FEDERAL HIGHWAY ADMINISTRATION

PROJECT

OR BLM ERFO 151-3301

WELLS CREEK LANDSLIDE

MAINLINE EARTHWORK

22+70.00 TO 28+60.00

BUREAU OF LAND MANAGEMENT

COOS BAY DISTRICT

DOUGLAS COUNTY, OREGON

File: c:\myfiles\pw_production\d0272836\Mainline Earthwork 95%.log 11/26/2016, 1:31:02 PM

Input File: pw:\Oregon\BLM_Coos_Bay_District\OR_BLM_ERFO_151‐3301\Development\CADD\Design\Mainline Earthwork_input unedited.inp Output File: Mainline Earthwork 95%.log

COMPUTING EARTHWORKS FOR BASELINE = CL

COMPUTING EARTHWORKS FOR JOB = 151

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

SKIP STATION RANGE = 0+00.00 to 0+00.00

22+70.00 RDWYEXC

Excavation 47.90 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0

Fill 0.00 0 0 1.00 0 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 21.65 0 0 0.00 0 0

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 25.84 0 0 0.00 0 0

22+80.00 RDWYEXC

Excavation 44.09 17 17 1.00 17 Subsoil Exc 0.00 0 0 1.00 0

Fill 0.00 0 0 1.00 17 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 20.20 8 0 0.00 17 8

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Page: 2

Fill 24.28 9 0 0.00 17 9

23+00.49 RDWYEXC

Excavation 31.16 28 28 1.00 45 Subsoil Exc 0.00 0 0 1.00 0

Fill 0.00 0 0 1.00 45 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 17.19 14 0 0.00 45 22

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 23.76 18 0 0.00 45 27

23+16.82 RDWYEXC

Excavation 21.99 16 16 1.00 61 Subsoil Exc 0.00 0 0 1.00 0

Fill 0.00 0 0 1.00 61 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 17.50 10 0 0.00 61 32

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 23.55 14 0 0.00 61 41

23+20.00 RDWYEXC

Excavation 19.66 2 2 1.00 63

Page: 3

Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 63 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 18.50 2 0 0.00 63 34

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 21.03 3 0 0.00 63 44

23+35.00 RDWYEXC

Excavation 18.47 10 10 1.00 73 Subsoil Exc 0.00 0 0 1.00 0

Fill 0.00 0 0 1.00 73 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 17.01 10 0 0.00 73 44

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 21.03 12 0 0.00 73 56

23+40.00 RDWYEXC

Excavation 10.84 3 3 1.00 76 Subsoil Exc 0.00 0 0 1.00 0

Fill 1.92 0 0 1.00 76 0

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 4

Fill 17.01 3 0 0.00 76 47

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 21.04 4 0 0.00 76 60

23+48.32 RDWYEXC

Excavation 0.00 1 1 1.00 77 Subsoil Exc 0.00 0 0 1.00 0

Fill 11.46 2 2 1.00 75 2

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 17.02 5 0 0.00 75 52

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 21.06 6 0 0.00 75 66

23+50.00 RDWYEXC

Excavation 11.43 0 0 1.00 77 Subsoil Exc 0.00 0 0 1.00 0

Fill 11.59 1 1 1.00 74 3

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 17.02 1 0 0.00 74 53

LAYER5

Page: 5

Fill 21.06 1 0 0.00 74 67

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.31 0 0 0.00 74 0

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 0 0 0.00 74 0

23+60.00 RDWYEXC

Excavation 11.00 4 4 1.00 81 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.34 6 6 1.00 72 9

SUBEXCAVATION

Excavation 35.73 7 7 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 72 0 Mass ordinate for SUBEXCAVATION = 7

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 72 59

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 72 75

SUBEXBACKFILL

Page: 6

Fill 42.89 8 0 0.00 72 8

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 72 4

23+70.00 RDWYEXC

Excavation 9.97 4 4 1.00 85 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.29 11 11 1.00 65 20

SUBEXCAVATION

Excavation 34.97 13 13 1.00 20 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 65 0 Mass ordinate for SUBEXCAVATION = 20

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 65 65

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 65 83

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 51.74 18 0 0.00 65 26

PERVIOUS

Page: 7

Fill 10.02 4 0 0.00 65 8

23+80.00 RDWYEXC

Excavation 10.00 4 4 1.00 89 Subsoil Exc 0.00 0 0 1.00 0 Fill 59.94 18 18 1.00 51 38

SUBEXCAVATION

Excavation 35.62 13 13 1.00 33 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 51 0 Mass ordinate for SUBEXCAVATION = 33

