AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 08/17/2011 N/A MT PRA GLAC 10(22)
AVALANCHE TO WEST
TUNNEL, PHASE VII
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-11-R-00011
9B. DATED (SEE ITEM 11)
07/14/2011
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT PRA GLAC 10(22), GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A003, dated 8/17/11 MT PRA-GLAC 10(22) Solicitation No. DTFH70-11-R-00011 GTSR Rehabilitation – Avalanche to West Tunnel Page 2, Phase VII
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-9. Adds bid item 26101-0000 Rock Dowel
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision F-5 204.05 Conserve Topsoil Adds subsection F-6 Revises pagination F-7 209.04 General Adds sentence F-13 252.03 General Deletes paragraph F-14 252.03 General Deletes 4 paragraphs F-14 252.03 General Deletes last sentence in 6th paragraph F-15 252.04 Placing Stones Revises first word in first paragraph
F-15 252.06 Measurement Adds sentence
F-15 252.07 Payment Adds “and 261” F-94 620.12 Acceptance Deletes sentence F-94 620.12 Acceptance Revises 106.04 F-96 Table 620-1 Deletes Table 620-1 F-99 209.04 General Replaces subsection
PLANS
Plan sheet #B.1 Adds bid item 26101-0000 Rock Dowel Plan sheet #E.1 Adds bid item 26101-0000 Rock Dowel to Rockery Wall Quantities
ENCLOSURES
Pages:
A-7 through A-14 F-5 through F-7 F-13 through F-15 F-94 F-96 F-99
Plan Sheets:
B.1 E.1
Notice to Offeror: Please submit revised pages A-7 through A-14 with your bid.
Project: MT PRA-GLAC 10(22)
GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid.
Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
The quantity for the following item of work is a Contract Quantity (see FP-03, Subsection 109.02):
63302-0000
A- 7
Bid Schedule
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
15101-0000 MOBILIZATION
ALL Lump Sum $___________________
15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL Lump Sum $___________________
15401-0000 CONTRACTOR TESTING
ALL Lump Sum $___________________
15501-0000 CONSTRUCTION SCHEDULE
ALL Lump Sum $___________________
15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL Lump Sum $___________________
15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE
6,930
LNFT $_______________ $___________________
15706-0300 SOIL EROSION CONTROL, SANDBAG
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Bid Schedule A
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
A- 8
15801-0000 WATERING FOR DUST CONTROL
2,160
MGAL $_______________ $___________________
20103-0000 CLEARING AND GRUBBING
19,000
SQYD $_______________ $___________________
20301-0200 REMOVAL OF BOULDER
EACH $_______________ $___________________
20301-1900 REMOVAL OF PIPE CULVERT
EACH $_______________ $___________________
20301-2700 REMOVAL OF STRUCTURE (WAYSIDE EXHIBIT)
EACH $_______________ $___________________
20301-3000 REMOVAL OF TRASH RECEPTACLE
EACH $_______________ $___________________
20401-0000 ROADWAY EXCAVATION
3,300
CUYD $_______________ $___________________
21101-2000 ROADWAY OBLITERATION, METHOD 2
4,300
SQYD $_______________ $___________________
25101-4000 PLACED RIPRAP, CLASS 4
CUYD $_______________ $___________________
25101-5000 PLACED RIPRAP, CLASS 5
CUYD $_______________ $___________________
25110-4000 GROUTED RIPRAP, CLASS 4
CUYD $_______________ $___________________
25125-0000 BOULDER
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Estimated Quantity Unit Bid Price Amount Bid
A- 9
25210-0000 ROCKERY (WALL)
SQYD $_______________ $___________________
26101-0000 ROCK DOWEL
LNFT $_______________ $___________________
30302-1000 DITCH RECONDITIONING
1,550
LNFT $_______________ $___________________
30503-0000 AGGREGATE-TOPSOIL COURSE
CUYD $_______________ $___________________
30802-2000 ROADWAY AGGREGATE, METHOD 2
3,875
TON $_______________ $___________________
31001-0000 RECYCLED AGGREGATE BASE
54,505
SQYD $_______________ $___________________
40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM
SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE 3 PAVEMENT
ROUGHNESS)
8,500
TON $_______________ $___________________
40205-3000 ANTISTRIP ADDITIVE, TYPE 3
TON $_______________ $___________________
40401-0000 MINOR HOT ASPHALT CONCRETE
TON $_______________ $___________________
41101-1000 PRIME COAT, GRADE CMS-2
TON $_______________ $___________________
41105-0000 BLOTTER
TON $_______________ $___________________
Project: MT PRA-GLAC 10(22)
GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
Bid Schedule A leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A003
Estimated Quantity Unit Bid Price Amount Bid
A- 10
41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
TON $_______________ $___________________
55901-0000 MEMBRANE WATERPROOFING
SQYD $_______________ $___________________
57501-0000 MINOR BRIDGE WORK
ALL Lump Sum $___________________
60201-0400 12-INCH PIPE CULVERT (animal crossing)
LNFT $_______________ $___________________
