Plans_1_of_3_MT_PARK_2013(1).pdf
PDF 7 MB Posted
- Attached to
- MT PARK 2013(1) Gardiner Gateway, Phase I Federal contract opportunity
- Solicitation number
- DTFH70-14-R-00010
About this file
Preliminary Plan sheets - 1 of 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A003_Gardiner.pdf | ||
| A002_MT_PARK_2013(1)_Part2.pdf | ||
| A002_MT_PARK_2013(1)_Part3.pdf | ||
| A002_MT_PARK_2013(1)_Part1.pdf | ||
| AMENDMENT_A001_Gardiner.pdf | ||
| Physical_Data_Request_Form_Gardiner.pdf | ||
| Plan_Request_for_Internet_Gardiner.pdf | ||
| RFP_Gardiner_.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/gardiner/ | — | |
| Prelims_Transmittal_Letter_MT_PARK_2013(1).pdf | ||
| Plans_2_of_3_MT_PARK_2013(1).pdf | ||
| Plans_3_of_3_MT_PARK_2013(1).pdf | ||
| Project_Description_MT_PARK_2013(1).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIM
IN
ARY
NOT FOR C
ONSTRUCTIO
N
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
Western Federal Lands Highway Division
Director, Project Delivery, C. Kratovil
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
MT PARK 2013(1)
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
MONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA
SASKATCHEWAN
N O
R T
H D
A K
O T
A
S O
U T
H D
A K
O T
A
WYOMING
ID
A
H O
UNITED STATES
CANADA
GLACIER
NATIONAL
PARK
YELLOWSTONE
NATIONAL
PARK
CHARLES M. RUSSELL
NATIONAL
WILDLIFE RANGE
Lake
Flathead
Elwell
Lake
M
Lake
Fort Peck
I SOS U IR
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City
Miles
Glendive
Point
Wolf Glasgow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
E N
O T
S
WOLLEY
R E
VIR
90 15
2 2
MONTANA
REVIR
GARDINER GATEWAY, PHASE I
LENGTH 1.035 MILES
See Sheet A.2 for Index to Sheets
SCALE IN MILES
20 0 20 40 60
W Y
O M I N
G
I D
A H
O
MONTANA
GARDINER
Helena
Bozeman
Billings
Butte Anaconda
B e a v e rh e a d
Mts.
Centennial Mts.
Falls
Idaho
MEM. PKWY.
JOHN D. ROCKEFELLER JR.
YELLOWSTONE
NATIONAL
PARK
PROJECT AREA
Vicinity Map
See Sheet A.4 for
Roadside Development.
Grading, Base, Paving, Drainage and
N
MONTANA
PARK COUNTY
YELLOWSTONE NATIONAL PARK
e n ot s w oll e Y reviR
Specifications, 2010
Montana Public Works Standard
Projects, FP-03 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
Design Vehicle e (max)
V
ADT (2035)
ADT (2015)
45' Tour Bus
0.040
20 MPH
A.1
STATE PROJECT
NUMBER
SHEET
MT
PARK 2013 (1)
A
M
A u g u s t
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d m t-a a a .d g n
R J o h n s o
W
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
EDITS
PDF FILE
PRE-ADD
ARY
NOT FOR C
ONSTRUCTIO
N
INDEX TO SHEETS INDEX TO SHEETS
INDEX TO SHEETS
INDEX TO SHEETS
N. ELECTRICAL UTILITIES
M. PERMANENT TRAFFIC CONTROL PLAN
N.7
N.6
N.5
N.3-4
N.1-2
M.8-10
M.4-7
M.1-3
LIGHTING PLAN - YELLOWSTONE TRAIL ROAD
LIGHTING PLAN - RR CONNECTION
LIGHTING PLAN - HWY 89
LIGHTING PLAN - W PARK
TABULATION OF QUANTITIES
PERMANENT TRAFFIC CONTROL STANDARD DETAILS
PERMANENT TRAFFIC CONTROL PLANS
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
F.12
F.11
F.10
F.9
F.8
F.7
F.6
F.5
F.4
F.1-3
E.14
E.13
E.12
E.11
E.10
E.9
E.8
E.7
E.5-6
E.4
E. 1-3
D.9
D.8
D.7
D.6
D.5
D.4
D.3
D.1-2
C.2-5
C.1
B.1-3
A.5
A.4
A.3
A.2
A.1
DETAIL NOTES
ARCH PARK PLAN
ARCH PARK PARKING LOT LAYOUT
POCKET PARK PLAN LAYOUT
YA LOOP DRIVEWAY
ARCH SIDEWALK AND HAIRPIN CURVE LAYOUT
YA PEDESTRIAN PLAZA
ROBERT REAMER CONNECTION
W PARK ST PARKING LOT
TABULATION OF QUANTITIES
W MAIN ST PLAN AND PROFILE
MAIN ST AT ARCH PARK PLAN AND PROFILE
YELLOWSTONE TRAIL ROAD PLAN AND PROFILE
ROBERT REAMER CONNECTION PLAN AND PROFILE
PARK ST / ROBERT REAMER CONNECTION PLAN AND PROFILE
HWY 89 (S 2ND ST) PLAN AND PROFILE
PARK ST PLAN AND PROFILE (406+00 TO 412+00)
ARCH BYPASS ROAD PLAN AND PROFILE
PARK ST PLAN AND PROFILE (394+00 TO 406+00)
ALIGNMENT AND SHEET INDEX
TABULATION OF QUANTITIES
DEMOLITION PLAN - MAIN STREET (N-S)
AND ARCH PARK
DEMOLITION PLAN - YELLOWSTONE TRAIL ROAD
