Preliminary Plans 1 of 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A002_Davey'sBridge.pdf | ||
| A001_Davey'sBridge.pdf | ||
| Book_2Solicitation IFB_Davey'sBridge.pdf | ||
| Physical Data_Request Form for Internet_Davey'sBridge.pdf | ||
| Plan Request for Interne_Davey'sBridget.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/daveys-bridge/ | — | |
| Book_1Solicitation IFB_Davey'sBridge.pdf | ||
| 2 of 2_Prelim Plans_Daveys Bridge.pdf | ||
| PROJECT DESCRIPTION__Davey's Bridge.pdf | ||
| Prelim Ltr_Daveys Bridge.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
ID
PFH 24(10)
I F a b .d g n
U
S S u r ft
D
C h e c k e d b y
R
M e a d o w s
P E
D e s ig n e d b y
INDEX TO SHEETS
H. DRAINAGE
G. EROSION CONTROL
F. WALLS
E. APPROACH ROADS
D. PLAN-PROFILE
C. TYPICAL SECTION(S)
B. SUMMARIES
A. GENERAL INFORMATION
L. BRIDGE
K. PERMANENT TRAFFIC CONTROL
J. TEMPORARY TRAFFIC CONTROL
I. SAFETY FEATURES
PRELIMINARY
NOT FOR CONSTRUCTION H.5
H.4
H.3
H.2
H.1
G.9
G.8
G.7
G.6
G.5
G.4
G.2-3
G.1
F.3
F.2
F.1
E.1
D.7
D.3-6
D.2
D.1
C.2
C.1
B.1-2
A.4
A.3
A.2
A.1
L.1-20
K.3
K.2
K.1
J.9
J.8
J.7
J.6
J.5
J.4
J.3
J.2
J.1
I.4
I.3
I.2
I.1
BRIDGE PLANS
STD DETAIL W634-2, LINEAR PAVEMENT MARKINGS
SIGNING AND PAVEMENT MARKINGS 10+00 TO 23+75
TABULATION OF PERMANENT TRAFFIC CONTROL QUANTITIES
INSTALLATION
STD DRWG. 635-14, TEMPORARY TRAFFIC CONTROL SIGN
CLOSURE LAYOUT
STD DRWG. 635-10, TEMPORARY TRAFFIC CONTROL SHOULDER
LANE CLOSURE LAYOUT (WITH FLAGGERS)
STD DRWG. 635-6, TEMPORARY TRAFFIC CONTROL SINGLE
CLOSURE LAYOUT (WITH FLAGGERS)
STD DRWG. 635-5, TEMPORARY TRAFFIC CONTROL ROAD
DIVERSION
STD DRWG. 635-4, TEMPORARY TRAFFIC CONTROL FOR
STD DRWG. 635-2, TEMPORARY PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL CONSTRUCTION PHASE 2
TEMPORARY TRAFFIC CONTROL CONSTRUCTION PHASE 1
TABULATION OF TEMPORARY TRAFFIC CONTROL QUANTITIES
G4 W-BEAM GUARDRAIL TO THRIE BEAM TRANSITION DETAIL
RELEASING TERMINAL TYPE CRT, WOOD POSTS
STD DRWG. 617-22, CRG W-BEAM GUARDRAIL CABLE
TERMINAL
STD DRWG. 617-20, G4 W-BEAM GUARDRAIL TYPE TANGENT
G4 W-BEAM GUARDRAIL WOOD POSTS
CUT SLOPES
STD DRWG. 602-6, PIPE CULVERT INLET TREATMENT IN
BEDDING
STD DRWG. 602-3, METAL AND PLASTIC PIPE CULVERT
STD DRWG. 602-2, METAL PIPE CULVERT COUPLING BAND
STD DRWG. 602-1, METAL PIPE CULVERT
TABULATION OF DRAINAGE QUANTITIES
HAZARDOUS MATERIALS CONTAINMENT PETROLEUM STORAGE
TEMPORARY CONCRETE WASHOUT
EROSION AND SEDIMENT CONTROL SEDIMENT TRAP BASIN
ENERGY DISSIPATOR
STD DRWG. 157-1, SILT FENCE
STD DETAIL W157-20, SEDIMENT WATTLE
EROSION CONTROL PLANS
TABULATION OF EROSION CONTROL QUANTITIES
MSE WALL (GEOGRID) DETAILS
MSE WALL DETAILS
MSE WALL ALIGNMENT PLAN AND PROFILE
MINOR APPROACH ROAD DETAILS
RIPRAP AND CURB DETAILS
PLAN AND PROFILES
SURVEY CONTROL
TABULATION OF PLAN AND PROFILE QUANTITIES
TYPICAL SECTIONS
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES - SCHEDULE A
