Detailed Drilling Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Geotechnical Drilling Services BPA, newest first.
File Type Posted
DTFH70-13-SSN-00004_Amend1-1.pdf PDF
Master_Quote_sheet.pdf PDF
Special_Agreement_Requirements_doc3.pdf PDF
Sources_Sought.pdf PDF
Field_Inspectors_Daily_Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drill-2012, Geotechnical Drilling Services Truck and Track Mounted Drill Rigs

Page A-1

Detailed Requirements

DESCRIPTION/SPECIFICATIONS

A. BLANKET PURCHASE AGREEMENT REQUIREMENTS

This agreement covers the following geographical area: the states of Alaska, Oregon, Washington, Idaho & Montana; and Yellowstone National Park & Grand Teton National Park in Wyoming. The Service Contract Act will be applicable. The actual work location will be designated within each Scope of Work (SOW) attached to an RFQ. The majority of the work will be in the Western States of Oregon, Washington, Idaho, Montana, Alaska and Wyoming to include National Parks and in or near National Forests

Definitions

PROJECT: The specific section of the highway or other property on which drilling is to be performed as set forth in the Scope of Work.

DRILL SITE: Consists of each borehole location, including access road(s), drill pad, staging area(s), and flagging area.

FHWA: Federal Highway Administration, Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, Washington

COR: Contracting Officer's Representative

FIELD INSPECTOR: Hole logger

SOW: Statement or Scope of work to be interchangeable

CALL: Award from a RFQ against the BPA

B. SCHEDULE OF DRILLING AND SAMPLING

The schedule for drilling and sampling, and depth of each boring required will be provided within the scope of work for a given RFQ.

C. CONTRACTOR-FURNISHED PROPERTY & SERVICES

All equipment must meet state, local and federal environmental requirements. Equipment must be free from petroleum leaks or other environmentally hazardous liquid. If the equipment does not meet these requirements, it could ultimately result in termination of the BPA.

C1. DRILLING MACHINE

The drilling machine requirements will consist of a truck or track mounted drill, capable of wire-line core drilling to a minimum depth of 200 feet, obtaining an H-size (approximately 2.5 inch diameter) core, and standard penetration tests (SPT) and samples for the full depth specified in each Scope of Work. The equipment shall also be capable of turning 8.25 inch (O.D.) hollow-stem augers to a depth of 80 feet.

Portable drilling machines will consist of drills capable of being transported to specific drill locations using a crane, helicopter, skidding, ATV or hand packable by a drill crew. Portable drills will be capable of wire-line core drilling to a minimum of 50 feet using N-size or H-size core. The equipment will also be capable of drilling to 60 feet using a casing advancer system with a large enough diameter

Page A-2 that an N-size core rods can be used to drill inside the casing. The drill shall be capable of conducting (SPT) tests and obtaining samples for the full depth specified in each Scope of Work. Drill sites will be off the main roads, on slopes below or above the road, on new road alignments, and on pioneer cat roads.

The drilling machine shall be furnished complete with all the materials, operating accessories, modifications, and attachments that may be necessary to fulfill the requirements of the RFQ. This includes, but is not limited to: drill fluid pumps; core barrel and rod; diamond core bits; SPT barrels, hammers, and assorted equipment; and water tanks, hoses, and accessory pumps. Inoperable equipment shall be repaired or replaced within 48 hours at the Contractor's expense.

C2. CORE DRILLING EQUIPMENT

H-sized triple tube or split tube wire-line core drilling equipment shall be used unless otherwise stated in the Scope of Work. Diamond bits, casing shoes and advancers, reaming shells, and asphalt coring bits, shall be supplied by the Contractor.

C3. AUGER DRILLING EQUIPMENT

Hollow stem augers for soil sampling to required depths, installation of instrumentation, and to allow H-sized coring to continue sampling shall have a minimum I.D. of 4.25 inches and maximum O.D. of 9 inches. All sampling rods, split spoon samplers, shoes, and auger tools shall be supplied by the Contractor.

C4. SUBGRADE SAMPLING EQUIPMENT

Large diameter earth auger shall have an O.D. of 14 – 16 inches and the capability to drill 5 feet below ground surface. The bit should have a nearly flat bottom profile. A ten inch OD solid stem auger, 5 feet long will be attached to the bit. Replacement auger teeth, sample bags, hand excavation equipment (rock hammer, shovel, post-hole digger, asphalt patch) and tamper shall be supplied by the Contractor.

C5. SPARK ARRESTERS

All stationary and mobile diesel and gasoline engines, except exhaust turbo-charged engines, used in the Contractor's operations shall be equipped with spark arresters.

D. PERSONNEL REQUIREMENTS

The Contractor shall furnish a drill crew consisting of at least one journeyman-level drill operator and one experienced drill helper. In addition, the SOW may indicate the need for flaggers. The Contracting Officer (CO) shall have the authority to require the replacement of any Contractor personnel not exhibiting adequate capability or reasonable safety and responsibility in their job performance.

Personnel removed due to Government determination of unsuitability shall be replaced within 2 days. If the Contractor replaces personnel during the performance of a SOW, there shall be no expense to the Government.