60201-0500 15-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-0600 18-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-0800 24-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1000 36-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1200 48-INCH PIPE CULVERT
LNFT $_______________ $___________________
60201-1600 72-INCH PIPE CULVERT
LNFT $_______________ $___________________
60202-0800 48-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
LNFT $_______________ $___________________
60501-0000 STANDARD UNDERDRAIN SYSTEM
LNFT $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Estimated Quantity Unit Bid Price Amount Bid
A- 11
60706-0000 CLEANING DRAINAGE STRUCTURE
EACH $_______________ $___________________
60901-0000 CURB, CONCRETE (Log Pattern)
LNFT $_______________ $___________________
61501-1100 SIDEWALK, ASPHALT
SQYD $_______________ $___________________
61901-0000 FENCE (LOG RAIL)
LNFT $_______________ $___________________
62026-1000 REMOVE AND RESET STONE MASONRY (headwall repair)
SQYD $_______________ $___________________
62027-1000 REMOVE AND RESET STONE MASONRY GUARDWALL (ASHLAR)
LNFT $_______________ $___________________
62031-0000 REPOINT STONE MASONRY
2,200
SQFT $_______________ $___________________
62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
HOUR $_______________ $___________________
62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH
HOUR $_______________ $___________________
62201-3000 HYDRAULIC EXCAVATOR (WITH HOE RAM ATTACHMENT)
HOUR $_______________ $___________________
62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB ATTACHMENT
HOUR $_______________ $___________________
Project: MT PRA-GLAC 10(22)
GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
Bid Schedule A leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A002 leeann.bush Typewritten Text Revised by leeann.bush Typewritten Text Amend A002 leeann.bush Typewritten Text Revised by leeann.bush
Amend A002
Estimated Quantity Unit Bid Price Amount Bid
A- 12
62201-3750 CHAIN SAW
HOUR $_______________ $___________________
62301-0000 GENERAL LABOR
HOUR $_______________ $___________________
62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
7,000
SQYD $_______________ $___________________
63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
EACH $_______________ $___________________
63302-0000 SIGN SYSTEM
SQFT $_______________ $___________________
63315-0000 RUMBLE STRIP
SQYD $_______________ $___________________
63316-1000 REMOVE AND RESET SIGN
EACH $_______________ $___________________
63318-1000 SNOWPOLE HOLDER
EACH $_______________ $___________________
63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
1,800
LNFT $_______________ $___________________
63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
72,000
LNFT $_______________ $___________________
63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (yellow) 3,100
LNFT $_______________ $___________________
63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL (White)
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VII
Bid Schedule A leeann.bush Typewritten Text Revised by leeann.bush
Amend A002
Estimated Quantity Unit Bid Price Amount Bid
A- 13
63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
EACH $_______________ $___________________
63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH
EACH $_______________ $___________________
63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
EACH $_______________ $___________________
63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
EACH $_______________ $___________________
63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
EACH $_______________ $___________________
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
19,000
LNFT $_______________ $___________________
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
SQFT $_______________ $___________________
64603-0100 FIXTURE, TRASH RECEPTACLE (INCLUDES RECYCLE RECEPTACLES)
EACH $_______________ $___________________
64603-0900 FIXTURE, PORTABLE TOILET
EACH $_______________ $___________________
64603-1200 FIXTURE, WAYSIDE EXHIBIT
EACH $_______________ $___________________
Project: MT PRA-GLAC 10(22)
Estimated Quantity Unit Bid Price Amount Bid
A- 14
64625-1000 MAINTENANCE, TOILET
EACH $_______________ $___________________
$_____________________TOTAL
Submitted by:
Name of Offeror
Project: MT PRA-GLAC 10(22)
F-5
Special Contract Requirements Project: MT PRA-GLAC 10(22), GTSR Rehabilitation, Avalanche to West Tunnel, Phase VII
03USC08/12/09
Section 204. — EXCAVATION AND EMBANKMENT
Construction Requirements
204.05 Conserve Topsoil. Delete the text of this Subsection and substitute the following:
The CO will designate topsoil salvage locations. Completely remove topsoil before beginning excavation. Remove the topsoil in one pass if possible. Use equipment capable of excavating small isolated pockets of topsoil. Do not handle topsoil in a wet or frozen condition.