DEMOLITION PLAN - ROBERT REAMER CONNECTION
DEMOLITION PLAN - HWY 89/2ND ST
DEMOLITION PLAN - PARK STREET
DEMOLITION PLAN - ARCH HAIRPIN/PARK ST
DEMOLITION PLAN - NORTH ENTRANCE
TABULATION OF QUANTITIES
TYPICAL SECTIONS
TABULATION OF QUANTITIES
SUMMARY OF QUANTITIES (NOT INCLUDED)
PROJECT SITE PLAN
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
TEMPORARY TRAFFIC CONTROL STANDARD DETAILS
TEMPORARY TRAFFIC CONTROL CONSTRUCTION PLANS
INDEX OF WORK AREAS
QUANTITIES (NOT INCLUDED)
TABULATION OF TEMPORARY TRAFFIC CONTROL
AND DISPOSAL SITES
STAGING, STOCKPILE, MATERIAL PROCESSING,
WATER SOURCE SITE
STD. DETAIL W157-20, SEDIMENT WATTLE
TREATMENT DETAILS
SOIL EROSION AND SEDIMENT CONTROL
SILT FENCE DETAILS
EROSION CONTROL PLANS
TABULATION OF EROSION CONTROL QUANTITIES
TRASH RACK DETAILS
WEST DITCH INFILTRATION DETAILS
TRENCH DRAIN DETAILS
PLAN & SECTIONS
WEST PARK STREET STORM SEWER OUTFALL
CONCRETE MANHOLE DETAILS
CURB INLET TYPE II
INLET DETAILS
HEADWALL DETAILS
INLET DETAILS
BASIN OUTLET DETAILS
4TH ST. STORM SEWER CP WALL
4TH ST. STORM SEWER OUTFALL SECTIONS
4TH ST. STORM SEWER OUTFALL PLAN
YELLOWSTONE TRAIL ROAD DRY WELL DETAILS
SWALE DETAILS (HYDRAULICS)
BASIN SECTION (HYDRAULICS)
BASIN PLAN (HYDRAULICS)
PLAN AND PROFILES - DRAINAGE
ALIGNMENT AND SHEET INDEX
TABULATION OF DRAINAGE QUANTITIES
SIGN AREA WALL PLANS
YA SIDEWALK, PARKING LT BUMPOUT, &
ARCH PARK STONE MASONRY SEATWALL DETAIL
ARCH PARK STAGE & SEATWALL TYPICAL SECTIONS
MSE WALL WITH MASONRY FACING DETAILS
MSE WALL WITH MASONRY FACING
WALL PLAN AND PROFILE
TABULATION OF WALL QUANTITIES
F. PARKING LOTS & PEDESTRIAN AREAS
E. MAINLINE PLAN AND PROFILES
D. DEMOLITION PLANS
C. TYPICAL SECTION
B. SUMMARIES
A. GENERAL INFORMATION
L. TEMPORARY TRAFFIC CONTROL PLAN
K. STAGING, STOCKPILING, WATER SOURCES
J. EROSION CONTROL
I. DRAINAGE
G. WALLS
L.8-12
L.3-7
L.2
L.1
K.2
K.1
J.12
J.11
J.10
J.2-9
J.1
I.36
I.35
I.34
I.33
I.32
I.31
I.30
I.29
I.28
I.27
I.26
I.25
I.24
I.23
I.22
I.21
I.7-20
I.6
I.1-5
G.9
G.8
G.7
G.6
G.4-5
G.3
G.1-2
A.2
STATE PROJECT
PARK 2013(1)
P
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a a b .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
ARY
NOT FOR C
ONSTRUCTIO
N
N
Lake
Rainbow
G A R D I N E RAirport
To M am m oth
4.0 M
iles
51.0 Miles
To Livingston e dils d n a L
C r e e k
PROJECT LOCATION
SEE SHEET A.5
VICINITY MAP
LANOITAN
SCALE IN MILES
0 2 lanoitaN yradnuoB en ot s wo ll eY reviR
Park survey and 1984 dependent survey
National Park per 1883
North boundary Yellowstone
A.4
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a a d .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
Towards Reese Creek Pit
Miles
NP
NP
NP
N P
NP
NP
NP
ARY
NOT FOR C
ONSTRUCTIO
N PARK 2013(1), Gardiner Gateway Phase 1
LEGEND:
A.5
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a a e .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y s t
S tr e e t
Yellowstone River
Spring Street
N th S tr e e t r d S tr e e t
E. Park Street
(EPS02)
E. PARK ST.
Water Street (WATER)
PROJECT SITE PLAN
Stone Street
Main Street
Park Street
See Sheet D.XX
ROBERT REAMER CONNECTION
See Sheet E.XX
VA Pedestrian Plaza
PARK NORTH BOUNDARY
YELLOWSTONE NATIONAL
Road. See Sheet D.XX
YNP North Entrance
See Sheet D.XX
Arch Bypass Road
Road. See Sheet D.XX
Yellowstone Trail
School
Gardiner
See Sheet F.3
Arch Park Stage
See Sheet E.9
Parking Lot
Arch Park
See Sheet D.XX
ROBERT REAMER CONNECTION
See Sheets E.XX
Parking Lot.
Oversized
Park Street n d S tr e e t)
H w y
"Discharge Point 001"
NB
NB
N B
N B
N B
JH 1001
JH 1002
JH 1028
JH 1029
JH 1048
JH 1049
JH 1050
JH 1058
JH 1059
Arch Park Parking Lot. See Sheet E.9
See Sheets E.XX
Parking Lot.
Park Street West
See Sheet E.8
Pocket Park.
Arch Park. See Sheet E.10
See Sheet E.7
YA Parking Lot
ARY
NOT FOR C
ONSTRUCTIO
N
FOOTNOTE:
C.2
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c b .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y asphalt and gravel.
