AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 7/28/2011 N/A MT PRA GLAC 10(22)
AVALANCHE TO WEST
TUNNEL, PHASE VII
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-11-r-00011
9B. DATED (SEE ITEM 11)
7/14/11
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT PRA GLAC 10(22), GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
See page 2 and 3 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 7/28/11 MT PRA-GLAC 10(22) Solicitation No. DTFH70-11-R-00011 GTSR Rehabilitation – Avalanche to West Tunnel Page 2, Phase VII
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-11. Revises quantity for Bid Item 62201-0250 Dump Truck Page A-11. Revises quantity for Bid Item 62201-0600 Backhoe Loader Page A-11. Adds Bid Item 62201-3000 Hydraulic Excavator (with hoe ram attachment) Page A-12. Revises quantity for Bid Item 62301-0000 General Labor
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision E-8 105.02(a) Material Sources Adds text E-18 107.11(n) Protection of Forests, Parks, and
Public Lands Adds text
E-33 153.02 Contractor Quality Control Plans Adds text E-48 156.06 Limitations on Construction
Operations Deletes text in (h)
F-2 203.04 Removing Material Adds “concrete” F-13 252.02 Material Adds text F-13- F-14
252.03 General Adds text on quarry stone
F-15 252.04 Placing Stones Adds text F-28- F-29
401.09 Aggregate Preparation Replaces subsection
F-51 575.01 Description Deletes text F-52- F-53
575.04 Wingwall removal and replacement at
Unnamed Creek Box Culvert
Deletes text
F-54 575.07 Acceptance Deletes text F-91 620.03 General Adds text F-97 622.01 Description Adds (g) through (i) F-97 622.02 Rental Equipment Adds item G-5 705.08 Stone for Rockery Walls Adds subsection G-13 – G-14
725 Miscellaneous Material Deletes duplicate items
G-17- G-18
725.35 Polymer Concrete Patching Material Moves from G-14
Notice to Offeror: Please submit revised pages A-7 through A-13 with your bid.
Amendment No. A002, dated 7/28/11 MT PRA-GLAC 10(22) Solicitation No. DTFH70-11-R-00011 GTSR Rehabilitation – Avalanche to West Tunnel Page 3, Phase VII
PLANS
Plan sheet #B.2 Revises quantity for Bid Item 62201-0600 Backhoe Loader Plan sheet #B.2 Adds Bid Item 62201-3000 Hydraulic Excavator Plan sheet #B.2 Revises quantity for Bid Item 62301-0000 General Labor Plan sheet #E.2 Revises Table “Item 61901-0000”
Plan sheet #E.3 Adds red argillite labels to boulders and rockeries Plan sheet #E.4 Adds red argillite labels to boulders and rockeries and changes
“vegetated island” to “construct island”
Plan sheet #F.2 Revises “Rockery Wall Height and Base width Requirements” table and revises section lengths Plan sheet H.3 Revises Note #2 Plan sheet I.4 Revises pipe wall thickness Plan sheet J.4 Deletes “Item 61901-0000 Fence (Log Rail)” table; table moved to amended sheet E.2 Plan sheets K.1 through K.5 Revises callouts for signs
ENCLOSURES
Pages:
A-7 through A-13 E-8 E-18 E-33 E-48 F-2 F-13 through F-15 F-28 through F-29 F-51 through F-54 F-91 F-97 G-5 G-13 through G-18
Plan Sheets:
B.2 E.2 through E.4 F.2 H.3 I.4 J.4 K.1 through K.5
Project: MT PRA-GLAC 10(22)
GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.
Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
The quantity for the following item of work is a Contract Quantity (see FP-03, Subsection 109.02):
63302-0000
A- 7
Bid Schedule
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
15101-0000 MOBILIZATION
ALL Lump Sum $___________________
15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL Lump Sum $___________________
15401-0000 CONTRACTOR TESTING
ALL Lump Sum $___________________
15501-0000 CONSTRUCTION SCHEDULE
ALL Lump Sum $___________________
15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL Lump Sum $___________________
15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
6,930
LNFT $_______________ $___________________
15706-0300 SOIL EROSION CONTROL, SANDBAG
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Bid Schedule A
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
A- 8
15801-0000 WATERING FOR DUST CONTROL
2,160
MGAL $_______________ $___________________
20103-0000 CLEARING AND GRUBBING
19,000
SQYD $_______________ $___________________
20301-0200 REMOVAL OF BOULDER
EACH $_______________ $___________________
20301-1900 REMOVAL OF PIPE CULVERT
EACH $_______________ $___________________
20301-2700 REMOVAL OF STRUCTURE (WAYSIDE EXHIBIT)
EACH $_______________ $___________________
20301-3000 REMOVAL OF TRASH RECEPTACLE
EACH $_______________ $___________________
20401-0000 ROADWAY EXCAVATION
3,300
CUYD $_______________ $___________________
21101-2000 ROADWAY OBLITERATION, METHOD 2
4,300
SQYD $_______________ $___________________
25101-4000 PLACED RIPRAP, CLASS 4
CUYD $_______________ $___________________
25101-5000 PLACED RIPRAP, CLASS 5
CUYD $_______________ $___________________
25110-4000 GROUTED RIPRAP, CLASS 4
CUYD $_______________ $___________________
25125-0000 BOULDER
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Estimated Quantity Unit Bid Price Amount Bid
A- 9
25210-0000 ROCKERY (WALL)
SQYD $_______________ $___________________
30302-1000 DITCH RECONDITIONING
1,550
LNFT $_______________ $___________________
30503-0000 AGGREGATE-TOPSOIL COURSE
CUYD $_______________ $___________________
30802-2000 ROADWAY AGGREGATE, METHOD 2
3,875
