DTFH70-13-SSN-00004_Amend1-1.pdf
PDF 54 KB Posted
- Attached to
- Geotechnical Drilling Services BPA Federal contract opportunity
- Solicitation number
- DTFH70-13-SSN-00004
About this file
Amends the BPA required submittals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Field_Inspectors_Daily_Report.pdf | ||
| Detailed_Drilling_Requirements_doc2.pdf | ||
| Master_Quote_sheet.pdf | ||
| Special_Agreement_Requirements_doc3.pdf | ||
| Sources_Sought.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
In consideration of the modification agreed to herein as complete equitable adjustments for the changes detailed herein, the contractor hereby releases the government from any and all liability under this contract attributable to the facts or circumstances giving rise to, arising from, or relating to, this modification.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by Elite Federal Forms, Inc.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
1 1
Amendment 001 09/05/2013 n/a
Department of Transportation Federal Highway Administration - WFLHD 610 East Fifth Street Vancouver, WA 98661
DTFH70-13-SSN-00004
07/11/2013
N/A
Amendment 1 revises items that are required to be submitted by contractor as part of BPA Submittal. Changes are shown in track changes on the attached page.
N/A
DTFH70-13-SSN-00004 Page2
All stationary and mobile diesel and gasoline engines, except exhaust turbo-charged engines used shall be equipped with spark arresters.
(See Contractor-Furnished property and Services, see Section C in the attached document for detailed requirements)
The personnel requirements will consist of one journeyman-level drill operator with 3 years minimum experience in the operation of drill equipment in the geotechnical field, driller’s license from each state, if required, where they perform work. Must be capable of performing standard geotechnical tests and be proficient in the use of split tube sampler and similar tests.
The experienced helper will work under the direct supervision of the driller. Must be able to lift heavy equipment in adverse weather conditions. Must have a minimum of 6 month’s experience working with heavy equipment.
Flag personnel shall be certified and perform in accordance with the “Manual on Uniform Traffic Control Devises, Part IV Section F.
(See Contractor- Personnel Requirements, Section D in the attached document for detailed requirements)
Contractor shall include in the package; a completed copy of the provision FAR 52.212-3, Offeror Representations and Certifications Commercial Items, Certificate of Liability Insurance, Five recent drilling references for which geotechnical drilling services were provided and contact information, a list of your 2011-2012 drilling jobs in which you performed geotechnical drilling services, your personnel and years of geotechnical experience, and a price sheet with your standard drilling prices that are able to be determined at time of package submission, if there is a line item on the Master Quote Sheet that you cannot determine the price you can leave it blank or put TBD (To be determined).
Submit by:
1. Email required document to: WFL.purchasing@dot.gov. Please include your company name and Geotechnical Drilling BPA in the subject line and DTFH70-13-SSN-00004
CONTACTS: Gunnar Prutz, Contracting Officer 360-619-7685
Telina Thompson, Contracting Officer 360-619-7738 Bob Beck, Technical Contact-Drilling Coordinator 360-619-7824
File details come from the government source that posted it. Updated .