T A B U L A T I O N O F B I D S
Schedule A Total of Bid Items: 7,078,600.00$ -35.4% 4,576,127.50$ -14.6% 6,042,472.00$ -16.9% 5,878,902.00$ -16.5% 5,910,406.00$ -13.9% 6,092,297.00$ -11.4% 6,271,502.50$ -9.7% 6,394,989.00$ -11.3% 6,278,149.50$ -0.7% 7,029,508.30$ Project No: CA FTBL 67110(1)
Project Name: Gecko Road
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line A0020 ALL LPSM 634,081.27$ 634,081.27$ 200,000.00$ 592,633.00$ 587,000.00$ 585,000.00$ 560,000.00$ 599,200.00$ 620,000.00$ 500,000.00$ 270,000.00$
15210-3000
Line A0040 7.800 MILE 4,052.53$ 31,609.73$ 62,400.00$ 62,400.00$ 70,200.00$ 156,000.00$ 23,400.00$ 171,600.00$ 43,485.00$ 195,000.00$ 628,266.60$
15215-1000
Line A0060 2 EACH 5,000.00$ 10,000.00$ 10,000.00$ 15,000.00$ 4,000.00$ 4,000.00$ 8,000.00$ 4,200.00$ 1,940.00$ 12,000.00$ 30,000.00$
15301-0000
Line A0080 ALL LPSM 120,000.00$ 120,000.00$ 50,000.00$ 40,000.00$ 105,000.00$ 175,000.00$ 85,000.00$ 187,000.00$ 210,000.00$ 150,000.00$ 324,791.00$
15401-0000
Line A0100 ALL LPSM 120,000.00$ 120,000.00$ 250,000.00$ 25,000.00$ 188,000.00$ 75,000.00$ 40,000.00$ 80,000.00$ 325,000.00$ 110,000.00$ 85,202.00$
15501-0000
Line A0120 ALL LPSM 25,000.00$ 25,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 2,500.00$ 80,000.00$ 2,000.00$ 10,140.00$ 5,000.00$ 20,000.00$
15705-1400
Line A0140 2,000 LNFT 10.00$ 20,000.00$ 6,000.00$ 10,000.00$ 7,000.00$ 10,000.00$ 10,000.00$ 10,800.00$ 20,000.00$ 6,000.00$ 30,000.00$
15802-0000
Line A0160 ALL LPSM 100,000.00$ 100,000.00$ 320,000.00$ 100,000.00$ 210,000.00$ 100,000.00$ 1,742,000.00$ 105,000.00$ 180,000.00$ 55,000.00$ 237,885.00$
20304-1000
Line A0180 ALL LPSM 85,000.00$ 85,000.00$ 5,000.00$ 240,000.00$ 35,000.00$ 25,000.00$ 20,000.00$ 27,000.00$ 25,000.00$ 15,000.00$ 75,000.00$
20401-0000
Line A0200 8,100 CUYD 27.24$ 220,644.00$ 291,600.00$ 364,500.00$ 121,500.00$ 162,000.00$ 243,000.00$ 172,530.00$ 283,500.00$ 170,100.00$ 534,600.00$
20402-0000
Line A0220 500 CUYD 100.00$ 50,000.00$ 18,000.00$ 37,500.00$ 32,500.00$ 12,500.00$ 15,000.00$ 13,375.00$ 70,000.00$ 65,000.00$ 35,000.00$
20701-0500
Line A0240 1,860 SQYD 2.00$ 3,720.00$ 1,860.00$ 4,650.00$ 6,510.00$ 5,580.00$ 18,600.00$ 5,952.00$ 6,510.00$ 7,440.00$ 27,900.00$
21101-1000
Line A0260 500 SQYD 2.48$ 1,240.00$ 21,500.00$ 12,500.00$ 4,000.00$ 5,000.00$ 1,000.00$ 5,375.00$ 325.00$ 7,500.00$ 15,000.00$
