Preliminary Plans 3 of 3__ID PFA CRMO 10(2) Loop Road Phase 2.pdf
PDF 4 MB Posted
- Attached to
- ID PRA CRMO 10(2), LOOP ROAD, PHASE 2
- Solicitation number
- DTFH70-09-B-00018
About this file
Preliminary Plans - 3 or 3
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H.7
STATE PROJECT
N
SHEET
NUMBER
ID
PRA-CRMO 10(2)
S
E P
I P
P
W P
:d m s
C h e c k e d b y
D e s ig n e d b y
Snowpole holder location
63318-1000
ITEM DESCRIPTION UNIT
24,240
2463401-0300
63401-0300
QUANTITY
Snowpole (type 1), holder
Pavement markings, type B, solid yellow, 4" wide
Pavement markings, type B, solid white, 24" wide each lnft lnft
Sign system
R1-1
(STOP)
N
N
N
300+00
Tree Molds
Road
Stop bar (12’ x 24") pavement markings, type B, solid white
Pavement markings, type B, solid yellow, 4" wide, (double line) from 300+00 to 360+60.44
360+60.44
Tree Molds Road =
100+00
Tree Molds Parking Area
Pavement markings, type B, solid yellow, 4" wide, (double line)
Pavement markings, type B, solid white, 4" wide
Pavement markings, type B, solid white, 4" wide
TREE MOLDS ROAD QUANTITIES
LEGEND:
NOTE:
1. Install Type 1 snow pole holders right side of road only, at all points of curvature and points of tangency for curves, as shown at turnouts, road junctions, and at a maximum spacing elsewhere of 100-feet.
TREE MOLDS ROAD
(PERMANENT TRAFFIC
CONTROL)
PMIS Pkg. No.: 4252 NPS Drwg. No. 138/41903
PRELIMINARY
H.9
Removing and resetting sign
Sawcutting pavement
Removal of curb and gutter, concrete
TREE MOLDS PARKING AREA
(DEMOLITION)
Removal of curb and gutter, concrete
Sawcutting pavement
Remove and reset trash receptacle
(See Section 646)
Removal of curband gutter, concrete
Removal of curb
& gutter, concrete
Removal of curb, asphalt
Remove and reset trash receptacle
(See Section 646)
Removing and resetting sign
Sawcutting pavement
Do not disturb existing paved waterway
Removal of paved waterway, asphalt
Removal of curb, asphalt
Do not disturb tree
Removal of curb, asphalt
Removal of sidewalk, asphalt removal of curb and gutter, concrete
Scale in feet
25 0 25 50 75
DEMOLITION AND REMOVAL
ITEM DESCRIPTION UNIT QUANTITY
20302-0300
20315-0000
63316-1000 lnft lnft each
N
SHEET
PRA CRMO 10(2)
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
Removal of sidewalk, asphalt
PMIS Pkg. No.: 4252 NPS Drwg. No. 138/41903
PRELIMINARY
T re e M old s A ccess R oad
H.10
PMIS Pkg. No.: 4252 NPS Drwg. No. 138/41903
Clearing limit
Clearing limit
1:2 -2%
1:2
7’ typ.
CP
92412
CP
92413
CP
92411
025 25 50 75
SECTION A-A
Embankment
A
A
QUANTITIES
QUANTITYDESCRIPTIONITEM
20102-0000
20401-0000
20430-1000
31001-0000
40101-1000
41101-1000
41201-0000
60901-2300
60902-0400
61501-0100
62405-0100
64620-0600
Sidewalk, concrete
Curb and gutter, concrete, 6-inch depth
Prime coat, grade CMS-2
Recycled aggregate base, 4-inch depth
Roadway excavation
Clearing and grubbing ALL
1.5
2each ton ton lnft
Remove and reset trash recepticle
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
92411
92412
92413
642250.537
642369.504
642241.910
1761024.019
1760956.836
1760853.970
5850.17
5854.63
5863.55
FOOTNOTE:
Scale in feet
Construct curb and gutter, concrete
Do not disturb tree
Construct curb and gutter, concrete. See Sheet L.1
Construct curb
& gutter, concrete
Existing trail
Construct sidewalk, concrete, 5’ wide
NORTHING EASTING
COORDINATE TABLE
P#
P2
P1 P4
P3
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21 P22
P23
P24
P25
P26 P27
P28
P29
P30
P31
P32
P33
P34
P35
P36
P37
P38
P39
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
642526.165
642527.251
642524.464
642526.863
642520.070
642492.284
642496.147
642492.392
642486.484
642477.549
642473.737
642346.587
642345.136
642322.479
642321.113
642308.252
642279.385
642269.416
642270.551
642276.875
1760873.861
1760870.775
1760854.826
1760860.738
1760858.912
1760848.531
1760842.022
1760838.679
1760843.445
1760812.979
1760821.375
1760846.430
1760839.071
1760904.341
1760901.670
1760851.250
1760860.698
1760862.609
1760868.531
1760871.422
NORTHING EASTING
COORDINATE TABLE
P#
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
P31
P32
P33
P34
P35
P36
P37
P38
P39
642284.865
642291.854
642291.706
642289.682
642280.655
642284.954
642285.484
642288.201
642287.322
642299.180
642334.483
642329.162
642307.876
642318.271
642325.249
642380.699
642415.361
642427.391
642467.888
1760874.258
1760886.356
1760890.594
1760893.593
1760939.658
1760942.210
1760947.182
1760969.187
1760987.165
1761000.707
1761004.549
1760985.256
1760967.355
1760922.552
1760905.494
1761005.038
1761005.038
1761005.038
1761005.038
Superpave pavement, 3/4-inch nominal maximum size aggregate, 0.3 to <3 million ESAL
Tack coat, grade CSS-1
100+00 Tree Molds
Parking Area = 360+60.43
Tree Molds Road
UNIT
6" Bedding
38" expansion joint
Existing ground
4" Concrete
60901-1300 260Curb, concrete, 15-inch depth
For information only: 0.50 acre (expanded parking area only).