The Contractor and not the Government is responsible under this agreement for the control, management, and supervision of the day-to-day activities and performance of their employees while performing the services required by the agreement. Services to be delivered under this agreement by the Contractor to the Government are non-personal as defined by FAR Part 37.

D1. JOURNEYMAN-LEVEL DRILL OPERATOR

Page A-3

The Drill Operator is responsible for the safe and efficient transportation, operation, and maintenance of equipment utilized in drilling, sampling, and testing of bore holes for bridge foundations, landslide investigations, soil survey, retaining wall foundations, and material source investigations. The Drill Operator supervises the building of access roads, and crane or boom truck operations as needed to gain access to sites. The Drill Operator shall have a minimum of 3 years of experience in the operation of drill equipment in the geotechnical field. Drill Operators shall possess a valid State driller’s license from each state, if required. The contractor shall have current driver's licenses that permit the transport of drill operation equipment. Such licenses shall comply with all applicable Federal and State codes and regulations. The Drill Operator's driving record shall indicate the safe and responsible use of drilling operation vehicles. The Drill Operator shall be capable of performing standard geotechnical tests such as the standard penetration test and thin wall undisturbed sampling (i.e. Shelby). In addition, the Drill Operator shall be proficient in the use of split spoon sampler and similar tests. The Drill Operator shall understand the use of, and be able to install, inclinometer casing and piezometer casing as directed. The Drill Operator shall be able to locate borings on the ground from plans or other diagrams and read and understand survey stakes. The Drill Operator shall be capable of following oral and/or written instructions of a general nature. Drill Operator shall be physically fit and capable of lifting and carrying heavy pieces of drill equipment in adverse or inclement conditions such as mud, snow, ice, or irregular terrain.

D2. DRILL HELPER

The Drill Helper shall work under the direct supervision of the Drill Operator. The Helper will be required to assist the Drill Operator with heavy lifting of drill equipment in possibly adverse conditions, such as mud, snow, ice, or uneven ground. The helper shall have a minimum of six (6) months experience working with heavy equipment. He shall be familiar with the operation of water pumps.

The Helper shall have a good overall mechanical aptitude and possess good manual dexterity. The Helper shall have current driver's licenses that permit the transport of drill operation equipment. Such licenses shall comply with all applicable Federal and State codes and regulations. The Helper's driving record shall indicate the safe and responsible use of drilling operation vehicles.

D3. FLAGGER

Flaggers shall perform in accordance with The Manual on Uniform Traffic Control Devices, Part VI, Section F - Control of Traffic Through Work Areas. Flaggers shall have current certifications (flagging cards) from the American Traffic Safety Services Association or a State agency.

D4. FIELD INSPECTOR

The contractor will provide an experienced (minimum 4 years) geotechnical engineer or geologist to act as the Field Inspector to log all drill holes when required in the scope of work for a drill project. All drill logs will be done in accordance with the Unified Soil Classification System and AASHTO. Digital pictures will be taken of each core box while it is on the project. gINT logs ( to be supplied by the government) will be produced based on the field logs and e-mailed to FHWA Drill Coordinator Bob Beck at; robert.beck@dot.gov The logs will be reviewed and sent back for gINT revisions. This process may require multiple revisions. The contractor will supply core boxes and wood separator blocks, the field inspector will supply a digital camera, zip lock bags, tape measures, writing utensils, hammers, knives, and other equipment as required.

The Field Inspector may be required to make a site visit prior to the start of drilling.

E. PERFORMANCE REQUIREMENTS

E1. GENERAL DRILLING

Page A-4

The Contractor shall perform the drilling at the locations set forth in the Scope of Work. WFLHD will stake or flag each drill site.

NOTE: The actual depth of holes may vary from the amount set forth in the SOW. The Contractor shall be paid for the actual number of holes drilled and the actual depths drilled.

E2. DRILL WORK

a. SOIL SAMPLING

The Contractor shall conduct standard penetration sampling in accordance with standard methods specified by the American Society for Testing and Materials (ASTM) in ASTM D 1586-84, Standard Test Method for Penetration Test and Split-Barrel Sampling of Soils. Shelby tube sampling shall be in accordance with ASTM D 1587-83, Standard Practice for Thin-Walled Tube Sampling of Soils. Standard penetration tests (SPT) shall be conducted in soil continuously to refusal, as determined by the SOW. The Contractor shall open the SPT sampler after each test, and provide the open sampler with sample contained within to the Field Inspector.

Borings shall be advanced using hollow stem augers with a center plug or bit. Subsurface materials at the drill site may preclude SPT sampling in some parts of one or more holes. If material is encountered that is too large for hollow stem augers to advance, the H-size core barrel shall be inserted, and advancement of the hole shall be continued with SPT tests taken as directed by the SOW.

If SPT refusal occurs prior to obtaining the specified depth, the borehole shall be advanced another 1½ feet and the Standard Penetration Test repeated. If SPT refusal occurs again the Field Inspector may direct the Driller to change to core drilling or to continue auguring to the required depths. SPT refusal is defined by AASHTO T 206 and ASTM D 1586, as when the number of blows exceeds 50 for any 6” increment, when the total number of blows equals 100 or if the sampler has not advanced as a result of the last 10 consecutive blows.