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 51 71

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 51 91

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.58 20 0 0.00 51 46

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 51 12

24+00.00 RDWYEXC

Page: 8

Excavation 9.96 7 7 1.00 96 Subsoil Exc 0.00 0 0 1.00 0 Fill 98.12 59 59 1.00 ‐1 97

SUBEXCAVATION

Excavation 35.93 26 26 1.00 59 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1 0 Mass ordinate for SUBEXCAVATION = 59

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 ‐1 84

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 ‐1 107

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.40 44 0 0.00 ‐1 90

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 ‐1 19

24+20.00 RDWYEXC

Excavation 9.55 7 7 1.00 103 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.67 47 47 1.00 ‐41 144

SUBEXCAVATION

Page: 9

Excavation 61.16 36 36 1.00 95 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐41 0 Mass ordinate for SUBEXCAVATION = 95

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 ‐41 97

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 ‐41 123

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 71.04 49 0 0.00 ‐41 139

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 ‐41 26

24+30.00 RDWYEXC

Excavation 10.67 4 4 1.00 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.76 5 5 1.00 ‐42 149

SUBEXCAVATION

Excavation 49.45 20 20 1.00 115 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐42 0 Mass ordinate for SUBEXCAVATION = 115

Page: 10

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐42 103

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐42 131

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 78.01 28 0 0.00 ‐42 167

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐42 30

24+40.00 RDWYEXC

Excavation 16.50 5 5 1.00 112 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐37 149

SUBEXCAVATION

Excavation 38.60 16 16 1.00 131 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐37 0 Mass ordinate for SUBEXCAVATION = 131

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐37 109

Page: 11

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐37 139

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 52.62 24 0 0.00 ‐37 191

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.97 4 0 0.00 ‐37 34

24+50.00 RDWYEXC

Excavation 21.58 7 7 1.00 119 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐30 149

SUBEXCAVATION

Excavation 35.59 14 14 1.00 145 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐30 0 Mass ordinate for SUBEXCAVATION = 145

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐30 115

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.19 8 0 0.00 ‐30 147

Page: 12

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 55.64 20 0 0.00 ‐30 211

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 4 0 0.00 ‐30 38

24+60.00 RDWYEXC

Excavation 17.15 7 7 1.00 126 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐23 149

SUBEXCAVATION

Excavation 41.87 14 14 1.00 159 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐23 0 Mass ordinate for SUBEXCAVATION = 159

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐23 121

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.14 8 0 0.00 ‐23 155

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 90.56 27 0 0.00 ‐23 238

Page: 13

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 4 0 0.00 ‐23 42

24+70.00 RDWYEXC

Excavation 10.01 5 5 1.00 131 Subsoil Exc 0.00 0 0 1.00 0 Fill 26.42 5 5 1.00 ‐23 154

SUBEXCAVATION

Excavation 60.04 19 19 1.00 178 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐23 0 Mass ordinate for SUBEXCAVATION = 178

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐23 127

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐23 163

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 96.41 35 0 0.00 ‐23 273

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.13 4 0 0.00 ‐23 46

Page: 14

24+80.00 RDWYEXC

Excavation 10.00 4 4 1.00 135 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.52 9 9 1.00 ‐28 163

SUBEXCAVATION

Excavation 107.19 31 31 1.00 209 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐28 0 Mass ordinate for SUBEXCAVATION = 209

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐28 133

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐28 171

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 130.44 42 0 0.00 ‐28 315

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐28 50

24+90.00 RDWYEXC

Excavation 9.98 4 4 1.00 139

Page: 15

Fill 20.95 8 8 1.00 ‐32 171

SUBEXCAVATION

Excavation 121.08 43 43 1.00 252 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐32 0 Mass ordinate for SUBEXCAVATION = 252

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐32 139

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐32 179

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 170.34 56 0 0.00 ‐32 371

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐32 54

25+00.00 RDWYEXC

Excavation 16.29 5 5 1.00 144 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 4 4 1.00 ‐31 175

SUBEXCAVATION

Excavation 96.47 40 40 1.00 292

Page: 16

Fill 0.00 0 0 1.00 ‐31 0 Mass ordinate for SUBEXCAVATION = 292

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 6 0 0.00 ‐31 145

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 ‐31 187

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 230.90 74 0 0.00 ‐31 445

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 4 0 0.00 ‐31 58

25+20.00 RDWYEXC

Excavation 23.16 15 15 1.00 159 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐16 175

SUBEXCAVATION

Excavation 88.36 68 68 1.00 360 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐16 0 Mass ordinate for SUBEXCAVATION = 360

LAYER2

Page: 17

Fill 3.12 1 0 0.00 ‐16 1

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 ‐16 158

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.90 16 0 0.00 ‐16 203

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 337.98 211 0 0.00 ‐16 656

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 7 0 0.00 ‐16 65

25+40.00 RDWYEXC

Excavation 30.09 20 20 1.00 179 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4 175

SUBEXCAVATION

Excavation 94.05 68 68 1.00 428 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4 0 Mass ordinate for SUBEXCAVATION = 428

LAYER2

Page: 18

Fill 5.05 3 0 0.00 4 4

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 4 171

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 4 219

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 482.92 304 0 0.00 4 960

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 7 0 0.00 4 72

25+60.00 RDWYEXC

Excavation 22.50 20 20 1.00 199 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 24 175

SUBEXCAVATION

Excavation 423.53 192 192 1.00 620 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 24 0 Mass ordinate for SUBEXCAVATION = 620

LAYER2

Page: 19

Fill 5.11 4 0 0.00 24 8

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 24 184

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 24 235

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 571.81 391 0 0.00 24 1351

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 24 79

25+80.00 RDWYEXC

Excavation 20.40 16 16 1.00 215 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 40 175

SUBEXCAVATION

Excavation 381.32 298 298 1.00 918 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 40 0 Mass ordinate for SUBEXCAVATION = 918

LAYER2

Page: 20

Fill 4.65 4 0 0.00 40 12

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 40 197

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 40 251

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 587.98 430 0 0.00 40 1781

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 40 86

26+00.00 RDWYEXC

Excavation 9.43 11 11 1.00 226 Subsoil Exc 0.00 0 0 1.00 0 Fill 27.58 10 10 1.00 41 185

SUBEXCAVATION

Excavation 498.08 326 326 1.00 1244 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 41 0 Mass ordinate for SUBEXCAVATION = 1244

LAYER2

Page: 21

Fill 11.29 6 0 0.00 41 18

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 41 210

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 41 267

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 697.19 476 0 0.00 41 2257

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 41 93

26+20.00 RDWYEXC

Excavation 9.39 7 7 1.00 233 Subsoil Exc 0.00 0 0 1.00 0 Fill 54.99 31 31 1.00 17 216

SUBEXCAVATION

Excavation 598.40 406 406 1.00 1650 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 17 0 Mass ordinate for SUBEXCAVATION = 1650

LAYER2

Page: 22

Fill 11.47 8 0 0.00 17 26

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 13 0 0.00 17 223

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 16 0 0.00 17 283

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 889.97 588 0 0.00 17 2845

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 17 100

26+30.34 RDWYEXC

Excavation 9.45 4 4 1.00 237 Subsoil Exc 0.00 0 0 1.00 0 Fill 56.67 21 21 1.00 0 237

SUBEXCAVATION

Excavation 855.84 278 278 1.00 1928 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 1928

LAYER2

Page: 23

Fill 10.63 4 0 0.00 0 30

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 7 0 0.00 0 230

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.06 8 0 0.00 0 291

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 975.83 357 0 0.00 0 3202

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 0 104

26+40.00 RDWYEXC

Excavation 9.74 3 3 1.00 240 Subsoil Exc 0.00 0 0 1.00 0 Fill 55.97 20 20 1.00 ‐17 257

SUBEXCAVATION

Excavation 876.34 310 310 1.00 2238 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐17 0 Mass ordinate for SUBEXCAVATION = 2238

LAYER2

Page: 24

Fill 10.69 4 0 0.00 ‐17 34

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.16 6 0 0.00 ‐17 236

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.20 8 0 0.00 ‐17 299

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 977.51 349 0 0.00 ‐17 3551

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐17 108

26+60.00 RDWYEXC

Excavation 10.55 7 7 1.00 247 Subsoil Exc 0.00 0 0 1.00 0 Fill 65.97 45 45 1.00 ‐55 302

SUBEXCAVATION

Excavation 889.01 654 654 1.00 2892 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐55 0 Mass ordinate for SUBEXCAVATION = 2892

LAYER2

Page: 25

Fill 12.32 9 0 0.00 ‐55 43

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.47 13 0 0.00 ‐55 249

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.51 16 0 0.00 ‐55 315

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 938.44 710 0 0.00 ‐55 4261

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 7 0 0.00 ‐55 115

26+70.00 RDWYEXC

Excavation 10.73 4 4 1.00 251 Subsoil Exc 0.00 0 0 1.00 0 Fill 59.24 23 23 1.00 ‐74 325

SUBEXCAVATION

Excavation 843.76 321 321 1.00 3213 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐74 0 Mass ordinate for SUBEXCAVATION = 3213

