Plans_3_of_3_MT_PARK_2013(1).pdf
PDF 4 MB Posted
- Attached to
- MT PARK 2013(1) Gardiner Gateway, Phase I Federal contract opportunity
- Solicitation number
- DTFH70-14-R-00010
About this file
Preliminary Plan sheets 3 of 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A003_Gardiner.pdf | ||
| A002_MT_PARK_2013(1)_Part1.pdf | ||
| A002_MT_PARK_2013(1)_Part2.pdf | ||
| A002_MT_PARK_2013(1)_Part3.pdf | ||
| AMENDMENT_A001_Gardiner.pdf | ||
| Plan_Request_for_Internet_Gardiner.pdf | ||
| RFP_Gardiner_.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/gardiner/ | — | |
| Physical_Data_Request_Form_Gardiner.pdf | ||
| Project_Description_MT_PARK_2013(1).pdf | ||
| Prelims_Transmittal_Letter_MT_PARK_2013(1).pdf | ||
| Plans_2_of_3_MT_PARK_2013(1).pdf | ||
| Plans_1_of_3_MT_PARK_2013(1).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N -2% min.
FOOTNOTE:
NOTE:
outlet and connector pipes appurtenances for connecting
Furnish and install fittings and through geotextile
Penetrate outlet pipe
Type I-A geotextile
12"
WALL DRAINAGE DETAIL
2.
1.
WALL DRAINAGE DETAILS
MASONRY FACING
MSE WALL WITH
6"
Select granular backfill
4" dia. wall drain outlet
4" dia. wall collector drain
NO SCALE
layout details.
See Sheets G.__, G.__, G.__, and G.__ for additional drainage draining slope toward wall drain outlets.
Install wall collector drains as shown with a minimum 2% positive
12"
Finished grade
Top of subgrade
Geogrid
Stone masonry
Mortar
4 (typ.)
Geotextile, type I-A (nonwoven)
Triangle tie, (typ.)
18" w e ld e d w ir e f a c e p a y l im it s v a r ie s
M e c h a n ic a ll y s ta b li z e d e a r th w a ll
MSE WALL
Sand, 2" max. depth
Width varies
Stage
S to n e m a s o n r y w a ll f a c in g p a y l im it s v a r ie s
(typ.)
18" Capstone m in
Toe of MSE wall min.
for outlet pipe
Drill hole ground
Existing conserved material
Backfill with suitable
Top of MSE wall and backfill limits
Wall excavation see This sheet for details
Install wall drainage, backfill, all lifts
Select granular m a x
.5 li ft ty p backfill
Structural
Granular backfill
Minimum 6" leveling pad
8"-10" (typ.)
14"
G.4
STATE PROJECT
NUMBER
SHEET
MT
PARK 2013(1)
A
M
J u ly
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d m t-a w d .d g n
C h e c k e d b y
D e s ig n e d b y
6" Topsoil seirav epolS material
Suitable conserved wall facing masonry
Stone
4" to 6" (typ.)
2%
Outlet pipe spacing not to exceed 50-feet.
Cut geotextile and penetrate pipe according to Section 605.
Fasten screen to end of wall drain outlet.
See Sheets G.__ and G.__ for details.
"8 3concrete paver, 8" x 8" x 2
Stage, precast
See Sheet G.8 for details seat wall.
30" Stone masonry and backfill limits Wall excavation
ARY
NOT FOR C
ONSTRUCTIO
N
FOOTNOTE:
NOTE:
Geotextile, type I-A (nonwoven)
12"
Top & bottom
(typ.)
(typ.)
(typ.)
.5 m a x
4' lap
(See tables this sheet)
Top of wall
LC
S e e t a b le s o n t h is s h e e t)
LIFT DIMENSIONS DETAIL
Geogrid (typ.)
NO SCALE
(See Sheet F.X)
Wall excavation, SHEET 1 OF 2
MASONRY FACING DETAILS
MSE WALL WITH
reinforcement length.
Extend select granular backfill a minimum 12-inch past prevent contact between the two layers.
geogrid reinforcement lap and overlaying geogrid layer to
Place a thin layer (2" typ.) of select granular backfill between geogrid reinforcement and geotextile type I-A.
Place a thin layer (2" typ.) of select granular backfill between length.
Extend top course lap to match top course reinforcement design elevation.
Vary thickness of top lift as needed to construct subgrade to the
Stationing shown in the table is along the roadway centerline.
See Sheets F.XX-XX for additional details.1.
Toe of MSE wall W a ll h e ig h t H v a r ie s select granular backfill
Min. 6" leveling pad
Base reinforcement length of base reinforcement
Bottom geotextile to cover full
(Welded wire forms not shown)
Geogrid lap for top course
Reinforcement length (L)
14"
G.5
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a w e .d
C h e c k e d b y
D e s ig n e d b y
18"
Select granular backfill, (all courses)
ARY
NOT FOR C
ONSTRUCTIO
N
SHEET 2 of 2
MASONRY FACING DETAILS
MSE WALL WITH
(ALL LIFTS)
LIFT DETAIL
Top of form
Geogrid
Geotextile, type I-A (nonwoven) wire, typ.
