TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
NATIONAL
PARK
SERVICE
Department of the Interior
A.1
STATE PROJECT
IDAHO
IDAHO 33
IDAHO
IDAHO
IDAHO
N
Scale in miles
20100510
SAWTOOTH
NATIONAL
FOREST
SNAKE RIVER PLAIN
Craters Of the Moon
N.M.
Lake
Wilcott
Snake
Lake
PROJECT LOCATION
Snake River
Arco Airport Borrow Pit Site
NE 14, SEC 11, T3N, R26E
Arco
Coeur d’Alene
95A
Moscow
93A
S N
A
K E
R
I V
E R
American Falls
Reservoir
BOISE
IDAHO
FALLS
POCATELLO
Mountain
Home
Twin Falls
15W
93A
YELLOWSTONE
NATIONAL
PARK
Pend
Orielle
Lake
KEY MAP OF IDAHO
W A
S H
IN
G
T O
N O
R E
G O
N
NEVADA
UTAH
W Y
O M
IN
G
M O
N T
A N
A
UNITED STATES
CANADA
ADT (YEAR)
V
2003-500 (June thru August)
25 MPH
Project Location
PLANS FOR PROPOSED PROJECT
INDEX TO SHEETS
Standard Specifications for Construction of Roads and Bridges on Federal Highway
Projects, FP-03 US Customary Units
PROJECT MANAGER
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PLANS PREPARED BY
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
A. GENERAL INFORMATION
B. SUMMARIES
C. TYPICAL SECTIONS
D. NORTH CRATER TRAIL PARKING AREA
E. DEVIL’S ORCHARD PARKING AREA
F. INFERNO CONE PARKING AREA
G. SPATTER CONE PARKING AREA
H. TREE MOLDS PARKING AREA
I. REHABILITATION
J. DRAINAGE
K. EROSION CONTROL
L. MISCELLANEOUS DETAILS
M. TEMPORARY TRAFFIC CONTROL
N. PERMANENT TRAFFIC CONTROL
SHEET
NUMBER
ID
PRA CRMO 10(2)
S
E P
I P
P
W P
:d m s
C h e c k e d b y
D e s ig n e d b y
Grading, base, paving, and reconstruct parking areas
TITLE SHEET
PLAN SYMBOLS AND ABBREVIATIONS
LOCATION MAP
SUMMARY OF QUANTITIES
TABULATION OF TYPICAL SECTIONS
TYPICAL SECTIONS AND PAVEMENT CONNECTION DETAIL
TYPICAL SECTIONS
NORTH CRATER TRAIL PARKING AREA (DEMOLITION)
NORTH CRATER TRAIL PARKING AREA (NEW CONSTRUCTION)
NORTH CRATER TRAIL PARKING AREA (PERMANENT TRAFFIC CONTROLS)
DEVIL’S ORCHARD PARKING AREA (DEMOLITION)
DEVIL’S ORCHARD ROAD AND PARKING AREA (PLAN - PROFILE)
DEVIL’S ORCHARD PARKING AREA (NEW CONSTRUCTION)
DEVIL’S ORCHARD PARKING AREA (PERMANENT TRAFFIC CONTROLS)
INFERNO CONE PARKING AREA (DEMOLITION)
INFERNO CONE PARKING AREA (NEW CONSTRUCTION)
INFERNO CONE PARKING AREA (PERMANENT TRAFFIC CONTROLS)
SPATTER CONE PARKING AREA AND ROAD (DEMOLITION)
SPATTER CONE PARKING AREA AND ROAD (NEW CONSTRUCTION)
FINISH ELEVATION TABLE / TYPICAL SECTION
SPATTER CONE PARKING AREA (PERMANENT TRAFFIC CONTROLS)
TREE MOLDS ACCESS ROAD (DEMOLITION)
TREE MOLDS ACCESS ROAD (NEW CONSTRUCTION)
TREE MOLDS ACCESS ROAD (PERMANENT TRAFFIC CONTROLS)
BIG SINK PARKING AREA
TREE MOLDS PARKING AREA (DEMOLITION)
TREE MOLDS PARKING AREA (NEW CONSTRUCTION)
TREE MOLDS PARKING AREA (PERMANENT TRAFFIC CONTROLS)
VISITOR PARKING AREA
VISITOR PARKING AREA (PERMANENT TRAFFIC CONTROL)
BONE YARD ROAD (INTERSECTION REHABILITATION)
LOOP ROAD (PAVED WATERWAYS)
TABULATION OF DRAINAGE
PAVED WATERWAY
STANDARD DRAWINGS 602-3, 602-5, 604-1, 604-3
EROSION CONTROL
SIDEWALK, CURBS, AND GUTTERS
CURBS
SNOWPOLE HOLDER
TABULATION OF QUANTITIES
TEMPORARY TRAFFIC CONTROL PLAN
TEMPORARY TRAFFIC CONTROL
CONSTRUCTION SIGN INSTALLATION - DETAIL DRWG. WM635-2
PERMANENT TRAFFIC CONTROL
METAL SIGN POST DETAILS
TRAFFIC LOOP DETAIL
A.1
A.2
A.3
B.1-3
C.1
C.2
C.3
D.1
D.2
D.3
E.1
E.2-3
E.4
E.5
F.1
F.2
F.3
G.1
G.2
G.3
G.4
H.1-3
H.4-6
H.7
H.8
H.9
H.10
H.11
I.1
I.2
I.3
I.4
J.1-2
J.3
J.4-9
K.1
L.1
L.2
L.3
M.1
M.2
M.3
M.4
N.1
N.2
N.3
BETTY CHON
APPROVED:
DATE
DATE
DATE
Regional Director, Pacific West Region, National Park Service
Superintendent, Craters of the Moon National Monument
RECOMMENDED:
DATE
Director, Project Delivery, Western Federal Lands Highway Division
Project Manager, Denver Service Center
National Park Service
LOOP ROAD, PHASE 2
TWIN FALLS
Bliss
Carey
Arco
IDAHO FALLS
POCATELLO
PRELIMINARY
BUTTE COUNTY
IDAHO
1.6 MILES SPUR ROADS & 6 PARKING AREAS
PMIS Pkg. No.: 4252 Drwg. No.: 138/41903
ID PRA CRMO 10(2)
PMIS PKG. NO. 4252
U. S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
CRATERS OF THE MOON NATIONAL
MONUMENT AND PRESERVE
A.3
STATE PROJECT
Scale in feet
LOCATION MAP
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
L O
O P
R O
A
TO CAREY
25 MILES
0400 400 800 1200
RESIDENCE
ROAD
PRA CRMO 10(2)
Loop Road 0+00
Riprap existing ditch at Residence
Road Loop Road 11+00
SUSPEND WORK
LOOP ROAD
12+00
CAMPGROUND
ROAD
Reconstruct
Service Road
Intersection
Loop Raod 20+00
BONE YARD
STOCKPILE AREA
BONE YARD
SERVICE ROAD
NORTH CRATER FLOW
PARKING AREA
TO ARCO 19 MILES
OLD MAN
PARKING AREA
RESUME WORK
DEVIL’S ORCHARD ROAD 10+00
LOOP ROAD 94+38.22
NORTH CRATER TRAIL
Loop Road 42+00
PARKING AREA
DEVIL’S ORCHARD
PARKING AREA
CAVES
PARKING AREA
END PROJECT
PRA CRMO 10(2)
LOOP ROAD
247+99.49
INFERNO CONE
PARKING AREA
Loop Road 143+00
RESUME WORK
SPATTER CONE ROAD 20+00
LOOP ROAD 151+43.74
SUSPEND WORK
SPATTER CONE ROAD
23+06
SPATTER CONE
PARKING AREA
L O
O P
R O
A D
RESUME WORK
TREE MOLDS ROAD 300+00
LOOP ROAD 189+38.05
TREE MOLDS ROAD
BIG SINK
PARKING AREA
TREE MOLDS
PARKING AREA
N
SUSPEND WORK
DEVIL’S ORCHARD ROAD
22+00
SUSPEND WORK
TREE MOLDS ROAD
360+60=
TREE MOLDS PARKING AREA
100+00
PRELIMINARY
PMIS Pkg. No.: 4252 Drwg. No.: 138/41903
BEGIN PROJECT
L O
O P
R O
A D
SYMBOLS:
Single lane road, one way traffic
Two lane road, two way traffic
C.2
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
ROADS
TYPICAL SECTION &
PAVEMENT CONNECTION
DETAIL
NOTE:
FOOTNOTE:
Work limit (Clearing limit) Roadway excavation
Removal of curb, asphalt
Existing pavement
Rotomilling 6-inch depth
Superpave pavement, 3/4-inch nominal maximum size aggregate, 0.3 to < 3 million ESAL, 3-inch compacted depth, place in two equal lifts
Match existing crown or superelevation rates, unless otherwise noted
Tack coat, grade CSS-1 place between lifts
Shoulder, excavation and placement
(conserved shoulder material)
Existing ground
Recycled aggregate base, 4" compacted depth
Prime coat, grade CMS-2, and blotter
Existing pavement
Loop road New construction or reconstruction
Finish Grade
Pavement structure
Sawcutting pavement
Tack coat
SECTION A-A
CONNECTION DETAIL
A
A
Loop road
R a d iu s Sawcutting pavement
Tack coat
Parking area access road or driveway
Includes asphalt curb, asphalt sidewalk, and paved waterway material removed. See Section 310.
Match existing conditions if not specified.
Slope for Spatter Cone Road and Tree Molds Road are 1:2.
Devil’s Orchard Road slope are indicated in staking report
(See FAR 52.236-4)
3 3
Curb, concrete, 6-inch depth
1.
2.
3.
4.
5.
6.
7.
Do not operate equipment outside of the work limit unless otherwise authorized by the CO.
Match existing road alignment, crown and superelevation rates.
(Spatter Cone & Tree Molds Roads)
Survey existing roads to establish existing centerline, and grade as per section 152.
Establish finish grade for Tree Molds and Spatter Cone Roads, one inch above existing grade.
Removal of asphalt curb, is incidental to recycled aggregate base.
At Spatter Cone, Tree Molds, and Devil’s Orchard Roads, pulverized to a depth of 6", remove top 2", compact remaining pulverized material as per Section 310
Place removed top 2" of pulverized material from roadway as embankment material in the new construction for parking areas.
PRELIMINARY
PMIS Pkg. No.: 4252 Drwg. No.: 138/41903
2"
Work limit
(Clearing limit) 3’12’12’3’
EXCAVATION NEW PAVEMENT STRUCTURE
20+00 to 23+06 (SPATTER CONE ROAD)
10+00 to 22+00 (DEVIL’S ORCHARD ROAD)
3" Max
300+00 to 360+60 (TREE MOLDS ROAD)
C.3
TYPICAL SECTIONS
NEW PAVEMENT STRUCTUREEXCAVATION
Work limit
NORTH CRATER TRAIL
INFERNO CONE, DEVIL’S ORCHARD,
SPATTER CONE, TREE MOLDS, BIG SINK
(Clearing limit)
1.
2.
3.
4.
5.
FOOTNOTE:
Place conserved topsoil at Tree Molds, Spatter Cone, and Devil’s
Orchard Parking Areas. See Section 624.
Includes asphalt curbs, asphalt sidewalk, and paved waterway material. See Section 310.
See Subsection 204.10.
Existing pavement
Roadway excavation
Removal of curb, asphalt
Rotomilling, 6-inch depth
Existing pavement
Superpave pavement, 3/4-inch nominal maximum size aggregate, 0.3 to < 3 million ESAL, 3-inch compacted depth, place in two equal lifts
Recycled aggregate base, 4" compacted depth
Curb, concrete, 6-inch depth
Embankment
Toe of the fill
Tack coat, Grade CSS-1, place between lifts
Prime coat, grade CMS-2, and blotter
WW Mesh-6" x 6" W2.0 x W2.0 Sidewalk, concrete 6" depth, broom finish, fill area inside concrete curb island, flush with finish grade
Recycled aggregate base, 4" compacted depth
Curb, concrete, 15-inch depth (typ.) See Sheet L.2 6" bed course
3" bed course (typ.)
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
Placing conserved topsoil, 3-inch depth
Existing ground
Superpave pavement, 34-inch nominal max.
size aggregate, 0.3 to <3 million ESAL, 3-inch compacted depth, place in two lifts. (See detail above)
Construct parking areas as shown in plans, utilizing established control points.
Removal of asphalt curb, is incidental to recycled aggregate base.
Rotomill existing parking area pavement to a depth of 6". Remove rotomilled material as required to construct new design grade as shown in the plans. Compact remaining rotomilled material as per subsections 301.04, 301.05, and 301.06.
Place recycled material removed as embankment in new construction at parking areas.
Blend grade at the North Crater Trail Parking Area to match existing Loop Road grade over a 10’ width adjacent to the Loop
Road.
PRELIMINARY
PMIS Pkg. No.: 4252 Drwg. No.: 138/41903
3’
2"
(Various width)
PARKING AREAS
ISLAND #2 DETAIL
DEVIL’S ORCHARD PARKING AREA
3"
Work limit (Clearing limit) 1:2
1:2 1:2
NOTE:
3"
Max.
D.1
Scale in feet
25 0 25 50 75
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
NORTH CRATER TRAIL
PARKING AREA
(DEMOLITION)
Removal of curb and gutter, concrete
Removal of sidewalk, asphalt
Sawcutting pavement lnft sqyd lnft
20302-0300
20303-3000
20315-0000
ITEM DESCIPTION UNIT QUANTITY
DEMOLITION AND REMOVAL
Removal of curb & gutter, concrete
Sawcutting pavement, follow edge of Loop Road
Loop Road
41+62
(approximate)
Do not disturb existing sign
Removal of sidewalk, asphalt
Sawcutting pavement
Loop Road
43+87
(approximate)
N
Maintain existing Loop Road width when establishing sawcutting pavement line.
NOTE:
1.
Remove asphalt trail as part of removal of sidewalk, asphalt, 10 ft of existing trail
Do not disturb existing box culvert
PRELIMINARY
PMIS Pkg. No.: 4252 NPS Drwg. No.: 138/41903
E.1
DEVIL’S ORCHARD
PARKING AREA
(DEMOLITION)
SHEET
S
E P
I P
P
W P
:d m e c k e d b y s ig n e d b y
DEMOLITION QUANTITIES
ITEM DESCRIPTION UNIT QUANTITY
Removal of signs
Removal of curb and gutter, concrete
Removal of sidewalk, concrete
Sawcutting pavement
20301-2400
20302-0300
20303-3200
20315-0000 each lnft sqyd lnft
Scale in feet
25 0 25 50 75
Sawcutting pavement, follow edge of existing
Loop Road pavement
(See pavement connection detail, Sheet C.2)
Existing edge of pavement
End reconstruction of road.
Begin demolition of
Devil’s Orchard Parking Area.
End removal of curb, asphalt, & road.
Begin removal of curb, asphalt, & parking area.
Pulverize asphalt, 6-inch depth
Begin removal of curb, asphalt
Removal of curb, asphalt, access road
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
Removal of signs, (KEEP RIGHT)
End removal of sidewalk, concrete.
End removal of curb and gutter, concrete
End removal of curb, asphalt
Removal of curb and gutter, concrete
Pulverize, 6-inch depth, entire parking area
Existing sign to remain, (The Devil’s Orchard)
Removal of sidewalk, concrete
Existing trail
Remove existing 3’ x 3’ concrete pad as part of removal of sidewalk, concrete
Removal of curb and gutter, concrete
Begin removal of sidewalk, concrete
Removal of paved waterway, asphalt
Removal of paved waterway, asphalt
1.
2.
3.
NOTE:
Include removal of curb, asphalt, with pulverizing, 6-inch depth, incidental to Item 31001.
Dispose of all material from removal of curb and gutter, concrete and removal of sidewalk, concrete, off project.
Complete all survey and present required submittals prior to commencment of demolition activities. See Section 152.