If volatile or poisonous gas is encountered, the boring shall be terminated and the COR shall be notified.

b. CORE DRILLING AND SAMPLING If auger and/or SPT refusal, as determined by the Field Inspector occurs, the Contractor will begin core drilling. Coring shall be performed in all fresh, broken, and/or weathered rock, providing continuous core samples of the materials being investigated. Asphalt cores shall be drilled through the entire thickness of asphalt present in the roadway, up to a maximum of 12 inches. Core samples shall be recovered in as intact a state as possible at the locations and to the depths prescribed in the Scope of Work. Core samples shall be emptied from the core barrel into a core tray or other suitable container that minimizes disturbance to the sample for examination.

The core will be boxed by the Contractor after the Field Inspector's examination. All recovered core and other drilled materials shall be delivered to the designated office according to the schedule established in the Scope of Work.

c. SUBGRADE SAMPLING

The COR will determine the frequency of subgrade sampling (e.g. .25 or.50 mile intervals) and/or select specific sampling locations in the SOW. Sampling shall begin by carefully augering through the pavement, if present, without disturbing the underlying baserock, and hand excavating the pavement material to the top of the baserock. Loosen baserock with auger without mixing with underlying materials. Hand excavate and place all baserock into sample bag(s). Hand clean base of hole so as not to mix baserock with underlying material. Carefully

Page A-5 loosen underlying material with auger so as not to mix individual, distinct layers. Sample each distinct strata encountered as determined by the COR to auger refusal or to a minimum depth of 5 feet. Obtain 100 pound samples in sand, silt and clay. Obtain 150 pound samples in predominantly gravel or cobble materials. Sample weight shall not exceed 70 pounds per bag.

The Contractor shall permit the COR to log the completed hole prior to backfilling. Backfill the hole with material suitable for compaction. Compact each 1 foot of loosely placed fill with a tamper. Replace baserock with gravel and/or sand. Replace pavement to original depth with compacted asphaltic patch.

E3. INSTALLATIONS

a. Standpipe Piezometer

The Contractor shall install a PVC standpipe Piezometer to the bottom of the designated borings after drilling is completed. One centering device shall be attached for each 20-25 feet of PVC pipe to insure adequate annular spacing throughout the length of the standpipe piezometer. A slotted PVC screen shall be installed within the water-bearing strata as specified in the SOW. Backfill around the screen shall consist of number 8, uniform graded silica sand. A bentonite seal shall be installed above the screen to the top of the hole. A cap of common materials shall be placed over the seal. A plastic cap shall be installed on top of the PVC pipe. A permanent, locking cover shall be cemented in place surrounding and protecting the top of the PVC pipe. All pipe, screens, bentonite, sand, and other materials necessary for installation shall be furnished by the Contractor.

b. INCLINOMETERS The Contractor shall install flush coupled, ABS plastic inclinometer casing. For installations of less than 100 feet, quick connect inclinometer casing may be used.

For installations of 100 feet or greater, quick connect couplings may not be used.

On 100 foot and deeper installations all casing joints will be connected using a PVC cement as specified by the manufacturer, and two "pop" rivets per joint.

Each joint will be covered by "duct" tape to preclude entrance of grout. The inclinometer casing shall be inserted inside the drill casing. The inclinometer casing shall contain four internal grooves at 90 degree intervals which shall be oriented in the bore-hole at the direction of the COR. The hole will be filled with grout before any drill rods are extracted. Grout shall be pumped continuously until the annular space is completely filled and excess grout is flowing from the hole at the ground surface. Grout for installing inclinometer casing will differ from the grout mixture required when grouting a vibrating wire piezometer in the same hole as inclinometer casing. Grout shall consist of a prepackaged Portland cement that meets the requirements of ASTM C 150-94, mixed with powdered bentonite. One cup of soda ash will be added to each grout batch of 100 gallons or less. The soda ash should be added before the cement is added.

Page A-6

Cement-bentonite grout mixes for inclinometer installations

Application

Grout for Medium to Hard Soils

Grout for Soft Soils

Materials

Weight

Ratio by

Ratio by

Water

30 gallons

2.5

75 gallons

6.6

Soda Ash 1 cup More will not benefit or be a detriment to the mix

In 100 gallons or less

1 cup More will not benefit or be a detriment to the mix

In 100 gallons or less

Portland Cement

94 lbs.

(1 sack)

94 lbs.

(1 sack)

Bentonite

25 lbs.

(as required)

0.3

39 lbs.

(as required)

0.4

Drillers are accustomed to mixing water and bentonite first, but this will not allow you to control the water-cement ratio. Mix water and cement first. Then add bentonite.

There is no particular amount of bentonite that you must add. The thickness of the grout varies with water, temperature, and agitation, so the amount of bentonite required will vary.

