AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 04/10/2013 N/A MT PRA GLAC 10(39),
GTSR Rehabilitation Siyeh Bend to
Rising Sun, Phase XII
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-12-R-00007
9B. DATED (SEE ITEM 11)
09/26/2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT PRA GLAC 10(39), GTSR Rehabilitation Siyeh Bend to Rising Sun Phase XII
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, 04/10/2013 MT PRA GLAC 10(39) Solicitation No. DTFH70-12-R-00007 GTSR Rehabilitation, Siyeh Bend to Rising Sun Page 2 Phase XII
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-14 Revises quantity for 62031-0000 Repoint Stone Masonry (Guardwall) Page A-14 Revises quantity for 62031-0000 Repoint Stone Masonry (Headwall) Page A-14 Revises quantity for 62201-0250 Dump Truck, 10 Cubic Yard Minimum Capacity Page A-14 Revises quantity for 62201-3000 Hydraulic Excavator with Hoe Ram Page A-15 Revises quantity for 62301-0000 General Labor Page A-19 Revises 61001-0000 Horizontal Drain Pipe, 2-inch weepholes Page A-19 Revises 61901-0000 Fence (Log Rail)
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision E-30 109.06A(a) Asphalt binder adjustment Revises PG F-11 205.11 Measurement Revises Subsection F-80 601 Minor Concrete Structures Deletes Section F-81 601A.01 Description Revises Subsection F-128 622.01 Description Adds (s) F-138 637.06 Payment Revises Section G-9 705.07 Boulders Revises Subsection
PLANS
Plan sheet B.4 Revises quantity for 62031-0000 Repoint Stone Masonry (Guardwall) Plan sheet B.4 Revises quantity for 62031-0000 Repoint Stone Masonry (Headwall) Plan sheet B.4 Revises quantity for 62201-0250 Dump Truck, 10 Cubic Yard Minimum
Capacity Plan sheet B.4 Revises quantity for 62201-3000 Hydraulic Excavator with Hoe Ram Plan sheet B.4 Revises quantity for 62301-0000 General Labor Plan sheet B.7 Revises bid item 61001-0000 Horizontal Drain Pipe, 2-inch weepholes and bid item 61901-0000 Fence (Log Rail) Plan sheet D.1 Adds location to table Item 21101-2000 Plan sheet D.61 Adds roadway obliteration Plan sheet E.1 Revises location in table Stone Material Requirements Plan sheet E.2 Revises table Item 61909-0000 Fence (Log Rail) Plan sheet E.14 Revises callout station for Log Fence in vegetated island Plan sheet F.1 Revises table 61001-0000 Plan sheet I.2-I.4 Revises quantities in column 62031-0000 to square feet Plan sheet J.3 Deletes 8” dimension in pipe Plan sheet K.1 Revises table Item 63504-1000
Notice to Bidders: Please submit revised pages A-7 through A-22 with your bid.
Amendment No. A002, 04/10/2013 MT PRA GLAC 10(39) Solicitation No. DTFH70-12-R-00007 GTSR Rehabilitation, Siyeh Bend to Rising Sun Page 3 Phase XII
PLANS - PEN AND INK CHANGE(S)
Please make the following pen & ink change(s):
Plan sheet #H.10 Revises call out for 5” utility conduit to 6” (call out in lower left corner of plan sheet)
ENCLOSURES
Pages:
A-7 thought A-22 E-30 F-11 F-80 F-81 F-128 F-138 G-9
Plan Sheets:
B.4 B.7 D.1 D.61 E.1 through E.2 E.14 E.17 F.1 I.2 through I.4 J.3 K.1
Page(s) not included due to Pen and Ink change(s):
H.10
A - 7
Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When a "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
Do not include an amount to protect against contingent cost increases to prices subject to the escalation coverage.
Bid Schedule
Project No:MT PRA GLAC 10(39)
Project Name:GTSR Siyeh Bend to Rising Sun, Phase XII
A - 8
Contract Quantity Pay Items
20401-0000 ROADWAY EXCAVATION
20801-0000 STRUCTURE EXCAVATION (ROES CREEK BRIDGE)
55104-1000 DYNAMIC PILE LOAD TEST
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (ROES CREEK BRIDGE)
55302-3200 PRECAST, PRESTRESSED CONCRETE GIRDERS (AASHTO TYPE IV)
55401-1000 REINFORCING STEEL
55401-2000 REINFORCING STEEL, EPOXY COATED
56401-1000 BEARING DEVICE, ELASTOMERIC
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A1020 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A1040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A1060 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A1080 15705-0100 SOIL EROSION CONTROL, SILT FENCE
9,500 LNFT $____________ $____________
A1100 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE (ROCK SOCK)
300 LNFT $____________ $____________
A1120 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
14,450 LNFT $____________ $____________
A1140 15706-0300 SOIL EROSION CONTROL, SANDBAG
250 EACH $____________ $____________
A1160 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A1180 20103-0000 CLEARING AND GRUBBING
2,876 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A1200 20301-0080 REMOVAL OF BENCH
8 EACH $____________ $____________
A1220 20301-0200 REMOVAL OF BOULDER
136 EACH $____________ $____________
A1240 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
A1260 20301-1200 REMOVAL OF HEADWALL
10 EACH $____________ $____________
A1280 20301-1400 REMOVAL OF INLET
3 EACH $____________ $____________
A1300 20301-1900 REMOVAL OF PIPE CULVERT
32 EACH $____________ $____________
A1320 20301-2400 REMOVAL OF SIGN (SHUTTLE SIGN)
4 EACH $____________ $____________
A1340 20301-2400 REMOVAL OF SIGN
70 EACH $____________ $____________
A1360 20301-2700 REMOVAL OF STRUCTURE (Wayside Exhibit)
2 EACH $____________ $____________
A1380 20301-2700 REMOVAL OF STRUCTURE (Monitoring Well Decommission)
7 EACH $____________ $____________
A1400 20301-3000 REMOVAL OF TRASH RECEPTACLE
8 EACH $____________ $____________
A1420 20302-0600 REMOVAL OF CURB, STONE
198 LNFT $____________ $____________
A1440 20302-1700 REMOVAL OF PAVED WATERWAY, ASPHALT (Gutter)
1,230 LNFT $____________ $____________
A1460 20302-2200 REMOVAL OF SEWERLINE
800 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A1480 20303-3000 REMOVAL OF SIDEWALK, ASPHALT
78 SQYD $____________ $____________
A1500 20303-3500 REMOVAL OF STONE MASONRY (GUARDWALL)
457 SQYD $____________ $____________
A1520 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (ROES CREEK BRIDGE)
ALL LPSM $___LPSM_____ $____________
A1540 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (Hitching Post and Livestock
Loading Ramp)
ALL LPSM $___LPSM_____ $____________
A1560 20401-0000 ROADWAY EXCAVATION
13,500 CUYD $____________ $____________
A1580 20402-0000 SUBEXCAVATION (Slide Stabilization)
4,500 CUYD $____________ $____________
A1600 20402-0000 SUBEXCAVATION (Deep Patch)
6,500 CUYD $____________ $____________
A1620 20402-0000 SUBEXCAVATION (Subgrade Stabilization)
1,700 CUYD $____________ $____________
A1640 20410-0000 SELECT BORROW
1,800 CUYD $____________ $____________
A1660 20410-0000 SELECT BORROW (DEEP PATCH)