25105-0300
Line A0280 1,860 CUYD 200.00$ 372,000.00$ 150,660.00$ 195,300.00$ 362,700.00$ 279,000.00$ 130,200.00$ 299,460.00$ 288,300.00$ 279,000.00$ 325,500.00$
30202-1000
Line A0300 19,200 TON 25.00$ 480,000.00$ 364,800.00$ 672,000.00$ 748,800.00$ 864,000.00$ 537,600.00$ 921,600.00$ 787,200.00$ 652,800.00$ 595,200.00$
30401-5700
Line A0320 7.800 MILE 56,000.00$ 436,800.00$ 156,000.00$ 351,000.00$ 663,000.00$ 585,000.00$ 507,000.00$ 625,950.00$ 546,000.00$ 312,000.00$ 663,000.00$
40101-5600
Line A0340 25,000 TON 150.00$ 3,750,000.00$ 2,062,500.00$ 2,712,500.00$ 2,250,000.00$ 2,250,000.00$ 1,750,000.00$ 2,400,000.00$ 2,375,000.00$ 3,125,000.00$ 2,240,000.00$
40105-3000
Line A0360 250.0 TON 585.00$ 146,250.00$ 87,500.00$ 43,750.00$ 46,250.00$ 87,500.00$ 75,000.00$ 93,750.00$ 47,250.00$ 100,000.00$ 60,750.00$
40601-0000
Line A0380 55.0 TON 650.00$ 35,750.00$ 44,000.00$ 60,500.00$ 26,125.00$ 27,500.00$ 16,500.00$ 29,425.00$ 22,000.00$ 33,000.00$ 99,000.00$
41201-0000
Line A0400 115.0 TON 615.00$ 70,725.00$ 92,000.00$ 69,000.00$ 95,450.00$ 57,500.00$ 34,500.00$ 61,525.00$ 57,500.00$ 86,250.00$ 207,000.00$
61904-0000
Line A0420 4 EACH 510.00$ 2,040.00$ 4,000.00$ 10,000.00$ 2,200.00$ 6,000.00$ 16,000.00$ 6,400.00$ 3,000.00$ 2,000.00$ 6,000.00$
62201-0300
Line A0440 40 HOUR 110.00$ 4,400.00$ 5,000.00$ 5,000.00$ 5,000.00$ 4,800.00$ 4,400.00$ 5,140.00$ 4,400.00$ 6,000.00$ 6,000.00$
62201-0400
Line A0460 40 HOUR 130.00$ 5,200.00$ 8,000.00$ 6,000.00$ 6,000.00$ 6,200.00$ 4,800.00$ 6,640.00$ 4,800.00$ 5,600.00$ 5,800.00$
62201-0900
Line A0480 40 HOUR 160.00$ 6,400.00$ 12,000.00$ 7,400.00$ 7,200.00$ 7,800.00$ 5,600.00$ 8,320.00$ 6,800.00$ 7,200.00$ 6,600.00$
62201-2050
Line A0500 40 HOUR 115.00$ 4,600.00$ 8,000.00$ 6,000.00$ 6,000.00$ 7,000.00$ 4,000.00$ 7,520.00$ 5,600.00$ 6,800.00$ 6,760.00$
62201-2850
Line A0520 40 HOUR 170.00$ 6,800.00$ 12,000.00$ 8,600.00$ 6,200.00$ 8,600.00$ 7,200.00$ 9,200.00$ 6,000.00$ 7,200.00$ 7,040.00$
62301-0000
Line A0540 80 HOUR 75.00$ 6,000.00$ 10,000.00$ 7,600.00$ 6,400.00$ 6,800.00$ 6,400.00$ 7,280.00$ 5,200.00$ 6,000.00$ 5,840.00$
62304-0000
Line A0560 80 DAY 1,300.00$ 104,000.00$ 17,600.00$ 136,000.00$ 104,000.00$ 76,000.00$ 80,000.00$ 81,600.00$ 120,000.00$ 72,000.00$ 74,800.00$
63301-0000
Line A0580 90 EACH 650.00$ 58,500.00$ 36,000.00$ 48,150.00$ 45,000.00$ 36,000.00$ 27,000.00$ 38,250.00$ 53,550.00$ 36,000.00$ 52,200.00$