The quantity of the bentonite ingredient to be added must be adjusted to obtain a suitable consistency. A watery mix is NOT acceptable. A mix that is too thick cannot be pumped. The Marsh funnel number of the liquid grout should be about 55 seconds +/- a few seconds

Page A-7

When you mix cement and water first, the amount of bentonite has to be adjusted. The amount is rarely ever equal to exactly 25 lbs. The final quantity also varies with the type of bentonite used, the method of mixing and the pH of the water.

Grout Mixes for Inclinometer and Piezometer in the Same Boring Grout Mix for Soft Soils

Materials Weight Ratio by Weight

Portland cement 94 lb (1 bag) 1

Water 75 gallons 6.6

Soda Ash 1 cup/100 gallons water

Bentonite 39 lb (as required) 0.4

Mix soda ash with water first then add the cement. Then mix in the bentonite.

Adjust the amount of bentonite to produce a grout with the consistency of heavy cream. If the grout is too thin, the solids and the water will separate. If the grout is too thick, it will be difficult to pump.

A permanent, locking 10 inch diameter cover shall be cemented in place surrounding and protecting the top of the PVC casing.

c. SONDEX: Installing Sondex pipe with inclinometer casing.

The contractor will need a 3 inch Sondex pipe (corrugated plastic pipe used for drains), Sondex pipe couplings, Sondex sensing rings, strong cable ties (16 inches or longer) or wire, mastic tape, and vinyl tape. The Sondex couplings are used to join lengths of Sondex pipe.

The cable ties or wire are used to secure the Sondex pipe to the bottom of the casing and to hold the Sondex couplings onto the Sondex pipe. The mastic tape and vinyl tape are used to

Grout Mix for Hard and Medium Soils

Materials Weight Ratio by Weight

Portland cement 94 lb (1 bag) 1

Water 30 gallons 2.5

Soda Ash 1 cup/100 gallons water

Bentonite 25 lb (as required)

0.3

Mix soda ash with water first then add the cement. Then mix in the bentonite.

Adjust the amount of bentonite to produce a grout with the consistency of heavy cream. If the grout is too thin, the solids and the water will separate. If the grout is too thick, it will be difficult to pump.

Page A-8 seal the bottom and each coupling so that grout cannot enter in the void between the Sondex pipe and the inclinometer casing.

Cut an 8 foot section of Sondex pipe. This will be attached to the bottom section of inclinometer casing. Cut the remaining Sondex pipe into 10 foot sections.

Attach sensing rings to the Sondex pipe at 3 foot intervals or as directed in the

Statement of Work. Protect the rings from corrosion with mastic and tape.

Prepare the bottom section of casing as usual, and then secure the bottom 12 to 18 inches of the 8 foot section of Sondex pipe to the bottom of the casing. This can be difficult because (1) the Sondex pipe is quite strong and larger in diameter than the casing, and (2) the bottom of the Sondex pipe must be sealed against entry of grout.

Seal the bottom of the Sondex pipe using mastic and tape. Slit the bottom of the Sondex pipe to flatten it against the inclinometer casing, secure it to the casing with cable ties or wire, and then carefully waterproof it.

Lower the first section into the borehole so you can connect the next section. If the borehole has water in it, the buoyancy of the inclinometer casing must be overcome by adding water inside the inclinometer casing or by other means. The inclinometer casing will not be held in place from the top.

Slide a 10 foot length of Sondex pipe over a 10 foot length of casing. Join the casing, then joint the Sondex pipe. Fit the Sondex coupling onto the butted ends of Sondex pipe. Secure with cable ties and then waterproof the entire coupling.

Lower the pipe into the borehole so you can connect the next section. Join the casing, and then join the Sondex pipe. Continue until the casing has reached the specified depth.

Protect the top of the casing and Sondex pipe from grout spills.

Backfill the borehole with grout. Use the grout mix specified in the scope of work.

F. FIELD INSPECTION- Inspector duties include but are not limited to;

The borings should be drilled as close to the marked locations as possible. Some may need to be offset a foot or two to fit the drill in next to the guardrail but make sure the driller doesn’t move the boring just so they have a 4 foot wide walking path along the drill.

Take an accurate measurement of the pavement thickness to the nearest 0.1 inch and try to determine the base thickness as best you can.

Take photos of each core box on site. Place core in the box like you’re reading a book, starting at the top and working from left to right and down. Label the beginning and end of each core run. Using a permanent marker, draw a line across all mechanical fractures.

Label all samples with at least the project name, boring number, depth, date, and sample number.

Record the recovery of each split spoon sample to the nearest inch. Take a photo of each boring location.

Page A-9

The boring Stationing is listed on the table in the drill request. Measure the offset from the existing centerline of the actual drilled location and note it on the logs.

Take water level reading during drilling, after completion, and after withdrawal of the drill rods.

When coring and the material is highly weathered, take SPT samples to get some idea how strong the rock is.

Field Inspector’s Report The field inspector will submit a daily report with the quantities delivered that day to match the quote sheet items. The field inspector will sign, and the driller will both sign the completed form.

Field Inspectors report format provided by the Government.

DATALOGGERS

The Field Inspector may be required to set up single channel dataloggers for use with vibrating wire piezometers. The vibrating wire piezometers will be wired to the dataloggers at the drill site. The dataloggers currently in use by WFLHD are produced by Slope Indicator. The Inspector will use the associated software to input calibration factors and set the reading schedule. The software is a free download from Slope Indicator’s website.