Longitudinal
(PLAN VIEWS)
GEOGRID BUTT DETAIL
Adjacent geogrids
TANGENT WALL FACE
backside without overlap
Butt adjacent geogrids at
Wall face
CURVE LEFT WALL FACE
Adjacent geogrids
Backside overlap acceptable
Wall face
Reinforcement length L
CURVE RIGHT WALL FACE
Adjacent geogrids
Backside separation acceptable
Reinforcement length L
Wall face
(PROFILE VIEW)
WELDED WIRE FORM LAYOUT DETAIL
18"
96"
WELDED WIRE FORM DETAIL
Longitudinal wires
Transverse wires
Top of form
STONE MASONRY ANCHOR DETAIL
masonry
Stone
Mortar
Geogrid type I-A (nonwoven)
Geotextile, Welded wire form Triangle tie
TRIANGLE TIE CONNECTION DETAIL
Welded wire form
Triangle tie
TRIANGLE TIE DETAIL
NOTE:
FOOTNOTE:
2.
1.
wire, (typ.)
Transverse wall face without overlap
Butt adjacent geogrids at wall face without overlap
Butt adjacent geogrids at
Reinforcement length (L) wall face without overlap
Butt adjacent geogrids at
(typ.)
ty p
Average masonry pitch line wire form longitutdinal wire of welded
Attach triangle tie to single
4 x 4 - W4-7 - W4-7
16" O.C. (min.)
Support struts spaced conforming to Subsection 725.34.
-inch diameter galvanized steel triangle wire ties 4 1Provide structure. See Section 620 for additional requirements.
Match stone pattern of existing masonry wall directly adjacent to
1"
96"
6"
" typ.2
6" (max.)
4" (min.)
center spacing, both vertically and horizontally.
Install triangle ties to welded wire forms at 16-inch maximum on designed alignment curvature.
requriements, and field cut bottom transverse wires to meet the
Field cut transverse wires to meet welded wire form layout support strut lengths.
The contractor is responsible for determining the appropriate
4 x 4 - W4-7 x W4-7
Welded wire form
(max.)
1" (mi n.)
G.6
STATE PROJECT
P
A p r il
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a w f.
d
C h e c k e d b y
D e s ig n e d b y spaced 16" O.C. (min.)
No. 4 wire support struts
40" min.
60" max.
form joints, typ.
Stagger welded wire
Machine direction)
(roll
Machine direction)
(roll
NO SCALE
Underlying mats
Return mat 4' min.
Wall end or wall edge at multiple lifts
18"
Uniaxial geogrid
Welded wire form (see detail this sheet) length (L)
Uniaxial geogrid reinforcement
RETURN MAT DETAIL
MSE WALL FACING AND
8"-10" bend transverse wires
Connect reinforcement or
ARY
NOT FOR C
ONSTRUCTIO
N
FRONT VIEW
PLAN (B-B)
R o w h e ig h ts v a r y
B B
A A
18"-20"
Varies
(approx.)
2" Mortar 24"-30"
G.7
STATE PROJECT
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a w g .d
C h e c k e d b y
D e s ig n e d b y
(approx.)
2" Mortar
NO SCALE
(typ.)
18" Capstone
SECTION C-C
C
C
12"
T h ic k
Varies 4"-5"
Stone relief
2"
10"
1" Mulch
4" Topsoil seira V
V a r ie s
S to n e r e li e f
BOTTOM ROW ONLY
PLAN (A-A)
TYPICAL SECTIONS
MSE WALL VENEER
ARCH PARK STAGE
ARY
NOT FOR C
ONSTRUCTIO
N
NO SCALE
END WALL DETAILS
ARCH PARK STAGE
2'-9"
3" (typ.)
2'-9"
3" (typ.)
2'-9"
2'-9"width x 6" depth Capstone
2'-9"width x 6" depth Capstone
2'-9" width x 6" depth Capstone
See Sheet G.4 for details MSE Wall, 12"
Varies 4"-5"
Stone relief
2"
10"
1" Mulch
4" Topsoil seiraV
2'-9"width x 6" depth Capstone
Stage
See Sheet ___ for details Stone masonry pillar, Slope -2%
2-inch depth Concrete pavers, 1-inch depth Sand leveling course, 2'-2"
1'-1"
6"
See Sheet ___ for details Stone masonry pillar, G.8
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a w g a .d
C h e c k e d b y
D e s ig n e d b y
ARY
NOT FOR C
ONSTRUCTIO
N
LOOP DRIVEWAY
YELLOWSTONE ASSOCIATION
N (saw cut existing sidewalk)
Construct stone curb stone curb
Construct Construct retaining wall
Construct seat wall
Yellowstone National Park
North Boundary
ARCH
HOUSE
YELLOWSTONE
ASSOCIATION
402+55 to 402+97, LT
Construct planter, furnish and place topsoil, 6-inch depth
Construct stone masonry, seatwall (20-inch height) masonry pillar (3' X 3')
Construct stone
4'3'16'3'
4'4' masonry, pillar (4' x 4')
Construct stone
3'
3'
Construct stone masonry, seatwall, 20-inch height
Construct stone masonry seatwall, (20-inch height)