TON $_______________ $___________________
31001-0000 RECYCLED AGGREGATE BASE
54,505
SQYD $_______________ $___________________
40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM
SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE 3 PAVEMENT
ROUGHNESS)
8,500
TON $_______________ $___________________
40205-3000 ANTISTRIP ADDITIVE, TYPE 3
TON $_______________ $___________________
40401-0000 MINOR HOT ASPHALT CONCRETE
TON $_______________ $___________________
41101-1000 PRIME COAT, GRADE CMS-2
TON $_______________ $___________________
41105-0000 BLOTTER
TON $_______________ $___________________
41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
TON $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Estimated Quantity Unit Bid Price Amount Bid
A- 10
55901-0000 MEMBRANE WATERPROOFING
SQYD $_______________ $___________________
57501-0000 MINOR BRIDGE WORK
ALL Lump Sum $___________________
60201-0400 12-INCH PIPE CULVERT (animal crossing)
LNFT $_______________ $___________________
60201-0500 15-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-0600 18-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-0800 24-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1000 36-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1200 48-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1600 72-INCH PIPE CULVERT
LNFT $_______________ $___________________
60202-0800 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
LNFT $_______________ $___________________
60501-0000 STANDARD UNDERDRAIN SYSTEM
LNFT $_______________ $___________________
60706-0000 CLEANING DRAINAGE STRUCTURE
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Estimated Quantity Unit Bid Price Amount Bid
A- 11
60901-0000 CURB, CONCRETE (Log Pattern)
LNFT $_______________ $___________________
61501-1100 SIDEWALK, ASPHALT
SQYD $_______________ $___________________
61901-0000 FENCE (LOG RAIL)
LNFT $_______________ $___________________
62026-1000 REMOVE AND RESET STONE MASONRY (headwall repair)
SQYD $_______________ $___________________
62027-1000 REMOVE AND RESET STONE MASONRY GUARDWALL (ASHLAR)
LNFT $_______________ $___________________
62031-0000 REPOINT STONE MASONRY
2,200
SQFT $_______________ $___________________
62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
HOUR $_______________ $___________________
62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH
HOUR $_______________ $___________________
62201-3000 HYDRAULIC EXCAVATOR (WITH HOE RAM ATTACHMENT)
HOUR $_______________ $___________________
62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB ATTACHMENT
HOUR $_______________ $___________________
62201-3750 CHAIN SAW
HOUR $_______________ $___________________
Project: MT PRA-GLAC 10(22)
GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
Bid Schedule A leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A002 leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A002 leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A002
Estimated Quantity Unit Bid Price Amount Bid
A- 12
62301-0000 GENERAL LABOR
HOUR $_______________ $___________________
62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
7,000
SQYD $_______________ $___________________
63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
EACH $_______________ $___________________
63302-0000 SIGN SYSTEM
SQFT $_______________ $___________________
63315-0000 RUMBLE STRIP
SQYD $_______________ $___________________
63316-1000 REMOVE AND RESET SIGN
EACH $_______________ $___________________
63318-1000 SNOWPOLE HOLDER
EACH $_______________ $___________________
63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
1,800
LNFT $_______________ $___________________
63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
72,000
LNFT $_______________ $___________________
63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (yellow) 3,100
LNFT $_______________ $___________________
63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL (White)
EACH $_______________ $___________________
63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
Bid Schedule A leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A002
Estimated Quantity Unit Bid Price Amount Bid
A- 13
63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH
EACH $_______________ $___________________
63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
EACH $_______________ $___________________
63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
EACH $_______________ $___________________
63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
EACH $_______________ $___________________
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
19,000
LNFT $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
64603-0100 FIXTURE, TRASH RECEPTACLE (INCLUDES RECYCLE RECEPTACLES)
EACH $_______________ $___________________
64603-0900 FIXTURE, PORTABLE TOILET
EACH $_______________ $___________________
64603-1200 FIXTURE, WAYSIDE EXHIBIT
EACH $_______________ $___________________
64625-1000 MAINTENANCE, TOILET
EACH $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Offeror
Project: MT PRA-GLAC 10(22)
E-8
Special Contract Requirements Project: MT PRA-GLAC 10(22), GTSR Rehabilitation – Avalanche to West Tunnel, Phase VII
03USC08/17/10
Section 105. — CONTROL OF MATERIAL
105.02 Material Sources. Amend as follows:
(a) Government-provided sources.