The Field Inspector may be required to wire and program Campbell Scientific CR10X dataloggers for use with thermisters strings, vibrating wire piezometers, in-place-inclinometers and various other geotechnical instruments. The Inspector must be familiar with the use Campbell Scientific CR10X dataloggers and use industry standard practices and procedures as well as following Campbell Scientific guidelines given in the owner’s manual. WFLHD will provide the CR10X dataloggers and owner’s manuals when Campbell Scientific equipment is called for in the Scope of Work.

G. WATER LEVEL TESTING

DOCUMENTATION

The Contractor shall monitor the drill runs and depths, SPT Blow counts, water color changes and estimated percent (%) water return. On a per drill run basis, the Drill Operator shall inform the Field Inspector of the materials encountered (fresh rock, broken rock, weathered rock, soil, boulders), type of drilling used, drilling activity performed, and measured depth to water.

The Contractor shall document any information that might give an indication to the character of, or a change in, the subsurface materials being encountered. The Contractor shall confirm with the Field Inspector the depth of all sample locations, beginnings and endings of runs, and water depths to the nearest tenth of a foot.

Page A-10

The Driller shall furnish a signed copy of the Driller’s Daily Log to the Field Inspector at the close of each workday. The Field Inspector will immediately review the Driller’s Daily Log for consistency with the Government’s daily records. The Field Inspector will note all difference and discuss with the Driller. If both parties agree, changes shall be made to the Driller’s Daily Log. All unresolved differences shall be recorded by the Field Inspector, signed by the Field Inspector and the Driller, and the Field Inspector will notify the COR by phone within 24 hours of close of the subject workday.

The Contractor shall mail the original Driller’s Daily Log to the COR to the address in the SOW within 72 hours of the subject workday. These daily records and the samples are considered deliverables and shall be received prior to payment authorization.

H. MARKING HOLES

Upon completion of the drilling, all drill holes, except those where observation wells are installed, or if the hole is in the traveled-way of the pavement, shall be clearly marked.

The Contractor shall furnish and install a 4 foot wood lath. The contractor shall label the lath with a permanent marking pen or paint pen (or durable equivalent). Each lath shall have the following information:

1. Drill hole number and station

2. Final hole depth

3. Date drilling completed

I. ABANDONMENT OF HOLES AND LOST EQUIPMENT

Should the drilling casing, augers, or apparatus be removed from a bore hole, or should the hole be abandoned, without the permission of the COR, or should a hole be started and for any reason not carried to the depth required by the SOW, or should the Contractor fail to furnish the COR, the required samples, cores, and daily logs, the Contractor shall make an additional boring at a location near the original site which will be selected by the COR. No payment shall be made for either the abandoned hole or any cores obtained therein. However, the contractor shall make a record of abandoned bore holes and note thereon the reasons for the abandonment. All completed test holes shall be abandoned in accordance with established state procedures.

Equipment lost in the drill hole or at any drill site will be the responsibility of the Contractor.

J. ROCK CORE PRESERVATION

The rock cores shall be placed in waxed cardboard or corrugated plastic core boxes provided by the Contractor. The cores from each boring shall be kept separate and the cores shall be properly placed in the order in which they were removed from the core barrel. Adjacent runs shall be separated by means of wood blocks (or equivalent). On each separation block the Contractor shall clearly, accurately and permanently mark:

The depth of the top of the run

The depth of the bottom of the run

The run number

The Contractor shall label the boxes showing the following information:

Page A-11

Date the core was obtained

Project name; boring number

Starting and ending depths of core

Contractor's name

K. ASPHALT CORE PRESERVATION

The asphalt cores shall be placed in individual plastic bags and placed in a box suitable for their protection and transport. On the plastic zip lock bag, with permanent ink, the contractor shall clearly write:

The thickness of asphalt drilled measured in the drill hole and an actual core length

The boring number, station, and project name The date

L. WATER HAULING

The contractor shall be in the water-hauling mode when obtaining and hauling water from an approved water source more than 800 feet from the drill hole. This includes furnishing and operating equipment for the loading and hauling of water. The contractor shall provide a water truck with a minimum capacity of 500 gallons per single load of water, a pump capable of pumping a minimum of 25 gallons per minute, and all necessary hoses. Water hauling will be paid only if the contractor loads and hauls three-quarters or more of the trucks capacity. The contractor will use only water sources designated and approved by in the SOW. If a water source or sources are not designated in the SOW, it is the contractor’s responsibility to locate a source. If the water source is within 800 feet of the drill hole, then the cost of water hauling or pumping is incidental to the cost of drilling.

M. MOBILIZATION-Two types of Mobilization and Demobilization will be used.

Mobilization & Demobilization (Dispatch Order) - Includes initial mobilization to the first drill site and demobilization from the last drill site of all required personnel, equipment, material, and incidentals needed to successfully complete the SOW.

Mobilization shall be to the first drill site at the FHWA's project location. Demobilization shall be from the last drill site at the FHWA's last project location to the Contractor's place of business.

