Snug_Harbor_PS E_Set_27_August_2015_updated.pdf
PDF 15 MB Posted
- Solicitation number
- DTFH70-15-B-00007
About this file
Plans set
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_SnugHarbor.pdf | ||
| A003_SnugHarbor.pdf | ||
| A002_SnugHarbor.pdf | ||
| Q A.pdf | ||
| BikeTrail_xs.pdf | ||
| GM_21-13.pdf | ||
| GravelSection_xs.pdf | ||
| SnugHarbor_xs.pdf | ||
| IFB_SnugHarbor.pdf | ||
| Plan_Request_form_SnugHarbor.pdf | ||
| SWPPP_AK_PFH_59(1) _Snug_Harbor_Paving_and_Bike_trail.pdf | ||
| PROJECT_DESCRIPTION_AK_PFH_59(1) _Snug_Harbor_Road.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Construction Easement
Riprap
N
Fiber Roll or Wattle
Permanent Easement line
Right-of-Way and
2.
1.
A.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d a k a b .d g n
AK PFH 59(1)
A
M
A u g u s t
C h e c k e d b y
D e s ig n e d b y that are shown on the plans.
construction work outside any Right-of-way, Permanent Easement, Temporary Easement
Agreements for Permanent and Temporary Easement Details. Do not do any
See State of Alaska Department of Transportation and Public Facilities Memorandum of
Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
B la k e ly C t.
B e a n C re e k
R a v e n R d
P ta r m ig a n P l
Float and Fish
Kenai River
Kenai Lake
Q u a rtz
C re e k
Rd.
sr et ni w d e s ol c(
Q u a rt z C re e k
N
Cooper Landing
VICINITY MAP
SCALE IN MILES
0.0 0.5
BEGIN PROJECT
END PROJECT
To A nc ho ra ge
WILDLIFE REFUGE
NATIONAL
KENAI
0.25 nL n eblo
H y w
H g nilr et
S naeB
.dR keerC
)sre tni w desolc(
School
Landing
Cooper
Drifters Lodge
Kenai Ri ver ywH gnilretS
Office
US Post y w H gnilr etS
Airport
Quartz Creek ywH gnilretS lP ecaF .S ya W s't su
R
Boat Launch
Old Cooper Landing
Adventures
River
Alaska
Snug Harbor Rd.
Snug Harbor Rd.
S n u g H a rb o r R d
ALASKA
ALASKA
Alaska Heavenly Lodge
ALASKA
Community Library
Cooper Landing
0.25
LEGEND:(Roadway sections) m ile s dr ofl e k c a h S k e er C
RECONSTRUCTION
BEGIN ROADWAY
300+00
END SHOULDER WIDENING
416+40.15 = 300+00
RECONSTRUCTION
END ROADWAY
338+38.82
ROADWAY RECONSTRUCTION
SHOULDER WIDENING
PATHWAY
BEGIN SHOULDER WIDENING
400+00
END PATHWAY
143+43.39 = 400+00
BEGIN PATHWAY
100+00
A.3
STATE PROJECT
NUMBER
SHEET
AK
PFH 59(1)
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 a c .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Shore Lane
Lake
Campus Drive
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1300 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LNFT 100 100
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 4,863 137 5,000
A0160 15801-0000 WATERING FOR DUST CONTROL MGAL 100 100
A0180 20101-0000 CLEARING AND GRUBBING ACRE 7.5 0.5 8.0
A0200 20302-0700 REMOVAL OF FENCE LNFT 45 10 55
A0220 20401-0000 ROADWAY EXCAVATION CUYD 16,377 371 127 16,875
A0240 20402-0000 SUBEXCAVATION CUYD 803 22 825
A0260 20410-0000 SELECT BORROW CUYD 8,327 125 148 8,600
A0280 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(WOVEN) SQYD 23,357 93 23,450
A0300 20703-2000 GEOGRID, STABILIZATION SQYD 822 28 850
A0320 25101-0100 PLACED RIPRAP, METHOD A,
CLASS 1 CUYD 3,205 45 3,250
A0340 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 22 8 30
A0360 25120-0100 RIPRAP DITCH, METHOD A, CLASS
1 LNFT 950 50 1,000
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 4,724 380 96 5,200
A0400 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 1,996 45 59 2,100
A0420 60103-0740 CONCRETE, HEADWALL FOR DOUBLE
60-INCH PIPE CULVERT EACH 2 2
A0440 60201-0600 18-INCH PIPE CULVERT LNFT 752 38 790
A0460 60201-0800 24-INCH PIPE CULVERT LNFT 350 50 400
A0480 60201-1000 36-INCH PIPE CULVERT LNFT 32 8 40
A0500 60201-1100 42-INCH PIPE CULVERT LNFT 34 6 40
A0520 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 1 1
A0540 60210-1100 END SECTION FOR 42-INCH PIPE
CULVERT EACH 1 1
MileStone: 100% Date Completed: In Progress Report Date: 08/27/15
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-A ug
-2
7:
A
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y-w fl.
xl sm
]S he et
STATE PROJECT
PFH 59(1) B.1AK
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0560 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 200 200
A0580 62201-0050 DUMP TRUCK, 5 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A0600 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 18-INCH WIDTH HOUR 40
A0620 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
A0640 62201-1400 BULLDOZER, 250HP MINIMUM
FLYWHEEL POWER HOUR 20
A0660 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 20
A0680 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 20
A0700 62301-0000 GENERAL LABOR HOUR 40
A0720 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 6.1 0.4 6.5
A0740 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 6.1 0.4 6.5
A0760 63302-0000 SIGN SYSTEM SQFT 110 10 120
A0780 63308-0000 OBJECT MARKER EACH 42 42
A0800 63316-1000 REMOVE AND RESET SIGN EACH 15 15
A0820 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 21,916 84 22,000
A0840 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 21,916 84 22,000
A0860 63401-1500 PAVEMENT MARKINGS, TYPE H,
SOLID (WHITE) LNFT 600 600
A0880 63401-2100 PAVEMENT MARKINGS, TYPE K,
SOLID (YELLOW) LNFT 300 300
A0900 63405-0050 PAVEMENT MARKINGS, SYMBOLS
(YIELD AHEAD) EACH 3 3
A0920 63405-0050 PAVEMENT MARKINGS, SYMBOLS
(XING) EACH 4 4
A0940 63405-0050 PAVEMENT MARKINGS, SYMBOLS
(BIKE SYMBOL) EACH 4 4
A0960 63502-1250 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 42-INCH EACH 80 20 100
A0980 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS LNFT 7,676 124 7,800
-A ug -2
7:
A M
MileStone: 100% Date Completed: In Progress Report Date: 08/27/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y-w fl.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
PFH 59(1) B.2AK
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A1000 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 134 26 160
A1020 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 70 70
A1040 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 900 100 1,000
A1060 63704-0000 VEHICLE EACH 1
-A ug -2
7:
A M
MileStone: 100% Date Completed: In Progress Report Date: 08/27/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y-w fl.
xl sm
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
PFH 59(1) B.3AK
TYPICAL SECTION
LC
NO SCALE
100+00 to 143+43.39
12" Select borrow
%1- %1+
%0.1- %0.1+
4' 4'2' Aggregate 2' Aggregate shouldershoulder
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
C le a r in g l im it s
C le a r in g l im it s
1:1 .5
1:2
1'
1'
FOOTNOTE:
limits establishment
Turf limits establishment
Turf
E x is ti n g
S n u g H a r b o r R o a d
R
W
Distance varies concrete pavement
2" Asphalt
Pathway Pathway
4" Roadway aggregate, method 2 class 1, type C (woven)
Separation-stabilization geotextile, PATHWAY
Construct slopes as shown in the Staking Report.
to be outsloped towards Snug Harbor Road.