Obtain stone masonry for work under Section 620, and stone for drystack wall work under sections 622/623, at the Glacier National Park Ballfield located approximately 0.5 miles from the West Entrance station. Available stone at this site is currently organized and stacked upon pallets. There is no charge for stone masonry material taken from the Glacier National Park Ballfield.
Comply with the following:
(1) Keep the site clean and accessible (except as set forth at Subsection 105.04(a) at all times;
and
(2) Return any unused stones to the original pallet stack from which they were removed.
Red argillite for revetment repair (898+20 to 899+60) is available on site at the revetment location. Obtain red argillite rock by recovering existing loose rocks from the face and toe of the revetment and surrounding area. The contractor may utilize red argillite stockpiled at Logan Pit and near the incinerator plant.
(b) Contractor-located sources.
Sites outside construction limits. Activities outside the construction limits that will require ground disturbance, occupation, clearing, or other environmental impacts are limited to the following; material sources, waste sites, staging areas, water sources. Prior to use of these sites, provide the following documents.
The requirements below do not apply to Government designated sources or commercial sources that are established, have provided material to public and private entities on a regular basis over the last two years, have appropriate State and local permits, and do not require expansion outside their currently established and permitted area.
(1) Proposed activity description. Submit a description, schedule, and location of the proposed activities for approval by the CO. Include maps of the area and other relevant information.
(2) Cultural resources. Submit written documentation satisfactory to the CO for a recommendation of either “no historic properties affected” or “no effect” according to 36 CFR 800.4(d)(1) for historic properties on or eligible for listing to the National Register of Historic Places. Provide either:
(a) Documentation showing there are no cultural resources present, and a recommendation of either “no historic properties affected” or “no effect” according to 36 CFR 800.4(d)(1). Documents must be prepared by an individual qualified under the Secretary of the Interior’s Standards and Guidelines for Archeology and Historic Preservation, 48 FR 44716-44740.
Revised by Amendment A002
E-18
(n) Decontaminate equipment including water tanks, pumps, hoses, etc. before entering Glacier National Park to eliminate the risk of transporting exotic species. Equipment stored within Glacier National Park or the Flathead Valley over winter shutdown periods does not require further decontamination, unless requested by the CO.
(1) Provide 7 days notice so that the decontaminating process can be monitored by the CO.
(2) Clean the exterior surface of all equipment transporting or coming in contact with water by pressure washing with a minimum of 2,900 psi at 122º F.
(3) Pressure wash with hot water the interior of all tanks, hoses and equipment to eliminate dirt, debris and organic matter, as mud, slime and plant material, etc. that would reduce the effectiveness of chlorine.
(4) After pressure washing is complete, perform disinfection process with a chlorine/water solution of 200 parts per million (ppm) chlorine and allow to stand in the tank a minimum of 12 hours. Use water for the disinfection process from a potable municipal source. Notify the CO of the water source for pre-approval. Use either powder (calcium) or liquid (sodium) hypochlorite as follows:
0.51 ounces of household bleach (sodium hypochlorite) per gallon of water produces a 200 ppm solution;
Example:
For a 4,000 gallon truck, (4,000 gallons x 0.51 ounces = 2040 ounces) = approximately 16 gallons of bleach required.
0.0026 pounds of 65 percent available powder calcium hypochlorite per gallon of water also produces a 200 ppm solution. Calcium hypochlorite is commonly used as swimming pool chlorine;
Example:
For a 4,000 gallon truck, (4,000 gallons x 0.0026 pounds = 10.75 pounds) =
10.75 pounds. of powder required.
(5) Mix additional 200 ppm solution and fill pumps, hoses, etc. and allow to stand a minimum of 12 hours. Take a sample and test it to verify the 200 ppm requirement is met.
(6) Open the distribution bar of the truck to allow chlorinated water into all parts of the system. Take a sample and test it to verify the 200 ppm requirement is met.
(7) Also take a sample after allowing the tank to stand a minimum of 12 hours to verify a minimum of 150 ppm. CO will verify test results.
Chlorine is toxic to fish and other organisms so the chlorine-water solution must not be allowed to enter any body of surface water. Dispose of the water outside of Glacier National Park. The chlorinated water may be disposed of at a sewage treatment plant if permission is obtained from the plant operator. Discharge water in a manhole far enough upstream so that the organic matter depletes the chlorine before entering the plant. Allow CO to pre-approve the disposal site and witness disposal.
E-33
03USC08/17/10
Section 153. — CONTRACTOR QUALITY CONTROL
Delete the text of this Section and substitute the following:
Description
153.01 This work consists of exercising management control to ensure work conforms to the contract requirements, providing inspection, obtaining samples for QC testing, and performing QC tests. See FAR Clause 52.246-12 Inspection of Construction.
Construction Requirements
153.02 Contractor Quality Control Plans. Provide QC plans for selected work features to the CO for approval at least 14 days prior to the start of the work feature. The absence of a plan for other items of work does not relieve the Contractor of complying with the contract requirements.
Additional quality control activities may be required to provide effective quality management. The contractor may use previously approved QC plans utilized under the current GTSR IDIQ contract and task orders, provided they are updated for the current task order and approved by the CO.