63309-0200
Line A0600 220 EACH 80.00$ 17,600.00$ 11,000.00$ 14,300.00$ 11,440.00$ 27,500.00$ 4,400.00$ 29,480.00$ 14,300.00$ 26,400.00$ 27,500.00$
63401-0700
Line A0620 99,650 LNFT 0.40$ 39,860.00$ 99,650.00$ 54,807.50$ 59,790.00$ 59,790.00$ 4,982.50$ 63,776.00$ 54,807.50$ 79,720.00$ 104,632.50$
63401-0800
Line A0640 27,090 LNFT 1.00$ 27,090.00$ 20,317.50$ 9,481.50$ 10,836.00$ 10,836.00$ 1,354.50$ 12,190.50$ 9,481.50$ 14,899.50$ 18,421.20$
63403-0400
Line A0660 5,740 SQFT 11.00$ 63,140.00$ 103,320.00$ 86,100.00$ 15,211.00$ 86,100.00$ 5,740.00$ 98,441.00$ 86,100.00$ 91,840.00$ 103,320.00$
63405-1350
Line A0680 40 EACH 115.00$ 4,600.00$ 9,400.00$ 16,000.00$ 11,600.00$ 18,000.00$ 1,520.00$ 19,260.00$ 16,000.00$ 18,000.00$ 12,000.00$
63405-1650
Line A0700 2 EACH 775.00$ 1,550.00$ 6,000.00$ 800.00$ 740.00$ 900.00$ 600.00$ 963.00$ 800.00$ 900.00$ 6,000.00$
63501-0000
Line A0720 ALL LPSM 10,000.00$ 10,000.00$ 5,020.00$ 10,000.00$ 10,000.00$ 75,000.00$ 20,000.00$ 56,000.00$ 75,000.00$ 8,000.00$ 75,000.00$
63602-6020
Line A0740 1 EACH 4,000.00$ 4,000.00$ 5,000.00$ 3,000.00$ 3,250.00$ 5,000.00$ 1,500.00$ 5,300.00$ 10,000.00$ 3,500.00$ 7,500.00$
Engineer's Estimate
5,000.00$ 3,000.00$ 3,250.00$ 5,000.00$ 1,500.00$ 5,300.00$ 10,000.00$ 3,500.00$ 7,500.00$
5,020.00$ 10,000.00$ 10,000.00$ 75,000.00$ 20,000.00$ 56,000.00$ 75,000.00$ 8,000.00$ 75,000.00$
3,000.00$ 400.00$ 370.00$ 450.00$ 300.00$ 481.50$ 400.00$ 450.00$ 3,000.00$
235.00$ 400.00$ 290.00$ 450.00$ 38.00$ 481.50$ 400.00$ 450.00$ 300.00$
18.00$ 15.00$ 2.65$ 15.00$ 1.00$ 17.15$ 15.00$ 16.00$ 18.00$
0.75$ 0.35$ 0.40$ 0.40$ 0.05$ 0.45$ 0.35$ 0.55$ 0.68$
1.00$ 0.55$ 0.60$ 0.60$ 0.05$ 0.64$ 0.55$ 0.80$ 1.05$
50.00$ 65.00$ 52.00$ 125.00$ 20.00$ 134.00$ 65.00$ 120.00$ 125.00$
400.00$ 535.00$ 500.00$ 400.00$ 300.00$ 425.00$ 595.00$ 400.00$ 580.00$
220.00$ 1,700.00$ 1,300.00$ 950.00$ 1,000.00$ 1,020.00$ 1,500.00$ 900.00$ 935.00$
125.00$ 95.00$ 80.00$ 85.00$ 80.00$ 91.00$ 65.00$ 75.00$ 73.00$
300.00$ 215.00$ 155.00$ 215.00$ 180.00$ 230.00$ 150.00$ 180.00$ 176.00$
200.00$ 150.00$ 150.00$ 175.00$ 100.00$ 188.00$ 140.00$ 170.00$ 169.00$
300.00$ 185.00$ 180.00$ 195.00$ 140.00$ 208.00$ 170.00$ 180.00$ 165.00$
200.00$ 150.00$ 150.00$ 155.00$ 120.00$ 166.00$ 120.00$ 140.00$ 145.00$
125.00$ 125.00$ 125.00$ 120.00$ 110.00$ 128.50$ 110.00$ 150.00$ 150.00$