Area Grading Plan. 1% minimum for concrete, 2% minimum for
Parking pavement and sidewalk slopes will be controlled by the
2% Slope
Varies
4" Aggregate base, grading D
2% Slope
0.3 to < 3 million ESAL maximum size aggregate, " nominal4 3" or 2
6" Superpave pavement,4" Recycled aggregate base
NORTH ENTRANCE
394+00 to 401+00
6" Bed course
Varies sidewalk
Concrete
2'-0"
Var ies
Concrete sidewalk 6" Bed course
6" Bed course
Varies
2'-0"
Va rie s se ir aV
LC
Shoulder ShoulderTraveled way Traveled way pivot point
Profile grade and
See H_Sheets
12" depth, (6" face).
Stone curb, type 1, 4" Bed course
399+65.51 to 401+00, LT
397+09.59 to 397+35.51, LT
Concrete
4" Bed course
2'-0"
Parking
2% Slope
5'-0"
4'-0"7'-6" to 11'7'-6" to 11'4'-0"
5'-0"13'-0"
(12" face). See H_Sheets
18" depth, Stone curb, type 1, 6" Bed course
397+35.51 to 399+65.51, RT
See H_Sheets
12" depth, (6" face).
Stone curb, type 1, 4" Bed course
5'-0" (min.)
(6" face). See H_Sheets
12" depth, Stone curb, type 1, 2'-0" to 14'-0"
Shoulder
399+65.51 to 401+00, LT
396+69.03 to 397+35.51, LT
Concrete
4" Bed course
2'-0"
Parking
2% Slope
5'-0" 13'-0"
397+35.51 to 399+65.51, LT
See H_Sheets
12" depth, (6" face).
Stone curb, type 1, (12" face). See H_Sheets
18" depth, Stone curb, type 1, Varies
Var ies
(6" face) See H_Sheets
12" depth, Stone curb, type 1, SHEET 1 of 9
ARY
NOT FOR C
ONSTRUCTIO
N
NOTE:
FOOTNOTE:
1.
See Section E for Park Street Parking Lot plans and quantities.
PARK STREET HAIRPIN TURN
401+00 to 403+00
2% Slope
YELLOWSTONE ASSOCIATION
PARK STREET AT
403+00 to 406+10
Va rie s
6'-0"
Slope (2% max.)
Shoulder
2'-0"
Traveled way
12'-0"
Traveled way
12'-0"
Shoulder or Head-in Parking
Varies 2'-0" to 33'-0"
Concrete sidewalk
Concrete sidewalk
Concrete sidewalk
See Sheet X.X for Snowpole locations.
asphalt and gravel.
area grading plan. 1% minimum for concrete, 2% minimum for
Parking pavement and sidewalk slopes will be controlled by the
4" Aggregate base, grading D
4" Aggregate base, grading D
Varies
6" Bed course 6" Bed course
6" Bed course
6" Bed course
6" Bed course
0utstanding detail
4' Pedestrian fence, See H_Sheets
12" depth, (6" face).
Stone curb, type 1, outstanding detail
4' Pedestrian fence, See H_Sheets
12" depth, (6" face).
Stone curb, type 1, See H_Sheets
12" depth, (6" face).
Stone curb, type 1, 4" Bed course
4" Bed course
4" Bed course
4" Bed course
See H_Sheets
12" depth, (6" face).
Stone curb, type 1, See H_Sheets
12" depth, (6" face).
Stone curb, type 1, See H_Sheets
12" depth, (6" face).
Stone curb, type 1, 5'-0"
1:3
Varies
Varies
Varies
Varies
2'-0"
2'-0"
2'-0"
2'-0"
3'-0"
Varies
1:20
6" Bed course (6" face). See H_Sheets
12" depth, Stone curb, type 1, 6" Bed course
Concrete sidewalk
0.3 to < 3 million ESAL maximum size aggregate, " nominal4 3" or 2
6" Superpave pavement,
0.3 to < 3 million ESAL maximum size aggregate, " nominal4 3" or 2
6" Superpave pavement, 4" Recycled aggregate base
4" Recycled aggregate base
C.3
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c c .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
7'-4" to 9'-0"
Shldr. Shldr.
(min.)
2'-0"
Traveled way
11'-10" to 20'-3"
Traveled way
12'-0"
(min.)
2'-0" 3'-0"
02:1
See F-Sheets for
Roadside Features
402+14.76 to 403+00
LC
Profile grade and pivot point
Varies 2% to 5%
Profile grade and pivot point
LC
See F Sheets for Roadside features or match existing vertical wall or stair
Concrete sidewalk
Varies
6" Bed course
See H_Sheets
12" depth, (6" face).
Stone curb, type 1, 4" Bed course
Varies
See F Sheets for Roadside features or match existing vertical wall or stair
2'-0"
2% Slope topsoil, 6-inch depth
Furnish and place
Varies
403+78.84 to 404+39.06, LT
SHEET 2 of 9
ARY
NOT FOR C
ONSTRUCTIO
N
NO SCALE
FOOTNOTE:
PARK STREET PARKING LOT
406+10 to 410+00
M a tc h li n e
Concrete sidewalk
PARK STREET ROADWAY
406+10 to 410+06
2% Slope
M a tc h li n e
5'-0"
1:20
Varies
Concrete sidewalk
SHEET 3 of 9
TYPICAL SECTIONS
3'-0"
Concrete sidewalk of building
Existing face
Remove existing
Concrete sidewalk sidewalk
2 2
4" Aggregate base, grading D
3" Crushed base course
3" Crushed base course
3" Crushed base course
3" Crushed base course
Width varies
4" Bedding
4" Bedding 4" Bedding
4" Bedding
12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, 12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, outstanding detail
4' Pedestrian fence, Varies
Varies
12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, 12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, Varies
Varies
Varies maximum size aggregate, 0.3 to < 3 million ESAL
" nominal4 3" or 2
16" Superpave pavement, 4" Recycled aggregate base
4" Recycled aggregate base maximum size aggregate, 0.3 to < 3 million ESAL
" nominal4 3" or 2
16" Superpave pavement, 3'-0"
C.4
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c d .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y : 20'-0"
Head-in parking
10'-0"
14'-0"
3'-0" 20'-0"
3'-0"
Two-way travelway pivot point Profile grade and
4" Bed course
4" Bed course sidewalk
Concrete
Concrete sidewalk
6" Bed course joint material expansion
Install joint material expansion
Install
6" Bed course
501+73.04 to 502+13.04 503+98.04 to 504+38.04
501+06.96 to 501+61.96 503+03.04 to 503+58.04
500+26.96 to 500+66.96 502+52.04 to 502+42.04
Varies
4" Bed course
4" Bed course sidewalk
Concrete
Concrete sidewalk topsoil, 6-inch depth
Furnish and place joint material expansion
Install seatwall (20-inch)
24" Stone masonry seatwall (20-inch)
24" Stone masonry Embankment material
502+23.04 to 502+42.04
M a tc h li n e
3'-0"
4" Pedestrian fence
6" Placed riprap, class 1
502+53.12 to 503+12.12
501+83.12 to 502+42.12
501+13.12 to 501+72.12
500+43.12 to 501+02.12
LC
pivot point
Profile grade and
3'-0"
Parallel parking
14'-0"
Traveled way
12'-0"
Traveled way
12'-0"
Shldr.2
3'-0"
Shldr.
