A002_SnugHarbor.pdf
PDF 1 MB Posted
- Solicitation number
- DTFH70-15-B-00007
About this file
Amendment A002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_SnugHarbor.pdf | ||
| A003_SnugHarbor.pdf | ||
| Q A.pdf | ||
| BikeTrail_xs.pdf | ||
| GM_21-13.pdf | ||
| GravelSection_xs.pdf | ||
| SnugHarbor_xs.pdf | ||
| IFB_SnugHarbor.pdf | ||
| Plan_Request_form_SnugHarbor.pdf | ||
| Snug_Harbor_PS E_Set_27_August_2015_updated.pdf | ||
| SWPPP_AK_PFH_59(1) _Snug_Harbor_Paving_and_Bike_trail.pdf | ||
| PROJECT_DESCRIPTION_AK_PFH_59(1) _Snug_Harbor_Road.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 10/15/15 N/A AK PFH 59(1)
SNUG HARBOR ROAD PAVING
AND BIKE TRAIL
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-15-B-00007
9B. DATED (SEE ITEM 11)
9/17/15
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK PFH 59(1), SNUG HARBOR ROAD PAVING AND BIKE TRAIL
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 10-15-15 AK PFH 59(1) Solicitation No. DTFH70-15-B-00007 Snug Harbor Road Paving and Bike Trail
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-9. Revises quantity for Bid item 20703-2000 Geogrid, Stabilization
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision G-6 Table 714-1 Adds Table
PLANS
Plan sheet #B.1 Revises quantity for Bid item 20703-2000 Geogrid, Stabilization Plan sheet #C.1 Adds new section Plan sheet #C.4 Revises call out in typical section Plan sheet #D.1 Revises quantity for Bid item 20703-2000 Geogrid, Stabilization
ENCLOSURES
Pages:
G-6
Plan Sheets:
B.1 C.1 C.4 D.1
Notice to Bidders: Please submit revised pages A-7 through A-11 with your bid.
G-6 DIVISION 700
Special Contract Requirements Project: AK PFH 59(1), Snug Harbor Road Paving and Bike Trail
Section 714. — GEOTEXTILE AND GEOCOMPOSITE DRAIN
MATERIAL
714.01. Geotextile. Delete Table 714-1 and substitute the following:
Table 714-1 Separation and Stabilization Geotextile and Geotextile Filter Requirements (1)
Strength and Durability Properties Property Test
Method
ASTM
Units Class 1 Class 2
Type of Geotextile Woven Nonwoven Woven Nonwoven Elongation at break D4632 % < 50 ≥ 50 < 50 ≥ 50 Minimum grab strength
D4632 lb (N) 250 (1110)
(890)
(1110)
(710)
Minimum sewn seam strength
D4632 lb (N) 290 (1290)
(800)
(980)
(620)
Minimum tear strength
D4533 lb (N) 100 (445)
(360)
(400)
(240)
Minimum puncture strength
D6241 lb (N) 620 (2760)
(1910)
(2220)
(1380)
Minimum ultraviolet stability
D4355 % 50% retained strength after 500 hours of exposure
Hydraulic Properties Property Test
Method
ASTM
Units Type A Type B Type C Type D Type E
Minimum permittivity
D4491 s-1 0.7 0.5 0.2 0.1 0.1
Maximum apparent opening size
(AOS)
D4751 Sieve size U.S.
(mm)
No. 40 (0.425)
No. 40 (0.425)
No. 60 (0.250)
No. 40 (0.425)
No. 70 (0.212)
(1) Do not use woven slit film geotextile.
714.03 Geogrid (Biaxial). (Added Subsection).
Modify Table 714-4 as follows:
Change the minimum opening size from ½ in (13mm) to 1-inch (25mm).
Section 718. — TRAFFIC SIGNING AND MARKING
MATERIAL
718.05 Object Marker and Delineator Posts. Add the following:
(d) Plastic. Resistant to ultraviolet light, ozone and hydrocarbon damage and remain flexible at a temperature of minus 40 °F. Provide posts with reflectors that are capable of self-erecting and remaining serviceable after 5 head-on impacts of 55 mph and 10 impacts at 35 mph with an automobile at an air temperature of plus 40 °F.