Mobilization (Project to Project) - Includes the mobilization of all equipment and support vehicles from one FHWA project to the next FHWA project as specified in the SOW.

The following are incidental to the Mobilization quote items: (1) preparing work area for drilling and sampling operations; (2 removing drill rods and augers from a completed borehole; (8) loading parts and drill related equipment onto drill rigs and support trucks;

and (9) steam cleaning of tools.

N. DRILL SITE PREPARATION-NEPA Clearence-to be provided or stated in the

SOW.

Page A-12

Drill Site Preparation consists of providing access to the drill site. Scope of Work will state whenever heavy equipment is required. Heavy equipment is defined as bull dozer, backhoe, excavator, crane or boom truck. Drill Site Preparation consists of all personnel and equipment needed to access, prepare, and reclaim a drill site. If access is possible without using heavy equipment, then drill site access, preparation and reclamation will be measured by the crew hour. Site preparation cannot be a substantial part of the total drilling project.

O. HEAVY EQUIPMENT STANDBY

When Drill Site Preparation involves the use of heavy equipment, the time when the heavy equipment is on project but not in active use will be considered Heavy Equipment Standby time.

P. FLAGGERS

The Contractor shall provide flaggers when drilling alongside or within the traveled way of a highway, street, or roadway, including bridges and tunnels, and all required equipment such as safety vests, flagging paddles, etc. All flagging personnel shall be certified and have their certification card with them while performing traffic control duties. Work is to be performed at the designated drill sites.

The work shall consist of the control of motorized and non-motorized vehicular traffic to protect project personnel at designated drill sites in a manner that provides the safe and efficient movement of traffic past or around drill equipment and/or crews performing work while protecting on-site workers and equipment. Work shall be performed in accordance with The Manual of Uniform Traffic Control Devices, Part VI. This work shall include the use of items such as: orange reflective vests; paddles marked "STOP" and "SLOW" on either side; where visibility between flaggers is poor or non-existent, hand-held two-way radios; and such signs as may be required to safely control the flow of traffic.

SPECIAL CONTRACT REQUIREMENTS

Storage of Materials

Materials shall be stored to assure the preservation of their quality and fitness for work. Right-of-way or other areas on Government land may be used for storage purposes, and shall be restored at the Contractor’s expense. All storage sites shall be approved by the COR.

Landscape Preservation

The Contractor shall give attention to the effect of contract operation upon the landscape, shall maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following:

A. PREVENTION OF LANDSCAPE DEFACEMENT

The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the COR. The Contractor shall gather rock debris or soil which falls outside the work due to contract operations and dispose of it as directed by the

Page A-13

COTR. For example, this may include rocks, blocks of soil, and pieces of wood dislodged during access construction or the building of drill pads.

B. PROTECTION OF STREAMS, LAKES, RESERVOIRS, AND WETLANDS

The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, reservoirs, and wetlands with fuels, oils, bitumens, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the COR. If a petroleum spill occurs, the Contractor shall immediately notify the landowner, the COR, and the State, County, or City emergency response system.

C. PROTECTION OF FORESTS, PARKS, AND PUBLIC LANDS

The Contractor shall comply with all regulations of the State fire marshal, conservation commission, Forest Service, National Park Service, Bureau of Land Management, Bureau of Indian Affairs, or other authority having jurisdiction governing the protection of land in the vicinity of the project.

D. USE OF PREMISES

1. Before any staging or camping areas are opened or operated on Government land or lands administered by the Government, the contractor shall obtain written permission through the COR. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

2. The Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State, and local regulations.

Hazardous Materials

Hazardous Materials Identification

The Contractor shall ensure that any material delivered for the Government is free of hazards of any kind, chemical or otherwise and/or will clearly identify any hazardous material upon delivery. Applicable clauses are included with each BPA.

A. DRILL FLUIDS

Contractor shall prevent drill fluids and cuttings from entering any water way at any time during drilling operations. Any additive to the drill water shall be biodegradable.

B. HAZARDOUS MATERIALS

The Contractor shall notify the COR of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDSs) for those materials available at the project.

The Contractor shall take appropriate preventive measures to insure that any spill of oil or oil products, including anti-freeze and hydraulic fluid, does not enter any stream or other waters of the United States or any of the individual States and shall conform to the regulations set by the state and local Fire Marshall.

If the total oil or oil products storage exceeds 1320 gallons, or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention Control

Page A-14 and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered engineer. If you would like a copy of these SPCC requirements, please request them in writing from the FHWA Contract Specialist (see Subsection L-102).

The Contractor shall immediately take action to contain and clean up, without expense to the Government, all petroleum products or other hazardous substance spills which are caused by the Contractor’s employees, directly or indirectly, as a result of operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and cleanup of all petroleum products or other hazardous substance spills caused by Contractor’s employees or resulting from construction operations.

Pollutants such as motor fuels, coolants, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on or into land or into rivers, streams, and impoundments, or into natural or manmade channels leading thereto. The Contractor shall properly dispose of vehicle oil filters, drained free-flowing oil, and oily rags as a hazardous waste. The contractor shall insure that absorbent wipes are available and a spill containment boom is deployed when working adjacent to streams.