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
1 4
1 0 2 1 1
Scale in miles d
R hc u or
C dl
O dR tiP kc oR dR keerC nosrednA
N
Pioneer Cemetery
Garden Valley
GARDEN VALLEY
CROUCH
D A
O R
S N
A M
W
OL
S K
NAB
keerC yrrebesooG kroF elddi
M reviR ett e y a P dR kr o F el d di M sknaB oT
VICINITY MAP
10+00.00
ID PFH 24(10)
BANKS LOWMAN HIGHWAY
A.4
STATE PROJECT
M
J u ly
U
S S u r ft c m y fi le s p w p r o d u c ti o n d m s I F a d .d g n
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
BEGIN APPROACH ROAD
50+00.00
ID PFH 24(10)
MIDDLE FORK ROAD
BEGIN PROJECT
END APPROACH ROAD
51+85.00
ID PFH 24(10)
MIDDLE FORK ROAD
END PROJECT
23+90.00
ID PFH 24(10)
BANKS LOWMAN HIGHWAY
m ile s
Gravel Pit
N O
T
FO
R
CO
N
STRUCTI
O N
PRELI
IN
ARY
m ile s T o L o w m a
FOOTNOTE:
10+00.00 to 23+90.00
BANKS LOWMAN HIGHWAY
TYPICAL SECTION
50+00.00 to 51+85.00
MIDDLE FORKS ROAD
TYPICAL SECTION
GUARDRAIL TYPICAL DETAIL
Superelevate roadway on curves at the rate "e" as indicated on the plan and profile curve data.
Construct slopes and ditches as shown in the Staking Report.
See Standard 602-6, "Pipe Culvert Inlet Treatment in Cut Slopes".
Provide turf establishment to the limits shown in the Staking Report.
See Sheet C.1 for quantities and locations.
TYPICAL SECTIONS
LC
Existing ground elb air aV ti mi
L g ni r a el
C
4:1 epolS %2epolS %2 elba ira
V ti mi
L g ni r a el
C 4:1
Unclassified borrow
1 1
LC
el ba ir a V elbairaV
Unclassified borrow
4:1 4:1 ti mil g ni r a el C ti mil g ni r a el C
15+00, LT to 16+26, LT
UNDERDRAIN SYSTEM
Existing ground
01:1
5.
1:
elb air aV ep ols lli F
Existing ground
C.2
STATE PROJECT
A
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s I F c a .d
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
NO SCALE
each lift in 2 or more lifts, tack between
7-inch compacted depth, placed
Hot asphalt concrete pavement, 5-inch compacted depth
Roadway aggregate, method 2, each lift in 2 or more lifts, tack between
7-inch compacted depth, placed
Hot asphalt concrete pavement, 5-inch compacted depth
Roadway aggregate, method 2, 5-inch compacted depth
Roadway aggregate, method 2, Idaho Section 4 Curb
See Sheet D.6 for details
Profile grade
Profile grade y a
W -f o -t h gi
R n oit c u rt s n o c f o sti mi L y a
W -f o -t h gi
R n oit c u rt s n o c f o sti mi L see Sheet D.6 for details
Idaho Section 10 curb, See Sheet I.1 for guardrail details n oit c u rt s n o c f o sti mi L y a
W -f o -t h gi
R n oit c u rt s n o c f o sti mi L y a
W -f o -t h gi
R
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
4-foot shoulder
9’ limits
Turf establishment limits
Turf establishment
4’
2-foot to 4-foot shoulder
14’14’
14’14’ limits
Turf establishment
4’ limits
Turf establishment
4’
BEGIN PROJECT
El= 3049.27
E= 30436.42
N= 20024.88
10+00.00
ID PFH 24(10)
BANKS LOWMAN HIGHWAY
D R= 1,250.00’
T= 242.48’
L= 479.00’ e= 5.6%
CUYD
EXC.