2,000 CUYD $____________ $____________
A1680 20502-0000 CONTROLLED BLASTING
10,456 SQFT $____________ $____________
A1700 20701-1200 EARTHWORK GEOTEXTILE, TYPE IV-A
2,343 SQYD $____________ $____________
A1720 20801-0000 STRUCTURE EXCAVATION (ROES CREEK BRIDGE)
190 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A1740 25101-1000 PLACED RIPRAP, CLASS 1
1 CUYD $____________ $____________
A1760 25101-4000 PLACED RIPRAP, CLASS 4
774 CUYD $____________ $____________
A1780 25101-5000 PLACED RIPRAP, CLASS 5
742 CUYD $____________ $____________
A1800 30302-1000 DITCH RECONDITIONING
9,000 LNFT $____________ $____________
A1820 55101-0200 CONCRETE FILLED STEEL PIPE PILES, IN PLACE (16" DIA X 0.5")
730 LNFT $____________ $____________
A1840 55104-1000 DYNAMIC PILE LOAD TEST
2 EACH $____________ $____________
A1860 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (ROES CREEK BRIDGE)
160 CUYD $____________ $____________
A1880 55302-3200 PRECAST, PRESTRESSED CONCRETE GIRDERS (AASHTO TYPE IV)
340 LNFT $____________ $____________
A1900 55401-1000 REINFORCING STEEL
5,900 LB $____________ $____________
A1920 55401-2000 REINFORCING STEEL, EPOXY COATED
30,500 LB $____________ $____________
A1940 56401-1000 BEARING DEVICE, ELASTOMERIC
8 EACH $____________ $____________
A1960 60101-0000 CONCRETE (BOX CULVERT REPAIR)
38 CUYD $____________ $____________
A1980 60201-0600 18-INCH PIPE CULVERT
950 LNFT $____________ $____________
A2000 60201-0800 24-INCH PIPE CULVERT
549 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A2020 60201-0900 30-INCH PIPE CULVERT
105 LNFT $____________ $____________
A2040 60201-1000 36-INCH PIPE CULVERT
347 LNFT $____________ $____________
A2060 60201-1200 48-INCH PIPE CULVERT
190 LNFT $____________ $____________
A2080 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (FLARED)
1 EACH $____________ $____________
A2100 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT (FLARED)
1 EACH $____________ $____________
A2120 60403-0000 INLET , TYPE 4
2 EACH $____________ $____________
A2140 60403-0100 INLET, TYPE 1
1 EACH $____________ $____________
A2160 60501-0000 STANDARD UNDERDRAIN SYSTEM (BARING CREEK BRIDGE)
215 LNFT $____________ $____________
A2180 60501-0000 STANDARD UNDERDRAIN SYSTEM (DEEP TRENCH)
50 LNFT $____________ $____________
A2200 60706-0000 CLEANING DRAINAGE STRUCTURE
31 EACH $____________ $____________
A2220 60706-0000 CLEANING DRAINAGE STRUCTURE (HORIZONTAL DRAINS)
29 EACH $____________ $____________
A2240 60811-0000 DRAINAGE CHUTE (TYPE 3)
6 EACH $____________ $____________
A2260 60901-4200 CURB, STONE, TYPE 1, 18-INCH DEPTH
407 LNFT $____________ $____________
A2280 61103-0600 6-INCH ENCASEMENT PIPE, POLYVINYL CHLORIDE (PVC) (Power utility conduit)
331 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
A2300 61902-0900 GATE, METAL
2 EACH $____________ $____________
A2320 62010-1000 STONE MASONRY GUARDWALL (ASHLAR CORE, TYPE 7)
40 LNFT $____________ $____________
A2340 62010-1000 STONE MASONRY GUARDWALL (ASHLAR, TYPE 9)
56 LNFT $____________ $____________
A2360 62010-1000 STONE MASONRY GUARDWALL (ASHLAR CORE, TYPE 8)
172 LNFT $____________ $____________
A2380 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
3 EACH $____________ $____________
A2400 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
7 EACH $____________ $____________
A2420 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT
3 EACH $____________ $____________
A2440 62011-0900 STONE MASONRY HEADWALL FOR 48-INCH PIPE CULVERT
1 EACH $____________ $____________
A2460 62013-2000 STONE MASONRY WALL (ASHLAR GUARDWALL, TYPE 3)
330 SQYD $____________ $____________
A2480 62013-2000 STONE MASONRY WALL (ASHLAR GUARDWALL, TYPE 2)
132 SQYD $____________ $____________
A2500 62013-2000 STONE MASONRY WALL (VENEER)
89 SQYD $____________ $____________
A2520 62026-1000 REMOVE AND RESET STONE MASONRY (MASONRY WALL REPAIR)
27.8 SQYD $____________ $____________
A2540 62026-1000 REMOVE AND RESET STONE MASONRY (MASONRY SPILLWAY REPAIR)
20 SQYD $____________ $____________
A2560 62027-0000 REMOVE AND RESET STONE MASONRY (MASONRY GUARDWALL)
25 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 14
A2580 62031-0000 REPOINT STONE MASONRY (GOLDEN STAIRCASE GUARDWALLS)
733 SQFT $____________ $____________
A2600 62031-0000 REPOINT STONE MASONRY (GOLDEN STAIRCASE RETAINING WALLS)
874 SQFT $____________ $____________
A002 A2620 62031-0000 REPOINT STONE MASONRY (GUARDWALL)
3,385 SQFT $____________ $____________
A2640 62031-0000 REPOINT STONE MASONRY (SUNRIFT GORGE)
1,170 SQFT $____________ $____________
A002 A2660 62031-0000 REPOINT STONE MASONRY (HEADWALL)
1,387.2 SQFT $____________ $____________
A2680 62031-0000 REPOINT STONE MASONRY (SPILLWAYS)
1,600 SQFT $____________ $____________
A2700 62032-0000 REPOINT STONE MASONRY (DEAD HORSE POINT)
ALL LPSM $___LPSM_____ $____________
A2720 62032-0000 REPOINT STONE MASONRY (HORSE UNDERPASS)
ALL LPSM $___LPSM_____ $____________
A002 A2740 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
160 HOUR $____________ $____________
A2760 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
250 HOUR $____________ $____________
A002 A2780 62201-3000 HYDRAULIC EXCAVATOR WITH HOE RAM
180 HOUR $____________ $____________
A2800 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT
230 HOUR $____________ $____________
A2820 62201-3800 PICKUP TRUCK, 1 TON (with snow plow)
200 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 15
A2840 62201-3800 PICKUP TRUCK, 1 TON , WITH PRESSURE WASHER WITH 100' OF WATER
LINE
200 HOUR $____________ $____________
A002 A2860 62301-0000 GENERAL LABOR
803 HOUR $____________ $____________
A2880 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (Restrooms Ahead)
2 EACH $____________ $____________
A2900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
2 EACH $____________ $____________
A2920 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH
500 EACH $____________ $____________
A2940 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
75 EACH $____________ $____________
A2960 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
10 EACH $____________ $____________
A2980 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
20 EACH $____________ $____________
A3000 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
75,700 LNFT $____________ $____________
A3020 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
1,154 SQFT $____________ $____________
A3040 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,560 HOUR $____________ $____________
A3060 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
220 DAY $____________ $____________