Where shown in plans.
Curve widening is applied to the shoulder.
area grading plan.
Parking pavement and sidewalk slopes will be controlled by the
M a tc h li n e
Concrete sidewalk
4" Bedding varies
Width varies
Width varies
Width
409+82.32 to 410+06.08, LT
409+28.35 to 409+45.92, LT
409+09.99 to 409+20.58, LT
Furnish and place topsoil, 6" depth
12" depth (6" face). See H_Sheets
Stone curb, type 1, (6" face). See H_Sheets
12" depth
Stone curb, type 1, Furnish and place topsoil, 6-inch depth
4" Aggregate base, grading D
Placed basalt riprap, 6" depth with geosynthetic
12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, 3" Crushed base course
3" Crushed base course
3" Crushed base course
3" Crushed base course
Construct curb and gutter, concrete, 12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 12" depth (sloping). See H Sheets
ARY
NOT FOR C
ONSTRUCTIO
N
NO SCALE
FOOTNOTE:
HWY 89 ROADWAY
PARK STREET TO
Concrete sidewalk Concrete sidewalk
Varies
Varies
M a tc h li n e
M a tc h li n e proposed concrete sidewalk
Match grade with
SHEET 4 of 9
TYPICAL SECTIONS
Slope (4% max.)
proposed concrete sidewalk
Match grade with
4" Aggregate base, grading D
3" Crushed base course
3" Crushed base course
4" Bedding
4" Bedding
12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, 12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, Varies
Varies
R .O .W maximum size aggregate, 0.3 to < 3 million ESAL
" nominal4 3", or 2
1", 8 36" Superpave pavement, R .O .W
4" Recycled aggregate base
C.5
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c e .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
" nominal maximum size aggregate.8 3utilize Superpave pavement, Curve widening is applied to the shoulder.
area grading plan.
Parking pavement and sidewalk slopes will be controlled by the
Shldr.Shldr.2 to 3'-0"
4'-0"
16'-0" to 19'-6"
Traveled way
17'-0"
Traveled way
4'-0" and pivot point
Profile grade
410+06 to 411+76
LC
M a tc h li n e varies
Width varies
Width varies
Width
Placed basalt riprap, 6" depth with geosynthetic
Furnish and place topsoil, 6" depth
Concrete sidewalk
4" Bedding
12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 3" Crushed base course
410+99.93 to 411+68.25, LT
410+06.08 to 410+29.33, LT
4" Bedding
12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 3" Crushed base course
410+85.43 to 410+99.93, LT
410+29.33 to 410+47.02, LT
12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 3" Crushed base course topsoil, 6" depth
Furnish and place
6" depth with geosynthetic
Placed basalt riprap, 4" Bedding sidewalk, concrete
Construct thickened sidewalk, concrete
Construct thickened
Concrete sidewalk
410+47.02 to 410+85.43, LT
Width Width varies varies varies
Width varies
Width varies
Width
Furnish and place topsoil, 6" depth
Concrete sidewalk
4" Bedding3" Crushed base course
(sloping). See H Sheets concrete, 12" depth
Construct curb and gutter, 411+49.55 to 411+70.14, RT varies
Width varies
Width
E n tr y S ig n L a y o u t
S e e F S h e e ts f o r
7'-0"
Concrete sidewalk
4" Bed course
6" Bed course
(6" face). See H-Sheets
Stone curb, type 1, 12" depth
410+06.08 to 411+13.74, RT
ARY
NOT FOR C
ONSTRUCTIO
N
NO SCALE
FOOTNOTE:
Concrete sidewalk
Concrete sidewalk
Slope varies
Slope varies
Varies
Varies
M a tc h li n e
M a tc h li n e
SHEET 5 of 9
TYPICAL SECTIONS
Varies (4% max.)
4" Cold recycled asphalt base course
4" Aggregate base grading D
3" Crushed base course
3" Crushed base course
4" Bedding
4" Bedding
411+76 to 412+45
412+45 to 415+85
OVERLAY SECTION
HWY 89 (2nd St)
Varies
Slope varies Slope varies
Varies
M a tc h li n e
M a tc h li n e joint material
Install expansion
4" Bedding
Concrete sidewalk
3" Crushed base course
NOTE:
RECONSTRUCTION AREA
HWY 89 ROADWAY
PARK STREET TO
asphalt pavement, 2" depth
Mill and remove existing
Prelevel
Prelevel joint material
Install expansion
4" Bedding
Concrete sidewalk
3" Crushed base course See H_Sheets concrete, 11" depth.