CUYD
EMB.
15+0012+0011+0010+00
3020 3020
3025 3025
3030 3030
3035 3035
3040 3040
3045 3045
3050 3035
3055 3040
D.3
STATE PROJECT
I F fc .d g n
U
S S u r ft
D e c k e d b y
M e a d o w s s ig n e d b y
N
Profile grade
Existing ground
Line to be constructed
Special ditch profile, LT
Special ditch profile, RT
.5 t o
.0
AR
12+25 RT
AR
14+74 RT
AR
14+74 LT
13+00 14+00
P O
T
.0
UTILITIES:
LEGEND:
Existing guardrail
MSE wall
Proposed guardrail
Riprap crossing powerline
Overhead
24" pipe culvertinstall
Remove and
24" pipe culvertinstall
Remove and
P ip e c u lv e r t
I d a h o S e c ti o n c u r b s e e S h e e t
D .6 see Sheet D.6
Section 4 curb, Construct Idaho
(866) 866-9204
Boise, ID 83705
1708 Annett Street
Garden Valley Cable
(208) 634-6110
McCall, ID 83638-3845
201 Lenora Street
Frontier Communications Corporation
(208) 388-2200
Boise, ID 83702
1221 W. Idaho St.
Idaho Power Corporate Headquaters
Boise, ID, 83706
901 N. Curtis Suite 503
Mountain Shadows Development Co.
Garden Valley, ID. 83622
PO Box 765
Fry, Dan V. & Shauna
Garden Valley, ID. 83622
PO Box 765
Fry, Dan V. & Shauna
X.X
X.X
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
install 24" culvert
Remove and p ip e c u lv e r t ditch profile, LT
Special
P O
T
.0
P C
.1
P T
.1 e= 5.
6%
Curve = C1
,0
.2
,0
.3
-1.8396%
-3.7907%
420’ VC
,0
.2
,0
.3
-1.8396%
-3.7907%
420’ VC
K = 215
SSD = 763’
,0
.0
,0
.6
,0
.2
,0
.4
,0
.4
,0
.6
,0
.0
24" CMP
C
M P
Su bd ivi sio n Pla t, file n o.
Blu e S ha do w Dr ive pe r t he M ou nt ain S ha do ws
GPS
10 3
3015 3015
30203020
3020 3020
30253025
Special ditch profile, RT
T
.9
.3
.9
.6
.7
.9
.9
T
Q500 = 6,730 cfs V500 = 7.38 fps WS500 = 3015.47Q100 = 5,720 cfs V100 = 6.85 fps WS100 = 3014.90 Q50 = 5,140 cfs V50 = 6.82 fps WS50 = 3014.55 Q2 = 2,600 cfs V2 = 4.87 fps WS2= 3012.48Middle Fork Payette River
.3
.2
.2
Guardrail, RT
Profile grade
Guardrail, LT
Guardrail, RTTransition railing, RT & LT
.1
.6
T
.0
.5
Q 50 = 1314.55
Middle Fork Payette River
Q500 = 6,730 cfs
Q100 = 5,720 cfs
Q50 = 5,140 cfs
= 2,600 cfsQ2
V500 = 7.38 fps
V100 = 6.85 fps
V50 = 6.82 fps
V2 = 4.87 fps
WS500 3015.47
WS100 = 3014.90
WS50 = 3014.55
WS2 = 3012.46
T
LEGEND:
Terminal section, tangent
BANKS LOWMAN HIGHWAY
and transition railing
Salvage existing bridge approach
M id d le F o r k
P a y e tt e R iv e r
M I D
D L E F
O R
K R
O A
DN
Line to be constructed
370’ VC370’ VC
K = 112
-0.5000%
-3.7907%
270’ VC
,0
.0
-3.7907%
,0
.6
270’ VC
K = 162
,0
.3
See Bridge Layout Sheets F.4 - F.X
Sta. 17+94.80
Begin Bridge
Sta. 19+57.14
End Bridge
Sta. 19+75.14
End Bridge Approach Slab
MSE wall, LT see Sheets F.1-3 for details
CRG Terminal Layout
See Sheet D.6 for
Offset -51.750 Lt
Sta. 19+75.14
Begin MSE wall face
End outside bridge wing wall
Finished grade MSE Wall face
MSE Wall face toe
See Sheet D.6 for curb detail under guardrail face 19+57 to 20+95.