A3080 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
14,000 FXHR $45.00 $630,000.00
Bid Schedule Schedule:A Schedule Type:Base
A - 16
A3100 63706-0000 RESIDENTIAL HOUSING
1,740 DAY $____________ $____________
A3120 64603-0900 FIXTURE, PORTABLE TOILET
4 EACH $____________ $____________
A3140 64625-1000 MAINTENANCE, TOILET
148 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
A - 17
Contract Quantity Pay Items
21101-2000 ROADWAY OBLITERATION, METHOD 2
40802-0200 COLD RECYCLED ASPHALT BASE COURSE, 3-INCH DEPTH
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
B1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B1020 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B1040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B1060 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
B1080 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
B1100 20410-0000 SELECT BORROW
610 CUYD $____________ $____________
B1120 21101-2000 ROADWAY OBLITERATION, METHOD 2
1,700 SQYD $____________ $____________
B1140 25120-2000 RIPRAP DITCH, CLASS 2 (TYPE 2)
500 LNFT $____________ $____________
B1160 25120-2000 RIPRAP DITCH, CLASS 2 (TYPE 1)
1,300 LNFT $____________ $____________
B1180 25125-0000 BOULDER
305 EACH $____________ $____________
B1200 25210-0000 ROCKERY (TRAIL WALL)
112 SQYD $____________ $____________
B1220 25210-0000 ROCKERY (1'-6" TOE WALL)
112 SQYD $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
A - 18
B1240 25210-0000 ROCKERY (BARRIER WALL)
4 SQYD $____________ $____________
B1260 25210-0000 ROCKERY (Wall)
229 SQYD $____________ $____________
B1280 26101-0000 ROCK DOWEL
60 LNFT $____________ $____________
B1300 30503-0000 AGGREGATE-TOPSOIL COURSE
145 CUYD $____________ $____________
B1320 30802-2000 ROADWAY AGGREGATE, METHOD 2
9,500 TON $____________ $____________
B1340 31001-0000 RECYCLED AGGREGATE BASE
130,693 SQYD $____________ $____________
B1360 40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
23,000 TON $____________ $____________
B1420 40205-3000 ANTISTRIP ADDITIVE, TYPE 3
223 TON $____________ $____________
B1440 40802-0200 COLD RECYCLED ASPHALT BASE COURSE, 3-INCH DEPTH
131,000 SQYD $____________ $____________
B1460 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
60 TON $____________ $____________
B1480 41101-1000 PRIME COAT, GRADE CMS-2
170 TON $____________ $____________
B1500 41105-0000 BLOTTER
1,800 TON $____________ $____________
B1520 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
50 TON $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
A - 19
B1540 41301-0800 ASPHALT PAVEMENT MILLING, 3-INCH DEPTH
130,693 SQYD $____________ $____________
B1560 50102-0900 PLAIN RIGID PAVEMENT, 8-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS
432 SQYD $____________ $____________
B1580 56604-0000 REINFORCED SHOTCRETE (GUARDWALL UNDERPINNING)
15 CUYD $____________ $____________
B1600 60901-4200 CURB, STONE, TYPE 1, 18-INCH DEPTH
220.0 LNFT $____________ $____________
B1620 60915-1000 WHEELSTOP, CONCRETE (LOG PATTERN)
29 EACH $____________ $____________
A002 B1640 61001-0000 HORIZONTAL DRAIN PIPE , 2-INCH WEEPHOLES
6 LNFT $____________ $____________
B1660 61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE
208 SQYD $____________ $____________
A002 B1680 61901-0000 FENCE (LOG RAIL)
809 LNFT $____________ $____________
B1700 62201-0000 EQUIPMENT (Survey Equipment)
40 HOUR $____________ $____________
B1720 62201-0000 EQUIPMENT (Bobcat)
10 HOUR $____________ $____________
B1740 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
170 HOUR $____________ $____________
B1760 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
96 HOUR $____________ $____________
B1780 62201-2050 ROLLER
30 HOUR $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
A - 20
B1800 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
B1820 62201-3000 HYDRAULIC EXCAVATOR (MINI)
15 HOUR $____________ $____________
B1840 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT
270 HOUR $____________ $____________
B1860 62201-3750 CHAIN SAW
40 HOUR $____________ $____________
B1880 62301-0000 GENERAL LABOR
480 HOUR $____________ $____________
B1900 62401-0400 FURNISHING AND PLACING TOPSOIL, 6-INCH DEPTH
221 SQYD $____________ $____________
A001 B1920 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
31 EACH $____________ $____________
B1940 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (SHUTTLE SIGN)
6 EACH $____________ $____________
B1960 63302-0000 SIGN SYSTEM
431.25 SQFT $____________ $____________
B1980 63306-2100 POST, WOOD, 8-INCH DIAMETER
1 EACH $____________ $____________
B2000 63316-1000 REMOVE AND RESET SIGN (Trail Sign)
5 EACH $____________ $____________
B2020 63318-1000 SNOWPOLE HOLDER
500 EACH $____________ $____________
B2040 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
160,000 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
A - 21
B2060 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
12,500 LNFT $____________ $____________
B2080 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW)
25,000 LNFT $____________ $____________
B2100 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL (WHITE)
1 EACH $____________ $____________
B2120 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
780 HOUR $____________ $____________
B2140 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
110 DAY $____________ $____________
B2160 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
7,000 FXHR $45.00 $315,000.00
B2180 64603-0100 FIXTURE, TRASH RECEPTACLE (GOVERNMENT FURNISHED)
10 EACH $____________ $____________
B2200 64603-0300 FIXTURE, BENCH (GOVERNMENT FURNISHED)
9 EACH $____________ $____________
B2220 64603-1200 FIXTURE, WAYSIDE EXHIBIT (GOVERNMENT FURNISHED)
4 EACH $____________ $____________
B2240 64604-1000 FIXTURE, HANDRAIL
202 LNFT $____________ $____________
B2260 64630-0000 ROADSIDE DEVELOPMENT (HITCHING POST AND LIVESTOCK LOADING
RAMP)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
A - 22
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(A - 8)
Schedule B - Option(A - 17)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
E-30
Special Contract Requirements Project: MT PRA GLAC 10(39), GTSR Rehabilitation, Siyeh Bend to Rising Sun, Phase XII http://www.wfl.fhwa.dot.gov/resources/construction/forms/contractor-forms.htm
For equipment that is not planned to be used at the time of the preconstruction conference, but is later used on the project, provide required information and data prior to mobilizing the equipment to the project.
109.06A Adjustments for Price Fluctuations. (Added Subsection).