Manually rake topsoil in areas where topsoil cannot be removed mechanically. Do not mix topsoil with subsoil. Break down shrubs and trees that are less than three feet in height, including roots, to a maximum diameter or length of 4 inches. Incorporate this material into conserved topsoil. Do not compact or drive upon topsoil during removal.
Stockpile conserved topsoil in rows no higher than 3 feet, and at locations described in Subsection 105.04. Place conserved topsoil under Section 624.
204.06 Roadway Excavation. Delete the text of this Subsection and substitute the following:
Excavate as follows:
(a) General. Do not disturb material and vegetation outside the construction limits.
Excavate material suitable for backfill or other purposes in a sequence that permits the placement of the excavation directly into its final position or in stockpiles for subsequent placing.
Use caution when excavating adjacent to existing stone masonry guardwalls. Take all necessary precautions to prevent damage to the structures.
Shape to drain and compact the work area to a uniform cross-section at the end of each day’s operations. Eliminate all ruts and low spots that could hold water.
(b) Rock cuts. Do not blast. Excavate rock cuts to a depth of 9-inches below finish grade within the roadbed limits. Backfill excavated areas to grade with other suitable material.
Compact the material according to Subsection 310.07.
Rock excavation is to be done by mechanical methods. Rock excavation requiring the use of a hoe ram is to be agreed upon by the CO and paid under Section 622.
(c) Earth cuts. Scarify earth cuts to 6-inches below subgrade within the roadbed limits.
Compact the scarified material according to Subsection 204.11.
Revised by Amendment A003
F-6
204.13 Sloping, Shaping, and Finishing. Delete the first paragraph of (a) and add the following:
(a) Sloping. Leave all slopes with roughened surfaces as they are being constructed as directed by the CO. Construct slopes to staked slope ratios, as shown in the cross sections and staking data, but steepen or flatten randomly and intermittently to simulate the irregularity of existing terrain as designated by the CO. Sculpt slopes to produce irregular ledges, shelves, and planting pockets for vegetation by steepening the nominal slope ratio in staggered locations suitable for placement of topsoil and vegetation.
Leave undisturbed boulders that are firmly in place and protruding from the slope, except those designated for removal under Section 203 or as directed by the CO.
Slope as follows:
(1) Earth slopes. Add material to the fill slopes to obtain varying and gently undulating contoured slope, rounding at toe of fills, and to flatten selected slopes to blend with existing land forms or promote revegetation when shown on the plans or determined by the CO. Round tops and bottoms of all slopes, including the slopes of drainage ditches.
204.14 Disposal of Unsuitable or Excess Material. Add the following to the first paragraph:
Dispose of excess usable material at Logan Pit or at alternate locations determined by the CO.
Where unsuitable material is not allowed in the Park boundaries, dispose legally off the project and comply with Subsections 107.10 and 107.11, and all applicable local, State, and Federal laws.
Measurement
204.16 Amend as follows:
Add the following to paragraph (a)(1)(a) Roadway prism excavation:
(a) Use the volume shown in the plan column on the summary of quantities sheet of the plans. The volume is subject to adjustments resulting from changes to slope stakes. See Subsection 152.03(c), Slope stakes and references.
