Prelim Ltr_ID PFH 88-1(1) Yankee Fork Road.pdf
PDF 24 KB Posted
- Attached to
- ID PFH 88-1(1) Yankee Fork Road Federal contract opportunity
- Solicitation number
- DTFH70-11-B-00001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A001_YankeeForkRoad.pdf | ||
| A001_YankeeForkRoad.pdf | ||
| Phys Data Request Form_Yankee.pdf | ||
| 1fbo_IFB1__YankeeFork.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/plans/yankee-fork-road/ | — | |
| Plans Request Form_Yankee.pdf | ||
| 2fbo_IFB2__YankeeFork.pdf | ||
| Updated Feb2011_PROJECT DESCRIPTION_ID PFH 88-1(1) Yankee Fork Road.pdf | ||
| PROJECT DESCRIPTION_ID PFH 88-1(1) Yankee Fork Road.pdf | ||
| Prelim Plans_Yankee Fork Road2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
610 East Fifth Street Vancouver, WA 98661-3801
(360) 619-7520 FAX: (360) 619-7932
Western Federal Lands Highway Division
NOTICE TO PROSPECTIVE BIDDERS
ID PFH 88-1(1)
YANKEE FORK ROAD
Solicitation No. DTFH70-11-B-00001
The attached preliminary plans and project description are being furnished to aid prospective bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not possible due to snow. Therefore, prospective bidders are encouraged to view the project during fall as conditions permit. No Federal Highway Administration personnel will be available for show-me tours.
While it is not required, we highly recommend that you videotape the entire project for your use during the estimating phase.
Project Location - This project is located approximately 144 miles northeast of Boise, Idaho and begins at the junction of Yankee Fork Road and SR 75 near Sunbeam, Idaho. The project begins at MP 0.0 heading north on Yankee Fork Road, ending at MP 3.1.
Project Work - The project consists of 3.1 miles of asphalt overlay, drainage, retaining walls, bridge work and other smaller items of work. It was designed using US survey foot measurement and references the Standard Specifications for Roads and Bridges on Federal Highway Projects, FP-03, US Customary Units
Technical Questions - Requests for specific technical information will only be accepted in writing. Please submit written questions by email or fax.
Email: plans_spec@dot.gov (plans_spec@dot.gov) FAX: 360-619-7932
General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Solicitation documents - Documents will be available during the winter of 2010/11. Please monitor our Western Federal Lands webpage http://www.wfl.fhwa.dot.gov/contracting/construction/ or the FedBizOpps site for actual date of solicitation release. To receive automatic notification through FedBizOpps, select the “Watch this opportunity” feature and follow the steps as indicated.
Thank you for your interest in our projects.
October 7, 2010 mailto:plans_spec@dot.gov� mailto:wfl.contracts@dot.gov� http://www.wfl.fhwa.dot.gov/contracting/construction/�
ID PFH 88-1(1)
File details come from the government source that posted it. Updated .