PROJECT DESCRIPTION MT PRA GLAC 10_22_ Avalance to West Tunnel Phase VII.pdf
PDF 18 KB Posted
- Solicitation number
- DTFH70-11-R-00011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A004-SF30-(GLAC).pdf | ||
| A003-(GLAC).pdf | ||
| A002 GLAC 10(22).pdf | ||
| Plan Request_GTSR.pdf | ||
| Physical Data Request Form_GTSR.pdf | ||
| 2_RFP for FBO | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT PRA GLAC 10(22), GTSR Rehabilitation, Avalanche to West Tunnel, Phase VII, Glacier National Park, Flathead County, Montana
The work consists of grading, base, pavement, drainage, rockery walls and repairs to bridge structures, including stone masonry repairs, waterproof membrane application and other small items of work.
Project length: 3.537 Miles
Fixed Completion Date: December 12, 2012
Estimated Price Range: $5 million to $7 million
Location: 30 Miles NE of Columbia Falls, Montana
DESCRIPTION OF WORK in US CUSTOMARY UNITS
DIVISION 150 – Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance YES X NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices)
Temporary Diversion Channels Sediment Wattles
Sand Bags
All
4760 LNFT
250 EACH
158 Watering for Dust Control 2,160 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 19,000 SQYD 202 Additional Clearing & Grubbing (clearing & grubbing) 203 Removal of Structures & Obstructions (structures, demolition)
Boulders Pipe Culverts
Structure (Wayside Exhibit) Trash Receptacles
109 EACH
9 EACH
1 EACH
3 EACH
204 Excavation & Embankment Roadway Excavation 3,300 CUYD
211 Roadway Obliteration 4,300 SQYD
DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap
Class 4 Class 5
Grouted Class 4 Boulders
60 CUYD
30 CUYD
16 CUYD
300 EACH
252 Rockery (Wall) 80 SQYD
DIVISION 300 – Aggregate Courses 303 Road Reconditioning
Ditch Reconditioning 1,550 LNFT 305 Aggregate-topsoil Course (crushed aggregate) 200 CUYD 308 Roadway Aggregate, Method 2 (crushed aggregate) 3,875 TON 310 Recycled Aggregate Course (asphalt pavement recycling) 54,505 SQYD
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 8,500 TON 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) 45 TON 411 Asphalt Prime Coat (asphalt surface treatment)
Blotter
66 TON
650 TON
412 Asphalt Tack Coat (asphalt surface treatment) 20 TON
DIVISION 550 – Bridge Construction 559 Waterproofing (membrane waterproofing) 500 SQYD 566 Shotcrete
Guardwall Underpinning 40 CUYD 575 Minor Bridge Work ALL
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both)
Pipe Culverts
515 LNFT
605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which) 500 LNFT
607 Clean Drainage Structure (culverts & drains) 16 EACH 609 Curb & Gutter (concrete – minor structures) (indicate which)
Colored concrete curb and gutter 364 LNFT 615 Sidewalks, Drive Pads & Paved Medians
(concrete – minor structures) 384 SQYD 619 Fences, Gates & Cattle Guards
Fences, Log Rail Stone Masonry Guardwall (Ashlar & Random Rubble)
Stone Masonry Guardwall (Repair) Stone Masonry Guardwall (Repoint)
586 LNFT
10 LNFT
2 SQYD
2,200 SQFT
621 Monuments & Markers (construction survey & staking) YES X NO 622 Rental Equipment X YES NO 623 General Labor 455 HOURS 624 Topsoil (landscaping & related items) 7,000 SQYD 633 Permanent Traffic Control Devices (traffic control devices)
Sign System (Govt. Furnished) Sign System
Rumble Strip Remove and Reset Sign
Snowpole Holder
5 EACH
2 SQFT
20 SQYD
12 EACH
300 EACH
634 Permanent Pavement Markings (traffic pavement markings) Type B, Solid (White)
Type B, Solid (Yellow)
1,800 LNFT
72,000 LNFT
Type B, Broken (Yellow)
Type B, Accessibility Symbol
3,100 LNFT
1 EACH
635 Temporary Traffic Control (traffic control – flaggers & pilot cars)
Barricade, Type 3 Tubular Marker, Type 28-inch
Drum Warning Light Type A Warning Light Type C
Pavement Markings Construction Sign
12 EACH
100 EACH
50 EACH
12 EACH
50 EACH
19,000 LNFT
1,100 SQFT
Flagger: Hours: 30,100 (IDIQ) Pilot Car: Hours: 848 (IDIQ) Other:
Fixtures:
Trash Receptacle (Including Recycle Receptacles) Portable Toilet
Wayside Exhibit Maintenance, Toilet
3 EACH
2 EACH
2 EACH
105 EACH
File details come from the government source that posted it. Updated .