Construct curb and gutter, maximum size aggregate, 0.3 to <3 million ESAL
" nominal8 32" Superpave pavement, 1.
joint material
Install expansion joint material
Install expansion
C.6
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c f.
d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
Place with overlay to eliminate a transverse joint at 412+45.
Includes 15 tons for prelevel.
Curve widening is applied to the shoulder.
area grading plan.
Parking pavement and sidewalk slopes will be controlled by the
Shoulder or Parallel Parking
12'-0"
Traveled way
11'-0"
Traveled way
11'-0"
Shoulder or Parallel Parking
Varies 7'-3" to 13'-0"
See Note 2
See Note 2
See Note 2
See Note 2 concrete sidewalk or match back of existing sidewalk.
Construct proposed concrete sidewalk up to existing raised
" nominal maximum size aggregate.8 existing asphalt pavement and replace with 2" Superpave
Hwy 89 roadway 412+45 to 415+85 (End of Project ), mill 2"
2.
Shoulder
12'-0"
Traveled way
11'-0"
Traveled way
11'-0"
Shoulder
3'-0" to 7'-3"
Place in two (2) 2" lifts maximum size aggregate, 0.3 to <3 million ESAL.
" nominal4 3", or 2
14" Superpave pavement, concrete, 11" depth. See H_Sheets
Construct curb and gutter, concrete, 11" depth. See H_Sheets
Construct curb and gutter, concrete, 11" depth. See H_Sheets
Construct curb and gutter,
0.3 to <3 million ESAL maximum size aggregate, " nominal8 32" Superpave pavement, LC
ARY
NOT FOR C
ONSTRUCTIO
N
NO SCALE
4" Cold recycled asphalt base course
4" Aggregate base grading D
598+50 to 604+93
Place in three (3) 2" lifts.
maximum size aggregate, 0.3 to <3 million ESAL.
" nominal4 3", or 2
16" Superpave pavement, C.7
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c g .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
ROBERT REAMER CONNECTION
SHEET 6 of 9
TYPICAL SECTIONS
2% Slope
2'-0" ditch
Rock-filled
4'-0"
Shoulder
3'-0"
Traveled way
11'-0" to 16'-3"
Traveled way
11'-0" to 16'-10"
Shoulder
3'-0"
2% Slope
4:1 seiraV sei ra
V excavated material
Suitable
4' Pedestrian fence, (where shown in the plans)
M a tc h li n e
S e e D it c h p r o fi le
LC
pivot point
Profile grade and
3'-0" 5'-0"
Shoulder
3'-0"
02:1
4" Pedestrian fence
Concrete sidewalk
4" Bedding
3" Crushed base course
601+38.65 to 601+60.34, LT 12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 3" Crushed base course
Shoulder
4'-9" to
2'-6"
See F_Sheets for Traffic Island detailsVaries
Station 602+88.02
Cross section of
M a tc h li n e
(sloping). See H Sheets gutter, concrete, 12" depth
Construct curb and
601+60.34 to 602+83.02, LT
(6" face). See H_Sheets
12" depth
Stone curb, type 1, 2% Slope
2% Slope
2% Slope
2% Slope
02:1
02:1
4" Pedestrian fence
4" Pedestrian fence
3'-0' 5'-0" and Parking Lot details
See F_Sheets for Traffic Island
Shldr.
6'-0" to
4'-3"
(sloping). See H Sheets gutter, concrete, 12" depth
Construct curb and
3" Crushed base course
4" Bedding
Concrete sidewalk
M a tc h li n e
S e e D it c h P r o fi le o r E n tr y S ig n P la z a D e ta il s
4" Bedding
Concrete sidewalk
6" Crushed base course
602+83.02 to 603+87.63, LT
603+87.63 to 604+93.00, LT
3'-0" 5'-0"
See F_Sheets for Parking Lot details
Shldr.
9'-10" to
6'-0"
9'-0"
4'-0" to8'-0"3'-0" plans Where shown in varies Slope
20'-0"
Shoulder
10'-0"
5'-0" to 20'-0"
2% Slope sidewalk Concretesidewalk
Concrete 4" Bedding
4" Bedding
3" Crushed base course
6" Bed course
6" Bed course
6-inch depth place topsoil, Furnish and
12" depth (6" face). See H Sheets
Stone curb, type 1, 12" depth (sloping). See H Sheets
Construct curb and gutter, face of building
Existing
603+34.41 to 604+37.41, RT
602+80.64 to 603+11.24, RT
2% Slope
2% Slope Varies
Driveway approach
31'-0"
Shoulder
10'-0" Pedestrian crossing
5'-3" to 7'-0" at driveway
8'-0"
Concrete driveway approach
?? Crushed base course
3" Crushed base course
12" depth (sloping). See H Sheets
Construct curb and gutter, 604+37.41 to 604+84.26, RT
603+11.24 to 603+34.41, RT
602+72.31 to 602+80.64, RT
Varies 16'-6" (min.)
Shoulder
7'-0" (min.)Varies
6-inch depth where specified in place
Sidewalk or furnish and place topsoil.
Concrete sidewalk
4" Bedding 3" Crushed base course
12" depth (sloping). See H Sheets
Construct curb and gutter, 604+84.26 to 604+93.00, RT
ARY
NOT FOR C
ONSTRUCTIO
N
NOTE:
FOOTNOTE:
1.
See Sheet X.X for Typical Section Quantities.
50+40 to 55+77
Varie s Varies
5'-0"
Var ies
Varies
Head-in Parking
Varies 3'-0" to 22'-6"
Traveled way
11'-0"
Traveled way
11'-0"
Head-in Parking
Varies 1'-0" to 46'-0"
Concrete sidewalk
Shldr
3'-0"
Traveled way
11'-0"
Traveled way
11'-0"
Shldr
3'-0"
4" Aggregate base, grading D
4" Aggregate base, grading D
3" Crushed base course
3" Crushed base course
2% Slope
1 1
13+20 to 14+88
Construct per Staking Notes.
