 433
28+10.00 RDWYEXC
Excavation 19.77 5 5 1.00 418 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.41 0 0 1.00 ‐326 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐326 353
Page: 39
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.07 9 0 0.00 ‐326 442
28+20.00 RDWYEXC
Excavation 30.98 9 9 1.00 427 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.01 0 0 1.00 ‐317 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐317 360
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.23 10 0 0.00 ‐317 452
28+25.07 RDWYEXC
Excavation 33.54 6 6 1.00 433 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.04 0 0 1.00 ‐311 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 4 0 0.00 ‐311 364
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.96 5 0 0.00 ‐311 457
Page: 40
28+40.00 RDWYEXC
Excavation 34.80 19 19 1.00 452 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐292 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.03 11 0 0.00 ‐292 375
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.59 14 0 0.00 ‐292 471
28+42.09 RDWYEXC
Excavation 35.74 3 3 1.00 455 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐289 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.03 1 0 0.00 ‐289 376
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 2 0 0.00 ‐289 473
28+58.75 RDWYEXC
Excavation 39.69 23 23 1.00 478
Page: 41
Fill 0.00 0 0 1.00 ‐266 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 18.69 12 0 0.00 ‐266 388
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 23.65 15 0 0.00 ‐266 488
28+60.00 RDWYEXC
Excavation 0.00 1 1 1.00 479 Subsoil Exc 0.00 0 0 1.00 0
Fill 0.00 0 0 1.00 ‐265 744
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 0.00 0 0 0.00 ‐265 388
LAYER5
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 0.00 1 0 0.00 ‐265 489
Page: 42
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult
Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 479 479 1.00 Subsoil Exc 0 0 1.00
Fill 744 744 1.00
SUBEXCAVATION
Excavation 3748 3748 1.00 Subsoil Exc 0 0 1.00
Fill 0 0 1.00
LAYER2
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 102 0 0.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 388 0 0.00
LAYER5
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 489 0 0.00
SUBEXBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 5767 0 0.00
PERVIOUS
Page: 43
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 149 0 0.00
Page: 44