Place as directed by the CO.
ton
Match existing trail width
DETAIL A
Construct sidewalk, concrete. See Sheet
L.1 and L.2
Construct curb and gutter, concrete
See Sheet L.1 and L.2
Construct sidewalk, concrete, south side, See Sheet L.1 and L.2, and Detail A
See detail A, Sheet L.1 and L.2
Remove and reset trash receptacle and pad
Construct sidewalk, concrete
See Sheet L.1
Construct curb and gutter, concrete. See Sheet L.1
Placing conserved topsoil, 2-inch to 4-inch depth
Construct curb and gutter, concrete. See Sheet L.1
Placing conserved shoulder material 2-inch to 4-inch depth
Curb, asphalt, 6-inch depth
Shoulder, excavation and placement
Placing conserved topsoil, 2-inch to 4-inch depth cuyd lnft lnft sqyd sqyd sqyd
Inft
Remove and reset trash receptacle and pad
LPSM
N
TREE MOLDS PARKING AREA
(NEW CONSTRUCTION)
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
Install catch basin and
18" pipe culvert with end section for 18-inch pipe culvert
Construct paved waterway, asphalt
Construct accessibility ramp. See Sheet L.1 full width of sidewalk
Info only cuydEmbankment 1200
PRELIMINARY
P T
.4
P O
T
.0
P C
.9
P T
.5
P C
.8
PT 104+81.54
PC 105+71.49
þÿ�S � �7
�°� �4 þÿ�N � �1
�3 �°� �1 þÿ �S
�6
�2 �2
T= 121.51’L= 195.99’þÿ�D�=� �4�3�°�R= 131.11’ T= 77.75’
L= 109.62’ þÿ�D�=� �9�5�°�
R= 60.00’ þÿ� � �c�=� �1�0�4�°� �
L= 163.67’
R= 53.76’ þÿ� � �c�=� �1�7�4�°� � þÿ�D�=� �1�0�6�°
T= 1,109.23’
D
D
D þÿ� � �c�=� �8�5�°� �3
Variable
T re e M old s R oad
6’
7’
7’ typ.
R 120
R
R
R
R
R
R .2
R .7
R .7
R
R
R 0 R
R
R 70
R
R
R
.2
.7
R 8
I.3
N
Work limit
(clearing limit)
Work limit
(clearing limit)
NORTHING EASTINGP#
654260.160
654273.565
654259.875
654277.135
654318.629
654349.504
654341.443
654267.461
1758721.153
1758714.279
1758687.585
1758663.047
1758709.152
1758704.297
1758753.643
1758735.390
P1
P2
P3
P4
P5
P6
P7
P8
BONE YARD ROAD
(INTERSECTION
REHABILITATION)
Sawcutting pavement follow edge of Loop Road
Roadway obliteration method 1
Roadway obliteration
Method 1
P7
Sawcutting pavement
Protect existing gate
P8
Match existing grade
P2
P1
P3
P4
P6
Match existing crown or superelevation rates, unless otherwise notedRoadway exavation
Existing pavement
1:2
Recycled aggregate base, 4" compacted depth
Prime coat, grade CMS-2, and blotter Existing aggregate base
Existing ground
Existing pavement
Surplus roadway excavation stockpiled in bone yard.
NOTE:
1.
2.
3.
4.
5.
FOOTNOTE:
Scale in feet
25 0 25 50 75
LCLC
P5
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
EXCAVATION
SECTION A-A
NEW PAVEMENT STRUCTURE
Sawcutting pavement
Roadway obliteration, method 1
Recycled aggregate base 4-inch depth
20315-0000
21101-1000
31001-1000 lnft sqyd sqyd
40101-1000 Superpave asphalt 34-inch nominal maximum size aggregate 0.3 to < 3 million ESAL, type V ton 29.34
41101-1000
41105-0000
Info only
Prime coat, grade CMS-2
Blotter
Embankment construction ton ton cuyd
0.12
1.63
Super pave pavement, 3/4-inch nominal maximum size aggregate, 0.3 < 3 million ESAL, 3-inch compacted depth
Pulverizing 6-inch depth
Dimensions not labeled are in feet.
See Sheet C.2 for connection detail, Bone Yard Road to
Loop Road.
After pulverizing Bone Yard Road intersection, remove pulverized material to a depth that will facilitate the design. Place removed pulverized material as embankment material in Devil’s Orchard, Spatter Cone or Tree Molds
Parking Area construction. Compact remaining rotomilled material as per subsection 310.
Match existing road alignment grade and crown.
Prepare recycled aggregate base as per section 310.
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No. 138/41903
R
3’ 12’ 12’
(Match existing width)
(Various width)
(Road obliteration method 1)
3’
ITEM DESCRIPTION UNIT QUANTITY
QUANTITIES
COORDINATE TABLE
A
A
R 50’
I.4
PMIS/NPS Pkg.No.:CRMO 004252 Drwg.No.:131/41,903
LOOP ROAD
(PAVED WATERWAYS)
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
N
Paved waterway, type 5
25+50 LEFT (Loop Road)
Paved waterway, type 5
242+00 LEFT (Loop Road)
Paved waterway, Type 5
42+50 LEFT (Caves Road)
Paved waterway, type 5
205+40 LEFT & RIGHT (Loop Road)
Paved waterway, type 5
180+15 RIGHT (Loop Road)
Scale in feet
25 0 25 50 75
NOTE:
1. Exact locations must be determined in the field.
PRELIMINARY
File details come from the government source that posted it. Updated .