Slopes are reversed from 100+00 to 103+60 to allow the trail
S lo p e s ta k e s
S lo p e s ta k e s
C.1
STATE PROJECT
P
J a n u a r y
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 c a .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
NO SCALE
12" Select borrow
400+00 to 416+40.15
Traveled way Traveled way
10'10' 4'
CUT SLOPE
ROUNDING DETAIL
C le a r in g l im it s
Va ria ble
D
C o n s tr u c ti o n l im it s
C le a r in g l im it s
5'
Tu rf es ta bli sh m en t l im its
Slope stake
0.25 D
Existing pavement
SHOULDER WIDENING
Shoulder Shoulder
R
W
R
W
Distance varies
B = 5'
5' 5'
SAFETY EDGE DETAIL
Red top
Point available in survey notes
Pull aggregate base to cover safety edge
Aggregate base course
Asphalt concrete pavement
Match existing superelevation vertical and tack
Saw cut
4" Roadway aggregate, method 2
12" Select borrow
4" Roadway aggregate, method 2
2" Asphalt concrete pavement 2" Asphalt concrete pavement
.5
FOOTNOTE:
3 See Cut Slope Rounding Detail.
Construct slopes as shown in the Staking Report.
proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than "B", reduce "B" to the cut height
S lo p e s ta k e s vertical and tack
Saw cut
4'2'
C le a r in g l im it s
S lo p e s ta k e typ
2:
1:
ty p.
C.2
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 c b .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Match existing superelevation 1:4
Distance varies
Turf establishment limits c o n s tr u c ti o n l im it s
S lo p e S ta k e
S lo p e S ta k e
S lo p e S ta k e
NO SCALE
1:2 class 1, rock blanket
Placed riprap, for surfacing detail
See Sheet C.3
FOOTNOTE:
Existing ground
1' Ditch
V a r ia b le
LC
326+75 to 328+00
322+50 to 324+00
314+50 to 315+00
1:2 for surfacing detail
See Sheet C.3
328+00 to 328+25
324+00 to 324+25
306+00 to 312+50
3.4' class 1, rock blanket
Placed riprap, SAFETY EDGE DETAIL
Red top
Point available in survey notes
Pull aggregate base to cover safety edge
Aggregate base course ditch, class 1
Riprap
.4
Asphalt concrete pavement for variances.
See Standard 602-6, Pipe Culvert Inlet Treatment in Cut Slopes
See Cut Slope Rounding Detail.
Construct slopes as shown in the Staking Report.
plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated on the and reduce the front slope rounding distance proportionally.
For cut heights less than "B", reduce "B" to the cut height dimension
Construct riprap (rock blanket) as shown in the cross sections.
CLASS 1 (rock blanket), TYPE A
PLACED RIPRAP, METHOD A,
CLASS 1 (rock blanket), TYPE B
PLACED RIPRAP, METHOD A,
1' Ditch
C.3
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 c c .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
1:
5'
C le a r in g l im it s stimil tnemhsilbatse fr uT
1' beyond edge of pavement seirav epolS
R
W excavation
Conserved
1:2
1:4
LC
12" Select borrow
Traveled way Traveled way
CUT SLOPE
ROUNDING DETAIL
C le a r in g l im it s
Va ria ble
2'
C le a r in g l im it s
Tu rf e st ab lis hm en t lim it s
5' 5'
1' beyond edge of pavement
4'10'
-2.000%-2.000%
10'4'
ShoulderShoulder
ROADWAY RECONSTRUCTION
1:
ty pi ca l
R
W concrete pavement
2" Asphalt
4" Roadway aggregate, method 2
C le a r in g l im it s
C o n s tr u c ti o n l im it s
10'
Distance varies
R
W
(typ.)
Distance varies
Slope stake
0.25 D
B = 10'
D
Profile grade point
Existing ground class 1, type C (woven)
Separation-stabilization geotextile, Distance varies
-1.604%
1:
1:
1.
5'Distance varies
R
W
C le a r in g l im it s
S lo p e s ta k e l im it s
Shoulder
4'
319+50 to 323+00
316+00 to 317+00
313+00 to 313+50
309+50 to 310+50
333+50 to 334+50
328+25 to 329+25
324+50 to 326+75
Slope varies
317+50 to 319+00
314+00 to 315+50
311+00 to 312+50
308+00 to 309+00
335+00 to 338+38
329+50 to 330+00
327+00 to 328+00
323+25 to 324+50 class 1, type C (woven) geotextile, Separation-stabilization
306+00 to 307+50
300+00 to 304+00
NO SCALE
1:2 1:4
LC
Traveled way Traveled way
304+00 to 306+00
SUBEX TYPICAL SECTION
2% Slope, (min)
DETAIL
1:
-4.400%
Profile grade point
Shoulder Shoulder concrete pavement
2" Asphalt
SAFETY EDGE DETAIL
Red top
Point available in survey notes
Pull aggregate base to cover safety edge
Aggregate base course
Asphalt concrete pavement
CL_SG
-4.400% aggregate, method 2
4" Roadway
2% Slope
(min.)
10'4' 4'10'
4'
12" Solid outlet pipe underdrain system
12" Perforated pipe geotextile, class 1, type c (woven) separation-stablization
Line bottom of excavation with separation-stabilization geotextile geogrid-stabilization on op of seablization geogrid. Place
Line bottom excavation
See Sheet D.10 for details
Riprap ditch, method A, class 1.
12" Ø perforated collector pipe Geotextile filter, class 2, type A or B
Granular backfill6"
24"
Fl ow
UNDERDRAIN SYSTEM DETAILS
12" PERFORATED PIPE
12" Perforated pipe
" mesh openings2 1" x 2
1approximately screen, No. 17 gage wire, drain pipe with galvanized wire
Cover outlet end of solid outlet
12" perforated pipe
12" elbow, 90°
12" soild outlet drain pipe end of 12" perforated pipe
Place 12" end cap on upper
FOOTNOTE:
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated and prevent soil from entering the connection joints.
the solid outlet pipe that allow unobstructed flow to the outlet
Provide connections between the perforated collector pipe and channel @ 304. Bevel end.
