Field_Inspectors_Daily_Report.pdf

PDF 15 KB Posted

Attached to
Geotechnical Drilling Services BPA Federal contract opportunity
Solicitation number
DTFH70-13-SSN-00004
Issued by
Department of Transportation Federal Highway Administration

About this file

Field Inspectors Daily Report

View the file

Other files for this federal contract opportunity

Other files attached to Geotechnical Drilling Services BPA, newest first.
File Type Posted
DTFH70-13-SSN-00004_Amend1-1.pdf PDF
Special_Agreement_Requirements_doc3.pdf PDF
Sources_Sought.pdf PDF
Detailed_Drilling_Requirements_doc2.pdf PDF
Master_Quote_sheet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Field Inspector’s Daily Report

Drilling BPA DTFH70- -A-000 Call #:________ Project Name:

QTY

Unit of measure

Fill in Mob/Demobilization Truck mounted drill

Mile

Mobilization/Demobilization Track mounted drill

Mobilization/Demobilization Portable drill

Casing Advancer Drilling (4 or 5 inch diameter)

Ft

Casing Advancer Drilling (2 ½ - 4 inch) (Portable drill rig)

HQ3 core drilling

NQ core drilling (portable drill rig)

Asphalt Cores 4-inch diameter, through roadway

Each

Hollow stem auger drilling 4 ¼” ID (8 ¼” OD)

Hollow stem auger drilling 3 ¼” ID (portable drill rig)

2.5 & 3 inch split spoon samples

SPT samples (other than 2.5 & 3”)

Shelby Tube Samples 2 ½ & 3-inch

Per Diem per person per day at Government rate for area:

Day

On Project Moves

Hour

Water Haul Identify source:

2.75 Inch Inclinometer Casing Installed

Lnft

2-inch Slotted Piezometer Casing Installed

2-inch Solid Piezometer Casing Installed

Crane Mob/Demob (highly variable with location) Each – Negotiated at time

Lump Sum

Crane Use ( highly variable with location) Hour/Day/Week – Negotiated at time

Standby Time (crane and operator) Hour – Negotiated at time

Hour/Day measure

Fill in Subgrade Drilling (includes crew, all materials and equipment)

Each Monitoring Well Cover Flush Mount with Locking Cap Installed

Each Monitoring Well Cover, above surface, Installed

Each Flagger Per Diem Per Person Day – Negotiated at time

Day

Flagging Personnel (not subject to wage determination) Hour – Negotiated at time

Flagging Personnel (not subject to wage determination) Overtime Hour – Negotiated at time

Mob/Demob for flagging personnel Lump Sum – Negotiated at time

Lump Sum

Flagging Equipment Day/Week – Negotiated at time

Shipping Samples (variable for each project) Lump Sum – Negotiated at time

Lump Sum

Standby Time (if any) for drill crew and equipment

Monitoring Well Permit (variable by jurisdiction) Negotiated at time

Each

Helicopter Use, highly variable with location and helicopter size Negotiated at time

Drill Crew Work (site preparation, skidding drill rig,)

Construct Drill Access (Bulldozer or Excavator) – Negotiated at Time

Ream Casing to Install Instrument

Crew Breaks (10 days on; 4 days off) Negotiated at Time

Fuel Surcharge When Fuel is beyond $4.00 a gallon - Negotiated at Time

Mile

Water Level Testing Hour

Prepare gINT logs Hour

On Project Field Inspection Hour

MOB and DEMOB for Field Inspector Lump

Per Diem for Field Inspector(at the government rate) Day measure

Fill in Other(give detail)

Other(give detail)

Other(give detail)

Other(give detail)

Other(give detail)

Field Inspector Name Printed:__________________________________________

Field Inspector Signature:____________________________________

Driller Name Printed:_______________________________________

Driller Signature:___________________________________________

Date:_____________________________________________________

Company Name:___________________________________________

File details come from the government source that posted it. Updated .