MT PRA GLAC 10(39), GTSR Rehabilitation, Siyeh Bend to Rising Sun, Phase XII, Glacier National Park, Glacier County, Montana

The work consists of grading, base, pavement, base, drainage, structures, and retaining walls and stone masonry guardwalls and other small items of work.

Project length: 9.13 Miles

Tentative Fixed Completion Date: Spring 2015 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $15 million to $20 million

Location: 6.2 Miles SW of St. Mary, Montana

DESCRIPTION OF WORK in US CUSTOMARY UNITS

Ba se

S ch ed ul e Op tio n

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes 157 Soil Erosion Control Devices (erosion control devices)

Sandbags Wattles

250 ea 14,450 lnft

158 Watering for Dust Control 5,040 mgal DIVISION 200 – Earthwork 201 Clearing & Grubbing 83,708 sqyd 202 Additional Clearing & Grubbing (clearing & grubbing) 1,000 sqyd 204 Excavation & Embankment 6,500 cuyd 207 Earthwork Geotextiles (geotextiles) 107,300 sqyd 208 Structure Excavation 558 cuyd 211 Roadway Obliteration 3,600 sqyd DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 1,580 cuyd DIVISION 300 – Aggregate Courses 301 Untreated Aggregate Courses (crushed aggregate)

200 cuyd

303 Road Reconditioning (pulverizing existing roadway) 140,000 sqyd 303 Road Reconditioning (ditch reconditioning) 9,000 lnft

Ba se

S ch ed ul e Op tio n

A

308 Minor Crushed Aggregate (crushed aggregate)

2,950 ton

DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 21,700 ton 408 Cold Recycled Asphalt Base Course (asphalt pavement recycling) 132,000 sqyd 409 Asphalt Surface Treatment 55 ton 411 Asphalt Prime Coat (asphalt surface treatment) 159 ton 412 Asphalt Tack Coat (asphalt surface treatment) 41 ton 413 Asphalt Pavement Milling 128,000 sqyd DIVISION 500 – Rigid Pavement 501 Portland Cement Concrete Pavement 320 sqyd DIVISION 550 – Bridge Construction 551 Driven Piles 640 lnft 552 Structural Concrete (concrete – major structures) 160 cuyd 553 Prestressed Concrete (concrete prestressed) 340 lnft 554 Reinforcing Steel 5,900 lb 554 Reinforcing Steel (epoxy coated) 30,500 lb 559 Waterproofing (concrete – major structures) 864 sqyd 566 Shotcrete 19 cuyd DIVISION 600 – Incidental Construction 602 Culverts & Drains 1,700 lnft 604 Manholes, Inlets, & Catch Basins(culverts & drains) (inlets) 4 605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (underdrains) 470 lnft 608 Paved Waterways (culverts & drains) drainage chutes 3

609 Curb & Gutter (concrete – minor structures) (stone curb) 407 lnft 615 Sidewalks, Drive Pads & Paved Medians (concrete – minor structures) 173 sqyd

619 Fences, Gates & Cattle Guards (log rail fence) 1,000 lnft 619 Fences, Gates & Cattle Guards (Gates) 1 ea 620 Stone Masonry (guardwalls) 1,450 lnft 622 Rental Equipment (yes/no) No Yes 633 Permanent Traffic Control Devices (traffic control devices) 550 sqft 634 Permanent Pavement Markings (traffic pavement markings) 282,602 lnft 635 Temporary Traffic Control – Flagger 30,000 hours 6,000 hours 635 Temporary Traffic Control – Pilot Car 600 hours 200 hours 635 Temporary Traffic Control – Traffic and Safety Supervisor 214 days 60 days 646 Buildings and Fixtures (benches, garbage & recycle bins and wayside exhibits) 23 ea

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 500 – Rigid Pavement
DIVISION 550 – Bridge Construction