Install outlet drain pipe thru embankment to daylight at existing shallowest location measured at
36" Select borrow is
C.4
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 c d .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b
QUANTITIES
TABULATION OF PLAN
FOOTNOTE:
2 Includes 1,558 SQYD for riprap ditch sections.
Includes 1,020 CUYD for subexcavation at 304+00 to 306+00.
D.1
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d a .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b
O
T
.0
P C
.8
P T
.1
P
C
.9
PT 103+
75.96
PC
4+ .7
P T
.5
P C
.1
P T
.4
.2
.2
10' VC
.0
20' VC
.0
18' VC
.4
20' VC
.6
30' VC
.2
20' VC
.9
16' VC
.1
20' VC
.4
40' VC
.0
.3
2' VC
.8
10' VC
.9
15' VC
.4
20' VC
.8
20' VC
40' VC
+3.2
+0.5094% +3.2
-1.1667%
-0.5000%
-3.0000%
-1 .3
+4.0
0%
-1.0845% -5.4820%
+1.562 5%
+4.2
2% +2.25
21% -1.5000%
+0.5238%
-0.5000%
-0.9091%
N Line to be constructed
Slope stake limits
100+00.00
El=454.27
E=1674209.5407
N=2371302.5438
Existing ground
Profile grade
CP
GPS
SNUG2
CP
12101
12" Select borrow
Existing surface
CONNECTION DETAIL
0+00, 103+92, 104+37, 143+39, 338+38
R= 10.00'
T= 11.11'
L= 16.76'
D
R= 10.00'
T= 9.29'
L= 14.97'
D
L= 184.28'
T= 93.65'
R= 420.00'
D
R= 500.00'
T= 4.15'
L= 8.30'
D
I n s ta ll
C
M P
Y A
W H
GI
H
G
NIL
R
ET
S
DA
OR
R
OBRA
H G
U
NS
concrete pavement 2" Asphalt
UTILITY CONTACT:
(907) 563-2003
Tel Alaska
Telephone:
(907) 563-7494
Chugach Electric Association (CEA)
Public Utility Department:
Saw cut and tack method 2 4" Roadway aggregate, PATHWAY
BEGIN
Edge of path
100+00 to 143+43.39
PATHWAY
PLAN AND PROFILE
Clearing limits
CUYD
EXC.
CUYD
EMB.
107+50105+00102+50100+00
430 430
435 435
440 440
445 445
450 450
455 455
460 460
465 465
470 470
D.2
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d b .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b
.5
20' VC
.0
20' VC
.0
100' VC
.2
40' VC
7.
.7
7.
-4.3333%
-6.1333%
.3
40' VC
.5
40' VC
.4
50' VC
.4
20' VC
.2
40' VC
.7
30' VC
.2
50' VC
.3
40' VC
+5.
+2.11 11%
-5.0000%
-2.1429%
-1.2000% +0.4167%
6.
P C
.1
P
T
.4
P C
.7
P R
C
.9
P T
.6
P C
.6
P R
C
.9
P T
.5
P C
.7
P T
.1
P C
.2
P T
.6
N
Line to be constructed
Existing ground
Profile grade
Profile grade475
I n s ta ll
C
M P
CP
12102
12103
CUYD
EXC.
CUYD
EMB.
122+50 120+00 117+50115+00 112+50 110+00107+50
440 470
445 475
450 480
455 485
460 490
465 495
470 500
475 505
480 510
40 173
L= 53.74'
T= 26.90'
R= 500.00'
D
L= 56.19'
T= 28.13'
R= 500.00'
D
L= 43.22'
T= 21.62'
R= 500.00'
D
R= 500.00'
T= 20.32'
L= 40.61'
D R= 500.00'
T= 35.29'
L= 70.47'
D R= 500.00'
T= 53.43'
L= 106.46'
D
100+00 to 143+43.39
PATHWAY
PLAN AND PROFILE
Curve= MOD31
D
R= 500.00'
T= 4.15'
L= 8.30' existing culvert under roadway pvc pipe that runs through
Preserve and protect existing
Slope stake limits
D.3
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d c .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Existing ground
.0
40' VC
.8
40' VC 1
.1
10' VC
.9
50' VC
.6
30' VC
.7
20' VC
.2
10' VC
.9
10' VC
.4
10' VC
.6
10' VC
.0
20' VC
.8
40' VC
.9
20' VC
.6
10' VC
.3
16' VC
.9
24' VC
.8
40' VC
.2
20' VC
.3
30' VC
.2
10' VC
.9
10' VC
.2
40' VC
.4
40' VC
.8
10' VC
.4
8' VC
.0
30' VC
.5
40' VC
20' VC
-4.6727% +4.
+2.00 00%-1.9958%
+4.
-4.7273%
-0.4182%
+1.97 92%
+2.30 00%
+5.
+4.
+3.6
2%
+2.34 00%
+3.8
1%
+2.30 00%
+3.3
+3.7
3% +5.
%-1.7308%
+2.6
7.
+2.20 00%
+0.5000% +2.10
00% +4.
+0.5263% +2.6
+0.5091%
-0.7000%
P C
.6
P R
C
.1
P T
.1
P C
.9
P R
C
.3
P T
.1
P C
.7
P R
C
.3
P T
.9
5 P
C
.8
P R
C
.2
P T
.7
P C
.9
P R
C
.4
P T
.8
P C
.7
P R
C
.0
P T
.5
P C
.2
P R
C
.0
P T
.5
P C
.7
P R
C
.2
P T
.7
P C
.8
P R
C
.3
P T
.9
P C
.2
P R
C
.1
P T
.9
P C
.6
P R
C
.3
P T
.2
Line to be constructed
CP
12104
CP
12105
CP
12106 stake limits
Slope
I n s ta ll
C
M P
11 129
L= 24.56'
T= 12.28'
R= 400.00'
D
L= 26.95'
T= 13.48'
R= 400.00'
D
L= 26.38'
T= 13.50'
R= 50.00'
D
T= 13.17'
L= 25.75'
D
R= 50.00' T= 13.17'
L= 25.75'
D
R= 50.00'
L= 25.56'
T= 13.07'
R= 50.00'
D
L= 25.61'
T= 13.09'
R= 50.00'
D
L= 25.42'
T= 12.99'
R= 50.00'
D
T= 13.02' L= 25.47'
D
R= 50.00'
L= 25.45'
T= 13.01'
R= 50.00'
D
L= 25.47'
T= 13.02'
R= 50.00'
D
L= 25.39'
T= 12.98'
R= 50.00'
D
T= 12.99'
L= 25.41'
D
R= 50.00'
R= 50.00'
T= 12.16'
L= 23.86'
D
L= 23.45'
T= 11.95'
R= 50.00'
D
L= 26.52'
T= 13.58'
R= 50.00'
D
T= 13.03'
L= 25.49'
R= 50.00'
D
L= 26.52'
T= 13.58'
R= 50.00'
D
R= 50.00'
T= 13.06'
L= 25.56'
D
L= 26.97'
T= 13.82'
R= 50.00'
D
T= 13.72'
L= 26.78'
D
R= 50.00'
R= 50.00'
T= 13.14'
L= 25.71'
D
L= 25.88'
T= 13.24'
R= 50.00'
D
See Sheet G.1
Install 18" culvert.
