Master Quote Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DTFH70-13-SSN-00004_Amend1-1.pdf | ||
| Detailed_Drilling_Requirements_doc2.pdf | ||
| Field_Inspectors_Daily_Report.pdf | ||
| Special_Agreement_Requirements_doc3.pdf | ||
| Sources_Sought.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drilling BPA DTFH70-13-SSN-00004 Project Name:
Offer Due By:
QTY
Price
Unit of measure
Fill in
Sub Total
Mob/Demobilization Truck mounted drill
Mile
Mobilization/Demobilization Track mounted drill
Mobilization/Demobilization Portable drill
Casing Advancer Drilling (4 or 5 inch diameter)
Ft
Casing Advancer Drilling (2 ½ - 4 inch) (Portable drill rig)
HQ3 core drilling
NQ core drilling (portable drill rig)
Asphalt Cores 4-inch diameter, through roadway
Each
Hollow stem auger drilling 4 ¼” ID (8 ¼” OD)
Hollow stem auger drilling 3 ¼” ID (portable drill rig)
2.5 & 3 inch split spoon samples
SPT samples (other than 2.5 & 3”)
Shelby Tube Samples 2 ½ & 3-inch
Per Diem per person per day at Government rate for area:
Day
On Project Moves
Hour
Water Haul Identify source:
2.75 Inch Inclinometer Casing Installed
Lnft
2-inch Slotted Piezometer Casing Installed
2-inch Solid Piezometer Casing Installed
Crane Mob/Demob (highly variable with location) Each – Negotiated at time
Lump Sum
Crane Use ( highly variable with location) Hour/Day/Week – Negotiated at time
Standby Time (crane and operator)
Hour – Negotiated at time Hour/Day Subgrade Drilling (includes crew, all materials and equipment)
Monitoring Well Cover Flush Mount with Locking Cap Installed
Monitoring Well Cover, above surface, Installed
Flagger Per Diem Per Person Day – Negotiated at time
Day
Flagging Personnel (not subject to wage determination) Hour – Negotiated at time
Flagging Personnel (not subject to wage determination) Overtime Hour – Negotiated at time
Mob/Demob for flagging personnel Lump Sum – Negotiated at time
Lump Sum
Flagging Equipment Day/Week – Negotiated at time
Shipping Samples (variable for each project) Lump Sum – Negotiated at time
Lump Sum
Standby Time (if any) for drill crew and equipment
Monitoring Well Permit (variable by jurisdiction) Negotiated at time
Each
Helicopter Use, highly variable with location and helicopter size Negotiated at time
Drill Crew Work (site preparation, skidding drill rig,)
Construct Drill Access (Bulldozer or Excavator) – Negotiated at Time
Ream Casing to Install Instrument
Crew Breaks (10 days on; 4 days off) Negotiated at Time
Fuel Surcharge When Fuel is beyond $4.00 a gallon - Negotiated at Time
Mile
Water Level Testing Hour
Prepare gINT logs Hour
On Project Field Inspection Hour
MOB and DEMOB for Field Inspector Lump
Per Diem for Field Inspector(at the government rate) Day
Other(give detail)
Other(give detail)
Other(give detail)
Quote amount: _____________
Project Start Date:________________ Project Completion Date:_____________ Company Name:___________________________________________
Signature of Authorized Representative Date