Ozone Depleting Substances

Public Law 102-484 places restrictions on the use of ozone depleting substances (ODS) in the performance of any Government contract. No calls will include any specification, standard, drawing, or other documents that requires the use of a Class I ODS in the design, manufacture, test, operation, or maintenance of any system, subsystem, item, component, or process; nor does it require the delivery of any item of supply that contains (or a requirement that can only be met by) a Class I ODS. Any doubts or questions shall be immediately referred to the Contracting Officer.

Authorizations

All permits and agreements (including right-of-way and easement) will be obtained by the Government.

Utility locates or clearance is the responsibility of the contractor.

Government-Furnished Data

With each Call order, the Government will furnish: (a) drawings or survey stations showing approximate locations of drill holes; and (b) all requirements set forth in applicable permits and/or agreements (including right-of-way and easement).

Load Limits

The Contractor shall comply with all current applicable load limits imposed on Federal, State, County, and City roads. The contractor shall make itself knowledgeable of all applicable load limits. This shall include National Park Service limits.

Safety

For safety requirements concerning contractor personnel, see FAR Contract Clause 52.222-41, Service Contract Act of 1965, as Amended, paragraph (h) Safe and Sanitary Working Conditions.

The Contractor shall provide and maintain work environments and procedures which will safeguard public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities.

Page A-15

The Contractor shall provide appropriate traffic safety devices when working in traveled roadways, highway intersections, railroads, utilities, bridges, restricted areas, etc.

All work shall be performed in accordance with all Federal and local laws and regulations.

Responsibility for Damage Claims

The Contractor shall indemnify and hold harmless the Government and its employees from suits, actions, or claims brought for injuries or damage received or sustained by any person, persons, or property resulting from the drilling operations or arising out of the negligent performance of the contract.

The Contractor shall procure and maintain until final acceptance of the contract, liability insurance of the types and limits specified below. The Contractor shall obtain insurance from companies authorized to do business in the appropriate state. The insurance shall cover all operations under the contract whether performed by the Contractor or by subcontractors.

The Contractor shall furnish “certificates of insurance” certifying that the policies will not be changed or canceled without mailing a copy to the Government. Insurance coverage in the minimum amounts sets forth below shall not relieve the Contractor of liability in excess of the coverage.

The Contractor shall carry insurance meeting the following minimums;

Worker’s Compensation Insurance. Minimum required by law.

Comprehensive or Commercial General Liability Insurance. Comprehensive or commercial general liability shall cover personal injury and property damage. It shall include coverage for contractual liability related to the indemnity provided under this contract and coverage for completed operations liability. Coverage limits shall not be less than $1,000,000 combined single limit for each occurrence. If the coverage has a general aggregate limit, it shall not be less than $2,000,000.

Automobile Liability Insurance. Automobile liability insurance may be written in combination with comprehensive or commercial general liability insurance. Coverage limits shall not be less than $1,000,000 combined single limit for each occurrence.

Pricing of Adjustments

When contract price adjustment is allowed by the contract clauses, the Contractor shall submit the adjustment in the form of hourly rates or lump sum amounts.

The price adjustment shall include an itemized breakdown of direct costs such as materials, labor and equipment. Data supporting the Contractor’s overhead rate shall also be included with the price adjustment.

Availability of Contractor Records

Upon request by the Contracting Officer, Contractor records related to this contract shall be made available in a timely manner to the Contracting Officer:

during contract performance;

for 3 years after final payment; and for such longer period, if any, as is required by applicable statute or by any other contract clause.

All subcontracts at any tier shall include a provision giving the Government the same rights as provided above with respect to the subcontractor’s records.

Page A-16

Inspection

The COR and the Field Inspector shall have the right to inspect and approve all materials and equipment specified in this contract before drilling commences.

Inspections may be made periodically as work progresses, or as work is completed, to determine acceptability of method and manner of performance, the end product of the operations, and to make measurement for payment.

Acceptance

Acceptance shall be considered as the time when all services have been performed, and all soil samples, boring logs, and records have been delivered, inspected, and found to be in conformance with the contract requirements.

The following are acceptance criteria for services performed under Call orders:

a. QUALITY. Standards for acceptable performance are stated in the specifications set forth in BPA.

b. QUANTITY. The quantity of work shall meet the minimum requirements established in the

Call order.

c. TIMELINESS. The Contractor shall complete work on schedule and shall meet the deadline for any critical requirements identified in the Call order.

Page A-17

Q. MEASUREMENT AND PAYMENT

Q1. GENERAL

For each Scope of Work, the agreement unit price listed for each bid item will constitute full compensation for furnishing all equipment, labor, materials, and supplies, and performing all operations necessary to complete each item of work as specified per Scope of Work. Material and work paid for under one item will not be paid for under any other item. The Contractor will not be compensated for loss of time or equipment due to breakdown of equipment, lack of proper equipment as determined by the COR, labor shortages or disputes, delay in obtaining materials, or for any other reason not directly the fault of the Government.