(a) Development. Develop QC plans for the following work features:
Construction survey and staking (Section 152);
Soil erosion control (Section 157);
Clearing and grubbing (Section 201);
Removal of structures and obstructions (Section 203);
Excavation and embankment, sloping, shaping, and finishing (Section 204);
Riprap (Section 251, 252)
Aggregate courses (Sections 305, 308, 310);
Asphalt pavement (Sections 401, 404, 411, 412);
Waterproofing (Section 559);
Minor bridge work (Section 575);
Drainage structures (Section 601A, 602, 605);
Concrete curb (Section 609);
Guardwall and other masonry structures (Section 620);
Roadside development (Section 646); and
Temporary traffic control (Sections 156, 635).
E-48
Place snowpoles around any hazards to remain during winter shutdown as directed by the CO.
156.06 Limitations on Construction Operations. Delete the text of this Subsection and substitute the following:
When the roadway is open to public traffic, restrict operations as follows:
(a) Operate equipment in the direction of traffic, where practical;
(b) For shoulder drop-offs in excess of 2-inches, provide “Low Shoulder” warning signs. For shoulder drop-offs in excess of 4-inches, provide a 1V: 3H fillet with “Low Shoulder” warning signs. Complete the construction of shoulders adjacent to traffic lanes to the same elevation within 7 days;
(c) Provide a minimum lane width of 10 feet in the tangent sections of the road. In the areas of tight centerline radius, increase the minimum lane width as directed by the CO. Use barricades, drums, or other acceptable devices to delineate traffic lanes through areas where the edge of pavement or intended path has been obliterated by construction operations;
(d) Confine staging, parking of equipment and vehicles, and storing of material to the locations identified in Subsection 105.04;
(e) Where switching traffic to a completed lane, provide adequate personnel and equipment to set or relocate traffic control devices;
(f) Maintain existing guardwalls, guardrails, and other barriers until removal is necessary for construction. Use a temporary barrier or appropriate channelizing devices while the barriers are absent. Install permanent guardwalls, guardrails, and barriers as soon as possible to minimize risk to the public;
(g) For purposes of facilitating traffic, perform grading or surfacing part-width at a time.
Make the width not under construction available to public traffic under alternate one-way control. Furnish pilot car and driver, or flaggers, or both, as ordered by the CO, to direct traffic through sections of road under one-way control;
(h)
Adjacent lanes must be paved and to the same elevation prior to winter shut-down;
(i) Do not perform construction operations during the following times:
(1) Between 6:00 p.m. Friday and 6:00 a.m. the following Tuesday of Labor Day weekend; and
(2) Between 6:00 p.m. July 3rd and 6:00 a.m. July 5th.
(j) Limit cumulative construction-caused delays to public traffic as follows:
(1) June 17, 2011 through September 18, 2011; June 15, 2012 through September 16, 2012; and after June 21, 2013:
F-2
Project: MT PRA-GLAC 10(22), GTSR Rehabilitation, Avalanche to West Tunnel, Phase VII
03USC06/04/07
Section 203. — REMOVAL OF STRUCTURES AND
OBSTRUCTIONS
Description
203.01 Add the following:
This work also consists of the following:
Removing and salvaging selected boulders within the project limits;
Removing drainage structures;
Removing and salvaging signs;
Removing and salvaging existing stone masonry guardwalls, veneer, and headwalls according to Section 620; and
Removing and salvaging trash receptacles, wayside exhibits, and their components.
Construction Requirements
203.03 Salvaging Material. Add the following:
The CO will determine which salvaged boulders are suitable to be used as placed boulders at locations shown in the plans. Stockpile boulders that are determined to be unsuitable at Logan Pit or the Glacier Park Ball Field. Boulders that are determined to be suitable for placement along the road may be stockpiled, at the Contractors discretion, at Logan Pit or at other staging areas to facilitate work. Do not damage boulders when removing, hauling, and stockpiling.
Stockpile removed signs that are not reset on the project, but are designated by the CO to be salvaged, at the West Glacier Sign Shop.
Maintain regulatory, informational, and warning signs in-place until removal is necessary for construction.
Salvage stone from existing stone masonry structures according to Subsection 620.05.
203.04 Removing Material. Delete the text of this Subsection and substitute the following:
(a) General. Saw cut sidewalks, curbs, concrete pavements, and structures when partial removal is required.
F-13
03USC01/01/04
Section 252. — SPECIAL ROCK EMBANKMENT AND
ROCK BUTTRESS
Delete the text of this Section and substitute with the following:
Description
252.01 This work consists of constructing rockery walls.
Material
252.02 Conform to the following Section or Subsections:
Bedding material 704.02 Select Borrow 704.07 Stone for rockeries 705.08 Epoxy-coated reinforcing bars 709.01 Earthworks Geotextile 714 Epoxy resin adhesive 725.21 Cement grout 725.22(e) Earthworks Geotextile 714
Rock obtained through structure excavation under Section 209 may be processed into stone for rockeries if the material meets the requirements in Subsection 705.08.