124+18
See Sheet G.1
Install 18" culvert.
126+27
See Sheet G.1
Install 18" culvert.
128+50
See Sheet G.1
Install 18" culvert.
132+17
See Sheet G.1
Install 18" culvert.
134+83
100+00 to 143+43.39
PATHWAY
PLAN AND PROFILE
CUYD
EXC.
CUYD
EMB.
137+50 135+00 132+50130+00 127+50 125+00122+50
480 480
485 485
490 490
495 495
500 500
505 505
510 510
515 515
520 520
TCP-2A
Parcel: Station:
TCP-2A
126+10 RT
123+75 RT
Don't cut trees in TCP-2A area without CO approval
Avoid well house, garage pad by 3-feet.
D.4
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d d .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Memorandum of Agreement conditions:
.1
20' VC
.4
20' VC
.8
40' VC
.6
20' VC
.5
.1
20' VC
.4
20' VC
.3
10' VC
.2
40' VC
.2
20' VC
.7
20' VC
.6
+0.3889% -5.6481% -0.3500%
+1.82 86%
-0.7877%
-1.2923% +1.86
67%
+4.
-5.5556%
-3.9477%
-4.2708%
20' VC
P O
T
.0
P I
.8
N
I n s ta ll
C
M P
El=515.66
E=1678200.8739
N=2370543.9542
Profile grade
Existing ground constructed
Line to be
12107
143+43.39 = 400+00
L= 24.13'
T= 12.30'
R= 50.00'
D
L= 23.46'
T= 11.95'
R= 50.00'
D
L= 25.21'
T= 12.88'
R= 50.00'
D
D
R= 50.00'
T= 12.53'
L= 24.55'
L= 25.34'
T= 12.95'
R= 50.00'
D
L= 25.48'
T= 13.02'
D
R= 50.00'
L= 25.10'
T= 12.82'
R= 50.00'
D
L= 25.24'
T= 12.89'
R= 50.00'
D
L= 15.48'
T= 9.78'
R= 10.00'
D
See Sheet G.1
Install 18" culvert.
141+75
See Sheet G.1
Install 18" culvert.
143+37
PATHWAY
END
limits stake
Slope
100+00 to 143+43.39
PATHWAY
PLAN AND PROFILE
CUYD
EXC.
CUYD
EMB.
145+00 142+50 140+00137+50
495 495
500 500
505 505
510 510
515 515
520 520
525 525
530 530
535 535
D.5
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d e .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Install 18" culvert. See Sheet G.1
140+06
Remove fence
140+00
139+70 to
Remove fence
140+15 to 140+30
E=1678097.2294
N=2370041.1695
E=1678200.8739
N=2370556.1337
CP
12108
CP
12109
CP
12110
12111
SHOULDER WIDENING
BEGIN
400+00 to 416+40.15
SHOULDER WIDENING
PLAN AND PLAN
See Sheet G.6 for details concrete headwall.
Construct
143+43.39 = 400+00.00
SHOULDER WIDENING
END
DAOR ROBRAH GUNS
See Sheet G.1
Install 18" culvert.
402+50
See Sheet G.1
Extend 24" culvert.
403+67
See Sheet G.1
Extend 24" culvert
416+26
N
N
416+40.15 = 300+00.00
Slope stake limits
Edge of pavement
Slope stake limits
Edge of pavement
Y A
WHTAP
of Pathway Centerline
Clearing limits
TCP-4
Parcel: Station:
408+00 LT
402+50 RT
TCP-5
TCP-5
TCP-4
Don't move woodpile without CO approval. Don't
Don't cut trees in TCP-4 area without CO approval cut trees in TCP-5 area without CO approval
D.6
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d f.
d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
L A
K E S
H O
R E L
A N
P O
T
.0
P C
.3
P T
.1
P C
.8
P T
.0
P O
T
.3
.5
+0.4348%
.5
250' VC
7.
60' VC
.0
5.
.8
60' VC
7.
N
Slope stake limits
Existing ground
Existing ground
Profile grade
Profile grade
Line to be constructed El=454.40
E=1679517.4498
N=2369819.2060
I n s ta ll
C
M P
R e m o v e
C
M P
300+00.00 to 338+38.82
ROADWAY RECONSTRUCTION
PLAN AND PROFILE
304+00 to 306+00
306+00 to 312+50
See Sheet C.4 for details
Subexcavation.
304+00 to 306+00
Subexcavation
300+00.00 = 416+40.15 e= 0.044
L= 514.82'
T= 291.44'
R= 440.00'
D
D
R= 1,350.00' T= 309.50' L= 608.48' e= 0.024
ROADWAY RECONSTRUCTION
BEGIN
with riprap blanket, class 1
Construct riprap ditch, 306+00 to 312+50
Construct riprap ditch, class 1
303+50 to 306+00
Existing edge of road
Proposed edge of road
Riprap blanket, method A, class 1, type BRiprap ditch, class 1
303+50 to 306+00
T
.1
TCP-8
E-8
Parcel: Station:
301+65 LT
300+75 LT
E-8
TCP-8
CUYD
EXC.
CUYD
EMB.
310+00 307+50 305+00302+50 300+00
445 465
450 470
455 475
460 480
465 485
470 490
475 495
480 500
485 505
D.7
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d g .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Don't move shed or generator bldg without CO approval
Don't cut trees in TCP-8 area without CO approval
800' VC
7.
-5.1605% .8
-5.1605%
7.
