PROJECT DESCRIPTION_ID PFH 88-1(1) Yankee Fork Road.pdf

PDF 25 KB Posted

Attached to
ID PFH 88-1(1) Yankee Fork Road Federal contract opportunity
Solicitation number
DTFH70-11-B-00001
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

Other files attached to ID PFH 88-1(1) Yankee Fork Road, newest first.
File Type Posted
A001_YankeeForkRoad.pdf PDF
A001_YankeeForkRoad.pdf PDF
1fbo_IFB1__YankeeFork.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/yankee-fork-road/ —
Plans Request Form_Yankee.pdf PDF
2fbo_IFB2__YankeeFork.pdf PDF
Phys Data Request Form_Yankee.pdf PDF
Updated Feb2011_PROJECT DESCRIPTION_ID PFH 88-1(1) Yankee Fork Road.pdf PDF
Prelim Ltr_ID PFH 88-1(1) Yankee Fork Road.pdf PDF
Prelim Plans_Yankee Fork Road2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID PFH 88-1(1) Yankee Fork Road, Salmon-Challis National Forest, Custer County, Idaho

The work consists of asphalt overlay, drainage, MSE retaining walls, rock fall protection, bridge rail, curb repair, cleaning/repainting steel girders, and other small items of work.

Project length: 3.1 miles

Fixed Completion Date: Approximately October 15, 2011

Estimated Price Range: $3 million to $5 million

Location: 144 miles northeast of Boise, Idaho near Sunbeam, ID

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 – Project Requirements 152 Construction Survey & Staking X YES NO 153 Contractor Quality Control and Assurance X YES NO 154 Contractor Sampling & Testing X YES NO 155 Schedules for Construction Contracts (construction schedules) X YES NO 157 Soil Erosion Control Devices (erosion control devices)

Silt fence Sediment Wattle

500 LNFT

1,200 LNFT

DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition)

Pipe Culvert MSE Wall Guardrail – Steel Bridge Rail

6 EACH

2 EACH

250 LNFT

204 Excavation & Embankment Ditch excavation 50 LNFT

DIVISION 250 - Slope Reinforcement and Retaining Walls 253 Gabions & Revet Mattresses 1,458 SQFT 255 Mechanically Stabilized Earth Walls (retaining walls)

Mechanically Stabilized Earth Wall, Gabion Face 2,052 SQFT

DIVISION 300 – Aggregate Courses 303 Road Reconditioning

Ditch Reconditioning 14,600 LNFT 308 Minor Crushed Aggregate (crushed aggregate)

Roadway aggregate, method 2 580 TON

ID PFH 88-1(1) Yankee Fork Road

DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Superpave Hot Asphalt Concrete Pavement 6,880 TON 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 2,230 TON 404 Minor Hot Asphalt Concrete (asphalt concrete pavement) 460 TON 413 Asphalt Pavement Milling 4,200 SQYD

DIVISION 550 – Bridge Construction 556 Bridge Railing Steel

Bridge railing – Thrie Beam 250 LNFT 563 Painting (structures, painting)

Exterior Bridge girders ALL LPSM

DIVISION 600 – Incidental Construction 602 Culverts (indicate one or both)

18” Pipe Culvert 24” Pipe Culvert 36” Pipe Culvert

192 LNFT

40 LNFT

100 LNFT

609 Curb (concrete – minor structures) (indicate which) Concrete 18 LNFT

617 Guardrail Terminal Section 4 EACH

634 Permanent Pavement Markings (traffic pavement markings) Permanent Pavement Markings, Type A Solid White Permanent Pavement Markings, Type A Solid Yellow

65,288 LNFT

65,288 LNFT

635 Temporary Traffic Control – Flagger Hours: 2,500 651 Rockfall Protection

Rockfall protection Fence 500 LNFT

DIVISION 150 – Project Requirements
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 550 – Bridge Construction
DIVISION 600 – Incidental Construction

File details come from the government source that posted it. Updated .