Format revised by Amendment A003
F-7
03USC03/08/11
Section 209. — STRUCTURE EXCAVATION AND BACKFILL
Construction Requirements
209.04 General. Add the following:
Rock excavation is to be done by mechanical methods. Rock excavation requiring the use of a hoe ram is to be agreed upon by the CO and paid under Section 622.
Conserve topsoil within the structure excavation limits according to Section 204 as directed by the CO.
Delete Table 209-1 and substitute the following:
F-13
03USC01/01/04
Section 252. — SPECIAL ROCK EMBANKMENT AND
ROCK BUTTRESS
Delete the text of this Section and substitute with the following:
Description
252.01 This work consists of constructing rockery walls.
Material
252.02 Conform to the following Section or Subsections:
Bedding material 704.02 Select Borrow 704.07 Stone for rockeries 705.08 Epoxy-coated reinforcing bars 709.01 Earthworks Geotextile 714 Epoxy resin adhesive 725.21 Cement grout 725.22(e) Earthworks Geotextile 714
Rock obtained through structure excavation under Section 209 may be processed into stone for rockeries if the material meets the requirements in Subsection 705.08.
It is not anticipated that structure excavation will produce adequate quantities for the rockery wall bid items. See Section 105 for additional material source information.
Construction Requirements
252.03 General. Survey according to Section 152 and verify the limits of the wall installation.
Perform the excavation and foundation preparation according to Section 209.
Construct rockery walls as shown on the plans and as directed by the CO.
Submit, for approval by the CO, a plan or narrative describing how work at the Little Red Rock turnout site will be accomplished, including the proposed timing of the work to minimize slope disturbance and potential instability.
Revised by Amendment A002
F-14
Do not begin construction of rockery walls until the construction start date is approved in writing by the CO. Submit the request for proposed start of construction date to the CO in writing at least 7 days prior to the proposed start date.
During construction of the wall, do not leave unsupported temporary excavations greater than 4 feet high overnight, over the weekend, or any other nonworking periods unless approved by the
CO.
For rockery walls, grade the foundation for a width equal to the required stones. Excavate to required depth for placement of a minimum 6-inch aggregate leveling course or to refusal on rock. Compact the leveling course in layers not to exceed 6-inches in depth to form a uniform foundation. Where foundation rock is encountered, utilize cement grout to create a 1” minimum depth grout bed in lieu of the aggregate leveling course.
Rock excavation is to be done by mechanical methods. Rock excavation requiring the use of a hoe ram is to be agreed upon by the CO and paid under Section 622.
When constructing rockery walls around existing culvert pipes in the rockery wall slope repair areas, place a minimum of 6-inches of bedding material around all sides of the pipe to provide a cushion between the pipe, rockery stone, and backfill.
252.04 Placing Stones. Construct rockery walls one course at a time. Incline the wall foundation and subsequent stone courses toward the back of the wall at similar to the wall face batter angle.
F-15
Key the first course of stone so that full contact is achieved with the leveling course. Where foundation rock is encountered and a 6-inch leveling course cannot be obtained, drill and set a minimum of three epoxy-coated reinforcement bars per the manufacturer’s recommendation for each stone of the first course. For walls higher than 6 feet, 2 stones may be placed in the base and second course to achieve the wall width dimensions shown in the plan set.
Construct rockery walls of class 1 through class 5 stones as shown in the plans. Increase the stone class from top to bottom with a uniform range of size in-between.
Place the stones in a stable orientation, with minimal voids; such that at least 80 percent of the exposed face of the wall is stone (class 1 through 5 stones). Seat and bed each course of stones by compacting the select granular backfill behind the stone to provide a stable condition for the entire wall. Compact each layer with mechanical or hand operated equipment in horizontal lifts not to exceed 6-inches when compacted. Key each stone into adjacent stones by utilizing the natural irregular shape of the stones. Use rock spalls to chock larger stones solidly in position and to fill voids between the stones. Do not use rock spalls to provide primary bearing support of the facing stones. Stack larger stones such that each stone is bearing on at least 2 stones of equal or larger class below.
Construct the exposed face of the rockery wall reasonably uniform, limiting projections beyond the neat line of the slope to 20 percent of the largest facing stone dimension.
