PROJECT_DESCRIPTION_AK_PFH_59(1) _Snug_Harbor_Road.docx
DOCX document 38 KB Posted
- Solicitation number
- DTFH70-15-B-00007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_SnugHarbor.pdf | ||
| A003_SnugHarbor.pdf | ||
| A002_SnugHarbor.pdf | ||
| Q A.pdf | ||
| BikeTrail_xs.pdf | ||
| GM_21-13.pdf | ||
| GravelSection_xs.pdf | ||
| SnugHarbor_xs.pdf | ||
| IFB_SnugHarbor.pdf | ||
| Plan_Request_form_SnugHarbor.pdf | ||
| Snug_Harbor_PS E_Set_27_August_2015_updated.pdf | ||
| SWPPP_AK_PFH_59(1) _Snug_Harbor_Paving_and_Bike_trail.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK PFH 59(1), Snug Harbor Paving and Bike Trail, Kenai Peninsula Borough, Alaska
The work consists of grading, excavation, embankment, drainage, base placement, asphalt concrete paving, riprap walls, concrete headwalls, signage, striping and other small items of work.
Project length: 1.8 Miles
Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $2 million to $3 million
Location: Approximately 75 miles S of Anchorage, Alaska
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
One Schedule Sch Name
DIVISION 150 – Project Requirements
| 152 Construction Survey & Staking (yes/no) |
| Yes |
| 153 Contractor Quality Control and Assurance |
(yes/no)
| Yes |
| 154 Contractor Sampling & Testing (yes/no) |
| Yes |
| 155 Schedules for Construction Contracts (construction schedules) (yes/no) |
| Yes |
| 157 Soil Erosion & Sediment Control (erosion control devices) |
Temp. Diversion Channel Fiber Roll 100lnft 5000lnft
| 158 Watering for Dust Control |
| 100m-gal |
DIVISION 200 – Earthwork
| 201 Clearing & Grubbing |
| 7.2acre |
| 204 Excavation & Embankment |
| 13,200cuyd |
| 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) |
| Select |
| 207 Earthwork Geosynthetics |
Geogrid 23,450sqyd 850sqyd
204 Subexcavation 204 Select Borrow 825cuyd 8450cuyd
DIVISION 250 – Slope Reinforcement and Retaining Walls
| 251 Riprap |
| 3130cuyd |
| 251 Riprap Ditch |
| 1,000lnft |
DIVISION 300 – Aggregate and Base Courses
| 302 Minor Crushed Aggregate |
| 5,200ton |
DIVISION 400 – Asphalt Pavements & Surface Treatments
| 403 Asphalt Concrete |
| 2,075ton |
DIVISION 600 – Incidental Construction
| 601 Minor Concrete Structures (concrete – minor structures) |
| 2 Headwalls |
602 Culverts & Drains (indicate one or both) 18inch Culvert 24inch Culvert 36inch Culvert 42inch Culvert 790lnft 400lnft 40lnft 40lnft
| 605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which) |
| 200lnft |
| 621 Monuments & Markers (construction survey & staking) (yes/no) |
| Select |
| 622 Rental Equipment (yes/no) |
| Yes |
| 623 General Labor (yes/no) |
| Yes |
| 625 Turf Establishment |
(indicate seeding or mulching separately) Seeding Mulch 6.0acre 6.0acre
634 Permanent Pavement Markings (traffic pavement markings) Pavement Symbols 45,000lnft 11each
| 635 Temporary Traffic Control – Flagger |
| 1,000hrs |
| 635 Temporary Traffic Control – Supervisor |
| 70days |
637 Facilities & Services (field offices, laboratories, & housing) Vehicle 1each