"4
20'-
"8 521'-
"16 940'-
2. See G_ Sheets for sidewalk and curb details.
1. See Section F for Wall Quantities and Details.
NOTE:
F.8
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a w g b .d
R J o h n s o
W
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
R=16.5'
W.PARK ST. (PSWØ3)
EXISTING WALL
CONNECTION TO
NEED TO SHOW
EXISTING WALL
CONNECTION TO
NEED TO SHOW
SECTION A
S E
C T I O
N
SECTION B
SECTION B
SECTION C
SECTION C
SECTION D
SECTION D
(3' X 3') masonry, pillar
Construct stone
6-inch depth and place topsoil, Construct planter, furnish
403+73 to 404+03, LT
Concrete stone masonry, pillar, (3' X 3') seatwall, (20-inch height)
Construct stone masonry, ARY
NOT FOR C
ONSTRUCTIO
N
"8 313'-5
SECTION C'-C' SECTION A'-A'
SECTION A-A
SECTION B-B
G.10a
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a w g c .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
MODIFICATIONS
COBBLE STONE WALL
ARCH HOUSE
Proposed stone masonry pillar
1" mulch
4" topsoil
Proposed cobble wall
Proposed stone masonry pillar
Existing cobble wall
Existing stairs sidewalk grade
Finished sidewalk grade
Finished
A'
A'
Yellowstone Association
Existing cobble wall at corner of
Yellowstone Association
Existing cobble wall at corner of excavated backfill
Fill with suitable
"8 313'-5
Extend handrail
C'
C'
Existing cobble wall
Proposed cobble wall
SECTION C-C
12"
4'
12"
5'-10"
4'
ARY
NOT FOR C
ONSTRUCTIO
N
P C
.4
9 4
G.11
STATE PROJECT
C h e c k e d b y
D e s ig n e d b y
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a w i.
d g n
LAYOUT PLAN
PLAZA
YA PEDESTRIAN
ARY
NOT FOR C
ONSTRUCTIO
N
G.12
STATE PROJECT
C h e c k e d b y
D e s ig n e d b y
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a w ia .d g n
PLAN
LOT BUMPOUT LAYOUT
PARK STREET PARKING
ARY
NOT FOR C
ONSTRUCTIO
N
P O
T
.9
P O
C
G.13
STATE PROJECT
C h e c k e d b y
D e s ig n e d b y
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a w ib .d g n
LAYOUT PLAN
PEDESTRIAN PLAZA
ENTRANCE SIGN
ARY
NOT FOR C
ONSTRUCTIO
N
FOOTNOTE:
pattern of Roosevelt Arch at a location to be determined by the CO.
Provide stones and construct a stone pattern to match the stone
POCKET PARK
STONE MASONRY SEATWALL
(20-INCH HEIGHT)
Excavation slope
Concrete footing, 6" depth
Bed course, 6" depth
#4 rebar, spaced 24" OC epoxy rebar in stone cap
Drill 1"Ø x 2" bore hole
Backfill material
9"
4" asphalt pavement
Concrete sidewalk or
:1 S lo p e
3" typ.
with flat top
4" stone masonry cap
1'-6"
(6"x8"x10")
Concrete masonry units
(6"x8"x16")
Concrete masonry units veneer facing
Stone masonry
:1 S lo p e
Excavation slope
ENTRANCE SIGN
STONE MASONRY SEATWALL
(36-INCH HEIGHT)
Excavation slope
Concrete footing, 6" depth
Bed course, 6" depth
#4 rebar, spaced 24" OC
Backfill material
9"
4" asphalt pavement
Concrete sidewalk or1 :1 S lo p e
3" typ.
Concrete masonry units (6"x8"x10")
1'-6"
Stone masonry facing
:1 S lo p e
Excavation slope
PARKING LOT
YELLOWSTONE ASSOCIATION
G.8
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a w m .d
C h e c k e d b y
D e s ig n e d b y epoxy rebar in stone cap
Drill 1"Ø x 2" bore hole with flat top
4" stone masonry cap
(6"x8"x16")
Concrete masonry units seirav epolS
1" mulch
4" topsoil ex ca va te d m at er ia l
Ba ck fil l w ith s ui ta bl e
#4 rebar (typ.)
#4 rebar (typ.)
STONE MASONRY SEATWALL
(52-INCH HEIGHT)
Excavation slope
Concrete footing, 6" depth
Bed course, 6" depth asphalt pavement
Concrete sidewalk or
:1 S lo p e
Concrete masonry units (6"x8"x10")
Stone masonry facing
:1 S lo p e epoxy rebar in stone cap
Drill 1"Ø x 2" bore hole with flat top
4" stone masonry cap
(6"x8"x16")
Concrete masonry units
#4 rebar (typ.)
1' -6"
24"
Construct sidewalk, concrete 4-inch depth
4"
3" typ.
9"
SEATWALL DETAILS
parking area
Association paved
Proposed Yellostone slope
Excavation
YELLOWSTONE ASSOCIATION LOOP DRIVEWAY
YELLOWSTONE ASSOCIATION LOOP DRIVEWAY
W. PARK ST
YELLOWSTONE ASSOCIATION PEDESTRIAN PLAZA
material
Suitable excavated
2 Fill all voids and CMU cells with grout.
epoxy rebar in stone cap
Drill 1"Ø x 2" bore hole
Backfill material with flat top
4" stone masonry cap
(6"x8"x16")
Concrete masonry units veneer facing
Stone masonry
#4 rebar, spaced 24" OC
YELLOWSTONE ASSOCIATION LOOP DRIVEWAY
COBBLE STONE FACING
COBBLE S
TONE F
ACI
NG
UPDATE T
O
SHOW
Association loop driveway building frontage. See detail this sheet.
Construct cobble stone facing on seatwalls along Yellowstone
ARY
NOT FOR C
ONSTRUCTIO
N
NO SCALE
3" (typ.)
2'-9"
See Sheet ___ for details Stone masonry pillar, PILLAR DETAILS
ARCH PARK STAGE
G.8
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a w g b .d
C h e c k e d b y
D e s ig n e d b
ARY
NOT FOR C
ONSTRUCTIO
N
1.
2.
3.
4.
5.
6.