100' VC
-1.6981%
.0
.5
100' VC
-6.7283%
140' VC
P C
.8
P T
.3
P C
.0
P T
.2
P C
.6
P T
.7
P C
.8
N
Line to be constructed
Slope stake limits
Existing ground
Profile grade
12114
CP
12115
CP
12116
I n s ta ll
C
M P
R e m o v e
C
M P
I n s ta ll
C
M P
R e m o v e
C
M P
12117
CP
300+00.00 to 338+38.82
ROADWAY RECONSTRUCTION
PLAN AND PROFILED
R= 1,350.00'
T= 309.50'
L= 608.48'
R= 1,205.00'
T= 260.59'
L= 513.27'
D
R= 145.00'
T= 69.18'
L= 129.10'
3,222
1,887
319+00 to 322+00
324+25 to 325+00
306+00 to 312+50 e= 0.024 e= 0.026 e= 0.060
312+50 to 313+00
Riprap ditch, class 1
Riprap ditch, class 1
Riprap ditch, class 1 with riprap blanket, class 1
Construct riprap ditch
306+00 to 312+50 without riprap ditch, class 1
Construct riprap blanket
314+50 to 315+00 class 1Construct riprap ditch, 319+00 to 322+00 without riprap ditch, class 1
Construct riprap blanket
322+50 to 324+00 with riprap blanket, class 1
Construct riprap ditch
324+00 to 324+25
Construct riprap ditch, class 1
324+25 to 325+00
Riprap blanket, method A, class 1, type B
324+00 to 324+25
Existing edge of road
Proposed edge of road class 1Construct riprap ditch, 312+50 to 313+00
Riprap blanket, method A, class 1, type B
Riprap blanket, method A
322+50 to 324+00 class 1, type A
CUYD
EXC.
CUYD
EMB.
325+00 322+50 320+00317+50 315+00 312+50310+00
505 490
510 495
515 500
520 505
525 510
530 515
535 520
540 525
545 530
D.8
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d h .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
314+50 to 315+00 class 1, type A
Riprap blanket, method A, W
.5
P C
.8
P T
.3
P C
.4
P T
.4
P C
.0
P T
.9
P C
.7
P T
.7
P O
T
.8
.0
-2.9646%
.6
100' VC
-4.6001%
140' VC
.7
+0.7606%
+0.7606%
.8
.1
.9
-5.0264%
-3.4870%
100' VC
100' VC
N
Profile grade
Existing ground
338+38.82
El=473.95
E=1682414.1728
N=2367728.6932
Slope stake limits
I n s ta ll
C
M P
R e m o v e
C
M P
I n s ta ll
C
M P
R e m o v e
C
M P
I n s ta ll
C
M P
R e m o v e
C
M P
CUYD
EXC.
CUYD
EMB.
340+00337+50335+00332+50330+00327+50325+00
460 460
465 465
470 470
475 475
480 480
485 485
490 490
495 495
500 500
300+00.00 to 338+38.82
ROADWAY RECONSTRUCTION
PLAN AND PROFILE
D
R= 145.00'
T= 76.63'
L= 141.00'
D
R= 385.00'
T= 255.28'
L= 450.84'
D
R= 250.00'
T= 98.73'
L= 188.05'
D
R= 220.00'
T= 78.86'
L= 151.44'
336+00 to 337+00
328+00 to 328+25 e= 0.060 e= 0.046 e= 0.054 e= 0.056
328+25 to 330+00
Riprap ditch, class 1
Riprap ditch, class 1
ROADWAY RECONSTRUCTION
END
without riprap ditch, class 1
Construct riprap blanket
326+75 to 328+00 with riprap blanket, class 1
Construct riprap ditch
328+00 to 328+25
Construct riprap ditch, class 1
328+25 to 330+00
Construct riprap ditch, class 1
336+00 to 337+00
Existing edge of road
Proposed edge of road
326+75 to 328+00 type A method A, class 1, Riprap blanket, Riprap blanket, mehtod A, class 1, type B
Line to be constructed
Clearing limits
D.9
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d i.
d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b
1:2 m in
336+00 to 337+00
328+25 to 330+00
324+25 to 325+00
319+00 to 322+00
312+50 to 313+00
303+50 to 306+00
D.10
STATE PROJECT
NUMBER
SHEET
B .B a s e .U
S c m y fi le s p w p r o d u c ti o n d
W o r k d d .c e l
AK PFH 59(1)
M a y
C h e c k e d b y
D e s ig n e d b y
DETAIL
RIPRAP DITCH
NO SCALE
for surfacing detail
See Sheet C.3
Riprap, class 1 geotextile, class 1, type C (woven)
Separation-stablization
4'
GPK FILE DATED July 2013
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION
12101 2370974.283 1674508.694 457.099 60ー29'23.38339" 149ー48'39.44228" 457.099 0.999877460 5/8"IR W/ FHWA ALUM CAP
12102 2370789.068 1675082.252 464.259 60ー29'21.54284" 149ー48'28.00357" 464.259 0.999877160 5/8"IR W/ FHWA ALUM CAP
12103 2370488.184 1675893.111 500.653 60ー29'18.55583" 149ー48'11.83522" 500.653 0.999875482 5/8"IR W/ FHWA ALUM CAP
12104 2370461.735 1676451.484 487.096 60ー29'18.27877" 149ー48'00.69091" 487.096 0.999876174 5/8"IR W/ FHWA ALUM CAP
12105 2370499.021 1676958.380 497.405 60ー29'18.63075" 149ー47'50.57029" 497.405 0.999875722 5/8"IR W/ FHWA ALUM CAP
12106 2370512.757 1677500.290 513.969 60ー29'18.74948" 149ー47'39.75214" 513.969 0.999874974 5/8"IR W/ FHWA ALUM CAP
12107 2370493.780 1677977.438 518.407 60ー29'18.54781" 149ー47'30.22878" 518.407 0.999874802 5/8"IR W/ FHWA ALUM CAP
12108 2370521.439 1678478.148 509.790 60ー29'18.80452" 149ー47'20.23214" 509.79 0.999875258 5/8"IR W/ FHWA ALUM CAP
12109 2370328.566 1678918.575 502.039 60ー29'16.89092" 149ー47'11.45307" 502.039 0.999875666 5/8"IR W/ FHWA ALUM CAP
12110 2370217.958 1679414.542 473.711 60ー29'15.78560" 149ー47'01.56028" 473.711 0.999877063 5/8"IR W/ FHWA ALUM CAP
12111 2369952.689 1679597.292 455.516 60ー29'13.16703" 149ー46'57.92989" 455.516 0.999877948 5/8"IR W/ FHWA ALUM CAP
12112 2369574.118 1679675.214 455.518 60ー29'09.43594" 149ー46'56.39951" 455.518 0.999877954 5/8"IR W/ FHWA ALUM CAP
12113 2369321.212 1679885.808 475.404 60ー29'06.93818" 149ー46'52.21287" 475.404 0.999877021 HUB & TACK
12114 2369191.810 1680466.413 516.089 60ー29'05.64455" 149ー46'40.63306" 516.089 0.999875126 5/8"IR W/ FHWA ALUM CAP
12115 2369052.780 1680731.398 529.130 60ー29'04.26641" 149ー46'35.35359" 529.13 0.999874526 5/8"IR W/ FHWA ALUM CAP
12116 2368845.311 1680972.055 529.823 60ー29'02.21497" 149ー46'30.56448" 529.823 0.999874514 5/8"IR W/ FHWA ALUM CAP
12117 2368700.893 1681472.533 511.888 60ー29'00.77566" 149ー46'20.58561" 511.888 0.999875415 5/8"IR W/ FHWA ALUM CAP
12118 2368377.832 1681925.446 489.240 60ー28'57.57832" 149ー46'11.56876" 489.24 0.999876539 5/8"IR W/ FHWA ALUM CAP
12119 2367988.249 1682036.112 481.710 60ー28'53.73749" 149ー46'09.38736" 481.71 0.999876909 HUB & TACK
12120 2367551.157 1682620.261 465.702 60ー28'49.41226" 149ー45'57.76041" 465.702 0.999877728 5/8"IR W/ FHWA ALUM CAP