Transition the beginning and end of the rockery walls into soil slopes or rock outcrops, if present, as directed by the CO.
252.05 Acceptance. Stone will be evaluated under Subsection 106.02.
Stone placement will be evaluated under Subsections 106.02 and 106.04.
Structure excavation, backfill, and leveling pad will be evaluated under Section 209.
See Table 252-1 for minimum sampling, testing and acceptance requirements.
Measurement
252.06 Measure the Section 252 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Rockery walls will be measured by the square yard of wall. Measurement will be made on the vertical plane of front face. Measure epoxy-coated reinforcing bars for payment by the linear foot.
Structural excavation will not be measured for payment. Backfill and leveling pad quantities will not be measured for payment. Earthwork geotextile will not be measured for payment.
Payment
252.07 The accepted quantities will be paid at the contract price per unit of measurement for the Section 252 and 261 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
F-94
620.09 Constructing Walls. Construct a 3 square yard sample section of stone masonry veneer for approval by the CO, before continuing with the work. The approved test section may be incorporated into the permanent work.
Construct stone masonry veneer and install triangle ties as shown in the plans, and according to Subsections 620.06 and 620.08.
620.10 Facing for Concrete. Conform to the following:
(a) Stone placed before concrete. Make the back of the masonry uneven to improve the bond to the concrete backing.
After the mortar has attained sufficient strength, clean the back masonry surface of all dirt, loose material, and mortar drippings. Wash surfaces of masonry just before placing the concrete by pressure water jet.
Place the first 12 inches of concrete height continuously. When placing the concrete, carry a neat cement grout of the consistency of cream on top of the concrete and against the masonry at all times. Coat all interstices in the back of the masonry with grout.
620.11 Guardwalls and Seat Walls. Construct a 10-foot sample section of stone masonry ashlar guardwall and a 10 foot sample section of stone masonry random rubble cavity guardwall.
Do not continue stone masonry placement before sample is approved by the CO. The approved sample sections may be incorporated into the permanent work.
Construct guardwalls as shown in the plans, and according to Subsections 620.06, 620.08, and 620.09, and this Subsection. Incorporate all stone shapes specified in the plans into the sample Section.
620.12 Acceptance.
Material for mortar will be evaluated under Subsections 106.02 and 106.03. Mortar will be evaluated under Subsections 106.02 and 106.03.
Stone for masonry structures will be evaluated under Subsections 106.02 and 106.04.
Construction or rehabilitation stone masonry structures will be evaluated under Subsections 106.02 and 106.04.
Excavation and backfill will be evaluated under Section 209.
Concrete will be evaluated under Section 601.
Lean concrete backfill will be evaluated under Section 614.
F-96
F-99
Section 624. — TOPSOIL
Construction Requirements
624.04 Placing Topsoil. Delete third sentence of the first paragraph and substitute the following:
Conserve all available topsoil under Sections 204 and 209. Use all conserved topsoil before furnishing topsoil. All furnished topsoil sources must meet the weed-free requirements in Subsection 105.02(b). If furnished topsoil is required, blend imported topsoil with conserved topsoil at a 2:1 ratio (maximum 2 imported to 1 conserved) prior to placing.
Place topsoil at the end of the last construction season, as directed by the CO. Do not disturb or remove topsoil after placement.
624.05 Acceptance. Add the following to the first paragraph:
Provide a soil analysis report for furnished topsoil.