It is not anticipated that structure excavation will produce adequate quantities for the rockery wall bid items. See Section 105 for additional material source information.
Construction Requirements
252.03 General. Survey according to Section 152 and verify the limits of the wall installation.
Perform the excavation and foundation preparation according to Section 209.
Construct rockery walls as shown on the plans and as directed by the CO.
Submit, for approval by the CO, a plan or narrative describing how work at the Little Red Rock turnout site will be accomplished, including the proposed timing of the work to minimize slope disturbance and potential instability.
Submit a plan for obtaining and shaping the stones. This plan should include the anticipated material source(s) and locations where stone shaping will take place. Requests to modify the plan must be submitted to the CO for approval and shall contain a brief description supporting the reason for the change to the plan.
F-14
Product must be in compliance with the material requirements of this contract. Prior to beginning full production of shaping from a material source, the contractor shall produce samples of each type of shaped stone that will be produced from that source. For each type of shaped stone, the contractor shall produce a sample of 5 stones. The Contractor shall notify the CO that the samples are available for inspection.
Allow 5 days for on-site inspection to occur. The Contractor may begin full production shaping of the stone after approval from the CO. Products from the full production will be visually inspected upon delivery to ensure they meet the same general physical characteristics of the approved samples.
The Contractor is to deliver all shaped stones to the Glacier National Park Storage Location, commonly known as the Ball Field per Subsection 105.04.
No shaping of material is allowed at the Storage Location.
Do not begin construction of rockery walls until the construction start date is approved in writing by the CO. Submit the request for proposed start of construction date to the CO in writing at least 7 days prior to the proposed start date.
During construction of the wall, do not leave unsupported temporary excavations greater than 4 feet high overnight, over the weekend, or any other nonworking periods unless approved by the CO. Stage the rockery wall construction by limiting unsupported temporary excavations to no more than 20 lineal feet at a time in each rockery wall section, unless otherwise approved by the
CO.
For rockery walls, grade the foundation for a width equal to the required stones. Excavate to required depth for placement of a minimum 6-inch aggregate leveling course or to refusal on rock. Compact the leveling course in layers not to exceed 6-inches in depth to form a uniform foundation. Where foundation rock is encountered, utilize cement grout to create a 1” minimum depth grout bed in lieu of the aggregate leveling course.
Rock excavation is to be done by mechanical methods. Rock excavation requiring the use of a hoe ram is to be agreed upon by the CO and paid under Section 622.
When constructing rockery walls around existing culvert pipes in the rockery wall slope repair areas, place a minimum of 6-inches of bedding material around all sides of the pipe to provide a cushion between the pipe, rockery stone, and backfill.
252.04 Placing Stones. Construct rockery walls one course at a time. Incline the wall foundation and subsequent stone courses toward the back of the wall at similar to the wall face batter angle.
F-15
Shape the first course of stone so that full contact is achieved with the leveling course. Where foundation rock is encountered and a 6-inch leveling course cannot be obtained, drill and set a minimum of three epoxy-coated reinforcement bars per the manufacturer’s recommendation for each stone of the first course. For walls higher than 6 feet, 2 stones may be placed in the base and second course to achieve the wall width dimensions shown in the plan set.
Construct rockery walls of class 1 through class 5 stones as shown in the plans. Increase the stone class from top to bottom with a uniform range of size in-between.
Place the stones in a stable orientation, with minimal voids; such that at least 80 percent of the exposed face of the wall is stone (class 1 through 5 stones). Seat and bed each course of stones by compacting the select granular backfill behind the stone to provide a stable condition for the entire wall. Compact each layer with mechanical or hand operated equipment in horizontal lifts not to exceed 6-inches when compacted. Key each stone into adjacent stones by utilizing the natural irregular shape of the stones. Use rock spalls to chock larger stones solidly in position and to fill voids between the stones. Do not use rock spalls to provide primary bearing support of the facing stones. Stack larger stones such that each stone is bearing on at least 2 stones of equal or larger class below.
Construct the exposed face of the rockery wall reasonably uniform, limiting projections beyond the neat line of the slope to 20 percent of the largest facing stone dimension.
Transition the beginning and end of the rockery walls into soil slopes or rock outcrops, if present, as directed by the CO.
252.05 Acceptance. Stone will be evaluated under Subsection 106.02.
Stone placement will be evaluated under Subsections 106.02 and 106.04.
Structure excavation, backfill, and leveling pad will be evaluated under Section 209.
See Table 252-1 for minimum sampling, testing and acceptance requirements.
Measurement
252.06 Measure the Section 252 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Rockery walls will be measured by the square yard of wall. Measurement will be made on the vertical plane of front face.
Structural excavation will not be measured for payment. Backfill and leveling pad quantities will not be measured for payment. Earthwork geotextile will not be measured for payment.