4" Bedding4" Bedding
0.3 to < 3 million ESAL maximum size aggregate, " nominal4 3" or 2
6" Superpave pavement, Varies
4" Recycled aggregate base
2'-0" 2'-0"
Concrete
Varies Varies
4" Recycled aggregate base
C.8
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c h .d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
SHEET 7 of 9
TYPICAL SECTIONS
EAST - WEST
MAIN STREET
NORTH - SOUTH
MAIN STREET
LC
LC
pivot point Profile grade and pivot point Profile grade and
5'-0"5'-0"
3" Crushed base course 3" Crushed base course
12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, See H Sheets concrete, 12" depth (sloping).
Construct curb and gutter, 2% slope
12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, 12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, 5'-0"
2% slope
0.3 to < 3 million ESAL maximum size aggregate, " nominal4 3" or 2
6" Superpave pavement, Concrete sidewalk
4" Bedding
4" Bedding
Concrete sidewalk excavated material
Suitable Vari es
(min.)
1'-0"
Shldr.
4'-0"
2:1
1:1
55+46.23 to 55+77.00, LT 53+46.61 to 55+77.00, RT
ARY
NOT FOR C
ONSTRUCTIO
N
2% Slope
Var ies
Concrete sidewalk
YELLOWSTONE TRAIL ROAD
Shldr
2'-0"
Traveled way
11'-0"
Traveled way
11'-0"
Shldr
2'-0"
TYPICAL SECTIONS
masonry wall
Existing stone
2% Slope
Existing ground Existing ground
2% Slope
Var ies
Va rie s
300+50 to 302+20
BYPASS ROAD
Width varies
Shoulder
4" Aggregate base, grading D
6" Bed course
6" Bed course
4" Bedding
See H_Sheets
12" depth, (6" face).
Stone curb, type 1, 6" Bed course
Outstanding detail
4' Pedestrian fence, 1:20
3'-0" 5'-0"
(6" face). See H_Sheets
12" depth, Stone curb, type 1, 4" Recycled aggregate base
2'-0" maximum size aggregate, 0.3 to < 3 million ESAL
" nominal4 3" or 2
16" Superpave pavement, 2'-0"
Varies
4" Aggregate base, grading D
4" Recycled aggregate base maximum size aggregate, 0.3 to < 3 million ESAL
" nominal4 3" or 2
16" Superpave pavement, SHEET 8 of 9 edging. See H_Sheets
Stone masonry, C.9
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c i.
d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
Varies
LC
LC
4'-0"11'-0"11'-0"4'-0" pivot point
Profile grade and pivot point Profile grade and
198+32.89 to 201+74 (Ditch RT)
Concrete sidewalk
4" Bedding
12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 3" Crushed base course
Var ies
Shoulder
2'-0"5'-0" (min.)
200+01.45 to 202+14.46, LT
Var ies
5'-0" (min.) 2'-0"
Shldr.
Concrete sidewalk
4" Bedding
6" Bed course
(6" face). See H Sheets
12" depth, Stone curb, type 1, 202+14.46 to 202+73.28, LT
Var ies
2'-0"
Shldr.
198+32.89 to 200+01.45, LT
3:1
2:1
3'-0"18'-0"
0' to of parking
Shoulder
See H Sheets
12" depth (6" face).
Stone curb, type 1, 6" Bed course
Placed riprap, class ??
198+32.89 to 201+75.91, RT
ARY
NOT FOR C
ONSTRUCTIO
N
2% Slope
TYPICAL SECTIONS
Existing ground
4" Aggregate base, grading D
4" Recycled aggregate base maximum size aggregate, 0.3 to < 3 million ESAL
" nominal4 3" or 2
16" Superpave pavement, Concrete sidewalk
4" Bedding
Varies
6" Bed course
SHEET 9 of 9
C.10
STATE PROJECT
u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a c j.
d
J o h n s
M c
Q u is to n B
K u n ih is a
C h e c k e d b y
D e s ig n e d b y
3RD STREET
30+35 to 31+29
EAST PARK STREET
100+20 to 100+83
Concrete sidewalk
4" Bedding
12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, 3" Crushed base course
Varies
4' Pedestrian fence
3'-0"5'-3"13'-0"11'-0"19'-3" to 31'-6" to
2'-0"
Shldr.Traveled wayTraveled way pivot point Profile grade and
12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 3" Crushed base course
02:1
(6" face). See H_Sheets
12" depth, Stone curb, type 1, Concrete sidewalk
3" Crushed base course
4" Bedding
Varies
12" depth (sloping). See H_Sheets
Construct curb and gutter, concrete, S e e F S h e e ts
P a r k S tr e e t
L o ts
M a tc h li n e
Varies Varies
Shldr.
2'-0"
Traveled way
11'-0"
Traveled way
11'-0"
Shldr.
2'-0"
S e e F S h e e ts
M a tc h li e
0.3 to < 3 million ESAL maximum size aggregate, " nominal4 3" or 2
6" Superpave pavement, 4" Recycled aggregate base
4" Aggregate base, grading D
Varies Varies pivot point
Profile grade and
S e e F S h e e ts
M a tc h li n e
Shldr.
2'-0" 12" depth, (6" face). See H Sheets
Stone curb, type 1, 6" Bed course
30+61.18 to 31+14.11, LT
30+96.33 to 31+15.37, RT
30+35.00 to 30+41.46, RT
Varies
6" depth with geosynthetic
Placed basalt riprap, 12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, 3" Crushed base course
Shldr.
2'-0"
Varies
P a r k in g L o t
P a r k S tr e e k a n d
R o a d w a y a r k S tr e e t
M a in li n e
3" Crushed base course
9'-0"
100+20.00 to 100+36.83, LT
6" depth with geosynthetic
Placed basalt riprap, 12" depth (sloping). See H Sheets
Construct curb and gutter, concrete, Shoulder or Head-in parking
2'-6" to 32'-10"
ARY
NOT FOR C
ONSTRUCTIO
N
P O
T
.0
P O
T
.1
P O
T
.9
C ur ve P
S W
D R .0 0'
T= 1.