Revised by Amendment A002
Sheet and Description
Section C Section D Section E Section F Section G Section H Section I
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1300 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LNFT 100 100
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 4,863 137 5,000
A0160 15801-0000 WATERING FOR DUST CONTROL MGAL 100 100
A0180 20101-0000 CLEARING AND GRUBBING ACRE 7.5 0.5 8.0
A0200 20302-0700 REMOVAL OF FENCE LNFT 45 45
A0220 20401-0000 ROADWAY EXCAVATION CUYD 16,377 371 127 16,875
A0240 20402-0000 SUBEXCAVATION CUYD 803 22 825
A0260 20410-0000 SELECT BORROW CUYD 8,327 125 148 8,600
A0280 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C,
WOVEN SQYD 23,357 93 23,450
A002 A0300 20703-2000 GEOGRID, STABILIZATION SQYD 1,355 45 1,400
A0320 25101-0100 PLACED RIPRAP, METHOD A,
CLASS 1 CUYD 3,205 45 3,250
A0340 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 22 8 30
A0360 25120-0100 RIPRAP DITCH, METHOD A, CLASS
1 LNFT 950 50 1,000
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 4,724 380 96 5,200
A0400 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 1,996 45 59 2,100
A0420 60103-0740 CONCRETE, HEADWALL FOR DOUBLE
60-INCH PIPE CULVERT EACH 2 2
A0440 60201-0600 18-INCH PIPE CULVERT LNFT 752 38 790
A0460 60201-0800 24-INCH PIPE CULVERT LNFT 350 50 400
A0480 60201-1000 36-INCH PIPE CULVERT LNFT 32 8 40
A0500 60201-1100 42-INCH PIPE CULVERT LNFT 34 6 40
A0520 60210-1000 END SECTION FOR 36-INCH PIPE
CULVERT EACH 1 1
A0540 60210-1100 END SECTION FOR 42-INCH PIPE
CULVERT EACH 1 1
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-O ct -2
:3
A M
C
M yF ile s\
Pr oj ec ts
\S nu g H ar bo r\ Am en dm en t_
2\
[S nu gH ar bo r_
EE
-A m en dm en t_ 2.
xl sx
]S he et
STATE PROJECT
B.1PFH 59(1)AK
SHEET
NUMBER
TYPICAL SECTION
NO SCALE
1:2 1:4
LC
Traveled way Traveled way
304+00 to 306+00
SUBEX TYPICAL SECTION
2% Slope, (min)
DETAIL
1:
-4.400%
Profile grade point
Shoulder Shoulder concrete pavement
2" Asphalt
SAFETY EDGE DETAIL
Red top
Point available in survey notes
Pull aggregate base to cover safety edge
Aggregate base course
Asphalt concrete pavement
CL_SG
-4.400% aggregate, method 2
4" Roadway
2% Slope
(min.)
10'4' 4'10'
4'
12" Solid outlet pipe underdrain system
12" Perforated pipe geotextile, class 1, type c (woven) separation-stablization
Line bottom of excavation with
See Sheet D.10 for details
Riprap ditch, method A, class 1.
12" Ø perforated collector pipe Geotextile filter, class 2, type A or B
Granular backfill6"
24"
Fl ow
UNDERDRAIN SYSTEM DETAILS
12" PERFORATED PIPE
12" Perforated pipe
" mesh openings2 1" x 2
1approximately screen, No. 17 gage wire, drain pipe with galvanized wire
Cover outlet end of solid outlet
12" perforated pipe
12" elbow, 90°
12" soild outlet drain pipe end of 12" perforated pipe
Place 12" end cap on upper
FOOTNOTE:
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated and prevent soil from entering the connection joints.
the solid outlet pipe that allow unobstructed flow to the outlet
Provide connections between the perforated collector pipe and channel @ 304. Bevel end.
Install outlet drain pipe thru embankment to daylight at existing shallowest location measured at
36" Select borrow is
2 Amendment A002
C.4
STATE PROJECT
AK
PFH 59(1)
A
M
O c to b e r
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d a f0 c d .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y separation-stabilization geotextile geogrid-stabilization on top of stabilization geogrid. Place
Line bottom of excavation with
QUANTITIES
TABULATION OF PLAN
FOOTNOTE:
2 Includes 1,558 SQYD for riprap ditch sections.
Includes 1,020 CUYD for subexcavation at 304+00 to 306+00.
Amendment A0022
D.1
STATE PROJECT
A
O c to b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 d a .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
TYPICAL SECTION
LC
NO SCALE
104+00 to 143+43.39
12" Select borrow
%1- %1+
%0.1- %0.1+
4' 4'2' Aggregate 2' Aggregate shouldershoulder
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
C le a r in g l im it s
C le a r in g l im it s
1:1 .5
1:2
1'
1'
FOOTNOTE:
limits establishment
Turf limits establishment
Turf
E x is ti n g
S n u g H a r b o r R o a d
R
W
Distance varies concrete pavement
2" Asphalt
Pathway Pathway
4" Roadway aggregate, method 2 class 1, type C (woven)
Separation-stabilization geotextile, PATHWAY
Construct slopes as shown in the Staking Report.
to be outsloped towards Snug Harbor Road.