12121 2367285.320 1682781.343 462.764 60ー28'46.78837" 149ー45'54.56472" 462.764 0.999877883 5/8"IR W/ FHWA ALUM CAP
SNUG1 2371205.963 1673829.042 454.818 60ー29'25.68424" 149ー48'52.99665" 454.818 0.999877519 5/8"IR W/ FHWA ALUM CAP
SNUG2 2371245.376 1674246.733 454.873 60ー29'26.06077" 149ー48'44.65619" 454.873 0.999877547 Damaged verify position before using
SNUG3 2367771.542 1682431.763 480.214 60ー28'51.58942" 149ー46'01.50660" 480.214 0.999877016 5/8"IR W/ FHWA ALUM CAP
SNUG4 2367711.339 1682181.944 489.332 60ー28'51.00515" 149ー46'06.49640" 489.332 0.999876557 5/8"IR W/ FHWA ALUM CAP
Note:
PROJECT : SNUG HARBOR ROAD
DATE OF FIELD WORK : 9/2012
DATE OF FINAL ADJUSTMENT : 7/2013
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : SPCS NAD83(2011); AK Zone 4
EPOCH DATE : 2011
VERTICAL DATUM : NAVD88 based on Geoid 12A
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
STATE PROJECT
PFH 59(1) D.11AK
c:
\m yf ile s\ pw _p ro du ct io n\ d0
S nu g2 _C nt rl S he et .x ls x]
Sh ee t 3-
N ov
-2
:5
L.
G ob le
7/
A .D av ie s 7/
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
QUANTITES
APPROACH ROAD
TABULATION OF
E.1
STATE PROJECT
a f0 g a .d g n
U
S I n t2
D
C J o r g e n s o n
C h e c k e d b y
J a c k D o u c e s ig n e d b edarg sseccA*
.xaM ± %2
End pavement
PLAN VIEW
SNUG HARBOR ROAD
Existing ground
12" Select borrow
Landing
Driveway approach
Varies
NO SCALE
of highwayLC existing radius
Match
SECTION A-A
APPROACH PROFILE
of driveway
Paved width
Driveway approach varies
*Access slope max. 15%
STATIONS 100+00 - 143+43
TYPICAL SECTION
DRIVEWAY APPROACH
8' 10' Landing4'4'
A A
R = 50' R = 50'
2' Aggregate shoulder
2' Aggregate shoulder
2' Aggregate shoulder
2' Aggregate shoulder
*Access grade
LC
~10' ~10'
R = 50'R = 50'
T r a v e le d w d g e o f
Edge of traveled way concrete pavement
2" Asphalt w a y
P a th w a y
P a th way
Path-way
Path-method 2
4" Roadway aggregate, E.2
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 g b .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b edarg ssecc
A* .xaM ± %2
End pavement
PLAN VIEW
SNUG HARBOR ROAD
Driveway approach
NO SCALE
of highwayLC existing radius
Match
APPROACH PROFILE
4' Shoulder
4' Shoulder
2' Apron
2' Apron
4'
Varies
Driveway approach varies edarg sseccA *
STATIONS 400+00 - 416+40
TYPICAL SECTION
DRIVEWAY APPROACH
*Access slope max. 15%
Edge of traveled way
Shldr
Existing ground
12" Select borrow
SECTION A-A
concrete pavement
2" Asphalt method 2
4" Roadway aggregate, A A 10'
Traveled way
E.3
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 g c .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
NOTE:
Do not perform work in permitted areas without CO approval.1.
.xaM ± %2
End pavement
PLAN VIEW
SNUG HARBOR ROAD
Landing
Driveway approach
NO SCALE
of highwayLC existing radius
Match
10'4'
Landing
APPROACH PROFILE
4' Shoulder Driveway approach varies
STATIONS 300+00 - 338+38
TYPICAL SECTION
DRIVEWAY APPROACH
Access grade
Acce ss g rade
Varies
Edge of traveled way
Shldr
4' Shoulder
Existing ground
12" Select borrow
SECTION A-A
concrete pavement
2" Asphalt method 2
4" Roadway aggregate, A A
10'
Traveled way
E.4
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 g d .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Do not perform work in permitted areas without CO approval.1.
1.
QUANTITIES
EROSION CONTROL
TABULATION OF
as needed.
Stationing is approximate, field adjust with the CO approval
F.1
STATE PROJECT
a f0 d a .d g n
U
S I n t2
D
C J o r g e n s o n
C h e c k e d b y c k D o u c s ig n e d b
100+00 TO 112+00
PLANS
EROSION CONTROL
Y A
W H
G I
H G
N I
L R
E T
S
Fiber roll yawhtaP
F.2
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d b .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Clearing limits
Slope stake limits
Edge of Pathway
Slope stake limits
SNUG HARBOR ROAD
SNUG HARBOR ROAD
Existing culvert
Existing culvert
Existing culvert
Existing culvert
Existing culvert
Install fiber rolls
104+50 to 113+40
Install fiber rolls
100+00 to 101+80
Install fiber rolls
102+50 to 103+50
Install fiber rolls
104+50 to 113+40
LEGEND:
Pathway
Wetland boundaries
Existing culvert
Existing culvert
SNUG HARBOR ROAD
Proposed culvert
Existing culvert
Existing culvert
SNUG HARBOR ROAD
112+00 to 126+00
PLANS
EROSION CONTROL
Install fiber rolls
104+50 to 113+40
Install fiber rolls
117+25 to 118+25
Install fiber rolls
118+25 to 119+25
Install fiber rolls
118+25 to 119+25
Install fiber rolls
122+80 to 123+80
Install fiber rolls
124+50 to 126+00
Pathway
Pathway
Fiber roll
F.3
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d c .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Slope stake limits
LEGEND:
Existing culvert
Existing culvert
126+00 to 140+00
PLANS
EROSION CONTROL
SNUG HARBOR ROAD
Proposed culvert
Proposed culvert
Clearing limits
Clearing limits
Install fiber rolls
129+70 to 131+80
Install fiber rolls
132+60 to 134+00
Install fiber rolls
132+60 to 134+00 Install fiber rolls
135+50 to 137+50
Install fiber rolls
136+00 to 138+50
Pathway
Pathway
Fiber roll
F.4
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d d .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Slope stake limits
Existing culvert Existing culvert
Existing culvert
140+00 to 143+43.39
PLANS
EROSION CONTROL
Fiber roll
Install fiber rolls
140+50 to 141+35
F.5
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d e .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
5 4
400+00 to 410+00
PLANS
EROSION CONTROL
Existing culvert
Existing culvert
Existing culverts
N
SNUG HARBOR ROAD
SNUG HARBOR ROAD
4' Shoulder
4' Shoulder
Clearing limits
Clearing limits
Clearing limits
Install fiber rolls
402+70 to 403+70
Install fiber rolls
408+50 to 409+50
408+00 to 408+60
Fiber roll
408+00 to 408+60 keerC drofelkcah S keerC drofelkcahS above the stream bottom.