Payment
252.07 The accepted quantities will be paid at the contract price per unit of measurement for the Section 252 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
F-28
(5) Equipped with automatic feed controls, which are properly adjusted to maintain a uniform depth of material ahead of the screed;
(6) Operable at forward speeds consistent with satisfactory mix lay down;
(7) Capable of producing a smooth finished surface without segregating, tearing, shoving, or gouging the mat; and
(8) Equipped with automatic screed controls with sensors capable of sensing grade from an outside reference line, sensing the transverse slope of the screed, and providing the automatic signals that operate the screed to maintain grade and transverse slope.
401.06 Surface Preparation. Clean the existing surface of all loose material, dirt, or other deleterious substances by approved methods, as applicable. Apply an asphalt tack coat to contact surfaces of pavements, curbs, gutters, manholes, and other structures according to Section 412.
401.07 Weather Limitations. Place mix on a dry, unfrozen surface when the air temperature in the shade is above 35º F and rising. For HMA conform to Table 401-3. For WMA conform to Subsection 401.03(c)(5).
401.08 Asphalt Preparation. Uniformly heat the asphalt binder to provide a continuous supply of the heated asphalt binder from storage to the mixer. Do not heat asphalt binder above 365° F.
Table 401-3 Asphalt Concrete Mix Placement Temperature
Compacted Lift Thickness < 2-Inches 2 – 3-Inches > 3-Inches Road Surface Temperature
F Minimum Lay-Down Temperature(1)
F < 35 (2) (2) (2)
35 –39.9 (2) (2) 280 40 – 49.9 (2) 285 275 50 – 59.9 295 280 270 60 – 69.9 285 275 265 70 – 79.9 280 270 265 80 – 89.9 270 265 260
90 265 260 255
(1) Never heat the asphalt concrete mix above the temperature specified in the approved mix design.
(2) Paving not allowed.
401.09 Aggregate Preparation. When lime is added to the aggregate prior to entering the plant, adjust the aggregate moisture to at least 4 percent by mass of aggregate. Mix the lime uniformly with the aggregate before introducing the aggregate into the dryer or dryer drum. Use calibrated weighing or metering devices to measure the amount of lime added to the aggregate.
F-29
For batch plants, heat, dry, and deliver aggregate for pugmill mixing at a temperature sufficient to produce a mix temperature within the approved range. Adjust flames used for drying and heating to prevent damage to and contamination of the aggregate. Additional plant adjustments may be required to provide dry aggregate at the reduced mixing temperatures of WMA.
Control plant operations so the moisture content of the mix behind the paver is 0.5 percent or less according to AASHTO T 329.
Before starting mix production, obtain approval of synchronized metering and weighing devices used to introduce a constant rate of lime and water.
Add lime to the asphalt concrete mix by one of the following methods:
(a) Method A. Add lime to the combined cold feed aggregate using an enclosed in-line cold feed mechanical pugmill mixer. Use a twin-shaft, continuous mixing pugmill with adjustable mixing paddles. Adjust the retention time of the mixture in the pugmill so no unmixed lime is visible after the lime and aggregate exit the pugmill.
(b) Method B. Add lime to the produced aggregates during stockpiling using a pugmill.
Distribute the lime per the stockpile ratios stated in the mix design.
A minimum moisture content of two percent by dry weight for coarse aggregate and four percent by dry weight for fine aggregate is required at the time the aggregates and lime are mixed. Marinate treated aggregate in stockpiles from 24 hours to 60 days before using in asphalt concrete mix. Do not use aggregate marinated longer than 60 days.
(c) Method C. Add lime to the combined cold feed aggregate by introducing the lime between aggregate layers as the aggregate flows from the cold feed bins. Mix the lime and aggregate on the conveyor belt by placing a minimum of six paddles over the conveyor belt. Make the paddles protrude into the aggregate flow and direct the aggregate to fold over itself causing the material to migrate from one side of the conveyor belt to the other. Space the paddles to provide complete mixing. Provide a metered water spray over the conveyor belt as necessary to control dust and to maintain minimum moisture content.
(d) Method D. Add the dry lime into drum dryer mixing plants just below the asphalt binder introduction point.
401.10 Mixing. Measure the aggregate and asphalt into the mixer according to the JMF. Mix until all the particles are completely and uniformly coated with asphalt according to AASHTO M 156.
Maintain the discharge temperature according to the JMF.
401.11 Hauling. Use vehicles with tight, clean, and smooth metal beds for hauling asphalt concrete mixes.
Coat the beds with an approved material to prevent the mix from adhering to the beds. Do not use petroleum derivatives or other coating material that contaminates or alters the characteristics of the mix. Drain the bed before loading.
F-51
03USC12/20/05
Section 575. — MINOR BRIDGE WORK
(ADDED SECTION)
Description
575.01 This work consists of furnishing materials, placing, and constructing minor bridge repair work. This work includes repairing deteriorated concrete along bridge slab and wall edges, repairing slab soffit spalls, and sealing the joint between concrete and masonry cladding at Granite Creek Culvert.