L= 2.
P C
.4
P T
.1
P O
T
.0
IR
W
V
V
B
JH
JH
Fo un d 1" I ro n R od w fla gg in g (b ur ie d 3" d ow n)
M A
T C
H L I N
E
S T
A
394+00.00
Line to be constructed
Non-contributing area boundary
Yellowstone North Entrance Road
(PSW03)
B y p a s s R d
(B Y P
BEGIN PROJECT
NORTH ENTRANCE
DEMOLITION PLAN
D.3
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a fg .d
C h e c k e d b y
D e s ig n e d b y
M A
TC
H
LI
N E S
TA
2+
ARY
NOT FOR C
ONSTRUCTIO
N
P T
.4
P O
T
.6
P O
C
.1
POT 3
0+73.
93=
P C
.8
P C
C
.5
P T
.5
P C
.4
9 4
P T
.1
POT 5
00+
00.
POT 7
+00 .00
AC
WV
IR
IR
AC
IR
WV
WV
AC
BM
BMACAC
G ss
C
C
T
W
SO
W
SO
W
S O
AC
JH 1001
JH 1002
JH 1028
JH 1029
ARCH HAIRPIN/PARK STREET
DEMOLITION PLAN
D.4
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a fh .d
C h e c k e d b y
D e s ig n e d b y x= x
4 .
A T
S E
N I
L H
C T
A M
02+13 .ATS ENILHCTAM
M A
T C
H L
IN
E S
T A . 2
M A T C
H L
IN
E
S T A
W. PARK ST.
S
R D S
T
North Boundary Yellowstone National Park
YELLO
W
S
TO
N E N
O R
TH
EN
TR
A N C E R
D
(PSW03)
(YST01
DAOR LIART ENOTSWOLLEY
Roosevelt Arch
Non-contributing area boundary
Remove curb and gutter, conc.
404+00 to 405+35, LT constructed
Line to be
Removal of sidewalk, concrete
404+01 to 405+34
Removal of monument
403+87
Removal of wall (concrete)
403+78 to 404+04
Removal of sidewalk, concrete
403+61 to 403+65
See G Sheets for quantity
Removal of wall (concrete).
403+48 to 403+50 of sidewalk, concrete
Removal
402+95 to 403+58 concrete
Removal of curb and gutter, 402+95 to 403+50
Remove boulder
403+26
Remove light pole
402+47
Removal of bollard
402+16
Removal of bollard
402+08
Removal of bollard
401+99
Removal of bollard
401+91
See H-Sheets for quantities
Removal of inlet and pipe, See H-Sheets for quantities
Remove headwall, N
(PS
03)
ARY
NOT FOR C
ONSTRUCTIO
N
POT 30
+73.9
3=
P O
T
.9
P C
.4
9 4
P T
.1
P C
.6
PT 411+50.99
POT 50
0+00.0
P O
C
AC
IR
WVWV
EM
WVWV
AC
G
W
SO
W
SO
W
SOW
SOW
SO
W
SOW
SOW
SO
W
SO
W
SO
W
SO
W
SO
8"DIA
4"DIA
GAS PUMP GAS PUMP
8"DIA
4"DIA
8"DIA
4"DIA 4"DIA 4"DIA 4"DIA 4"DIA 4"DIA 4"DIA 4"DIA
8"DIA
8" 8"
8" 8" 8" 8" 8" 8" 8" 8" c m p
ABANDONED
PHONE BOOTH
C
C
C C
C
C
CCCC
C
CC
B
FP FP
IR
67106710
(W PARK LOT 2)
(PSW03)
(BYP01)
PARK STREET
DEMOLITION PLAN
D.5
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a fi .d
C h e c k e d b y
D e s ig n e d b y
W. PARK ST.
N
Road connection
Robert Reamer
Lot. See Sheet E.5
W. Park St. Parking
Y W
H
MATCHLINE STA. 411+82
MATCHLINE STA. 302+20
MATCHLINE STA. 31+30
S
N D S
T
R D
S
R D S
T
(PSC03)
Non-contributing area north boundary
Non-contributing area south boundary
See H-Sheets for quantities
Remove existing inlet, See H-Sheets for quantities
Remove existing pipe, trash receptacle
Remove existing
405+59
500+32 to 504+50. LT Remove Wheelstops (log)
Remove sidewalk, concrete
500+25 to 504+57, LT
3RD ST / 30+00.00
406+11.74 =
PARK ST -
(including recycle receptacle)
Removal of trash receptacle
408+00 Remove boulders (4 total)
410+91 to 411+18
Removal of fence (log rail)
411+03
Remove boulder
410+72(including recycle receptacle)
Removal of trash receptacle, 410+11
M A
T C
H L I
E
S
T A
POT 504+78.84=POC 411+26.47
ARY
NOT FOR C
ONSTRUCTIO
N23
24A C
K
K
G G G
PC 409+93.63
P T
.9
P I 4
.8
P I 2
.6
8PO
T
4+ .8 7=
PO
C
.4
PI
4+ .8
PI
.6
HIGHWAY 89/2ND STREET
DEMOLITION PLAN
D.6
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a fj .d
C h e c k e d b y
D e s ig n e d b y
S. 2ND ST. (HWY 89)
W
M A I N S
T
E
M A I N S
T
(PSW03)
