About this file

Amendment A002

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 April 12, 2011 N/A ID PFH 88-1(1)

YANKEE FORK ROAD

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X DTFH70-11-B-00001

9B. DATED (SEE ITEM 11)

3/14/2011

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(_X_ ) is extended, ( ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ID PFH 88-1(1), YANKEE FORK ROAD

See page two for additional revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

New bid opening date: April 20, 2011

Amendment No. A002, dated 4/12/11 ID PFH 88-1(1) Solicitation No. DTFH70-11-B-00001 Yankee Fork Road

REVISIONS ARE AS FOLLOWS:

SF 1442 SOLICITATION, OFFER AND AWARD (Pen & Ink Change)

Page A-3, Block 13A. Change the bid opening date to 4/20/2011.

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision E-13 107.10(c ) Other Requirements Adds (25)

PLANS - PEN AND INK CHANGE

Please make the following pen & ink change:

Plan sheet #H.2 Add the following to Footnote 1: “Length of cable net panels is approximately 20 feet with final length approved by CO.”

ENCLOSURES

Pages: E-13

Page not included due to Pen & Ink change: A-3 Sheet not included due to Pen & Ink change: H.2

New bid opening date: April 20, 2011

E-13

Special Contract Requirements ID PFH 88-1(1) Yankee Fork Road

(7) Do not refuel equipment or vehicles within 100 feet of rivers, streams or identified wetlands.

If on-site fuel tanks are used, approved containment devices will be required.

(8) Place appropriate spill containment and/or absorbent pads around all pumps and generators in use.

(9) Perform all instream work after August 1.

(10) Dewater culvert sites at locations with flowing water by either pump or diversion method. If pump method is used, install a temporary cofferdam with a portable pump placed in front of the dam and pump water downstream of the culvert. If diversion is used install a temporary bypass pipe that will divert water around the dewatered work site.

(11) Do not construct cofferdams with material mined from the stream or floodplain.

(12) Place double rows of straw wattles in areas where construction is within 10 feet of the stream.

(13) Place a tarp to capture paint and debris underneath all areas where the bridge paintwork and cleaning will occur.

(14) Do not use or perform machinery work within the Yankee Fork River.

(15) No blasting allowed. Break down instream rocks or bedrock using non-explosive alternatives. Remove rock debris as directed by CO.

(16) During instances of precipitation and high flow conditions, cease all project operations that result in uncontrollable erosion in the construction area, except efforts to minimize storm or high flow erosion.

(17) Conserve and stockpile native streambed materials above the bank full elevation for later use in channel rehabilitation. Keep these materials separate from other stockpiled materials that are not native to the streambed to prevent contamination from fine soils.

(18) Remove all construction waste materials from riparian areas.

(19) Operate equipment from the top bank unless specifically authorized to work in the channel and an ingress and egress route is pre-approved. Do not drive equipment in flowing water.

(20) Do not stockpile excavated material in the waterway or adjacent to wetlands.

(21) Re-vegetate all areas disturbed by project construction with native species immediately upon completion of the project. Re-vegetation shall include planting native woody species adjacent to the stream.

(22) No ditch reconditioning between stations 26+00 LT and 31+00 LT.

(23) No staging of equipment between stations 26+00 LT and 31+00 LT.

(24) The access road culvert at 28+92 shall be replaced using only previously disturbed areas to perform the work. The work shall not extend beyond the base of the slope at the existing ditch.

Construction fencing shall be used from 27+92 to 29+92 to mark no-work zones as determined by the CO. Low-impact methods of removing debris and conducting the work shall be used.

(25) Prevent damage to 40” tree and its root system on outlet side during removal of pipe at 119+89 and installation of pipe at 119+91.

Revised by Amendment A001

Revised by Amendment A002