Construct Idaho Section 10 curb
CUYD
EXC.
CUYD
EMB.
20+0016+0015+00
3005 3005
3010 3010
3015 3015
3020 3020
3025 3025
3030 3030
3035 3035
3040 3040
D.4
STATE PROJECT
I F fd .d g n
U
S S u r ft
D e c k e d b y
M e a d o w s s ig n e d b y
17+00 18+00 19+00 21+00 22+00
.0 groundExisting
Transition railing, RT & LT
Riprap Trench detail
See Sheet D.6 for a
Energy Dissipator detail
See Sheet G.6 for
CP
28101
Sta. 17+76.80 approach slab
Begin
MATCHLINE MIDDLE FORKS
see Sheet D.6 powerline crossing
Overhead see Sheet D.6
Section 4 curb, Construct Idaho and reset fence
Remove
Remove and reset fence reset fence
Remove and
Energy Dissipator detail
See Sheet G.6 for
Garden Valley, ID. 83622
PO Box 765
Fry, Dan V. & Shauna
Horseshoe Bend, ID. 83629
108 Mountain View Dr.
Reay, Mary B.
Garden Valley, ID. 83622
PO Box 765
Fry, Dan V. & Shauna
Horseshoe Bend, ID. 83629
108 Mountain View Dr.
Reay, Mary B.
Boise, ID 83714
5683 Bogart
Logan, George J.
X.X
X.X
Banks Lowman 16+90.15
Middle Fork 50+00=
EL 3029.74 ft
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
Point of minimun bridge clearance = 1.15 feet
Elev. 3012
S h op b en d G -4 g u ar dr ai l
To be relocated by others for Bridge Layout details
See Sheet L.1-20
Idaho Section 4 curb, 14+91.00, LT to 16+26.00, LT
P T
.1
Bo ise , I
D
B og ar t
Lo ga n, G eo rg e J.
Ta x
ID
RP0
9N04 E1
T
UP
30203020
3020 3020
30253025
30 30
CUYD
EXC.
CUYD
EMB.
25+0023+7522+50
3005 3005
3010 3010
3015 3015
3020 3020
3025 3025
3030 3030
3035 3035
3040 3040
D.5
STATE PROJECT
S e p
A
M I F fe .d g n
U
S S u r ft
D e c k e d b y
M e a d o w s s ig n e d b y
El= 3,028.04
E= 31686.76
N= 19443.08
23+90.00
ID PFH 24(10)
BANKS LOWMAN HIGHWAY
Line to be constructed
Existing ground
Profile grade
BANKS LOWMAN HIGHWAY
N
END PROJECT
Horseshoe Bend, ID. 83629
108 Mountain View Dr.
Reay, Mary B.
Horseshoe Bend, ID. 83629
108 Mountain View Dr.
Reay, Mary B.
X.X
X.X
PRELI
M
IN
ARY
N O
T
FO
R
CO
N
STRUCTI
.3
D
R= 3,250.00’
T= 258.20’
L= 515.32’ e= 3.2%
Curve= C2
+1.1639%
,0
.0
+1.1639%
,0
.0
0 3020
Existing ground
Profile grade
Special ditch profile, LT
BEGIN APPROACH ROAD
END APPROACH ROAD
E= 31164.04
N= 19943.73
51+85.00
ID PFH 24(10)
MIDDLE FORK ROAD
Line to be constructed
N
=Banks Lowman Rd 16+90.15
El.=3029.74
E= 31074.39
N= 19781.90
50+00.00
ID PFH 24(10)
MIDDLE FORK ROAD
51+00 52+00
CUYD
EXC.
CUYD
EMB.
50+00
3020 3020
3025 3025
3030 3030
3035 3035
D.6
STATE PROJECT
S e p
A
M I F ff .d g n
U
S S u r ft
D e c k e d b y
M e a d o w s s ig n e d b y
LEGEND:
CRG SectionC
C
.2
.2
Guardrail RT
CP
28101
Guardrail location
See Sheet D.5 for
Energy Dissipator detail
See Sheet G.6 for
Energy Dissipator detail
See Sheet G.6 for
X.X
X.X
24" pipe culvert
Remove and install
P ip e c u lv e r t
PRELI
M
IN
ARY
N O
T
FO
R
CO
N
STRUCTI
,0
.4
-1.0000%
,0
.7
,0
.2
+0.6152%
30’ VC
K = 19
,0
.1
,0
.6
,0
.9
0 3 ,0
.6
T
B o is e
, ID
B o g a rt
L o g a n , G e o rg e J.
T a x
ID
R
P
N E
Urban roadway width measured to here
Pavement
Pavement
R=1"
R=2"
R=1", typ.
IDAHO SECTION 10 CURB
NO SCALE
ground
Existing plastic drain pipe
D.7
STATE PROJECT
I F fg .d g n
U
S S u r ft
D e c k e d b y s ig n e d b y
"2 1R=
", typ.2 1R=1
Bridge abutment wall
Existing ground
El. 3016 ft.
El. 3015 ft
Unclassifed borrow
El. 3012 ft
Class 4 riprap
Type 4-A, geotextile fabric
El. 3005 ft
RIPRAP TRENCH DETAIL
Granular backfill
Idaho Section 4 curb
Earthwork geotextile, type I-A
DETAILS
RIPRAP AND CURB
UNDERDRAIN DETAIL WITH CURB
(14+91.00 to 16+26.00)
Riprap, class 1
8"
6" 1"1"
1’ 10"
8"
4’-0"
14’-0"
NO SCALE
DETAILS
MINOR APPROACH ROAD
FOOTNOTE:
-/+ A% -/+ B% -/+ C%
X X
X
X
A
R
APPROACH ROAD SYMBOL
Right-of-way or easment line
End hot asphalt concrete pavement of approach roadLC
PLAN
APPROACH ROAD
epols yawdaoR
SECTION A-A
APPROACH ROAD PROFILE
of highwayLC
Unclassified borrow
Right-of-way or easement line
Existing ground
A
A
Edge of traveled way
E.1
STATE PROJECT
S e p
A
M I F q a .d g n
U
S I n t2
D e c k e d b y
R
M e a d o w s s ig n e d b y stationing.
See above table and plan & profile sheets for approach road roadway slope and the existing ground.
Vary the approach road profile slope near the ends to blend with pavement, 7" compacted depth
Hot asphalt concrete
5" compacted dpeth
Roadway aggregate, method 2, N O
T
FO
R
CO
N
STRUCTI
IN
ARY
S h o u ld e r l in e
W
’R
L
R
Variable
A CB
L’
5’ of roadLC
CUYD
EXC.
CUYD
EMB.
3004 3004
3008 3008
3012 3012
3016 3016
3020 3020
3024 3024
3028 3028
3032 3032
F.1
STATE PROJECT
I F d a .d g n
U
S I n t2
D e c k e d b y
M e a d o w s s ig n e d b y
PLAN AND PROFILE
MSE WALL ALIGNMENT
23 20 21
Wall alignment at wall face
BEGIN MSE WALL ALIGNMENT
END WALL ALIGNMENT
El. 3026.57
0+00.00
El. 3026.05
1+20.00
El. 3017.05
1+20.00
Toe of wall
El. 3008.57
0+00.00
Existing ground at wall face
Top of wall
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
= 0+00.00 (Wall)
19+76.14 (Main) - 51.750, LT = 1+20.00 (Wall)
20+94.22 (Main) - 36.937, LT
Finished grade at wall face
See Sheets F.3-F.4 for details
Construct MSE wall (geogrid)
MSE WALL FOUNDED ON BEDROCK
MSE WALL NOTE:
FOOTNOTE:
1.
granular
Varies
LC
MSE WALL DETAILS
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
F.2
STATE PROJECT
e p te m b e r
U
S S u r
D c m y fi le s p w p r o d u c ti o n d m s I F d b .d
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
Design Data:
SELECT GRANULAR BACKFILL
Unit weight = 130 lb/ft‡
Cohesion = 0
RETAINED BACKFILL
Unit weight = 135 lb/ft‡
Cohesion = 0
FOUNDATION MATERIAL
Unit weight = 120 lb/ft‡
Cohesion = 0
MSE WALL TYPICAL
:1 .5 of 1’ past reinforcement
Extend excavation a minimum
Slope varies
(vertical)
Wall face
2:1 slopeFinished
TOP OF MSE WALL
Road surface
Roadway backfill
Construct backfill
Select see detail on Sheet F.3
Underdrain system, Sheet D.7
Riprap, see
Existing ground for bottom reinforcement
Provide level bearing surface structural backfill
Min. 6" leveling pad facingWelded wire granular backfill
4" to 8" Select tubing at Station 21+20 slope with non-perforated
(nonwoven). Daylight out of warpped in geotextile, type I-A
3" Perforated drainage tubing
Granular backfill
HACP, 7" depth
Furnish select granular backfill at face of wall meeting the requirements of Subsection 704.10 with a size gradation between 4-inches and 8-inches.