Material
575.02 Conform to the following Subsections:
Structural Concrete 601A Reinforcing Steel 554.02 Non-Shrink Grout 725.22(c) Cement Grout 725.22(g) Membrane Waterproofing 725.31 Resin for Bonded Reinforcing 725.32 Concrete Bonding Agent 725.33 Reinforcing Steel Epoxy Paint 725.34
Construction Requirements
575.03 Concrete repair. Remove unsound concrete according to Subsection 203.04. When removing concrete using mechanical impact methods that do not use jack hammers heavier than 15 pounds and chipping hammers heavier than nominal 15 pound class for all concrete removal.
Take care not to damage stone masonry elements adjacent to concrete removal. If stone masonry elements are damaged, notify the CO and do not commence with further removal until approved.
Divert channel flow beneath spans where repair work is being performed.
Dispose of all removed materials according to Subsection 203.05.
Provide temporary works according to Section 562.
Perform stone masonry repointing after concrete repairs are complete.
(a) Edges of slabs and walls. Remove concrete along the edges of slabs and walls as identified in the plans and to a maximum depth of 6-inches.
F-52
Leave surface of remaining sound concrete rough to an amplitude of approximately ¼ in.
Before concrete placement, apply an approved concrete bonding agent to the surface according to the manufacturer’s recommendation.
Drill and resin bond reinforcing steel into sound concrete using an approved resin and according to the manufacturer’s recommendation. Unless stated otherwise in the manufacturer’s recommendations, use a drill bit diameter 5/64-inch larger than the out-to-out diameter of the reinforcing steel. Use either a diamond bit core drill or a carbide bit rotary hammer with four cutting edges on the diameter.
Clean holes with a non-metallic brush, compressed air, and water. Remove excess water from the hole. The clean hole may be damp, but be free of concrete dust, foreign matter, and standing water.
Furnish and install class C (AE) structural concrete per Section 601A to original neat line.
Construct forms to match existing formwork pattern and material type.
(b) Slab soffit. There are two types of slab soffit spall repairs:
Type A. For exposed reinforcing steel at a depth of 1-inch or less from the projected horizontal soffit surface, clean the exposed reinforcing steel according to Subsection 203.04(c) and apply an approved reinforcing steel epoxy paint to the exposed reinforcing per the manufacturer’s recommendations; and
Type B. For exposed reinforcing steel at a depth greater than 1-inch from the projected horizontal soffit surface, saw cut to a depth of ¾-inch minimum around the perimeter of spall and remove all unsound concrete within the limits of the repair area including a minimum of 1¼-inch clear around the exposed reinforcing steel. Use hand tools (hammers and chisels) to achieve the final required depth.
After concrete removal, sandblast all exposed reinforcing steel, and concrete surfaces that will be in contact with repair material. Remove all rust and foreign material. Clean the sound concrete surface by flushing with oil-free compressed air.
Furnish and install class C(AE) structural concrete per Section 601A to original neat line.
Construct forms to match existing formwork pattern and material type.
F-53
575.05 Seal joint between concrete and stone masonry at Granite Creek Culvert. Excavate as required to access joint between top slab and stone masonry at downstream end of Granite Creek Culvert according to Section 209. Backfill according to Section 209.
Clean joint between the top slab and stone masonry along the width of the large culvert to ensure it is clean and free of debris prior to grouting. Clean with compressed air and flush with water.
Install measures to prevent containment of grout so that it does not enter the channel. Protect adjacent surfaces not to be covered with grout from splatter or coating.
Furnish and install an approved non-shrink grout per the manufacturer’s recommendations.
After grout installation, construct membrane waterproofing along the joint according to Subsection 559.04. Do not install asphaltic concrete wearing surface on membrane. After installation of membrane waterproofing, place roadway fill on top of culvert to the required grade to complete road restoration.
575.06 Grout injection beneath bottom slab at Granite Creek Culvert. Fill voids beneath the bottom slab visible from the inlet and outlet with a cement grout according to 725.22(g).
Proportion grout mix, with or without sand, as required to develop an unconfined compressive strength not less than 3,000 psi in accordance with AASHTO M85 (ASTM C150) and accepted by the CO, and with a water-cement ratio compatible with pumping and placement requirements.
Provide injection holes a minimum of 1½-inches in diameter or of sufficient diameter to ensure unrestricted flow.
Provide two pressure gauges, one at grout pump and the other on manifold hookup at collar of hole being grouted. Use pressure gauges that can be read to an accuracy of at least 5 pounds per square inch gauge (psig).
Provide suitable stop valves at collar of hole for use in maintaining pressure, as required, until grout has set.
Pressure inject grout beneath bottom slab of culvert to limits as approved by the CO. Install grout holes as required to monitor the extent of grouting; escape of grout through holes is permitted to indicate satisfactory filling of voids. Continuously monitor pressure and volume of grout during grouting operations. Do not pump at a pressure that will damage the structure.
Operate and control pumps to deliver grout uniformly and steadily.
Inject grout continuously to approved limits, unless otherwise directed by the CO.
F-54
Prevent setting of grout, which may escape on exposed surfaces; remove grout and restore surface to original condition as approved by the CO. Fill all grout holes in bottom slab to original neat line.
575.07 Acceptance. Material for Minor Bridge Work will be evaluated under Subsections 106.02 and 106.03. Furnish product certifications for each shipment of prepackaged non-shrink grout, resin for bonded reinforcing, polymer concrete patching material, concrete bonding agent, and reinforcing steel epoxy paint.