No payment will be made for any work abandoned by the Contractor or rejected by the COR because of failure to meet SOW requirements.

Q2. MOBILIZATION AND DEMOBILIZATION (Dispatch Order)

a. MEASUREMENT. Mobilization and demobilization will be measured by the number of miles (travel price). The work covered under this item includes mobilization and demobilization of all required personnel, equipment, materials, and incidentals to the project. The total distance for mobilization shall be the mileage by direct route between the Contractor's place of business and the first drill site at a specific project as specified in the Scope of Work. The total distance for demobilization shall be from the last drill site at the FHWA’s project to the Contractor's place of business.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for Mobilization and Demobilization (Dispatch Order) per Scope of Work or group of Scope of Work if they are executed consecutively. Drill Site Preparation that does not involve the use of heavy equipment shall be incidental to this quote item.

Q3. MOBILIZATION (project to project)

a. MEASUREMENT. Mobilization (project to project) includes mobilization of all required personnel, equipment, materials, and incidentals from one project to the next.

The total distance shall be the mileage by direct route between projects as specified in the Scope of Work.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for Mobilization (project to project).

Q4. DRILL SITE PREPARATION

a. MEASUREMENT. Drill Site Preparation will be measured by the number of hours each piece of heavy equipment is in operation.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for Drill Site Preparation regardless of the type of heavy equipment used.

Q5. HEAVY EQUIPMENT STANDBY

Page A-18

a. MEASUREMENT. Heavy Equipment Standby will be measured by the number of hours each piece of equipment is on project, expected to be used again on project, but not currently being used. Heavy Equipment Standby will be limited to 8 hours a day, not to exceed 40 hours per week for each piece of equipment.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for Heavy Equipment Standby, regardless of the type of heavy equipment.

Q6. CORE DRILLING (Rock or Soil) & HOLLOW STEM AUGER DRILLING

a. MEASUREMENT. Drilling will be measured for payment by the number of linear feet ordered, unless otherwise directed by the COR.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation to drill the hole, to temporarily case the hole, to dispose of drill cuttings, to pump or bail water, and to furnish boxes for core shipment. No measurement or payment will made for drilling of rejected or abandoned holes or footage drilled in excess of Government authorized total depth.

Q7. ASPHALT CORES

a. MEASUREMENT. Drilling asphalt cores will be measured for payment by the number of cores ordered unless otherwise directed by the COR.

b. PAYMENT. Payment will be made at the prices set forth in the Quote schedule. This price and payment will be full compensation to drill the hole, to furnish bags and boxes for asphalt core shipment, and to replace/patch the pavement.

Q8. SUBGRADE SAMPLING

a. MEASUREMENT. Subgrade sampling will be measured for payment by the number of test holes ordered unless otherwise directed by the COR.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation to drill the hole, sample the material, fill hole, and replace/patch pavement.

Q9. SHELBY TUBE SAMPLING & SPLIT SPOON SAMPLING

a. MEASUREMENT. Sampling will be measured by the number of samples taken.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for obtaining the sample as required.

Q10. STANDARD PENETRATION TESTS

a. MEASUREMENT. Standard penetration tests will be measured for payment by the number of tests performed.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for this item of work.

Q11. INCLINOMETER CASING INSTALLED (1.9" O.D. & 2.75" O.D.& 3.3”O.D.)

Page A-19

a. MEASUREMENT. Inclinometer casing will be measured for payment by the number of linear foot in-place.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for all costs incurred to furnish casings in-place.

Q12. SONDEX INSTALLATION

a. MEASUREMENT. Sondex casing will be measured for payment by the number of linear feet in-place.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for all costs incurred to furnish casings in-place.

Q13. Standpipe Piezometer (1.0" PVC & 2.0" PVC)

a. MEASUREMENT. Standpipe Piezometer will be measured for payment by the number of linear feet in-place.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for all costs incurred to furnish Standpipe Piezometer in-place.

Q14. WATERHAULING

a. MEASUREMENT. Water Hauling will be measured by the hour. If the designated water source is more than 1/4 mile from the borehole, measurement shall begin at the time equipment leaves the borehole and stop when the equipment returns to the borehole. If the water source is within 1/8 mile of the borehole, then the cost is incidental and no payment will be made under this item.

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for all costs incurred in obtaining and hauling water.

Q15. FLAGGERS

a. MEASUREMENT. Flaggers, including equipment, will be measured by the hour, for each hour a person is actually performing the work. The contractor shall round portions of an hour up to the half hour. Time measured in excess of 40 hours per week will be measured at the overtime rate

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule. This price and payment will be full compensation for all costs incurred during flagging operations. If flagging is unnecessary, no payment will be made for temporary traffic control devices and such costs will be considered incidental to the cost of drilling.

Q16. FIELD INSPECTOR

a. MEASUREMENT. Field Inspection, including equipment, will be measured by the hour, for each hour a person is actually performing the work. The contractor shall round portions of an hour up to the half hour.

Page A-20

b. PAYMENT. Payment will be made at the prices set forth in the Quote Schedule.

This price and payment will be full compensation for all costs incurred during field work on a project.

Quote sheet attached