7.
Fencing (all types)
Pavers
Square cone curb @ ADA ramps
Snow pole holders
Stone inlay rumble strip
(see Gibbon Falls project)
All curb transitions
Wayside exhibits (change to
WY YELL 10(16) Sheet W.11)
OUTSTANDING DETAILS
NO SCALE
Match top of curb grade
FOOTNOTE:
See Sheet X.X for Plan locations.
expansion joint filler non-extruding
" preformed 4 3 to concrete surface
Apply broom finish
6" x 6" W4.0 x W4.0 WWF
SHEET 1 OF 4
ROADWAY DETAILS
ADJACENT TO CONCRETE CURBING
SIDEWALK, CONCRETE, (4-inch DEPTH)
MASONRY EDGING
ADJACENT TO STONE CURBING AND
SIDEWALK, CONCRETE, (4-inch DEPTH)
Match top of curb grade
Stone masonry curb.
See Sheet x.x for details to concrete surface
Apply broom finish
6" x 6" W4.0 x W4.0 WWF ground
Match existing
Roadway structure.
See Section C for details
Roadway structure
See Section C for details
Sidewalk, concrete, 4" depth
Bed course, 4" depth
6" Bed course
3" Crushed base course See G_Sheets concrete, 11' depth (sloping).
Construct curb and gutter
H.1
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a h a .d
A h la
E a g le T e a m
C h e c k e d b y
D e s ig n e d b y
Match top of curb grade
6" Bed course
Match top of curb grade
Stone masonry curb.
See Sheet x.x for details
4" preformed non-extruding expansion joint filler
6" Bed course
See Section C for details
Roadway structure, non-extruding expansion joint filler
" preformed4
Width Varies
Sidewalk, concrete, 4" depth 4" preformed non-extruding expansion joint filler
4" depth
Bed course, Variable
ARY
NOT FOR C
ONSTRUCTIO
N
Road structure, see C Sheets
Road structure, see C Sheets
Expansion joint
DETAIL
NO SCALE
(SLOPED)
CONCRETE, 12-INCH DEPTH
CURB AND GUTTER,
R
R
1"
24"
(see Note 2)
3" Crushed base course, 6" Bed course
DETAIL
12"
6"
Concrete sidewalk
"2
R1
R
"2
24"
(SLOPED)
CONCRETE, 12-INCH DEPTH
CURB AND GUTTER,
Face of curb
12" DEPTH
STONE CURB, TYPE 1,
3" Bed course
.8
.1
8.9"
SHEET 2 OF 4
ROADWAY DETAILS
H.2
STATE PROJECT
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a h b .d
C h e c k e d b y
D e s ig n e d b y at ADA ramp sidewalk
Concrete
Curb, concrete
6" Bed course
6"
STONE MASONRY INLAY
12" DEPTH
CURB, CONCRETE,
" above gutter lip4 1" to 8
1to be
Finished street surface " above gutter lip 4
1" to 8 surface to be
Finished street
45°0'
6"
AT ADA RAMPS
SIX INCH CURB BREAK
3"
Sidewalk Grade
12-inch depth concrete, Construct, curb, (see Note 2) base course
3" Crushed
Sidewalk Grade
AT ADA RAMPS
CURB BREAK
STONE MASONRY
18-inch depth stone, type 1, Construct curb, ARY
NOT FOR C
ONSTRUCTIO
N
CORNER TRANSITION
TO SQUARE CONCRETE CURB
SLOPED CONCRETE CURB
TRANSITION
STONE CURB TO SQUARE CURB
grade at the ADA ramp
Cut/ Shape stone masonry curbing to match
Curb, stone, type 1, 18-inch depth
Curb, concrete, 12-inch depth
Curb, concrete, 12-inch depth (sloped)
Curb, concrete, 12-inch depth
1:101:10
Curb, stone, type 1, 18-inch depth
1:10 1:101
ADA RAMP
STONE CURB TRANSITION AT
SHEET 2a OF 4
ROADWAY DETAILS
H.2a
STATE PROJECT
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a h b a .d
C h e c k e d b y
D e s ig n e d b
ARY
NOT FOR C
ONSTRUCTIO
N
NO SCALE
SHEET 3 OF 4
ROADWAY DETAILS
A
A
5'-0"
Transition
Transition
Drive approach
Slo pe /4 " p er '-0
5'- 0" C ur bwalk
C-lin e
B-lin e Va rie s
1'
Joint (only when placed by curb machine)
No joint
No joint
" slope2
" lip2
Property line
"2
C-line
B-line
End of flair section
Optional bottom of concrete
C u r b w a lk
NOTE:
2.
1.
slabs (not to exceed 100 square feet surface).
Provide rectangular joint pattern dependent on width of on center, #4 rebar 2-feet in length.
machine is allowed by the engineer with dowelling 2-feet
Approach will be placed monolithically except when curb
(WITH FLAIR SECTIONS)
CURB WALK DRIVE APPROACH DETAIL
SECTION A-A
B
B
Transition
Transition
Alley approach
Slo pe /4 " p er '-0
5'- 0" C ur bwalk
C-lin e
B-lin e Va rie s
1'
No joint
" slope2
" lip2
Property line
"2
C-line
B-line
End of flair section
Optional bottom of concrete
(WITH FLAIR SECTIONS)
CURB WALK ALLEY APPROACH DETAIL
SECTION B-B
driveway width does not change.
Tapers shall be 5-feet in length. Standard
Approach will be placed monolithically.
nioj noitcartnoC nioj noitcartnoC
" max.2
Invert 2" min.