berms with a minimum height of 3-feet minimum flow of 90 cfs. Construct diversion
Shackleford Creek that is able to pass a
Install and maintain a diversion system at 1.
NOTE:
Install fiber rolls
407+10 to 408+10
Install fiber rolls
403+70
402+70 to
Existing culvert
Clearing limits
Slope stake limits
Slope stake limits
4' Shoulder redluohS '4
L A
K E S
H O
R E L
A N
E
F.6
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d f.
d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
410+00 to 416+40.15
PLANS
EROSION CONTROL
SNUG HARBOR ROAD
Existing culvert
Clearing limits
Clearing limits
Install fiber rolls
415+25 to 416+25
Fiber roll
F.7
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d g .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
4' Shoulder
4' Shoulder
300+00 to 312+00
PLANS
EROSION CONTROL
DAOR ROBRAH GUNS
DAOR ROBRAH GUNS
Clearing limits
Clearing limits
Clearing limits
Clearing limits
Edge of travel way
Edge of travel way
Install fiber rolls
300+00 to 300+50
Install fiber rolls
300+73 to 301+77
Install fiber rolls
301+89 to 304+05
Install fiber rolls
304+15 to 305+15 new culvert
Proposed
304+14
Fiber roll
F.8
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d h .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
4' Shoulder
4' Shoulder
4' Shoulder
4' Shoulder
Slope stake limits
Slope stake limits
Slope stake limits
Install fiber rolls
310+00
306+41 to
Install fiber rolls
306+01
304+72 to
6.
312+00 to 326+00
PLANS
EROSION CONTROL
SNUG HARBOR ROAD
SNUG HARBOR ROAD
Proposed new culvert
316+60
Proposed new culvert
321+87
Edge of travel way
Edge of travel way
Clearing limits
Clearing limits
Clearing limits
Install fiber rolls
316+60 to 317+60
Install fiber rolls
320+80 to 321+80
Fiber roll
F.9
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d i.
d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
Clearing limits
4' Shoulder
4' Shoulder
4' S hou lder
4' S hou lder
Slope stake limits
.5
SNUG
HARBOR R
OAD
DAOR ROBRAH GUNS
326+00 to 338+38.82
PLANS
EROSION CONTROL
Proposed new culvert
329+14
Proposed new culvert
331+02
Clearing limits
Clearing limits
Clearing limits
Edge of travel way
Install fiber rolls
328+15 to 329+15
Proposed new culvert
334+02
Fiber roll
F.10
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d j.
d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
4' Sh ou lde r
4' Sh ou lde r
4' Shoulder
4' Shoulder
Slope stake limits
Slope stake limits
Slope stake limits
Slope stake limits
Edge of travel way
331+00
330+00 to
Install fiber rolls
334+10 to 335+10
C A
M P
U S D
R I V
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
REVISED:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
FIBER ROLL
W157-21
119.5'
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5"
J u ly
U
C m y fi le s p w p r o d u c ti o n d a f0 d k .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
F.11 PFH 59(1) AK
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area s
10.4 x 16 15705 -1300
25101 -0200
60103 -0740
60201 -0600
60201 -0800
60201 -1000
60201 -1100
60210 -1000
60210 -1100
63308 -0000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
S O
IL
E
R O
S
IO
N C
O N
TR
L, TE
PO
R A R Y
D
IV
ER
S
IO
H
A N
N
EL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
C O
N C R
ET
E, H
EA
D
W A
LL
F
R
U B
LE
0-
IN
C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
EN
D
S
EC
TI
O
N F
O R
6-
IN
PI
PE
C
U
LV
ER
T
EN
D
S
EC
TI
O
N F
O R
2-
IN
PI
PE
C
U
LV
ER
T
O B
JE
C T
M A R K
ER
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT CUYD EACH LNFT LNFT LNFT LNFT EACH EACH EACH Lt Rt
102+45 2 11 80 2 P Trail 118+24 3 1 34 1 2 25 P Trail, install end section on outlet 124+18 2 12 84 2 P Driveway 126+27 2 14 86 2 P Driveway 128+50 2 8 76 2 P Driveway 132+17 2 9 68 2 P Driveway 134+83 2 10 92 2 P Driveway 136+69 3 6 26 2 P Trail 137+67 4 1 32 1 2 15 P Trail, install end section on outlet 140+06 2 10 86 2 P Driveway 141+75 2 15 100 2 5 P Driveway 143+37 2 6 30 2 P Driveway
402+50 2 4 50 2 P Driveway 403+67 2 4 10 2 Extension 408+15 2 4 100 22 2 Headwall 416+26 2 4 10 2 Extension
304+00 3 20 60 2 25 P Inlet Treatment, type I 316+60 4 10 44 2 P Inlet Treatment, type I 321+87 5 22 46 2 8 P Inlet Treatment, type I 329+14 5 17 52 2 8 P Inlet Treatment, type I 331+02 5 17 52 2 P Inlet Treatment, type I 334+02 5 24 50 2 7 P Inlet Treatment, type I
PROJECT TOTAL 229 100 22 2 752 350 32 34 1 1 42
Allowable Pipe Material P Plastic
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
G.1 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D ra in ag e.
xl sx
]S he et
-J ul
-2
:2
PM
J.
D ou ce y
/2
C
Jo rg en so n
/2
D es ig ne d by
C he ck ed b y:
NUMBER
PFH 59(1)AK
METAL PIPE CULVERT
602-1
3" x 1" CORRUGATIONS
INCHES INCHES
INCHES MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
3" x 1" CORRUGATIONS 3" x 1" CORRUGATIONS5" x 1" CORRUGATIONS
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
METAL THICKNESS (INCH/GAGE)
METAL THICKNESS (INCH/GAGE)METAL THICKNESS (INCH/GAGE)
INCHES INCHES INCHES INCHES INCHES INCHESINCHES
0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/100.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
3.5 analysis by the CO.