PMIS Pkg. No. 90959 NPS Drwg. No. 117/41956
SUMMARY OF QUANTITIES
B.1
STATE PROJECT
NUMBER
SHEET
MT
PRA GLAC 10(22)
g la c b a .d g n
U
S I n t2
D
R J o h n s o n
C h e c k e d b y
K
A u s ti n
W
M c
Q u is to
D e s ig n e d b y
‡40401-0000 ‡MINOR HOT ASPHALT CONCRETE ‡ TON ‡ 23 ‡ ‡ ‡ ‡ ‡ 19 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 42 ‡ 45 ‡
‡40205-3000 ‡ANTISTRIP ADDITIVE, TYPE 3 ‡ TON ‡ 82 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 82 ‡ 85 ‡
‡ ‡MILLION ESAL (TYPE 3 PAVEMENT ROUGHNESS) ‡ TON ‡ 8167 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 8167 ‡ 8,500 ‡
‡ ‡NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO 3 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡
‡40101-5600 ‡SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡
‡31001-0000 ‡RECYCLED AGGREGATE BASE ‡ SQYD ‡ 54505 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 54505 ‡ 54,505 ‡
‡30802-2000 ‡ROADWAY AGGREGATE, METHOD 2 ‡ TON ‡ 3875 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 3875 ‡ 3,875 ‡
‡30503-0000 ‡AGGREGATE-TOPSOIL COURSE ‡ CUYD ‡ 175 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 175 ‡ 200 ‡
‡30302-1000 ‡DITCH RECONDITIONING ‡ LNFT ‡ ‡ 1413 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 1413 ‡ 1,550 ‡
‡26101-0000 ‡ROCK DOWEL ‡ LNFT ‡ ‡ ‡ 390 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 390 ‡ 390 ‡
‡25210-0000 ‡ROCKERY (WALL) ‡ SQYD ‡ ‡ ‡ 85 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 85 ‡ 100 ‡
‡25125-0000 ‡BOULDER ‡ EACH ‡ ‡ 67 ‡ 167 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 234 ‡ 300 ‡
‡25110-4000 ‡GROUTED RIPRAP, CLASS 4 ‡ CUYD ‡ ‡ ‡ ‡ ‡ ‡ 11 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 11 ‡ 16 ‡
‡25101-5000 ‡PLACED RIPRAP, CLASS 5 ‡ CUYD ‡ ‡ ‡ ‡ ‡ ‡ ‡ 25 ‡ ‡ ‡ ‡ ‡ ‡ ‡ 25 ‡ 30 ‡
‡25101-4000 ‡PLACED RIPRAP, CLASS 4 ‡ CUYD ‡ ‡ ‡ ‡ ‡ ‡ ‡ 49 ‡ ‡ ‡ ‡ ‡ ‡ ‡ 49 ‡ 60 ‡
‡21101-2000 ‡ROADWAY OBLITERATION, METHOD 2 ‡ SQYD ‡ ‡ 3908 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 3908 ‡ 4,300 ‡
‡20401-0000 ‡ROADWAY EXCAVATION ‡ CUYD ‡ ‡ 2957 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 2957 ‡ 3,300 ‡
‡20301-3000 ‡REMOVAL OF TRASH RECEPTACLE ‡ EACH ‡ ‡ ‡ 3 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 3 ‡ 3 ‡
‡20301-2700 ‡REMOVAL OF STRUCTURE (WAYSIDE EXHIBIT) ‡ EACH ‡ ‡ ‡ 1 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 1 ‡ 1 ‡
‡20301-1900 ‡REMOVAL OF PIPE CULVERT ‡ EACH ‡ ‡ ‡ ‡ ‡ ‡ ‡ 9 ‡ ‡ ‡ ‡ ‡ ‡ ‡ 9 ‡ 9 ‡
‡20301-0200 ‡REMOVAL OF BOULDER ‡ EACH ‡ ‡ 23 ‡ 86 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 109 ‡ 109 ‡
‡20103-0000 ‡CLEARING AND GRUBBING ‡ SQYD ‡ ‡ 17514 ‡ 239 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 17753 ‡ 19,000 ‡
‡15801-0000 ‡WATERING FOR DUST CONTROL ‡ MGAL ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 2,160 ‡ 2,160 ‡
‡15706-0300 ‡SOIL EROSION CONTROL, SANDBAG ‡ EACH ‡ ‡ ‡ ‡ ‡ 250 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 250 ‡ 250 ‡