5'
5'
Varies
5'-0"
20'-0"
5'-0"
5'-0"
" max.2 12" min., 4
Invert alley approach
NOTE:
surfaces or landings.
Locate drainage inlets and manholes outside of ramp walking
-inches.2 that are flush and free of abrupt vertical changes not to exceed
Construct ramp transitions between walks, gutters, or streets exclusive of the detectable warning fields.
create a slip resistant surface on concrete ramp surfaces, Use a coarse broom finish running perpendicular to the slope to in any direction.
The maximum cross slopes of ramps must not exceed 2%
(flow line)
Center line of alley
3.
4.
H.3
STATE PROJECT
A p r il
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a h c .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b
ARY
NOT FOR C
ONSTRUCTIO
N
SHEET 4 OF 4
ROADWAY DETAILS
m in
5' m in.
4' m in.
5' m in.
14' Ram p
A
A
Radius point
Back of walk
5' m
in. 5' m in
3' m in
Curb turn gutter bottom
Face of determined by engineer
Ramp location to be
PLAN
X-line
Back of walk
Top of curb
Flow line
RAMP - FRONT
5' min.4' min.5' min.
Walk
Landing - 4' min.Ramp - 6' min. slope 1" per 1'-0" max.Gutter
" per 1' max.4 1Slope
X-lineNo lip
" per 1' max.4 1Slope
RAMP SECTION A-A
3" Gravel base
ACCESSIBILITY RAMP DETAIL
double gutter.
" above edges of4 1" to 8
1Finished street surface to be design requirements of individual applications.
The width with proportional invert may vary to satisfy the epoxy coated #4 rebar. 2-foot in length.
Dowel walk to curb and gutter with 2-foot maximum on center
Diagonal or mid-radius ramps are not allowed.
Place two (2) ADA ramps at uncontrolled intersections.
shall decide if two ramps are required.
Not all intersections will have two ramps per corner; engineer pavement
Top flush with pavement
Street with rounded top dia. brass cap
"2 12" to 2 above bottom of box
" 2 1deeper than
6" to 9" but no and solidly placed poured in place or precast sack mix or better)2 1(6
Standard concrete corners and 4 No. 2 rebars
" chamfered2 1square with corners or reinforced precast 4"
" chamfered 2 1square with
Non-reinforced 6" min. round or
MONUMENT BOX
or approved equal.
Neenah Foundry Co. (Pattern No. R-1971 or Pattern No. 1970)
Caird Engineering Works (Pattern No. 50658) or
3.
4.
5.
6.
NO SCALE
Face of curb
Monument box Monument box lid
H.4
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a h d .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b
ARY
NOT FOR C
ONSTRUCTIO
N
10.4 x 16 15706 -0200
20301 -1400
20301 -1900
20303 -3600
20701 -1300
25101 -3000
25101 -5000
25124 -0000
25510 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60401 -0000
60403 -0000
60526 -0000
62011 -0100
62011 -0500
62011 -0600
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
S O
IL
E
R O
S
IO
N C
O N
TR
L, C H
EC
K D
A M
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
R
EM
O V A L
O F
W A
LL
EA
R
TH
W O
R K G
EO
TE
X
TI
LE
TY
PE
IV
-B
PL
A C
ED
R
IP
R A P, C
LA
S S
PL
A C
ED
R
IP
R A P, C
LA
S S
R
IV
ER
C
O B B
LE
S
S
EL
EC
T
G R A N
U
LA
R B
A C K
FI
LL
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
M A N
H O
LE
IN
LE
T
D R A
IN
A G
E C H
A S E
S
TO
N E
M A S O
N R Y
H
EA
D W
LL
FO
2-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH SQYD SQYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT EACH EACH LNFT EACH EACH EACH Lt Rt Yellowstone North Entrance 396+80 74 2 398+36 74 1 2 398+36 to 397+70 66 398+70 30 2 398+70 to 399+64 94 399+64 30 2 399+64 to 400+03 397+80 to 398+23 86 86 398+05 1 398+25 1 400+03 40 1 2 400+03 to 401+28 136
Park St 401+28 to 401+60 51 401+60 1 401+60 to 401+71 5 401+71 1 401+71 to 401+82 5 401+72 1 1 403+95 7 404+26 7 404+55 7 405+24 7 405+72 7 406+77 7 406+45 to 407+00 1 406+85 to 407+25 86 86 407+00 1 407+05 1 406+83 1 407+17 7 407+57 7 407+97 7
CUMULATIVE TOTAL 172 2 2 2 0 0 0 0 172 0 121 250 234 0 4 8 63 0 2 2
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
I.1 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
PA
R K2
_D ra in ag e.
xl sx ]S he et
-A ug -2
8:
A M
J.