LAYER2

Page: 26

Fill 11.72 4 0 0.00 ‐74 47

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.62 6 0 0.00 ‐74 255

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.66 8 0 0.00 ‐74 323

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 955.65 351 0 0.00 ‐74 4612

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐74 119

26+80.00 RDWYEXC

Excavation 10.71 4 4 1.00 255 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.14 21 21 1.00 ‐91 346

SUBEXCAVATION

Excavation 146.19 183 183 1.00 3396 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐91 0 Mass ordinate for SUBEXCAVATION = 3396

LAYER2

Page: 27

Fill 31.44 8 0 0.00 ‐91 55

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.77 7 0 0.00 ‐91 262

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.81 8 0 0.00 ‐91 331

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 904.98 345 0 0.00 ‐91 4957

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.25 4 0 0.00 ‐91 123

26+85.78 RDWYEXC

Excavation 11.30 2 2 1.00 257 Subsoil Exc 0.00 0 0 1.00 0 Fill 49.38 11 11 1.00 ‐100 357

SUBEXCAVATION

Excavation 138.17 30 30 1.00 3426 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐100 0 Mass ordinate for SUBEXCAVATION = 3426

LAYER2

Page: 28

Fill 30.55 7 0 0.00 ‐100 62

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.86 4 0 0.00 ‐100 266

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.90 5 0 0.00 ‐100 336

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 856.55 189 0 0.00 ‐100 5146

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 2 0 0.00 ‐100 125

26+96.37 RDWYEXC

Excavation 11.20 4 4 1.00 261 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.83 16 16 1.00 ‐112 373

SUBEXCAVATION

Excavation 646.76 154 154 1.00 3580 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐112 0 Mass ordinate for SUBEXCAVATION = 3580

LAYER2

Page: 29

Fill 24.41 11 0 0.00 ‐112 73

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.03 7 0 0.00 ‐112 273

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.09 9 0 0.00 ‐112 345

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 742.83 314 0 0.00 ‐112 5460

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐112 129

27+00.91 RDWYEXC

Excavation 12.53 2 2 1.00 263 Subsoil Exc 0.00 0 0 1.00 0 Fill 431.73 39 39 1.00 ‐149 412

SUBEXCAVATION

Excavation 46.84 58 58 1.00 3638 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐149 0 Mass ordinate for SUBEXCAVATION = 3638

LAYER2

Page: 30

Fill 24.28 4 0 0.00 ‐149 77

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.12 3 0 0.00 ‐149 276

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.19 4 0 0.00 ‐149 349

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 269.35 85 0 0.00 ‐149 5545

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 2 0 0.00 ‐149 131

27+10.00 RDWYEXC

Excavation 22.68 6 6 1.00 269 Subsoil Exc 0.00 0 0 1.00 0 Fill 280.23 120 120 1.00 ‐263 532

SUBEXCAVATION

Excavation 129.41 30 30 1.00 3668 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐263 0 Mass ordinate for SUBEXCAVATION = 3668

LAYER2

Page: 31

Fill 22.33 8 0 0.00 ‐263 85

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.31 6 0 0.00 ‐263 282

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.37 8 0 0.00 ‐263 357

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 295.81 95 0 0.00 ‐263 5640

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 3 0 0.00 ‐263 134

27+20.00 RDWYEXC

Excavation 53.09 14 14 1.00 283 Subsoil Exc 0.00 0 0 1.00 0 Fill 209.34 91 91 1.00 ‐340 623

SUBEXCAVATION

Excavation 153.60 52 52 1.00 3720 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐340 0 Mass ordinate for SUBEXCAVATION = 3720

LAYER2

Page: 32

Fill 11.26 6 0 0.00 ‐340 91

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.51 7 0 0.00 ‐340 289

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.57 8 0 0.00 ‐340 365

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 195.96 91 0 0.00 ‐340 5731

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.00 4 0 0.00 ‐340 138

27+30.00 RDWYEXC

Excavation 88.38 26 26 1.00 309 Subsoil Exc 0.00 0 0 1.00 0 Fill 133.68 64 64 1.00 ‐378 687

SUBEXCAVATION

Excavation 0.00 28 28 1.00 3748 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐378 0 Mass ordinate for SUBEXCAVATION = 3748

LAYER2

Page: 33

Fill 9.73 4 0 0.00 ‐378 95

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.71 7 0 0.00 ‐378 296

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.01 8 0 0.00 ‐378 373

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 36 0 0.00 ‐378 5767

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.95 4 0 0.00 ‐378 142

27+39.75 RDWYEXC

Excavation 100.24 35 35 1.00 344 Subsoil Exc 0.00 0 0 1.00 0 Fill 57.45 35 35 1.00 ‐378 722