Price adjustments for pay items listed in Table 109-1 will be made when the price fluctuation for products used in the performance of the work exceed specified limits. Adjustments are not intended to compensate for normal day-to-day fluctuations, seasonal changes, or to serve as a guarantee of full compensation for price fluctuations. It does provide for sharing in a portion of the risk, which could result from unusual price fluctuations. No price adjustments will be made for work performed beyond the fixed completion date.
Table 109-1 Pricing Adjustment Pay Items
Pay Item Number
Pay Item Description Product
40101-1000 Superpave pavement Asphalt binder
& Fuel
40802-0200 Cold recycle asphalt base, 3-inch depth Binder portion of emulsified asphalt
& Fuel
Monthly adjustments will be accrued with the payment or rebate to be made in the final voucher.
A partial price adjustment payment may be made once every 12 months or when the unpaid accrued increase exceeds $10,000 when requested in writing. The Government will withhold a rebate when the deductive accrual exceeds $10,000.
The maximum allowable monthly and final adjustment for payment to the Contractor or rebate to the Government is limited to 50 percent of the Base Price Index (BPI).
(a) Asphalt binder adjustment. The Government will determine price indexes using price data obtained from the “Asphalt Weekly Monitor®” by Poten and Partners, Inc. The weekly high and low selling price data for Primarily PG 58-28 and PG 64-22 reported for Western Montana will be averaged and used to establish a BPI and a Monthly Performance Price Index (MPPI). These indexes are defined as follows:
(1) Base price index. The BPI is a price index determined by the arithmetic average for prices in the 4 “Asphalt Weekly Monitor®” publications immediately preceding the bid opening.
BPI(Asphalt Binder) = $ [PRICE TO BE INSERTED AT AWARD] per ton
(2) Monthly performance price index. The Monthly Performance Price Index (MPPI) is the arithmetic average of the weekly price data from four “Asphalt Weekly Monitor®”
Revised by Amendment A002
F-11
Project: MT PRA-GLAC 10(39), GTSR Rehabilitation, Siyeh Bend to Rising Sun, Phase XII
Add the following:
(e) Obliteration of half casts. Remove all drill hole half-casts from the final face.
Measurement
205.11 Delete the second and third paragraph of this Subsection and substitute the following:
Measure blasting by the square foot of the finished face shot, projected on a vertical plane as shown in the blast plan.
Measure controlled blasting and production blasting by the SQFT under the controlled blasting pay item.
F-80
03USC07/26/05
Section 601. — MINOR CONCRETE STRUCTURES
F-81
Section 601A. — MINOR CONCRETE FOR SELECT STRUCTURES
(ADDED SECTION)
Description
601A.01 This work consists of furnishing, placing, finishing, and curing concrete for the box culvert.
Structural concrete class is designated as shown in Table 601A-1.
Material
601A.02 Conform to the following Subsections:
Hydraulic cement 701.01 Masonry cement 701.02 Fine aggregate 703.01 Coarse aggregate 703.02 Reinforcing steel 709.01 Curing material 711.01 Air-entraining admixture 711.02 Chemical admixtures 711.03 Latex modifier 711.04 Concrete color agent 711.05 Joint fillers and sealants 712.01 Elastomeric bearing pads 717.10 Polychloroprene 717.16 Water 725.01 Silica fume (microsilica) 725.04 Fly ash 725.04 Ground iron blast-furnace slag 725.04 Linseed oil 725.14 Grout 725.22 Color coating 725.24
Construction Requirements
601A.03 Composition (Concrete Mix Design). Design and produce concrete mixtures that conform to Tables 601A-1 and 601A-2 for the class of concrete specified. Determine design strength values according to ACI 318. Structural concrete shall also conform to the following ACI specifications.
ACI 211.1 Standard Practice for Selecting Proportions for Normal, Heavy Weight and Mass Concrete;
F-128
(n) Moving concrete barriers (2170+43 to 2171+18, Rt and 2174+90 to 2175+60, Rt) as directed by the CO;
(o) Placing conserved stone from the adjacent rock cut and minor grading at Wild Goose Island Overlook (2251+50 to 2252+00) as directed by the CO;
(p) Remove and salvage limestone rock outcrop (2253+50 to 2256+35, Lt), equipment used to haul materials to waste is not included for payment;
(q) Rock excavation required under Sections 204 and 209, includes equipment required to break or rip the material only;
(r) Minor surveying as directed by the CO; and
(s) Obliterate the concrete weir upstream from Roes Creek Bridge as directed by the CO.
Remove all debris larger than 1 cubic foot with a hydraulic excavator. The remaining debris will be removed from the creek by others. Legally dispose of all weir debris outside of the Park boundaries.
Construction Requirements
622.02 Rental Equipment. Add the following:
Furnish and operate the following equipment:
Number of Units Type of Equipment
1 Dump Truck, 10 cubic yard minimum capacity
1 Wheel Loader, 2 cubic yard minimum rated capacity bucket
Hydraulic excavator, crawler mounted, 1.0 cubic yard minimum capacity with thumb attachment Hydraulic excavator (with hoe ram attachment) Hydraulic excavator (mini)
Chain saw Roller Pickup truck, 1 ton (with pressure washer and 100ft. of water line) Pickup Truck, 1 ton (with snow plow) Motor Grader, 12 foot minimum blade Bobcat Survey Instrument (Total Station)
Submit the model number and serial number for each piece of equipment before use. Make equipment available for inspection and approval before use.
Revised by amendment A002
F-138
Table 637-2 Minimum Facility Furnishings and Services
Property Residential
Housing Unit
Folding deck chair 2
Storage cabinet 3
Fire extinguisher 1
Smoke Alarms 2
Refrigerator, 18-cubic foot 1
Range and oven, standard 22-inch 1
Microwave Oven, 900 watts, 0.5 cu ft 1
Laundry (washer, dryer) 1
Kitchen table with 4 chairs 1 set
Standard Sofa, 5 foot 1
Coffee table 1
Easy chair 1
End table 1
Table lamp 2
Queen bed 1
Night stand 1
Night stand lamp 1
Dresser, 6-drawer 1
Entertainment stand 1
Vacuum cleaner, bagless, 12amp 1
Measurement
637.05 Measure the Section 637 items listed in the bid schedule according to Subsection 109.02
Payment
637.06 The accepted quantities will be paid at the contract price per unit of measurement for the Section 637 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Measure residential housing by the day.
G-9
Project: MT PRA GLAC 10(39), GTSR Rehabilitation, Siyeh Bend to Rising Sun, Phase XII
03USC09/11/06
Section 705. — ROCK
705.02 Riprap Rock. Delete the text of this Subsection and substitute the following:
Furnish hard, durable, angular rock that is resistant to weathering and water action and free of organic or other unsuitable material. Angular rock is characterized by sharp, clean edges at the intersections of relatively flat surfaces. Do not use shale, rock with shale seams, or other fissile or fissured rock that may break into smaller pieces in the process of handling and placing.