‡15705-1500 ‡SOIL EROSION CONTROL, SEDIMENT WATTLE ‡ LNFT ‡ ‡ ‡ ‡ ‡ 6930 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 6930 ‡ 6,930 ‡
‡ ‡CHANNEL ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15702-1000 ‡SOIL EROSION CONTROL, TEMPORARY DIVERSION ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡
‡15501-0000 ‡CONSTRUCTION SCHEDULE ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15401-0000 ‡CONTRACTOR TESTING ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15201-0000 ‡CONSTRUCTION SURVEY AND STAKING ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15101-0000 ‡MOBILIZATION ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡ ITEM ‡ DESCRIPTION ‡ UNIT ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡CONTROL ‡CONTROL ‡ ‡ ‡ ‡ PLAN ‡ SCHEDULE ‡
‡˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜‡SECTIONS ‡ PROFILE ‡ ‡ ‡CONTROL ‡S ‡ ‡DETAILS ‡TRAFFIC ‡TRAFFIC ‡ ‡ ‡ ‡ ‡ BID ‡
‡ ‡ TYPICAL ‡ PLAN AND‡ TURNOUTS‡ NOT USED‡ EROSION ‡STRUCTURE‡ DRAINAGE‡ MISC. ‡TEMPORARY‡PERMANENT‡ ‡ ‡ ‡------------------------‡
‡ PLAN SHEET SECTION -------->>‡SECTION C‡SECTION D‡SECTION E‡SECTION F‡SECTION G‡SECTION H‡SECTION I‡SECTION J‡SECTION K‡SECTION L‡ ‡ ‡ ‡ ESTIMATED QUANTITIES ‡
Õ˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝‚
3 Amendment 003
PMIS Pkg. No. 90959 NPS Drwg. No. 117/41956
TABULATION OF QUANTITIES
LOCATION LT/RT
TOTAL
LOCATION
(LNFT)
QUANTITY
LT/RT
RT
TOTAL
(WAYSIDE EXHIBIT)
REMOVAL OF STRUCTURE
ITEM 20301-2700
964+90 1
LTRed Rock 2
E.1
STATE PROJECT
NUMBER
SHEET
MT
PRA GLAC 10(22)
g la c e a .d g n
U
S I n t2
D
R J o h n s o
C h e c k e d b y
K
A u s ti n
W
M c
Q u is to n D e s ig n e d b y
(including recycle receptacles)
RECEPTACLE
REMOVAL OF TRASH
ITEM 20301-3000
LOCATION
(SQYD)
QUANTITYLT/RT
TOTAL
RT 19
CLEARING AND GRUBBING
ITEM 20103-0000
NOTES
LT 17
LT
LT 29
LT 44884+30 to 884+80
885+90 to 886+25
907+15 to 907+80
908+14 to 908+44
964+65 to 964+70
Little Red Rock Turnout
Shoulder Area
Remove 3 Trees at Avalanche Chute Turnout
Gravel Walkway Red Rock Turnout
Overlook Area at Red Rock Turnout
BOULDER QUANTITIES
LOCATION LT/RT
BOULDER
ITEM 25125-0000
TOTAL
Trash Recycle
1010+70 to 1013+35
884+30 to 884+75
884+88 to 885+75
885+75 to 885+97
896+77 to 897+13
898+96 to 899+57
906+28 to 907+00
906+88 to 907+24
908+50 to 909+35
925+80 to 926+20
927+10 to 927+50
933+20 to 933+60
934+75 to 935+15
939+50 to 940+05
942+75 to 943+29
962+60 to 963+30
962+60 to 966+50
965+45 to 966+50
981+60 to 981+90
983+20 to 983+60
992+08 to 994+54
LT
LT
LT
LT
RT
LT
RT
LT
LT
Lt
Lt
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT 0
LOCATION LT/RT
(CUYD)
BACKRILL
GRANULAR
SELECT
(SQYD)
TYPE IV-D
GEOTEXTILE,
(CUYD)
EXCAVATION
STRUCTURE
TOTAL
FOR INFORMATION ONLY
(SQYD)
ROCKERY WALL
25210-0000
ITEM
ROCKERY (WALL) QUANTITIES
85 48 69 98
16786
907+64 to 907+73
884+55.10 to 885+60.00 LT 64 33 50 67
908+45.00 to 908+65.65 LT 21 15 19 31
908+45 to 908+59 LT 0 2
(EACH)
REMOVAL OF BOULDERS
ITEM 20301-0200
QUANTITY (EACH)
(LNFT)
ROCK DOWEL
26101-0000
ITEM
3 Amendment 003