N ei gh or n
4/
S
Le on
4/
D es ig ne d by
C he ck ed b y:
NUMBER
PARK 2013(1)WA
ARY
NOT FOR C
ONSTRUCTIO
N
10.4 x 16 15706 -0200
20301 -1400
20301 -1900
20303 -3600
20701 -1300
25101 -3000
25101 -5000
25124 -0000
25510 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60401 -0000
60403 -0000
60526 -0000
62011 -0100
62011 -0500
62011 -0600
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
S O
IL
E
R O
S
IO
N C
O N
TR
EC
K D
A M
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
R
EM
O V A L
O F
W A
LL
EA
R
TH
W O
R K G
EO
TE
X
TI
LE
PL
A C
ED
R
IP
R A P, C
LA
S S
PL
A C
ED
R
IP
R A P, C
LA
S S
R
IV
ER
C
O B B
LE
S
S
EL
EC
T
G R A N
U
LA
R B
A C K
FI
LL
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
M A N
H O
LE
IN
LE
T
D R A
IN
A G
E C H
A S E
S
TO
N E
M A S O
N R Y
H
EA
D W
2-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH SQYD SQYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT EACH EACH LNFT EACH EACH EACH Lt Rt
PREVIOUS SHEET: 172 2 2 2 172 121 250 234 4 8 63 2 2
408+05 to 408+45 86 86 408+25 1 408+03 1 408+37 7 408+77 7 409+17 7 409+57 7 409+97 7 406+23 to 406+39 14 406+76 10 407+51 10 408+26 10 409+01 10 409+39 to 409+49 10 409+79 to 409+89 10 410+39 to 410+46 11
HWY 89
413+21 2 413+21 to 413+75 100 413+63 1 413+64 1 413+65 1 413+75 40 2 413+75 to 414+25 52 414+64 40 1 2
Robert Reamer Con 597+52 to 597+92 86 86 597+72 1 597+94 1 599+12 to 599+63 86 86 599+52 1 599+64 1
CUMULATIVE TOTAL 430 5 4 3 0 0 0 0 430 0 353 250 234 0 8 14 183 0 2 2
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
Robert Reamer Con
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
I.2 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
PA
R K2
_D ra in ag e.
xl sx ]S he et
2)
-A ug -2
8:
A M
J.
N ei gh or n
4/
S
Le on
4/
D es ig ne d by
C he ck ed b y:
NUMBER
ARY
NOT FOR C
ONSTRUCTIO
N
10.4 x 16 15706 -0200
20301 -1400
20301 -1900
20303 -3600
20701 -1300
25101 -3000
25101 -5000
25124 -0000
25510 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60401 -0000
60403 -0000
60526 -0000
62011 -0100
62011 -0500
62011 -0600
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
S O
IL
E
R O
S
IO
N C
O N
TR
EC
K D
A M
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
R
EM
O V A L
O F
W A
LL
EA
R
TH
W O
R K G
EO
TE
X
TI
LE
PL
A C
ED
R
IP
R A P, C
LA
S S
PL
A C
ED
R
IP
R A P, C
LA
S S
R
IV
ER
C
O B B
LE
S
S
EL
EC
T
G R A N
U
LA
R B
A C K
FI
LL
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
M A N
H O
LE
IN
LE
T
D R A
IN
A G
E C H
A S E
S
TO
N E
M A S O
N R Y
H
EA
D W
2-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH SQYD SQYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT EACH EACH LNFT EACH EACH EACH Lt Rt
PREVIOUS SHEET: 430 5 4 3 430 353 250 234 8 14 183 2 2
600+13 to 600+42 86 86 600+27 1 600+43 1 600+84 to 601+15 86 86 601+00 1 601+17 1 601+60 6 601+61 6 603+63 to 604+03 86 86 603+83 1 604+05 1 603+35 6 603+58 6 603+81 6 604+02 7 604+21 8
Yellowstone Trail R 200+65 1 200+60 to 200+74 20 200+67 to 201+54 1 200+74 1 200+74 to 201+22 72 200+95 1 1 201+22 1 201+22 to 201+72 48 201+72 1 201+72 to 202+22 48 202+22 1 202+20 1 202+20 to 202+22 13 202+22 to 203+45 120 203+45 1 203+45 to 203+46 13
CUMULATIVE TOTAL 688 8 5 5 0 0 0 0 688 0 379 250 542 0 15 16 228 0 2 3
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
I.3 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
PA
R K2
_D ra in ag e.
xl sx ]S he et
3)
-A ug -2
8:
A M
J.
N ei gh or n
4/
S
Le on
4/
D es ig ne d by
C he ck ed b y:
NUMBER
ARY
NOT FOR C
ONSTRUCTIO
N
10.4 x 16 15706 -0200
20301 -1400
20301 -1900
20303 -3600
20701 -1300
25101 -3000
25101 -5000
25124 -0000
25510 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60401 -0000
60403 -0000
60526 -0000
62011 -0100
62011 -0500
62011 -0600
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
S O
IL
E
R O
S
IO
N C
O N
TR
EC
K D
A M
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
R
EM
O V A L
O F
W A
LL
EA
R
TH
W O
R K G
EO
TE
X
TI
LE
PL
A C
ED
R
IP
R A P, C
LA
S S
PL
A C
ED
R
IP
R A P, C
LA
S S
R
IV
ER
C
O B B
LE
S
S
EL
EC
T
G R A N
U
LA
R B
A C K
FI
LL
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
M A N
H O
LE
IN
LE
T
D R A
IN
A G
E C H
A S E
S
TO
N E
M A S O
N R Y
H
EA
D W
2-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH SQYD SQYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT EACH EACH LNFT EACH EACH EACH Lt Rt
PREVIOUS SHEET: 688 8 5 5 688 379 250 542 15 16 228 2 3
203+46 1 203+46 to 205+57 210 205+57 13 1 1 205+57 to 206+57 101
Main St (N-S) 50+98 to 51+35 86 86 51+17 1 51+38 1 51+25 1 51+25 to 51+49 20 51+49 1 51+49 to 53+30 141 53+30 1 54+10 to 55+45 457 250 16 457 251 3 1
Main St (E-W) 12+99 to 13+15 20 13+15 1 13+15 to 13+23 5 13+23 1 13+10 10 1 13+10 to 13+21 5 13+21 1
Stone St 52+52 1 1 52+52 to 51+70 80 52+04 1 52+04 to 51+70 48 49+87 to 51+70 186
4th St Outfall 10+04 1
CUMULATIVE TOTAL 1231 9 6 5 0 250 16 0 1231 251 593 436 853 128 21 27 228 1 2 3
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
Main St (E-W)
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
I.4 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
PA
R K2
_D ra in ag e.
xl sx ]S he et
4)
-A ug -2
8:
A M
J.