(varies)embankment
Toe of wall see Sheet D.7 concrete curb, Asphalt
5" depth
Base aggregate, Select granular backfill Geogrid reinforcement
(typical all)
Geotextile, type I-A
Geogrid reinforcement
(typical all)
Top of MSE wall, see detail below
For wall elevation, see
MSE Wall Tabulation table v a r ie s
W a ll h e ig h t H
H W a ll h e ig h t v a r ie s
6" min.
24"
30"
Geogrid wrap
4’ min.
2’
(see MSE Wall Tabulation table)
Reinforcement length (varies)
8" ty p ty p ty p ty p ty p
18"
WELDED WIRE FORM
WIRE FORM TYPICAL LAYOUT
TYPICAL SECTION
P a r a ll e l to r o a d w a
1% min.
FOOTNOTE:
4 x 4 - W4.7 x W4.7
96"
PROFILE
F.3
STATE PROJECT
S e p
A
M I F d c .d g n
U
S I n t2
D e c k e d b y
M e a d o w s s ig n e d b y requirements.
Field cut transverse wires to meet welded wire form layout
DETAILS
MSE WALL (GEOGRID)
galvanized ring type fasterners
Alternately, butt forms and use adjoining wire form for support.
Place edge of wire form inside
Longitudinal wires
Butt geogrid, no overlap
Geogrid
Stagger form joints
UNDERDRAIN SYSTEM
6" PERFORATED PIPE
PRELI
M
IN
ARY
N O
T
FO
R
CO
N
STRUCTI
60’ along length of wall
Provide outlet drain pipe every spaced 16" C. to C.(min.)
No. 4 wire support struts
Transverse wiresTop of form type I-A
Earthwork geotextile
30" connect outlet and collector pipes
Provide applicable fittings to
Granular backfill ty p
6"
8’-0" (typ.)
Reinforcement length min.
40"
12"
30153015
3015 3015
30203020
3020 3020 3020
30253025
30 30
30553060
30653070
STATE PROJECT
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s I F g b .d g n
MIDDLEFORK ROAD
50+00 to 53+00
EROSION CONTROL PLAN
BANKS LOWMAN HIGHWAY
21+00 to 28+00
EROSION CONTROL PLAN
G.3
ID PFH 24 (10)
Install fiber wattles along slopes
22+00 to 23+90
Install fiber wattles along slopes
21+00 to 23+90
Existing roadway
NOTE:
2.
1.
class 2 energy dissipator
Placed riprap, Install silt fence energy dissipator
Placed riprap, class 2
Install silt fence
NOTE:
4.
3.
2.
1.
disturbed area around the pipe inlet and outlet.
Within 24 hours after each pipe installation is completed, seed
FOOTNOTE:
END PROJECT
El= 3026.20 E= 31686.76 N= 19443.08
23+90.00
ID PFH 24(10)
BANKS LOWMAN HIGHWAY
J u ly
N
N
See Sheet D.4 for fiber wattle detail.
field as approved by the CO.
Final location of erosion control devices to be determined in the
See Sheet D.7 for sediment trap basin detail.
See Sheet D.6 for energy dissipator detail.
See Sheets D.4-5 for fiber wattle and silt fence details.
field as approved by the CO.
Final location of erosion control devices to be determined in the
Install fiber wattles along slopes
19+70 to 22+00
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
Install 24" pipe culvert
NO SCALE
Symmetrical aboutLC
UNDERPASS
ANIMAL/PEDESTRIAN
embankment slope
Miter parallel to
ALLOWABLE HEIGHTS OF COVER
SPAN RISE
CORRUGATED METAL
12 GAGE THICK
COVER
MIN. MAX.