705.03 Rock for Masonry Structures. Add the following:
Furnish stone conforming to the size and shape specified in the plans. Provide stone according to Section 620 and Section 105.
705.07 Boulders. (Added Subsection).
Furnish boulders conforming to the size, shape and stone type specified in the plans, and according to Sections 105 and 251.
Boulders will be blocky, with the top surface of the boulder having a minimum of 75 percent of flat surface and a maximum 5 degree offset to the horizontal plane when set in its final position.
705.08 Stone for Rockery Walls. (Added Subsection).
Furnish hard, durable, angular stones free of organic and spoil material. Furnish stones with breadth and thickness at least one-half its length. Furnish stones graded in a well-balanced range conforming to the sizes shown on the plans.
Match rockery wall stones to the color and characteristics of the material outlined in the plans.
Do not haul or place rockery wall stones until color and material characteristics are approved by the CO. Rockery wall stone material sources may be approved for use prior to the proposal opening date as detailed in the Notice to Offerors.
705.09 Stone for Rock Socks. (Added Subsection).
Furnish a washed well graded 1½ -inch (minus) fractured aggregate that shall comply with gradation on this sheet (1½ -inch minus).
Wire mesh shall be fabricated of 10 gage poultry mesh, or equivalent, with a maximum opening of ½ -inch recommended minimum roll width of 48-inches.
Wire mesh shall be secured using ”Hog Rings” or wire ties at 6-inch centers along all joints and at 2-inch centers on ends of socks.
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L
TYPICAL
SECTIONS
PLAN AND
PROFILE
TURNOUTS WALLS
EROSION
CONTROL
STRUCTURES DRAINAGE
MISCELLANEOUS
DETAILS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
A2560 62027-0000 REMOVE AND RESET STONE
MASONRY (MASONRY GUARDWALL) LNFT 25 25
A2580 62031-0000 REPOINT STONE MASONRY (GOLDEN
STAIRCASE GUARDWALLS) SQFT 733 733
A2600 62031-0000 REPOINT STONE MASONRY (GOLDEN
STAIRCASE RETAINING WALLS) SQFT 874 874
A002 A2620 62031-0000 REPOINT STONE MASONRY
(GUARDWALL) SQFT 3,385 3,385
A2640 62031-0000 REPOINT STONE MASONRY
(SUNRIFT GORGE) SQFT 1,170 1,170
A002 A2660 62031-0000 REPOINT STONE MASONRY
(HEADWALL) SQFT 1,387.2 1,387.2
A2680 62031-0000 REPOINT STONE MASONRY
(SPILLWAYS) SQFT 1,600 1,600
A2700 62032-0000 REPOINT STONE MASONRY (DEAD
HORSE POINT) LPSM All ALL
A2720 62032-0000 REPOINT STONE MASONRY (HORSE
UNDERPASS) LPSM All ALL
A002 A2740 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 160
A2760 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 250
A002 A2780 62201-3000 HYDRAULIC EXCAVATOR WITH HOE
RAM HOUR 180
A2800 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 230
A2820 62201-3800 PICKUP TRUCK, 1 TON (with snow plow) HOUR 200
A2840 62201-3800 PICKUP TRUCK, 1 TON, WITH
PRESSURE WASHER WITH 100' OF
WATER LINE HOUR 200
A002 A2860 62301-0000 GENERAL LABOR HOUR 803
A2880 63301-1000 SIGN SYSTEM, GOVERNMENT
FURNISHED SIGN (Restrooms
Ahead) EACH 2 2
A2900 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 2 2
-A p r-
:4 P
M
MileStone: Amendment A002 Amendment Review Date: In Progress Report Date: 04/09/13 c:
\m yf ile s\ p w p ro d u ct io n \d m s9 su m m a ry
-w fl -A
.x ls m
]S h ee t (4
SUMMARY OF QUANTITIES - BASE
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
MT PRA GLAC 10(39) B.4MT
NUMBER
SHEET
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L
TYPICAL
SECTIONS
PLAN AND
PROFILE
TURNOUTS WALLS
EROSION
CONTROL
STRUCTURES DRAINAGE
MISCELLANEOUS
DETAILS
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
B1600 60901-4200 CURB, STONE, TYPE 1, 18-INCH
DEPTH LNFT 220.0 220.0
B1620 60915-1000 WHEELSTOP, CONCRETE (LOG
PATTERN) EACH 29 29
A002 B1640 61001-0000 HORIZONTAL DRAIN PIPE, 2-INCH
WEEPHOLES LNFT 6 6
B1660 61501-0500 SIDEWALK, EXPOSED AGGREGATE
CONCRETE SQYD 208 208
A002 B1680 61901-0000 FENCE (LOG RAIL) LNFT 761 48 809
B1700 62201-0000 EQUIPMENT (Survey Equipment) HOUR 40
B1720 62201-0000 EQUIPMENT (Bobcat) HOUR 10
B1740 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 170
B1760 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 96
B1780 62201-2050 ROLLER HOUR 30
B1800 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 20
B1820 62201-3000 HYDRAULIC EXCAVATOR (MINI) HOUR 15
B1840 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 270
B1860 62201-3750 CHAIN SAW HOUR 40
B1880 62301-0000 GENERAL LABOR HOUR 480
B1900 62401-0400 FURNISHING AND PLACING
TOPSOIL, 6-INCH DEPTH SQYD 221 221
A001 B1920 63301-1000 SIGN SYSTEM, GOVERNMENT
FURNISHED SIGN EACH 31 31
B1940 63301-1000 SIGN SYSTEM, GOVERNMENT
FURNISHED SIGN (SHUTTLE SIGN) EACH 6 6
B1960 63302-0000 SIGN SYSTEM SQFT 431.25 431.25
B1980 63306-2100 POST, WOOD, 8-INCH DIAMETER EACH 1 1
B2000 63316-1000 REMOVE AND RESET SIGN (Trail
Sign) EACH 5 5
B2020 63318-1000 SNOWPOLE HOLDER EACH 300 200 500
B2040 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 157,965 2,035 160,000
B2060 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 12,134 366 12,500
-A p r-
:4 P
M
MileStone: Amendment A002 Amendment Review Date: In Progress Report Date: 04/09/13 c:
\m yf ile s\ p w p ro d u ct io n \d m s9 su m m a ry
-w fl -A
.x ls m
]S h ee t (7
SUMMARY OF QUANTITIES - OPTION A
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
MT PRA GLAC 10(39) B.7MT
ROADWAY QUANTITIES
ITEM DESCRIPTION UNIT
BOULDER QUANTITIES
LOCATION
LOCATION
(SQYD)
QUANTITY
Roadway excavation20401-0000
QUANTITY
TOTAL
FOR INFO ONLY Roadway embankment
CUYD
CUYD
(EACH)
BOULDER
ITEM 25125-0000
(EACH)
REMOVAL OF BOULDERS
ITEM 20301-0200
NPS PMIS No. 140760 NPS Drwg. No. 117/108026
SHEET 1 of 2
TABULATION OF QUANTITIES
SIDE
SIDE
LOCATION
(SQYD)
QUANTITY
GEOTEXTILE, TYPE IV-A
ITEM 20701-1200
LOCATION
LT
TOTAL
2253+00 to 2256+00
TOTAL
LOCATION
(SQYD)
QUANTITY
RT
RT
SIDE
SIDE
SIDE
12,713
CONTROLLED BLASTING
ITEM 20502-0000
RT 609
1826+60 to 1827+80
1830+34 to 1839+71
1846+59 to 1852+80
TOTAL
(EACH)
QUANTITY
DECOMMISSION)
(MONITORING WELL
REMOVAL OF STRUCTURE
ITEM 20301-2700
2065+36
TOTAL
LT
LT
1844+10 to 1844+75 RT
1855+85 to 1856+55 163
1921+50 to 1921+83 RT 70
1928+40 to 1928+70 RT 127
1928+65 to 1929+00 82
LOCATION
TOTAL
(LNFT)
QUANTITY
SIDE
LT2534+00 to 2542+00 800
LOCATION
TOTAL
(LNFT)
QUANTITY
SIDE
2065+43 1
2066+30 1
2066+52 1
OFFSET
8' LT
4' RT
4' RT
8.5' LT
83 51
5,998
2540+60
2540+60
2156+70 9' RT
20' RT
B-13
B-14
12' LT
B-16
B-15
B-21
B-50
B-51
LOCATION
(EACH)
QUANTITY
REMOVAL OF GATE
ITEM 20301-1100
1914+12 1
LOCATION
(LNFT)
QUANTITY
SIDE
TOTAL 1
B a s e
B a s e
B a s e
B a s e
B a s e
B a s e
Base Option A
2534+00 to 2542+00
2534+00 to 2542+00
RT
LT
LOCATION
(CUYD)
QUANTITYSIDE NOTES
B a s e
(TELEPHONE LINE)
CONDUITS
REMOVAL OF UTILITY
1,230
1,600
10,413
10,413
(For information only)
D.1
STATE PROJECT
MT PRA GLAC 10(39)
g la c fa
.d g n
U
S I n t2
D
R J o h n s o n
C h e c k e d b y
W
M c
Q u is to n D e s ig n e d b y
Limestone @ Wild Goose East
Limestone @ Wild Goose West
Debris pile
Green Argillite
Green Argillite
Green Argillite
Green Argillite
Green Argillite
Green Argillite
Red Argillite
Red Argillite
ASPHALT (GUTTER)
WATERWAY,
REMOVAL OF PAVED
ITEM 20302-1700
(LNFT)
DEPTH
21.5
18.5
HOLE
BORE
LOCATION
FOR INFORMATION ONLY
SALVAGE ROCK AS NEEDED
(MASONRY GUARDWALL)
STONE MASONRY
REMOVE AND RESET
ITEM 62027-0000
TOTAL 25
2171+75 to 2171+90
2066+94 to 2067+04
RT
RT
(SQFT)
QUANTITY
O p ti o n A
METHOD 2
ROADWAY OBLITERATION
ITEM 21101-2000
TOTAL 1,978
REMOVAL OF SEWER LINE
ITEM 20302-2200
B a s e
2295+26 to 2295+87
2279+27 to 2281+81
2278+93 to 2281+76
2101+00 to 2101+66
2049+71 to 2051+00
2047+15 to 2048+45
2042+10 to 2044+08
2026+76 to 2030+66
RT
LT
RT
RT
RT
RT
RT
RT
B a s e
2253+00 to 2256+35
2245+00 to 2251+00
2172+48 to 2177+00
2171+00 to 2175+00
2170+50 to 2170+55
2150+50 to 2151+30
2105+40 to 2107+90
2080+35 to 2081+75
2073+17 to 2074+75
2068+90 to 2069+00
2042+00 to 2043+75
2032+00 to 2039+00
LT
LT
LT
RT
RT
RT
LT & RT
LT
RT
RT
RT
RT
2,037.0
1,467.3
1,829.1
30.0
1.0
3.0
8.0
3.0
3.0
3.0
8.0
6.5
2255+29 to 2256+30
2253+14 to 2254+90
2243+01 to 2244+91
2212+55 to 2212+86
2204+92 to 2205+57
2203+80 to 2204+82
2203+26 to 2203+73
2173+08 to 2176+35
2136+34 to 2136+57
2134+91 to 2135+09
2120+71 to 2122+22
2118+14 to 2118+55
2063+04 to 2064+06
2054+33 to 2054+52
2038+74 to 2039+25
2031+24 to 2031+52
2027+95 to 2028+51
2015+52 to 2016+05
2014+16 to 2014+56
1997+10 to 1997+41
1994+94 to 1995+73
1988+78 to 1989+68
1987+03 to 1987+77
1959+30 to 1961+36
1959+25 to 1959+87
1922+76 to 1923+80
1880+38 to 1881+11
1845+98 to 1850+79
RT
RT
LT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
2 Revised by Amendment A002.
5 4
4715 4720
4730473547404745475047554760
-4.3290%
,6
.2
300' VC
K = 50
-4.3290% +1.710
7%
-4.3290%
P T
.7
CUYD
EXC.
CUYD
EMB.
2177217621752174217321722171
4654 4640
4656 4642
4658 4644
4660 4646
4662 4648
4664 4650
4666 4652
4668 4654
D.61
STATE PROJECT
MT
PRA GLAC 10(39)
g la c fz z h .d g n
I n t_ ft
D
J o h n s e c k e d b y
W
M c
Q u is to
D e s ig n e d b y
L = 643.96'
T = 344.82'
R = 727.00'
N
CP
Garbage
NPS PMIS No. 140760 NPS Drwg. No. 117/108026
Profile grade
Existing ground
Existing ground
Profile grade
Line to be constructed
Ditch reconditioning
2170+00 to 2178+50, LT
See Sheet F.5 for details ashlar, type 3. See Sheet F.5 for details see Sheet J.2 for details
Roadway obliteration, see Sheet C.5 for details
Subexcavation limits, see Sheet C.4 for details
Deep patch limits, as directed by the CO under Section 622/623
Move concrete barrier (Jersey barriers)
2174+90 to 2175+60, RT
2170+90 to 2171+20, RT
Construct stone masonry guardwall, 2170+45 to 2171+20, RT
Construct stone masonary guardwall, ashlar, type 2.
2176+90 to 2179+15, RT
See Sheet E.21 for details
Asphalt Turnout.
Dead Horse Point, 2169+43 to 2175+60, RT
See Sheet J.1 for details
Roadway obliteration.
2174+86 to
Construct stone
2175+38, RT
masonry guardwall, ashlar, type 3.
See Sheet F.5 for details
Construct stone masonry guardwall, type 2.
2175+38 to 2175+60, RT
See Sheet F.5 for details2171+75 to 2171+90, RT
Salvage green argillite (as needed) and remove debris pile
2172+48 to 2177+00, LT
(approved source of select borrow (deep patch)) as directed by the CO under Section 622/623
NOTE:
1.
repointing locations and quantities.