N ei gh or n
4/
S
Le on
4/
D es ig ne d by
C he ck ed b y:
NUMBER
ARY
NOT FOR C
ONSTRUCTIO
N
10.4 x 16 15706 -0200
20301 -1400
20301 -1900
20303 -3600
20701 -1300
25101 -3000
25101 -5000
25124 -0000
25510 -0000
60201 -0400
60201 -0800
60201 -0900
60201 -1000
60401 -0000
60403 -0000
60526 -0000
62011 -0100
62011 -0500
62011 -0600
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
S O
IL
E
R O
S
IO
N C
O N
TR
EC
K D
A M
R
EM
O V A L
O F
IN
LE
T
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
R
EM
O V A L
O F
W A
LL
EA
R
TH
W O
R K G
EO
TE
X
TI
LE
PL
A C
ED
R
IP
R A P, C
LA
S S
PL
A C
ED
R
IP
R A P, C
LA
S S
R
IV
ER
C
O B B
LE
S
S
EL
EC
T
G R A N
U
LA
R B
A C K
FI
LL
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
M A N
H O
LE
IN
LE
T
D R A
IN
A G
E C H
A S E
S
TO
N E
M A S O
N R Y
H
EA
D W
2-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
4-
IN
C H
P
IP
E C
U
LV
ER
T
S
TO
N E
M A S O
N R Y
H
EA
D W
0-
IN
C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH SQYD SQYD CUYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT EACH EACH LNFT EACH EACH EACH Lt Rt
PREVIOUS SHEET: 1231 9 6 5 250 16 1231 251 593 436 853 128 21 27 228 1 2 3
10+04 to 9+21 80 9+21 1 9+21 to 8+27 90 8+27 1 8+27 to 7+92 32 7+92 1 7+92 to 7+43 46 7+43 1 7+43 to 5+03 236 5+03 1 5+03 to 4+33 66 4+33 1 4+33 to 3+14 115 3+14 1 3+14 to 2+77 33 2+77 1 2+77 to 1+80 94 1+80 1 1+80 to 1+19 60 0+61 to 1+19 34 15 13 17
Bypass Rd 301+11 48 2 301+54 48 2
PROJECT TOTAL 1265 9 6 5 15 250 29 17 1231 251 593 484 901 980 30 27 228 1 6 3
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the thickness (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
TABULATION OF DRAINAGE QUANTITIES
Note: The quantities shown hereon are approximate and are subject to field adjustments.
STATE PROJECT
I.5 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
PA
R K2
_D ra in ag e.
xl sx ]S he et
5)
-A ug -2
8:
A M
J.
N ei gh or n
4/
S
Le on
4/
D es ig ne d by
C he ck ed b y:
NUMBER
ARY
NOT FOR C
ONSTRUCTIO
N s t
S tr e e t
Yellowstone River
Spring Street
N th S tr e e t r d S tr e e t
E. Park Street
(CONFPARK)
CONFLUENCE PARK
(W_PARK_LOT_02)
PARK ST. PARKING LOT
Sheet I.11Sheet I.9
S h e e t I .1
S h e e t I.
WALL (AMPWALL01)
RETAINING
ARCH PARK
Sheet I.13
S heet I.7
(ARCHSIDEWALK)
ARCH SIDEWALK
CONNECTION (PSC03)
ROBERT REAMER
ENTRY SIGN
BYPASS ROAD (BYP01)
S h e e t I .1
DRAINAGE A (DRAIN01)
OUTFALL
(3RD01)
3rd St
(1ST01)
1st St
(EPS02)
E. PARK ST.
(RAT01)
RIVER ACCESS TRAIL
Water Street (WATER)
Stone Street (STONE01)
Main Street (MAIN_E-W01)
Park Street (PSW01)
YN
P N orth Entrance R oad (PS
W 03)
)10TSY( daoR liarT
SY
SHEET INDEX
AND
ALIGNMENT
DRAINAGE B (DRAIN02)
OUTFALL
(MAIN N-S01)
MAIN St (N-S)
NORTH BOUNDARY
NATIONAL PARK
YELLOWSTONE
I.6
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a e a .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
School
Gardiner n d S tr e e t)
H w y
Sheet I.8
(PSW03)
(2ND ST)
HWY 89
S h e e t I.1
Sheet I.15
S h e e t I .1
S h e e t I .1
ARY
NOT FOR C
ONSTRUCTIO
N
N
SCALE IN FEET
0 5 105
I.21
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a e p .d
C h e c k e d b y
D e s ig n e d b y
INFILTRATION BASIN
STONE STREET
C
WEST MAIN STREET
B C
A
A
B C
20'-0"
Spillway
PVC outlet pipe
36" dia.
sewer, inv out 5269.6
Existing storm
Ditch flowline, elev 5273.7
Proposed grade contour edges, elev 5274 ditch bottom
Proposed
Basin top, 5278
Class 3 riprap
Proposed ditch grade contour
Existing
Basin bottom, 5266
Dry well, rim elev 5273.7
20'-0" (typ.)10'-5"
71'
6'-0"
73'-4" min. length grout plug remove 5' and place 4' inv out 5269.7, Existing storm sewer, S T
O N
E S
T
1 See Sheet I.22.
FOOTNOTE:
River cobbles (backfill)
Structure
Outlet
Top of river cobbles, (backfill) 5274.0
ARY
NOT FOR C
ONSTRUCTIO
N
I.22
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a e q .d
C h e c k e d b y
D e s ig n e d b y
INFILTRATION BASIN
STONE STREET
ty p .)Basin top, 5278
SECTION B
SECTION A
SECTION C
DRY WELL DETAIL
NOTE:
See Sheet H.20 for Typical Dry Well Details.1.