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.32 3 0 0.00 ‐378 98

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 34

Fill 18.90 7 0 0.00 ‐378 303

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.97 8 0 0.00 ‐378 381

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.95 4 0 0.00 ‐378 146

27+46.37 RDWYEXC

Excavation 33.16 17 17 1.00 361 Subsoil Exc 0.00 0 0 1.00 0 Fill 38.44 12 12 1.00 ‐373 734

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.46 2 0 0.00 ‐373 100

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 5 0 0.00 ‐373 308

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.12 6 0 0.00 ‐373 387

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.94 2 0 0.00 ‐373 148

Page: 35

27+49.21 RDWYEXC

Excavation 32.36 4 4 1.00 365 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.89 3 3 1.00 ‐372 737

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.90 1 0 0.00 ‐372 101

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 2 0 0.00 ‐372 310

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 2 0 0.00 ‐372 389

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.94 1 0 0.00 ‐372 149

27+50.00 RDWYEXC

Excavation 22.35 0 0 1.00 365 Subsoil Exc 0.00 0 0 1.00 0 Fill 18.97 1 1 1.00 ‐373 738

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.29 0 0 0.00 ‐373 101

Page: 36

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 1 0 0.00 ‐373 311

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 1 0 0.00 ‐373 390

PERVIOUS

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 ‐373 149

27+60.00 RDWYEXC

Excavation 19.21 8 8 1.00 373 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.73 4 4 1.00 ‐369 742

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 1 0 0.00 ‐369 102

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐369 318

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 9 0 0.00 ‐369 399

Page: 37

27+70.00 RDWYEXC

Excavation 51.47 13 13 1.00 386 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.23 0 0 1.00 ‐356 742

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.05 7 0 0.00 ‐356 325

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 9 0 0.00 ‐356 408

27+80.00 RDWYEXC

Excavation 30.23 15 15 1.00 401 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.62 1 1 1.00 ‐342 743

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐342 332

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.13 9 0 0.00 ‐342 417

27+90.00 RDWYEXC

Excavation 16.02 8 8 1.00 409 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.55 1 1 1.00 ‐335 744

Page: 38

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.75 7 0 0.00 ‐335 339

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.24 8 0 0.00 ‐335 425

28+00.00 RDWYEXC

Excavation 7.56 4 4 1.00 413 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.99 0 0 1.00 ‐331 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐331 346

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.34 8 0 0.00 ‐331 433

28+10.00 RDWYEXC

Excavation 19.77 5 5 1.00 418 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.41 0 0 1.00 ‐326 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐326 353

Page: 39

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.07 9 0 0.00 ‐326 442

28+20.00 RDWYEXC

Excavation 30.98 9 9 1.00 427 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.01 0 0 1.00 ‐317 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 7 0 0.00 ‐317 360

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.23 10 0 0.00 ‐317 452

28+25.07 RDWYEXC

Excavation 33.54 6 6 1.00 433 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.04 0 0 1.00 ‐311 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.04 4 0 0.00 ‐311 364

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.96 5 0 0.00 ‐311 457

Page: 40

28+40.00 RDWYEXC

Excavation 34.80 19 19 1.00 452 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐292 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.03 11 0 0.00 ‐292 375

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.59 14 0 0.00 ‐292 471

28+42.09 RDWYEXC

Excavation 35.74 3 3 1.00 455 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐289 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.03 1 0 0.00 ‐289 376

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.49 2 0 0.00 ‐289 473

28+58.75 RDWYEXC

Excavation 39.69 23 23 1.00 478

Page: 41

Fill 0.00 0 0 1.00 ‐266 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 18.69 12 0 0.00 ‐266 388

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 23.65 15 0 0.00 ‐266 488

28+60.00 RDWYEXC

Excavation 0.00 1 1 1.00 479 Subsoil Exc 0.00 0 0 1.00 0

Fill 0.00 0 0 1.00 ‐265 744

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 0.00 0 0 0.00 ‐265 388

LAYER5

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 0.00 1 0 0.00 ‐265 489

Page: 42

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult

Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 479 479 1.00 Subsoil Exc 0 0 1.00

Fill 744 744 1.00

SUBEXCAVATION

Excavation 3748 3748 1.00 Subsoil Exc 0 0 1.00

Fill 0 0 1.00

LAYER2

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00

Fill 102 0 0.00

LAYER3

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00

Fill 388 0 0.00

LAYER5

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00

Fill 489 0 0.00

SUBEXBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00

Fill 5767 0 0.00

PERVIOUS

Page: 43

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00

Fill 149 0 0.00

Page: 44

Page: 45