A003_SnugHarbor.pdf

PDF 90 KB Posted

Attached to
AK PFH 59(1), Snug Harbor Road Paving and Bike Trail
Solicitation number
DTFH70-15-B-00007
Issued by

About this file

Amendment A003

View the file

Other files

File Type Posted
BidSum_SnugHarbor.pdf PDF
A002_SnugHarbor.pdf PDF
Q A.pdf PDF
BikeTrail_xs.pdf PDF
GM_21-13.pdf PDF
GravelSection_xs.pdf PDF
SnugHarbor_xs.pdf PDF
IFB_SnugHarbor.pdf PDF
Plan_Request_form_SnugHarbor.pdf PDF
Snug_Harbor_PS E_Set_27_August_2015_updated.pdf PDF
SWPPP_AK_PFH_59(1) _Snug_Harbor_Paving_and_Bike_trail.pdf PDF
PROJECT_DESCRIPTION_AK_PFH_59(1) _Snug_Harbor_Road.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A003 10/16/15 N/A AK PFH 59(1)

SNUG HARBOR ROAD PAVING

AND BIKE TRAIL

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-15-B-00007

9B. DATED (SEE ITEM 11)

9/17/15

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK PFH 59(1), SNUG HARBOR ROAD PAVING AND BIKE TRAIL

Amendment A003 is issued to revise the following:

BID SCHEDULE

Page A-9. Revises quantity for Bid item 20703-2000 Geogrid, Stabilization

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

A - 7

Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule

Project No:AK PFH 59(1)

Project Name:Snug Harbor Road Paving and Bike Trail

A - 8

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

ALL LPSM $___LPSM_____ $____________

A0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0120 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

100 LNFT $____________ $____________

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

5,000 LNFT $____________ $____________

A0160 15801-0000 WATERING FOR DUST CONTROL

100 MGAL $____________ $____________

A0180 20101-0000 CLEARING AND GRUBBING

8.0 ACRE $____________ $____________

A0200 20302-0700 REMOVAL OF FENCE

55 LNFT $____________ $____________

A0220 20401-0000 ROADWAY EXCAVATION

16,875 CUYD $____________ $____________

A0240 20402-0000 SUBEXCAVATION

825 CUYD $____________ $____________

A0260 20410-0000 SELECT BORROW

8,600 CUYD $____________ $____________

A0280 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (WOVEN)

23,450 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 9

A0300 20703-2000 GEOGRID, STABILIZATION

1,400 SQYD $____________ $____________

A0320 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

3,250 CUYD $____________ $____________

A0340 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

30 CUYD $____________ $____________

A0360 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1

1,000 LNFT $____________ $____________

A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2

5,200 TON $____________ $____________

A0400 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

2,100 TON $____________ $____________

A0420 60103-0740 CONCRETE, HEADWALL FOR DOUBLE 60-INCH PIPE CULVERT

2 EACH $____________ $____________

A0440 60201-0600 18-INCH PIPE CULVERT

790 LNFT $____________ $____________

A0460 60201-0800 24-INCH PIPE CULVERT

400 LNFT $____________ $____________

A0480 60201-1000 36-INCH PIPE CULVERT

40 LNFT $____________ $____________

A0500 60201-1100 42-INCH PIPE CULVERT

40 LNFT $____________ $____________

A0520 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

1 EACH $____________ $____________

A0540 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT

1 EACH $____________ $____________

A0560 60501-0000 STANDARD UNDERDRAIN SYSTEM

200 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:AK PFH 59(1)

Project Name:Snug Harbor Road Paving and Bike Trail

Leeann.Bush Typewritten Text A003

Leeann.Bush Typewritten Text

Leeann.Bush Typewritten Text

A - 10

A0580 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY

40 HOUR $____________ $____________

A0600 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,

18-INCH WIDTH

40 HOUR $____________ $____________

A0620 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY

40 HOUR $____________ $____________

A0640 62201-1400 BULLDOZER, 250HP MINIMUM FLYWHEEL POWER

20 HOUR $____________ $____________

A0660 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

20 HOUR $____________ $____________

A0680 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM

CAPACITY WITH THUMB ATTACHMENT

20 HOUR $____________ $____________

A0700 62301-0000 GENERAL LABOR

40 HOUR $____________ $____________

A0720 62510-2000 SEEDING, HYDRAULIC METHOD

6.5 ACRE $____________ $____________

A0740 62515-2000 MULCHING, HYDRAULIC METHOD

6.5 ACRE $____________ $____________

A0760 63302-0000 SIGN SYSTEM

120 SQFT $____________ $____________

A0780 63308-0000 OBJECT MARKER

42 EACH $____________ $____________

A0800 63316-1000 REMOVE AND RESET SIGN

15 EACH $____________ $____________

A0820 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)

22,000 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 11

A0840 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)

22,000 LNFT $____________ $____________

A0860 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID (WHITE)

600 LNFT $____________ $____________

A0880 63401-2100 PAVEMENT MARKINGS, TYPE K, SOLID (YELLOW)

300 LNFT $____________ $____________

A0900 63405-0050 PAVEMENT MARKINGS, SYMBOLS (YIELD AHEAD)

3 EACH $____________ $____________

A0920 63405-0050 PAVEMENT MARKINGS, SYMBOLS (XING)

4 EACH $____________ $____________

A0940 63405-0050 PAVEMENT MARKINGS, SYMBOLS (BIKE SYMBOL)

4 EACH $____________ $____________

A0960 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

100 EACH $____________ $____________

A0980 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

7,800 LNFT $____________ $____________

A1000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

160 SQFT $____________ $____________

A1020 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

70 DAY $____________ $____________

A1040 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER

1,000 FXHR $77.00 $77,000.00

A1060 63704-0000 VEHICLE

1 EACH $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:AK PFH 59(1)

Project Name:Snug Harbor Road Paving and Bike Trail

Leeann.Bush Typewritten Text

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A003