10'-0"10'-0"
Place grout plug
5273.7
Elev
Spillway crest, 5276 embankment fill
Select
Grade to drain, 5%
Basin bottom, 5266 embankment fill
Select
Geotextile, type 4-B
Basin top, 5278
Finished grade
Existing grade
Bottom elev 5266.9 section
Perforated manhole
Flat top section
Riser ring
Rim Elev 5273.7 Median drain frame and grate
Basin bottom, 5266 type 4-B
Geotextile, Finished grade
5273.7
Elev
10'-0" embankment fill
Select
Existing grade
Elev 5274
Grade to drain, 5%
Dry well
Transition to existing grade
33'-0" 20'-0"10'-5"
Rim elev 5273.7
Class 3 riprap
Dry wellBasin bottom, 5266
IE 5271.8
outlet pipe
36" dia PVC
Existing grade
Ditch flowline, elev 5273.7
Rim elev 5274
Grate
Concrete outlet headwall
Finished grade
100-yr W.S. 5275.4
50-yr W.S. 5275.0 overtopping curb, 5274.8 elevation before
Maximum flood
25-yr W.S. 5274.6
10-yr W.S. 5274.3
Existing 24" Ø sewer pipe
16'-0"
19'-10"
71'-0"
River cobbles (backfill) backfill around dry well river cobbles
Minimum 1'
River cobbles (backfill)
River cobbles (backfill) backfill in dry well
No river cobble backfill around dry well river cobbles
Minimum 1' outlet from school, IE 5269.6
Existing 24" Ø storm
ARY
NOT FOR C
ONSTRUCTIO
N
El. 5247
El. 5251
C h e c k e d b y
D e s ig n e d b y
I.26
STATE PROJECT
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a e u .d g n
J H
J H
SHED
STAIRS
SCALE IN FEET
2.5 0 52.5
C
10'-0"
6'-0"
"4 322'-2
"4 121'-9
"8 76'-2 sanitary cleanout
Install
Relocate sanitary service
Existing timber wall
Existing right of way
"8 36'-8 with class 5 riprap augment existing boulders away from property line, Re-grade waterway to slope with headwall, IE = 5247.0
Sta. 1+19.45 outfall and rockery headwall culvert outfall
Maintain existing
3'x5' PC concrete trench concrete trench
5' wide PC
D
C
B
D C
B
6' x 5' PC concrete trench
6' x 5' PC concrete trench waterway (2% slope)
Class 3 riprap existing rockery wall
Remove 15' of
N
E
A
E
A
13'
DETAILS
SEWER OUTFALL
4TH STREET STORM
Transition to existing grade
TOW 5251.0
CIP wall, 24" x 35" arch cm p
ARY
NOT FOR C
ONSTRUCTIO
N
I.27
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a e v .d
C h e c k e d b y
D e s ig n e d b y
DETAILS
SEWER OUTFALL
4TH STREET STORM
1% 2% t o
8"
5'-0" 8"
9"
5'-0" 8"
P r o p e r ty l in e
6'x5' PC concrete trench
3'x5' PC concrete trench
Existing grade
CIP concrete footing
Relocate sanitary service
Regrade area to drain and rockery headwall culvert outfall
Maintain exising
Existing 8" VCP sanitary sewer
36" Ductile iron pipe
El. 5246.3
IE 5247.0
El. 5247.0
Existing grade
El. 5251.0
CIP concrete wall outfall and rockery headwall
Maintain exising culvert
5' wide PC concrete trench
3'x5' PC concrete trench
El. 5246.9 El. 5246.8
El. 5244.0 Class 3 riprap
6' x 5' PC concrete trench
Existing boulders
Shed
Transition to existing grade
Existing grade with class 5 riprap augment existing boulders away from property line, Re-grade waterway to slope
Class 5 riprap
El. 5250.0
100-year W.S. (63 cfs)
Existing boulders
El. 5247.0
Existing grade west wall
Existing grade ditch center
Existing grade east wall with class 5 riprap augment existing boulders away from property line, Re-grade waterway to slope
Regrade area to drain
Existing grade
El. 5246.9 to 5246.8
Relocate sanitary service
Existing 8" VCP sanitary sewer
El. 5250.0 timber wall
Existing
Existing grade
Shed
Class 5 riprap
Class 3 riprap
Shed
P r o p e r ty l in e
P r o p e r ty l in e to existing grade
Transition
El. 5244.0
SECTION B-B
SECTION A-A
SECTION E-E
SECTION D-D
SECTION C-C
P r o p e r ty l in e
CIP concrete sill (9" thick) trench PC concrete
5'-0"
El. 5248.67
El. 5247.0 to 5246.9
El. 5250
El. 5251
El. 5247
File details come from the government source that posted it. Updated .