See Sheet F.2 for Dead Horse Point
Removal of masonry guardwall
(masonry retaining wall) Remove and reset stone masonry
Removal of stone masonry (guardwall)
2174+86 to 2175+45, RT
Removal of stone masonry (guardwall)
2176+90 to 2179+15, RT
S e e S h e e t I .1 c h u te ty p e
C o n s tr u c t d r a in a g e
R t
Guardwall underpinning. See Sheet F.8 for details
2171+92 to 2173+50, RT
LEGEND:
See Sheet J.1 for details
Roadway obliteration.
LOCATION NOTES
NPS PMIS No. 140760 NPS Drwg. No. 117/108026
LOCATION
(EACH)
QUANTITY
TOTAL
RECEPTACLE
REMOVAL OF TRASH
ITEM 20301-3000
LOCATION
(EACH)
QUANTITY
TOTAL
SIDE
SIDE
E.1
STATE PROJECT
g la c r a .d g n
U
S I n t2
D
J o h n s e c k e d b y
M c
Q u is s ig n e d b y
SHEET 1 OF 3
TABULATION OF QUANTITIES
LOCATION SIDE
2040+26
2038+99
RT
RT
QUANTITY
LPSM
LPSM
BOULDER QUANTITIES
LOCATION
TOTAL
(EACH)
BOULDER
ITEM 25125-0000
(EACH)
REMOVAL OF BOULDERS
ITEM 20301-0200
SIDE
25453
LOCATION
(EACH)
QUANTITY
TOTAL
SIDE
REMOVAL OF BENCHES
ITEM 20301-0800
TOTAL
LOCATION
(SQYD)
QUANTITYLT/RT
2065+13 to 2067+10 LT
NOTES
Baring Creek
SQYD
REMOVAL OF SIDEWALK, ASPHALT
ITEM 20303-3000
2064+51
2064+30
2063+01
2062+90
2039+39
2039+29
1919+69
1919+50
RT
RT
LT
LT
RT
RT
RT
RT
2267+11
2251+98
2214+31
2172+06
2119+65
2067+84
2029+74
1916+94
RT
LT
RT
RT
RT
RT
RT
RT
LOCATION
(EACH)
QUANTITY
TOTAL
(WAYSIDE EXHIBIT)
REMOVAL OF STRUCTURE
ITEM 20301-2700
SIDE
1957+68
1917+27
RT
RT
2064+43
2063+20
2039+63
1919+59
RT
LT
RT
RT
(SHUTTLE SIGN)
REMOVAL OF SIGNS
ITEM 20301-2400
LOCATION
(LNFT)
QUANTITY
TOTAL
SIDE
REMOVAL OF CURB, STONE
ITEM 20302-0600
2065+13 to 2067+11 LT
Base Option A
B a s e
B a s e
B a s e
Barrier Rock
Rockery Walls
Other Areas
1823+61 to 1962+00
2020+00 to 2074+00
2242+00 to 2258+00
1914+15 to 1923+00
2028+40 to 2041+38
2065+13 to 2069+10
2066+17 to 2067+50
STONE TYPE
Dolomitic Limestone
Helena Formation
STONE MATERIAL REQUIREMENTS
FOR INFORMATION ONLY
Dolomitic Limestone
Helena Formation added to other turnouts
Overlook at 1950+50, and barrier rock
Jackson Glacier Overlook, Grizzly Point, Saint Mary Falls area and Sunrift Gorge
Saint Mary Falls area
Sunrift Gorge Curbing
Sunrift Gorge Stairs
Wild Goose Overlook area
Red Argillite
Red Argillite
Green Argillite
Red Argillite
2066+83 to 2067+02 30% Red Argillite
Dolomitic Limestone, 70% Helena Formation
Sunrift Gorge (West) Transit Crows Nest
Sunrift Gorge (East) Crows Nest @ Stairs
LT/RT
RT
RT
Rock Cut
Limestone From Adjacent
RT
RT
RT
RT2064+00 to 2064+60
LT
25% Chief Cliff Argillite
25% Green Argillite, and
25% Red Argillite, Dolomitic Limestone, 25% Helena Formation
LT
LT/RT
2295+76 TO 2297+10 LT/RT
Dolomitic Limestone
Helena Formation Roes Creek Bridge
2279+27 to 2281+81 RT Dolomitic Limestone
Helena Formation Boulders along shoulder
2253+44 to 2255+37
2251+55 to 2251+95
2251+14 to 2252+37
2249+50 to 2249+83
2248+45 to 2249+83
2243+21 to 2244+89
2071+90 to 2072+10
2069+75 to 2070+71
2064+59 to 2064+80
2063+60 to 2065+05
2063+42 to 2064+03
2062+63 to 2063+00
2051+17 to 2054+33
2041+10 to 2041+30
2039+98 to 2040+09
2038+58 to 2040+47
2030+96 to 2031+45
2029+45 to 2029+77
2028+39 to 2028+75
1959+52 to 1959+90
1959+31 to 1959+56
1955+77 to 1955+98
1950+20 to 1950+61
1920+83 to 1921+00
1918+63 to 1924+00
1917+68 to 1918+00
1915+40 to 1917+12
1846+11 to 1848+17
1846+00 to 1848+60
RT
RT
RT
RT
RT
LT
RT
RT
RT
LT
RT
LT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
LOCATION
(CUYD)
QUANTITY
TOTAL 610
RT
2028+73 to 2029+43
2029+79 to 2030+37
NOTES
SELECT BORROW
ITEM 20410-0000
LT/RT
2039+26 to 2039+95 RT 168
2039+98 to 2040+09 RT
2251+11 to 2252+42 RT 351
RT
St Mary Falls Transit
St Mary Falls Parking Turnout
St Mary Falls Parking Turnout
St Mary Falls Parking Turnout
Wild Goose Island Overlook
O p ti o n A
LIVESTOCK LOADING RAMP)
OBSTRUCTIONS (HITCHING POST AND
REMOVAL OF STRUCTURES AND
ITEM 20304-1000
B a s e B a s e
B a s e
B a s e
Jackson Glacier Overlook and Gunsite Pass2
E.2
STATE PROJECT
g la c r b .d g n
U
S I n t2
D
J o h n s e c k e d b y
M c
Q u is s ig n e d b y
NPS PMIS No. 140760 NPS Drwg. No. 117/108026
LOCATION
(LNFT)
QUANTITY
TOTAL
NO SCALE
SHEET 2 OF 3
TABULATION OF QUANTITIES
STATION
SECTIONS
6-FOOT
NO. OF
TOTAL
(LNFT)*
LENGTH
* Includes two end sections per fence location.