Concrete repair will be evaluated under Subsections 106.02, 106.03 and Section 601A.
Temporary works will be evaluated under Section 562.
Seal joint between concrete and stone masonry at Granite Creek Culvert will be evaluated under Subsections 106.02 and 106.03.
Material for grout injection beneath bottom slab at Granite Creek Culvert will be evaluated under Subsections 106.03 and 106.04. Installation of grout injection will be evaluated under Subsections 106.02 and 106.04.
Measurement
575.08 Measure the Section 575 items listed in the bid schedule according to Subsection 109.02.
Payment
575.09 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 575 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
F-91
Salvage stone from existing stone masonry structures according to Subsection 620.05.
When salvaged stone is used, combine salvaged stone with new stones stockpiled at Logan Pit and at the Glacier Park Ball field, as listed in Subsection 105.02(a). Blend the salvaged and new stone, and use new stones of the same color and shape to create a uniform appearance.
Construction Requirements
620.03 General. Construct stone masonry that matches the character of existing historic masonry along the Going-to-the-Sun roadway for that particular item of work. Character includes stone finish, stone size, stone color, masonry pattern, joint size, joint finish and seeding, and mortar color and texture.
The CO will identify existing masonry structures to be used as examples in repointing stone masonry, resetting masonry walls and new construction of stone masonry structures. Each historic structure is unique and may contain multiple character elements to be matched.
Do not repoint or place stone masonry when the ambient temperature of the outside air or material is below 32º F. Maintain completed masonry in a moistened condition at a temperature above 40º F for 72 hours after construction.
Excavate and backfill according to Section 209.
Construct drainage chutes within constructed or reset guardwalls at locations determined by the CO. The type of drainage chute to be included within constructed or reset guardwalls will be determined by the CO.
Prior to assessing the limits of stone masonry repointing or repair, clean all stone masonry surfaces, including the tops of all walls, headwalls, and arches, of all loose mortar, dirt, vegetation, and any foreign material. Take care to preserve lichen growth wherever possible. Do not use power saws or grinders. Remove mortar to a depth of 2½ times the joint width, or 2½-inches, whichever is less. Clean joints of all loose fragments and dust with pressurized air or water [not to exceed 400 pounds per square inch (psi)] and a natural or nylon brush. Do not use chemicals for cleaning unless approved by the CO.
620.04 Qualifications. Before beginning work, submit proof to the CO that proposed stonemasons have experience in completing projects of similar character and complexity.
Provide the following:
(a) The names and work histories of the stonemasons employed by the Contractor or Subcontractors who will be responsible for the stone masonry work. Provide stonemasons who have successfully completed at least five stone masonry projects. Submit brief descriptions of each project along with photos, owning agency’s name, and current telephone number; and
F-97
03USC01/01/04
Section 622. — RENTAL EQUIPMENT
Description
622.01 Delete the text of this Subsection and substitute the following:
This work consists of furnishing and operating equipment for the construction work as ordered by the CO and listed below. Work under this Section does not include equipment time used to perform work provided for under any other pay item shown in the bid schedule. The work anticipated under this Section includes:
(a) Field cut exposed rebar at Haystack Creek culvert (1116+58);
(b) Final grading and shaping at roadway obliteration areas;
(c) Performing minor landscaping and vegetation/debris removal within the work limits and outside of clearing and grubbing limits as directed by the CO;
(d) Repair red argillite rockery wall (899+25 to 899+72, Lt);
(e) Grading culvert inlets and outlets to drain;
(f) Remove and reset riprap revetment at 898+00 to 899+72.
(g) Reset drystack retaining walls at Unnamed Creek box culvert and Granite Creek box culvert, including transportation of additional stone to the site.
(h) Performing grading, shaping, and finish work related to island construction at Red Rock turnout.
(i) Rock removal to establish grade for constructing rockery walls.
Construction Requirements
622.02 Rental Equipment. Add the following:
Furnish and operate the following equipment:
Number of Units Type of Equipment
1 Dump Truck, 10 cubic yard minimum capacity
1 Backhoe loader, 8 cubic feet minimum rated capacity bucket, 30-inch width
1 Hydraulic excavator, crawler mounted, 1.0 cubic yard minimum capacity with thumb attachment
1 Hydraulic Excavator (with hoe ram attachment)
1 Chain saw
Submit the model number and serial number for each piece of equipment before use. Make equipment available for inspection and approval before use.
G-5
03USC09/11/06
Section 705. — ROCK
705.02 Riprap Rock. Add the following:
Match riprap to the color and characteristics of the material excavated from the surrounding area.
Do not haul or place riprap until color and material characteristics are approved by the CO.
705.03 Rock for Masonry Structures. Add the following:
Furnish stone conforming to the size and shape specified in the plans. Provide stone according to Section 620 and Section 105.
705.07 Boulders. (Added Subsection).
Furnish Helena Formation Dolomitic Limestone boulders to match the color and characteristics of the native stone in the surrounding project area.