Preliminary Plans 2 of 3__ID PFA CRMO 10(2) Loop Road Phase 2.pdf
PDF 3 MB Posted
- Attached to
- ID PRA CRMO 10(2), LOOP ROAD, PHASE 2
- Solicitation number
- DTFH70-09-B-00018
About this file
Preliminary Plans - 2 of 3
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E.4
STATE PROJECT
5740.11
5733.96
5734.16
5733.77
5733.95
5735.10
5733.35
5734.73
5734.18
5733.78
5734.22
5735.08
5734.36
5734.22
5736.43
5739.99
5740.66
5733.87
5734.26
5734.33
5734.22
5733.57
5734.02
5734.13
1,763,171.33
1,763,260.39
1,763,331.17
1,763,377.87
1,763,424.52
1,763,454.25
1,763,476.64
1,763,576.61
1,763,576.96
1,763,580.17
1,763,553.02
1,763,426.11
1,763,406.73
1,763,393.64
1,763,233.33
1,763,160.22
1,763,131.30
1,763,403.86
1,763,453.38
1,763,476.39
1,763,490.87
1,763,481.65
1,763,410.45
1,763,394.87
651,053.82
651,041.51
651,077.11
651,086.31
651,082.98
651.080.36
651,099.36
651,057.46
651,027.07
650,999.99
650,933.81
650,931.10
650,932.65
650,957.28
650,989.96
651,031.31
651,060.74
651,031.75
651,054.36
651,059.35
651,059.58
650.960.60
650,975.12
651,090.11
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P24
All
1,551
1,417
2,681
47.3
1.9
LPSM
cuyd each lnft ton sqyd ton ton ton lnft lnft lnft lnft sqyd sqyd each
1,763,312.30
1,763,275.84
1,763,357.31
1,763,356.00
1,763,343.68
1,763,491.67
1,763,416.45
1,763,296.30
651,012.30
651,012.89
651,001.58
650,991.66
650,994.78
651,009.52
651,004.44
651,029.44
R1
R2
R3
R4
R5
R6
R7
R8
25 0 25 50 75
Scale in feet
CONTROL POINTS
EASTING ELEVATIONNORTHINGNAME
5741.51
5734.35
1763174.6330
1763590.8820
651066.5290
651003.7730
92502
92503
(See Sheet L.1, L.2, and J.3 for details.)
G
.5
.7
.5
.2
.0
.0
.5
.0
.0
.0
.0
.0
.0
-1 .0
.0
.0
%-0.75% 1.00%T o L oop road
.0
-1 .0
.0
-1.00% 0.50%
-0 .7
.7
.5
-0 .2
0.50% -0.25%
.2
.0
.1
A
A
E
C
G
E
E
D
B
C
D
F
F
Existing trail exit
P1
P17
P16
P2
P3
P4
P24 P5
P6
P7
P8
P9
P10
P11
Install 18 inch pipe culvert P12
P13
P14
P18
P19
P20
P21
P22
P23
R1
R2
R3
R4
R5
R6
R7
Island #1
R8
End reconstruction Devil’s
Orchard road, begin construction of parking area
D
Island #3
Construct catch basin
Existing trail
Limit of paved waterway
Limit of paved waterway
Limit of paved waterway
Construct top of island curb flush with finish grade (Island #2)
See Sheet C.3, and L.2, Detail A
For information only: 1.1 acres.
Quantity shows only expanded parking area.
Includes 145 cu yds of topsoil and 20 cu yds of shoulder material.
For information only: 80 cu yds of bed course.
Limit of paved waterway
A
B
C
D
E
F
LEGEND:
COORDINATE TABLE
NORTHING EASTINGR#
QUANTITIES
DESCRIPTIONITEM UNIT QUANTITY
COORDINATE TABLE
NORTHING EASTING
GROUND.
ELEV.
P#
DEVIL’S ORCHARD
PARKING AREA
(NEW CONSTRUCTION)
SHEET
NUMBER
ID
PRA CRMO 10(2)
S
E P
I P
P
W P
:d m s
C h e c k e d b y
D e s ig n e d b y
Construct sidewalk tie in to existing path (Adjust as required & ensure 5 min behind accessibility ramp)
30’ R
50’ R
20102-0000
20401-0000
20465-0000
20430-1000
30802-1000
31001-1000
40101-1000
41101-1000
41201-0000
60802-0500
60901-1300
60901-0400
60902-0400
61501-0100
62405-0100
64620-0600
1.
2.
3.
4.
5.
Dimensions not labeled are in feet.
Construct curb, asphalt, from 22+00 to point P2, LT. & from 22+00 to point P15 RT.
Construct curb and gutter, concrete, from point P15 to point P2.
Place boulders from new excavation, within island #3 as directed by the CO.
Construct slopes as shown in the staking report.
(See FAR 52.236-4)Install curb, concrete, 6-inch depth
Install sidewalk, concrete
Install curb and gutter, concrete
Construct accessibility ramp
Construct paved waterway
Reinstall trash recepticle & conc. pad
Curb, concrete, 15 inch depth
Clearing and grubbing
Roadway excavation
Conserve and place boulders
Shoulder, excavation and placement
Roadway aggregate, method 1, 4" compacted depth
Recycled aggregate base, 4" depth
Superpave pavement, 3/4-inch nominal maximum size aggregate, 0.3 to < 3 million ESAL
Prime coat grade CMS-2
Tack coat, CSS-1
Paved waterway, type 5
Curb, concrete, 15-inch depth
Curb, concrete, 6-inch depth
Curb and gutter, concrete, 6" depth
Sidewalk, concrete
Placing conserved topsoil, 2-inch depth
Remove and reset trash receptacle
P15
Suspend A
Begin C
End C
Resume A
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No.: 138/41903
CP
92503
CP
92502
P T
.1
P T
.2
P C
.6
P C
.4
P T
.5
P C
.5
P T
.0
7P O
T
.0
P C
.3
P T
.3
P C
.6
PT 27+97.42PC 28+16.09
.0
.0
.7
.0
R
R 4’
R
R
R
R
R
R
R6’
23’
R30’
R .5
R
R 50’
R
R
.5
30’
NOTE:
FOOTNOTE:
F.1
N Removal of curb and gutter, concrete
Removal of accessibility ramp, asphalt, is incidental to
Item 20302-1700, removal of sidewalk, asphalt.
INFERNO CONE PARKING AREA
(DEMOLITION)
Loop Road
143+00 (Approx.)
Sawcutting pavement, follow edge of Loop Road
Removal of curb, asphalt
Removal of pipe culvert
Removal of catch basin
Removal of curb and gutter, concrete
Removal of curb and gutter, concrete
Removal of sidewalk, asphalt
Do not disturb existing platform
Remove existing accessibility ramp, asphalt
Removal of curb, asphalt
Loop Road
145+60 (Approx.)
Sawcutting pavement, follow edge of Loop Road
DEMOLITION AND REMOVAL
ITEM DESCIPTION UNIT QUANTITY
20302-0300
20315-0000
Removal of curb and gutter, concrete
Sawcutting pavement lnft lnft
NOTE:
Maintain existing Loop Road width when establishing sawcutting pavement line.
1.
FOOTNOTE:
Scale in feet
20 10 0 20 40 60 80
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No.: 138/41903
G.2
647924.9640
647385.6050
647,620.541
647,518.423
647,453.490
647,449.360
647,445.000
647,379.680
647,371.780
647,390.670
647,391.310
647,385.874
647,407.282
647,438.533
647,473.349
647,518.908
647,724.245
647,570.306
647,531.889
647,530.463
647,539.897
647,541.085
647,491.003
647,469.223
647,472.594
647,505.805
647,587.997
647,423.630
647,419.810
647,444.410
1,758,600.026
1,758,620.949
1,758,629.140
1,758,635.420
1,758,622.710
1,758,510.140
1,758,511.460
1,758,495.610
1,758,489.840
1,758,446.748
1,758,421.750
1,758,418.140
1,758,419.121
1,758,435.967
1,758,602.077
1,758,589.049
1,758,572.556
1,758,557.362
1,758,558.485
1,758,548.551
1,758,462.227
1,758,459.722
1,758,439.941
1,758,452.164
1,758,518.654
1,758,478.120
1,758,453.050
1,758,461.630
6007.07
6015.85
6018.39
6016.73
6019.80
6023.11
6022.70
6022.44
6023.13
6024.66
6024.89
6033.17
6024.74
6021.81
6001.53
6011.80
6016.79
6018.96
6018.07
6018.19
6023.43
6022.78
6023.55
6021.49
6012.77
6023.28
6023.72
6023.26
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
P31
P32
P33
P34
P35
P36
P37
P38
P39
P40
P41
P42
P43
P44
P45
P46
P47
P48
647,440.22
647,447.71
647,478.04
647,515.70
647,514.21
647,526.46
647,464.72
647,463.54
647,708.31
647,382.53
647,372.51
647,380.38
647,373.71
647,382.19
647,359.29
647,367.98
647,373.64
647,378.96
647,397.09
647,407.49
1,758,482.17
1,758,467.31
1,758,592.33
1,758,600.24
1,758,600.54
1,758,563.19
1,758,456.77
1,758,454.74
1,758,619.07
1,758,457.16
1,758,451.51
1,758,453.63
1,758,445.65
1,758,448.41
1,758,360.66
1,758,372.00
1,758,380.68
1,758,389.12
1,758,408.92
1,758,416.82
6022.30
6022.61
6019.82
6016.60
6016.70
6018.21
6022.99
6023.08
6001.31
6024.36
6023.36
6024.34
6023.28
6024.48
6022.28
6022.76
6023.64
6024.18
6024.89
6024.98
P49
P50
P51
P52
P53
P54
P55
P56
P57
P58
P59
P60
P61
P62
P63
647,423.71
647,943.24
647,014.63
647,948.85
647,920.93
647,974.13
647,861.65
647,882.24
647,932.74
647,987.70
647,878.25
647,860.76
647,834.40
647,806.58
647,806.34
1,758,419.91
1,758,849.64
1,758,751.27
1,758,803.15
1,758,761.26
1,758,766.75
1,758,710.42
1,758,724.21
1,758,742.43
1,758,747.42
1,758,751.27
1,758,739.61
1,758,720.78
1,758,698.82
1,758,666.87
R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
647,648.8960
647,622.7080
647,628.9990
647,472.3130
647,423.2690
647,514.4860
647,481.6650
647,440.7900
647,509.9900
647,469.2700
1,758,573.0650
1,758,574.4310
1,758,559.5410
1,758,449.9370
1,758,467.0630
1,758,594.3660
1,758,587.5470
1,758,471.3300
1,758,597.3800
1,758,617.6900 s e e s h e e t
G
22+00.00
N 647,799.2860
E 1,758,676.8310
El 6,004.26
Construct paved waterway, type 5
23+06.00
Begin parking area
23+00.00
N 647,721.4230
E 1,758,614.0830
El 6,001.16
24+00.00
N 647,643.7210
E 1,758,551.1350
El 6,008.11 P25
P20
P19
B
A
S E
L
I N
E þ ÿ S
P63
P61 P T
.0
P55
P60
P56
P59
P53
P57
P62 E 1,758,763.1150CP 92103 N 647,924.9640P
C
.8
P54
P52
.0
6021.42
6015.61
1758763.1150
1758551.3210
92102
92103
NAME NORTHING
CONTROL POINTS
EASTING ELEVATION
E 1,758,551.3210
N 647,385.6050
CP 92102P7
P38
P6
P4
R9
P33
P32
R6
P16
R2
P1
P34
P30
P29
R8
P26
P27
P8
P14
P39
P40
P41
P42
27+09.13
P45
P44
P43
P46
P47
P48
26+40.00
N 647,417.8740
E 1,758,448.6460
EL 6,024.00
25+40.00
N 647,495.5620
E 1,758,511.6150
El 6,020.79
P12
R4
P13
P23
C
B
C
P10
P9
P35
P36
P22
P24
P21
A
F
A
P2
C
P3
C
B
D
C E
G
C
C
A
A
B
C
D
E
F
G C
B
G
A
A
A
A
Loop Road
P C
.9
PT 24+06.17
(Existing alignment)
24+69.47
(Existing alignment)
BASE LIN
E
P11
P5
R10
P31
R7
R1
P58
LEGEND:
NOTE:
P49
P28
P18
P17
R3
Protect existing planter
S
7 1 5’
52" W þ ÿ S
25+40.00
N 647,534.9380
E 1,758,463.0090
El 6,020.79
A
A
CP
92102
Sawcutting pavement, follow edge of new
Loop road pavement, (typ)
R5
5.65’ R
(E x is tin g a lig n m e n t)
Construct paved waterway, type 5
6025.06
6013.84
6019.14
6015.10
6014.86
6016.70
6010.60
6013.01
6015.62
6018.26
6013.11
6012.08
6009.03
6005.41
6004.54
COORDINATE TABLE
NORTHINGP# EASTING
GROUND.
ELEV.
P# NORTHING EASTING
GROUND.
ELEV.
NORTHINGP# EASTING
GROUND.
ELEV.
NORTHINGR# EASTING
COORDINATE TABLE
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
SPATTER CONE PARKING
AREA & ROAD
(NEW CONSTRUCTION)
Dimensions not labeled are in Feet.
See sheet J.3, L.1, and L.2 for details.
Construct curb, asphalt, between points, P50 and P2, P14 and P51
Construct curb and gutter, concrete, between points, P2 and
P14, and contiuously around perimeter of all Parking area islands.
Protect existing vegetaton in the existing island near the
Loop Road / Spatter Cone Road junction.
Existing alignment and grade from 20+00.00 to 22+00.00 constitutes initial field control for layout of road work.
Conduct construction survey and staking as per section 152.
Construct from 22+00.00 to 27+09.13 with initial control as described in the Finish Elevation Table, sheet G.3.
1.
2.
3.
4.
5.
6.
7.
Scale in feet
25 0 25 50 75
A
P15 Begin C
Resume A
P37 End C
Install curb, concrete
Install sidewalk, concrete
Install curb and gutter, concrete
Construct accessibility ramp
Construct catch basin
Install 18" pipe culvert with 1 end section
Reinstall trash receptacle and conc. pad
Existing parking area and access road.
Direction of surface water runoff
P51 Begin A
P50 End A
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No.: 138/41903
R
R
R3’
R
R 3’
R
R 6’
R
R
R
R
R8’ R
20’
5’
R
R
R
R5.65’
R
R
R
R6’
20.35’
R
R 4’
R
R .4
R .5
R
7.5’
R
.5
R
146.45’
R
7.5
R
35.35’
S
E þÿ� S� �
3�9
�0 �0
R
Suspend
H.1
300+00
Tree Molds
Road
Do not disturb existing waterway
Sawcutting pavement along edge of Loop Road
Do not disturb existing waterway
Begin removal of curb, asphalt, right
Begin removal of curb, asphalt, left
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of sidewalk, asphalt
TREE MOLDS ROAD
(DEMOLITION)
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
N
N
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No. 138/41903
H.2
SHEET
PRA-CRMO 10(2)
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
TREE MOLDS ROAD
(DEMOLITION)
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
See BIG SINK PARKING AREA sheet H.8
Removal of paved waterway, asphalt
Do not disturb existing catch basin and pipe culvert
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
N
N
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No. 138/41903
H.3
N N
End removal of curb, asphalt, left
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
TREE MOLDS ROAD
(DEMOLITION)
SHEET
PRA-CRMO 10(2)
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
Do not disturb existing catch basin and pipe culvert
Removal of paved waterway, asphalt
360+60.44
Tree Molds Road =
100+00
Tree Molds Parking Area
End removal of curb, asphalt, right, Tree Molds Road
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No. 138/41903
File details come from the government source that posted it. Updated .