RT
RT
RT
RT
1882+14 to 1883+01
1917+21 to 1918+14
1959+04 to 1959+56
2029+86 to 2030+51
SECTIONS
8-FOOT
NO. OF
2252+01 to 2253+42
2249+93 to 2251+34
RT
RT
SIDE
FENCE (LOG RAIL)
ITEM 61901-0000
1916+26 to 1916+78
RT
O p ti o n A
LOCATION
(EACH)
QUANTITY
TOTAL
(LOG PATTERN)
WHEEL STOP, CONCRETE
ITEM 60915-1000
SIDE
2039+27 to 2041+07
1959+03 to 1959+41
1958+10 to 1958+61
RT
RT
RT
O p ti o n A
18-INCH DEPTH
CURB STONE, TYPE 1,
ITEM 60901-4200
LT/RT
2066+95 to 2067+15 LT 60.5
LOCATION
(SQYD)
QUANTITY
TOTAL
SIDE
2064+15 to 2064+55
2063+10 to 2063+50
2030+54 to 2030+94
2029+00 to 2029+40
1917+20 to 1917+60
1917+20 to 1917+60
RT
LT
RT
RT
RT
LT
SMOOTHNESS/ROUGHNESS
8-INCH DEPTH, TYPE C
PLAIN RIGID PAVEMENT,
ITEM 50102-0900
O p ti o n A
O p ti o n A
1881+10 to 1881+98 93
RT
(EACH)
STAIRS
2066+25 to 2066+85 RT 29
159.5
2065+13 to 2069+10 LT 74
LOCATION
TOTAL
(TON)
QUANTITY
LOCATION
TOTAL
SIDE
O p ti o n A
ROCKERY (WALL)
ITEM 25210-0000
(SQYD)
QUANTITY
LOCATION
TOTAL
SIDE
(SQYD)
QUANTITY
2029+79 to 2030+37 RT
LOCATION
TOTAL
SIDE
(SQYD)
QUANTITY
ROCKERY (TRAIL WALL)
ITEM 25210-0000
O p ti o n A
O p ti o n A
O p ti o n A
LOCATION
TOTAL
SIDE
(SQYD)
QUANTITY
1922+70 to 1922+80 RT
ROCKERY (BARRIER WALL)
ITEM 25210-0000
O p ti o n A
2066+84 to 2066+95
2063+90 to 2064+60
2039+26 to 2039+95
2029+52 to 2029+86
2028+73 to 2029+43
1916+79 to 1917+18
LT
RT
RT
RT
RT
RT
SIDE
ROCKERY (1'-6" TOE WALL)
ITEM 25210-0000
2029+79 to 2030+53 RT 40
METHOD 2
ROADWAY AGGREGATE,
ITEM 30802-2000
(FOR INFO. ONLY)
(LNFT)
HEIGHT
AVERAGE
(FOR INFO. ONLY)
(LNFT)
HEIGHT
AVERAGE
2029+29 to 2029+43
1922+54 to 1922+72
1922+28 to 1922+58
1917+20 to 1918+25
1917+18 to 1918+23
RT
RT
RT
RT
RT
6.0
7.5
6.4
4.0
5.5
9.0
1914+15 to 1918+33
1917+19 to 1918+26
1918+54 to 1923+66
1959+40 to 1960+39
2029+50 to 2031+65
2039+28 to 2041+06
2039+96 to 2040+49
2041+30 to 2041+89
2051+18 to 2054+33
2063+19 to 2064+92
2063+50 to 2065+22
2066+23 to 2066+90
2066+97 to 2067+12
2248+30 to 2256+30
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
LT
RT
LT
RT
6232039+98 to 2040+09
2251+11 to 2252+42
RT
RT
3.0
3.5
3.0
3.0
4.0
RT 132041+75
LOCATION
(LNFT)
QUANTITY
TOTAL
ROCK DOWEL
ITEM 26101-0000
2066+84 to 2066+95 LT 60
LT/RT
O p ti o n A
ONLY
FOR INFORMATION
NUMBER OF DOWELS
TOTAL B
a s e
2 Revised by Amendment A002.
2029+01 to 2029+40 RT 39 3 22
P C
.6
NPS PMIS No. 140760 NPS Drwg. No. 117/108026
LAYOUT INFORMATION
NORTHING EASTING STATION NOTESPOINT OFFSET
SHEET 11 OF 23
TURNOUT DESIGNS
N
MOUNDED ISLAND DETAILS
SECTION B-B
FOOTNOTE:
LAYOUT INFORMATION
NORTHING EASTING STATION NOTESPOINT OFFSET
See Sheet E.39 for details
8-inch depth, type C smoothness.
Construct plain rigid pavement, 2030+54 to 2030+94, RT
See Sheet J.1 for details
Place boulders, 5 total.
2028+39 to 2028+75, RT
See Sheet J.1 for details
Place boulders, 6 total.
2029+45 to 2029+77, RT
See Sheet J.1 for details
Place boulders, 6 total.
2030+96 to 2031+45, RT
See Sheet E.34 for details
Install fixture bench.
2030+50, RT
See Sheet E.35 for details
Install fixture bench.
2030+35, RT
See Sheet E.34 for details government furnished.
Install trash receptacle, 2030+06, RT
See Sheet E.35 for detals
Install fixture bench.
2029+70, RT
See Sheet E.39 for details type C smoothness.
pavement, 8-inch depth, Construct plain rigid
2029+00 to 2029+40, RT
B
B
P206
P205
P204
P203
P202
P201
P200
P200
P201
P202
P203
P204
P205 P206 P207
P208
P209 P211
P212
P210
1639120.86
1639116.25
1639089.55
1639071.75
1639054.04
1639050.58
1639045.40
976436.24
976426.91
976399.95
976381.97
976346.10
976321.04
976283.45
2030+10.41
2030+00.00
2029+64.00
2029+40.00
2029+00.00
2028+76.00
2028+40.00
11.00 RT
11.00 RT
23.00 RT
31.00 RT
31.00 RT
2300 RT
11.00 RT
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement
E.14
STATE PROJECT
g la c r n .d g n
U
S I n t2
D
J o h n s e c k e d b y
M c
Q u is s ig n e d b y
2028+40 to 2031+43, RT
ASPHALT TURNOUT
ST MARY FALLS, TRANSIT
R
R
R
R
R
R
R
1639179.55
1639160.47
1639147.75
1639147.11
1639131.19
1639124.99
976555.08
976532.71
976517.80
976516.51
976479.75
976453.65
2031+42.94
2031+14.45
2030+95.45
2030+94.00
2030+54.00
2030+27.85
11.00 RT
18.20 RT
23.00 RT
23.00 RT
21.00 RT
15.00 RT
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement
P212
P211
P210
P209
P208
P207
R
See Sheet E.33 for details
Install fence (log rail).
2029+86 to 2030+51, RT
A
A
See Sheet E.37 for details.
See Sheet E.32 for details
Construct rockery (trail wall).
2029+29 to 2029+43, RT
See Sheet E.31 for details
Construct rockery (wall).
2029+52 to 2029+86, RT
See Sheet E.31 for details
Construct rockery (toe wall).
2029+79 to 2030+53, RT
See Sheet E.31 for details
Construct rockery (toe wall).
2029+79 to 2030+37, RT
See Sheet E.37 for details
Construct vegetated island.
2028+99 to 2029+41, RT
See Sheet E.33 for details
Install fence (log rail).
2029+01 to 2029+40, RT
See Sheet E.35 for details government furnished (Shuttle sign).
Install sign system, 2029+78, RT
See Sheet E.35 for details government furnished (Shuttle sign).
Install sign…