Slopes are reversed from 100+00 to 103+60 to allow the trail
S lo p e s ta k e s
S lo p e s ta k e s
C.1
STATE PROJECT
P
J u n e
U
S S u r ft m y fi le s p w p r o d u c ti o n d a f0 c a .d g n
C J o r g e n s o n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b y
LC
12" Select borrow
%1- %1+
%0.1- %0.1+
4' 4'2' Aggregate 2' Aggregate shouldershoulder
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
C le a r in g l im it s
C le a r in g l im it s
1:1 .5
1:2
1'
1' limits establishment
Turf limits establishment
Turf
E x is ti n g
S n u g H a r b o r R o a d
R
W
Distance varies concrete pavement
2" Asphalt
Pathway Pathway
4" Roadway aggregate, method 2 class 1, type C (woven)
Separation-stabilization geotextile, PATHWAY
S lo p e s ta k e s
S lo p e s ta k e s
100+00 to 104+00
2 Amendment A002
Geogrid, stabilization 2
A - 7
Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.
When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:AK PFH 59(1)
Project Name:Snug Harbor Road Paving and Bike Trail
A - 8
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0120 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
100 LNFT $____________ $____________
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
5,000 LNFT $____________ $____________
A0160 15801-0000 WATERING FOR DUST CONTROL
100 MGAL $____________ $____________
A0180 20101-0000 CLEARING AND GRUBBING
8.0 ACRE $____________ $____________
A0200 20302-0700 REMOVAL OF FENCE
55 LNFT $____________ $____________
A0220 20401-0000 ROADWAY EXCAVATION
16,875 CUYD $____________ $____________
A0240 20402-0000 SUBEXCAVATION
825 CUYD $____________ $____________
A0260 20410-0000 SELECT BORROW
8,600 CUYD $____________ $____________
A0280 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (WOVEN)
23,450 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0300 20703-2000 GEOGRID, STABILIZATION
1,355 SQYD $____________ $____________
A0320 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
3,250 CUYD $____________ $____________
A0340 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
30 CUYD $____________ $____________
A0360 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
1,000 LNFT $____________ $____________
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2
5,200 TON $____________ $____________
A0400 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
2,100 TON $____________ $____________
A0420 60103-0740 CONCRETE, HEADWALL FOR DOUBLE 60-INCH PIPE CULVERT
2 EACH $____________ $____________
A0440 60201-0600 18-INCH PIPE CULVERT
790 LNFT $____________ $____________
A0460 60201-0800 24-INCH PIPE CULVERT
400 LNFT $____________ $____________
A0480 60201-1000 36-INCH PIPE CULVERT
40 LNFT $____________ $____________
A0500 60201-1100 42-INCH PIPE CULVERT
40 LNFT $____________ $____________
A0520 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
1 EACH $____________ $____________
A0540 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT
1 EACH $____________ $____________
A0560 60501-0000 STANDARD UNDERDRAIN SYSTEM
200 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:AK PFH 59(1)
Project Name:Snug Harbor Road Paving and Bike Trail
Leeann.Bush Typewritten Text A002
Leeann.Bush Typewritten Text
Leeann.Bush Typewritten Text
A - 10
A0580 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A0600 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
40 HOUR $____________ $____________
A0620 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A0640 62201-1400 BULLDOZER, 250HP MINIMUM FLYWHEEL POWER
20 HOUR $____________ $____________
A0660 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
A0680 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT
20 HOUR $____________ $____________
A0700 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A0720 62510-2000 SEEDING, HYDRAULIC METHOD
6.5 ACRE $____________ $____________
A0740 62515-2000 MULCHING, HYDRAULIC METHOD
6.5 ACRE $____________ $____________
A0760 63302-0000 SIGN SYSTEM
120 SQFT $____________ $____________
A0780 63308-0000 OBJECT MARKER
42 EACH $____________ $____________
A0800 63316-1000 REMOVE AND RESET SIGN
15 EACH $____________ $____________
A0820 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
22,000 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A0840 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
22,000 LNFT $____________ $____________
A0860 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID (WHITE)
600 LNFT $____________ $____________
A0880 63401-2100 PAVEMENT MARKINGS, TYPE K, SOLID (YELLOW)
300 LNFT $____________ $____________
A0900 63405-0050 PAVEMENT MARKINGS, SYMBOLS (YIELD AHEAD)
3 EACH $____________ $____________
A0920 63405-0050 PAVEMENT MARKINGS, SYMBOLS (XING)
4 EACH $____________ $____________
A0940 63405-0050 PAVEMENT MARKINGS, SYMBOLS (BIKE SYMBOL)
4 EACH $____________ $____________
A0960 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
100 EACH $____________ $____________
A0980 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
7,800 LNFT $____________ $____________
A1000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
160 SQFT $____________ $____________
A1020 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
70 DAY $____________ $____________
A1040 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,000 FXHR $77.00 $77,000.00
A1060 63704-0000 VEHICLE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:AK PFH 59(1)
Project Name:Snug Harbor Road Paving and Bike Trail
Leeann.Bush Typewritten Text
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A002 |
File details come from the government source that posted it. Updated .