Fill heights exceeding 100 feet require special
INCHES
" CORRUGATIONS2
1" x 3
22" CORRUGATIONS2
1" x 3
" CORRUGATIONS2
1" x 3
22 " CORRUGATIONS2
1" x 3
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
G.2
PROJECT
a f0 e b .d g n
U
S C u s to m a r y
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL ROUND PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
DIAMETER
SIZE
PIPE
COVER
MINIMUM
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
pavement.
the pavement for both flexible and rigid height from the top of the pipe to the top of for rigid pavements. Measure maximum fill pavements, and to the top of the pavement pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular helical lockseam and welded seam pipe.
corrugations are more restrictive than those of heights for culvert pipe with annular lockseam and welded seam pipe only. Fill
The fill heights in the table are for helical
4.
3.
2.
1.
gradient.
amount of camber or increase the pipe culvert elevation of the inlet invert, reduce the parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward
SPAN x RISE
SIZE
PIPE ARCH
SPAN x RISE
SIZE
PIPE ARCH
COUPLING BAND
METAL PIPE CULVERT
602-2
3 x 1
5 x 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 x 64 to 142 x 91
60 x 46 to 81 x 59
87 x 64 to 142 x 91
60 x 46 to 81 x 59
49 x 33 to 83 x 57
17 x 13 to 42 x 29
INCHES INCHES INCHES
MINIMUM BAND WIDTH (INCHES)
1 x 2
1 x 3
10.5
10.5
10.5
10.5
10.5
10.5
10.5
" for 21" round culvert (24" x 18" pipe arch) or more2
" for 18" round culvert (21" x 15" pipe arch) or less8 diameter of bolt:
0.052 inch for steel or 0.048 inch for aluminum. Fasten coupling bands with the following thicknesses thinner than the thickness of the pipe to be connected, and no thinner than as the connecting pipe. Provide coupling bands not more than 3 nominal sheet
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal rerolled with 3" x 1" pipe corrugations.
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" x 3
2ends rerolled with 2 having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on pipe
Use annular corrugated bands with pipes having annular corrugations or with helical pipe steel, or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
less. Use a matching metal having a nominal thickness of not less than 0.040 inch for
Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or
" corrugations on rerolled pipe ends.2 1" x 3
2sizes apply to 2
The minimum band widths shown for 3" x 1" and 5" x 1" corrugated
42" diameter to 42" diameter, required above
Second angle connection optional
42" diameter to 42" diameter, required above
Second angle connection optional
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
G.3
PROJECT
a f0 e c .d g n
U
S C u s to m a r y
COUPLING BANDS FOR METAL PIPE CULVERT
Band Band
SLEEVE JOINT
Stab type joint
Smoother sleeve with center stop.
SMOOTH SLEEVE BAND FLAT BAND
W
SIDE VIEW
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W W
SIDE VIEW SIDE VIEW
Band Angle
Oval Lug
Bar & Strap
Wedge and Strap
Wedge
Integral Flange
STANDARD BAND CONNECTIONS
Bolts
Angle
END VIEW
ANNULAR BAND
Bolts
Angle
END VIEW
HELICAL BAND
strap connector
Bolt, bar and
Pipe
Band
END VIEW
SEMI-CORRUGATED BAND
NOTE:
Band Bolts Band Bolts
W
4 5 underdrain 6 2.
1.
Section 26 may be used.
specifications for Highway Bridges, Division II performance criteria of AASHTO Standard devices that comply with the joint
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless the dimension of the end corrugation in the pipe.
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to
Use helical corrugated bands with pipes having helically corrugated ends.
PipePipe
BandBand heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest
SPAN x RISE
PIPE ARCH
BANDS
CORRUGATED
ANNULAR
BANDS
CORRUGATED
HELICALLY
BANDS
CORRUGATED
SEMI-
SIZE
CORRUGATION
DIAMETER
ROUND PIPE
DRAFT: 2/2009
REVISED: 4/1994 6/2005
602-5
PLASTIC PIPE CULVERT
12 57
66.5
63.5
45.5
24.5
14.5
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET) INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)
INCHES
DIMENSIONS
INCHES
DIAMETER
INCHES
DIAMETER
INCHES MAXIMUM FILL HEIGHT (FEET)HEIGHT (FEET)
MAXIMUM FILL
INCHESINCHES
DIAMETER
MAXIMUM FILL HEIGHT (FEET)INCHESINCHES
DIAMETER 1.4771.2921.3851.1540.9230.8570.607
MINIMUM WALL THICKNESS (INCHES)
MINIMUM WALL THICKNESS (INCHES)
0.358 0.438 0.358 0.438
STATE PROJECT
NUMBER
SHEET
G.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
F e b r u a r y
U m y fi le s p w p r o d u c ti o n d a f0 e d .d g n
PFH 59(1) AK
NO SCALE
POLYVINYL CHLORIDE (PVC) PLASTIC ROUND PIPE CULVERT
PLASTIC PIPE END SECTION
SIDE
TOP
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 3350
SMOOTH WALL (SOLID WALL) CORRUGATED RIBBED
SIZE
PIPE
SIZE
PIPE
SIZE
PIPE
SIZE
PIPE
FILL HEIGHT TABLE AND MINIMUM CELL CLASSIFICATION NUMBER PER ASTM D 1784
SMOOTH WALL (SOLID WALL) RIBBED
SIZE
PIPE
NUMBER 335434C
CELL CLASSIFICATION
NO. 435400C
CELL CLASS.
NO. 335434C
CELL CLASS.
COVER
MINIMUM
NO. 12454
CELL CLASS.
NO. 12364
CELL CLASS.
COVER
MINIMUM
NO. 12454C
CELL CLASS.
NO. 12364C
CELL CLASS.
SIZE
PIPE
A
C
D
B
NOTE:
COVER
MINIMUM
NO. 334433C
CELL CLASS.COVER
MINIMUM
COVER
MINIMUM
A B C D
FRONT
END SECTION DIMENSIONS
POLYETHYLENE (PE) PLASTIC ROUND PIPE CULVERT
and rigid pavement.
pipe to the top of the pavement for both flexible
Measure maximum fill height from the top of the to the top of the pavement for rigid pavements.
culvert to the subgrade for flexible pavements, and
Measure minimum cover from the top of the pipe of camber or increase the pipe culvert gradient.
the elevation of the inlet invert, reduce the amount elevation on the parabolic curve as designed exceeds
Develop camber on a parabolic curve. If the midpoint ordinate amount equal to 1% of the pipe length.
a chord through the inlet and outlet inverts an
When directed, camber pipe culverts upward from
2.
30"
24"
18"
7'
6'
5'
602-6
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET
1'
1'
(min.)
4' d ip a t c e n te r
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .