PROJECT_DESCRIPTION_AK_PFH_59(1) _Snug_Harbor_Road.docx

DOCX document 38 KB Posted

Attached to
AK PFH 59(1), Snug Harbor Road Paving and Bike Trail
Solicitation number
DTFH70-15-B-00007
Issued by

View the file

Other files

File Type Posted
BidSum_SnugHarbor.pdf PDF
A003_SnugHarbor.pdf PDF
A002_SnugHarbor.pdf PDF
Q A.pdf PDF
BikeTrail_xs.pdf PDF
GM_21-13.pdf PDF
GravelSection_xs.pdf PDF
SnugHarbor_xs.pdf PDF
IFB_SnugHarbor.pdf PDF
Plan_Request_form_SnugHarbor.pdf PDF
Snug_Harbor_PS E_Set_27_August_2015_updated.pdf PDF
SWPPP_AK_PFH_59(1) _Snug_Harbor_Paving_and_Bike_trail.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK PFH 59(1), Snug Harbor Paving and Bike Trail, Kenai Peninsula Borough, Alaska

The work consists of grading, excavation, embankment, drainage, base placement, asphalt concrete paving, riprap walls, concrete headwalls, signage, striping and other small items of work.

Project length: 1.8 Miles

Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $3 million

Location: Approximately 75 miles S of Anchorage, Alaska

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

One Schedule Sch Name

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no)
Yes
153 Contractor Quality Control and Assurance

(yes/no)

Yes
154 Contractor Sampling & Testing (yes/no)
Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no)
Yes
157 Soil Erosion & Sediment Control (erosion control devices)

Temp. Diversion Channel Fiber Roll 100lnft 5000lnft

158 Watering for Dust Control
100m-gal

DIVISION 200 – Earthwork

201 Clearing & Grubbing
7.2acre
204 Excavation & Embankment
13,200cuyd
205 Blasting Consultant (Consultant/Engineering Services) (yes/no)
Select
207 Earthwork Geosynthetics

Geogrid 23,450sqyd 850sqyd

204 Subexcavation 204 Select Borrow 825cuyd 8450cuyd

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap
3130cuyd
251 Riprap Ditch
1,000lnft

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate
5,200ton

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete
2,075ton

DIVISION 600 – Incidental Construction

601 Minor Concrete Structures (concrete – minor structures)
2 Headwalls

602 Culverts & Drains (indicate one or both) 18inch Culvert 24inch Culvert 36inch Culvert 42inch Culvert 790lnft 400lnft 40lnft 40lnft

605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which)
200lnft
621 Monuments & Markers (construction survey & staking) (yes/no)
Select
622 Rental Equipment (yes/no)
Yes
623 General Labor (yes/no)
Yes
625 Turf Establishment

(indicate seeding or mulching separately) Seeding Mulch 6.0acre 6.0acre

634 Permanent Pavement Markings (traffic pavement markings) Pavement Symbols 45,000lnft 11each

635 Temporary Traffic Control – Flagger
1,000hrs
635 Temporary Traffic Control – Supervisor
70days

637 Facilities & Services (field offices, laboratories, & housing) Vehicle 1each