6’ - 8" 7’ - 1" 4’ 26’
NOTE:
4.
3.
2.
1.
H.7
STATE PROJECT
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s I F e g .d
C h e c k e d b y
D e s ig n e d b
PLACEMENT
SIDE
Invert treatment Invert treatment, see Note 3
SECTION
6 Kips per square foot.
Designed for H-20 live load and maximum allowable soil pressure of available in the vicinity of the structural plate underpass installation.
length. The earth shall consist of naturally occurring materials the Structural Plate Underpass, Design 1, for its full width and of corrugations) of base aggregate shall be placed in the invert of
Unless indicated otherwise a 10-inch depth (over the inside crests
Allowable height of cover is indicated in the table.
inside crests of corrugations.
Span and rise dimensions are nominal and are measured to the
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
Span
6’-8"
R is e c o r n e r p la te
H e ig h t o f
Length in a multiple of 2’
W20-1
51+85
51+85
N
W20-1
W3-4
W20-7a
W16-2P
WORK
AHEAD
ROAD
BE
PREPARED
TO STOP
FEET
G20-2
W20-1
W3-4
W20-7a
W16-2P
BE
PREPARED
TO STOP
WORK
AHEAD
ROAD
W20-7a
W20-1W3-4
W16-2P
BE
PREPARED
TO STOP
WORK
AHEAD
ROAD
ROAD WORK
END
G20-2
G20-2
FEET
FEET
J.2
STATE PROJECT
ID PFH 24(10)
S e p
A
M if n b .d g n
U
S S u r ft
D e c k e d b y s ig n e d b y
Bridge Work Zone
NO SCALE CONSTRUCTION PHASE 1
TRAFFIC CONTROL
TEMPORARY
ROAD WORK
END
ROAD WORK
END
.2
T r a ff ic S h if t
B e g in fo o t
T r a ff ic S h if t
E n d fo o t
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
500’ 500’ 500’
5’
0’
0’
5’
425’
425’
0’
G20-2
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
W20-1
G20-2
G20-2
51+85
W20-1 W20-1
G20-1
G20-1 W20-1
G20-1
WORK
350 FT
ROAD
WORK
750 FT
ROAD
ROAD WORK
NEXT X MILES
WORK
350 FT
ROAD
WORK
700 FT
ROAD
ROAD WORK
NEXT X MILES
W20-1
G20-1
ROAD WORK
NEXT X MILES
WORK
750 FT
ROAD
WORK
350 FT
ROAD
NOTE:
N
J.3
STATE PROJECT
if n d .d g n
U
S S u r ft
D e c k e d b y
M e a d o w s s ig n e d b y
CONSTRUCTION PHASE 2
TRAFFIC CONTROL
TEMPORARY
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
Maintain 12-foot lanes.
Finish construction on new bridge.
Switch traffic to new bridge and demolish old bridge.
3.
2.
1.
Temporary Traffic Phase 2
0’
0’
0’
0’
350’ 350’ 350’
See Sheet J.7 for Diversion Details
350’
SPEED
LIMIT
10+00 to 23+75
PAVEMENT MARKINGS
SIGNING AND
R2-1
Solid White line
Double Yellow line
Solid White line
Solid White line
Sign 1
Sign 2
Sign 3
Signs mounted above stop sign
See K.2 for sign details
FOOTNOTE:
SPEED
LIMIT
R2-1
STOP
W1-7
R1-1
Sign 7
Sign 6Sign 5
Solid White line
Solid White line
Solid White line
Double Yellow line
Double Yellow line
Sign 4
Stop bar
24’ White
BROWN GUIDE SIGN
DIRECTION "SEVENTH DAY ADVENTIST 1.4 MI"
GUIDE "DAVEY’S BRIDGE"
GUIDE "DAVEY’S BRIDGE"
N O
T
FO
R
CO
N
STRUCTI
IN
ARY
"BANKS LOWMAN HIGHWAY"
D3-1 "MIDDLE FORK ROAD"
D3-1
Sign 8
K.2
STATE PROJECT
NUMBER
SHEET
ID PFH 24(10)
e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d m s if p c .d
C h e c k e d b y K
L o ft s g a a r d e n
D e s ig n e d b y R
M e a d o w s
File details come from the government source that posted it. Updated .