M
A I N
E
W
M
A I N
E
W
END PROJECT
MDT 870+98.68
415+84.29 =
N
See H-Sheets for quantities inlets and pipes, Remove existing
Removal of light pole
413+71, RT
Removal of light pole
414+89, RT
concrete
Remove curb and gutter, 411+76 to 413+84, LT
Remove sidewalk, concrete
412+64 to 413+78, LT concrete
Remove curb and gutter, 414+51 to 415+81, LT
Remove curb and gutter, concrete
414+44 to 415+63, RT
Remove sidewalk, concrete
414+51 to 415+63, RT
Remove sidewalk, concrete
414+51 to 415+58, LT road connection
Robert Reamer
Removal of sign
411+70
Remove sidewalk, concrete, 411+76 to 413+77, RT
Remove curb and gutter, concrete
411+76 to 413+77, RT and begin mill and overlay roadway reconstruction
Approximate end of
412+45
Removal of light pole
412+58, RT
reconstruction
Begin MDT
411+76
MATCHLINE 24+35
MATCHLINE 22+57
ARY
NOT FOR C
ONSTRUCTIO
N
P K
T
AC
IPACACAC
WV
G
T
WV
T
TUPTEM
WV
WV
WV
WVWV
EM
IR
b p
N B
P
P
W
SO
W
SOW
SO
W
SO
W
SO W
SO
W
SO
W
SO
W
SO
W
SOW
SO
W
SO
FP FP
FPFP
P C .0
P R
C
.5
PT 601+63.07
PC 602+04.48
P T
.0
P O
T
.9
P C
.6
PT 411+50.99
P O
C
P O
T
.0
P C
.3
P T
.6
N
W. PARK ST.
S S
T S
T
E. PARK ST.
Non-contributing area boundary
H W
Y
S
N D S
T
ROBERT REAMER CONNECTION
(PSC03)
P O
B
Remove sidewalk, concrete
604+95 to 602+36, RT
(EPS02)
SEE PARK 2013(1)B
MATCHLINE STA. 10+83,
Remove fence
601+80 to 602+23, RT
Remove gate
601+78, RT
Remove fence
601+48 to 601+76, RT
.E
VA
RE
M
A E
R T
R E
B O
R
(PSW03)
Remove fence
400+32 to 411+18, LT
603+42 to 604+36, RT
Remove Wheelstops
Remove fence
601+53 to 605+36, LT
Remove boulder
603+99
Removal of bollard
601+32
Removal of bollards, (3 total)
600+28 to 600+31
ROBERT REAMER CONNECTION
DEMOLITION PLAN
See Sheet E.4
W. Park St. parking lot.
Remove boulder
601+64
Remove boulder
605+XX, LT
Remove fence
(X total)
Remove boulders
Remove boulder
601+84, LT
North Boundary Yellowstone National Park
D.7
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a fk .d
C h e c k e d b y
D e s ig n e d b y
S e e Y e llo w st o n e N o rt h E n tr a n ce
M A T C H
LI
N E
POT 1
0+05.
50=
POT 1
01+
06.
ARY
NOT FOR C
ONSTRUCTIO
N
P C
.0
P R
C
.5
P C
C
.3
PT 201+56.02
PC 202+21.51
P C
C
.3
P T
.4
P O
T
.6
P O
C
.1
WV
WV
WV
WV
WV
WV
WV
WF EM
WV
UP
G
G
P
C
T
T
W
S O
ARCH PARK
AND
YELLOWSTONE ROAD
DEMOLITION PLAN
D.8
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a fl .d
C h e c k e d b y
D e s ig n e d b y
W. PARK ST.
DAOR LIART ENOTSWOLLEY
kraP lanoitaN enotswolleYyradnuoB htroN
N
M A T C
H L
IN
E S
T A . 5
M A
IN
S
T.
M A
IN
_N -5
= +102 TSY
MAIN
N-
50+ 00.
(PSW03)
(YST01) M
A
T C
H L
IN
E
ROAD (PSW03)
NORTH ENTRANCE
YELLOWSTONE
ARY
NOT FOR C
ONSTRUCTIO
N
PC
.0
P R C
.5
PCC 201+10.31
PT
1+ .02
PC 2
+21 .51
PCC 202+72.37
W V W
V W V W
V W
VW
V
W V
W F
EM
W V
U P
IP
IR
A C
A C
IR
G
G
N B
P
C
T
T
T
W S
O
WS
O
WS
O
W S
O
WS
O
WS
O
WS
O
W S
O
(MAIN
N-
S0 1)
D.9
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m t-a fm .d
C h e c k e d b y
D e s ig n e d b y
AND FOURTH STREET
MAIN STREET (N-S)
DEMOLITION PLANS
.TS NIAM .W
M A
T C
H L I N
E S
T A . 5
(M
AIN
E-W
01)
M
AIN
S
T.
(concrete landing)
Remove sidewalk, concrete
50+97 to 51+01, LT
(concrete landing)
Remove sidewalk, concrete
51+52 to 51+58, LT
Remove light pole
52+45, RT
(log rail)
Removal of fence, 50+35 o 51+30 concrete
Removal of sidewalk, 51+25 to 51+26 concrete
Removal of sidewalk, 51+26 to 51+29
Remove sidewalk, concrete
51+31 to 51+34 concrete
Remove sidewalk, 51+35 to 51+37 concrete
Remove sidewalk, 51+69 to 52+00
(log rail)
Removal of fence, 51+39 to 51+70
(concrete road patch)
Remove sidewalk, concrete
51+50 to 52+39, RT
H-Sheets for quantities and pipe, See
Remove existing inlet
H-Sheets for quantities existing pipe. See
Plug and abandon
(including recycling receptacle)
Removal of trash receptacle
51+25
(including recycling receptacle)
Removal of trash receptacle
51+27
(including recycling receptacle)
Removal of trash receptacle
51+32
(including recycling receptacle)
Removal of trash receptacle
51+37
14+90
END PROJECT
Remove light pole
14+78, RT
(concrete utility road patch)
Remove sidewalk, concrete
14+80 to 14+84, RT
N fence, (log base)
Removal of
51+76 to 52+72 concrete, 11-inch depth
Construct curb & gutter, 49+90 to 52+97, RT
File details come from the government source that posted it. Updated .