1,000.00$ 2,500.00$ 550.00$ 1,500.00$ 4,000.00$ 1,600.00$ 750.00$ 500.00$ 1,500.00$
800.00$ 600.00$ 830.00$ 500.00$ 300.00$ 535.00$ 500.00$ 750.00$ 1,800.00$
800.00$ 1,100.00$ 475.00$ 500.00$ 300.00$ 535.00$ 400.00$ 600.00$ 1,800.00$
350.00$ 175.00$ 185.00$ 350.00$ 300.00$ 375.00$ 189.00$ 400.00$ 243.00$
82.50$ 108.50$ 90.00$ 90.00$ 70.00$ 96.00$ 95.00$ 125.00$ 89.60$
20,000.00$ 45,000.00$ 85,000.00$ 75,000.00$ 65,000.00$ 80,250.00$ 70,000.00$ 40,000.00$ 85,000.00$
19.00$ 35.00$ 39.00$ 45.00$ 28.00$ 48.00$ 41.00$ 34.00$ 31.00$
81.00$ 105.00$ 195.00$ 150.00$ 70.00$ 161.00$ 155.00$ 150.00$ 175.00$
43.00$ 25.00$ 8.00$ 10.00$ 2.00$ 10.75$ 0.65$ 15.00$ 30.00$
1.00$ 2.50$ 3.50$ 3.00$ 10.00$ 3.20$ 3.50$ 4.00$ 15.00$
36.00$ 75.00$ 65.00$ 25.00$ 30.00$ 26.75$ 140.00$ 130.00$ 70.00$
36.00$ 45.00$ 15.00$ 20.00$ 30.00$ 21.30$ 35.00$ 21.00$ 66.00$
5,000.00$ 240,000.00$ 35,000.00$ 25,000.00$ 20,000.00$ 27,000.00$ 25,000.00$ 15,000.00$ 75,000.00$
324,791.00$
320,000.00$ 100,000.00$ 210,000.00$ 100,000.00$ 1,742,000.00$ 105,000.00$ 180,000.00$ 55,000.00$ 237,885.00$
3.00$ 5.00$ 3.50$ 5.00$ 5.00$ 5.40$ 10.00$ 3.00$ 15.00$
10,000.00$ 5,000.00$ 5,000.00$ 2,500.00$ 80,000.00$ 2,000.00$ 10,140.00$ 5,000.00$ 20,000.00$
250,000.00$ 25,000.00$ 188,000.00$ 75,000.00$ 40,000.00$ 80,000.00$ 325,000.00$ 110,000.00$ 85,202.00$
560,000.00$ 599,200.00$ 620,000.00$ 500,000.00$ 270,000.00$
8,000.00$ 9,000.00$ 20,000.00$ 3,000.00$ 22,000.00$ 5,575.00$ 25,000.00$ 80,547.00$
5,000.00$ 7,500.00$ 2,000.00$ 2,000.00$ 4,000.00$ 2,100.00$ 970.00$ 6,000.00$ 15,000.00$
Peter Vander Werff Constr L.B.Civil Construction, Inc. Granite Construction Co.Hat Creek Const.&Matls Inc.Pyramid Const. & Aggregates, Inc. Coffman Specialities, Inc. dba SWP Contracting & Paving Hazard Construction Co Siatic Contractors dba Shawnan
8,000.00$
200,000.00$ 592,633.00$ 587,000.00$ 585,000.00$
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, APPROACH ROAD
FULL DEPTH RECLAMATION, METHOD 2, 10-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
SOIL EROSION CONTROL, FIBER ROLL
WATERING FOR DUST CONTROL
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
SUBEXCAVATION
SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE E
ROLLER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
GENERAL LABOR
SPECIAL LABOR (BIOLOGICAL MONITOR)
SIGN SYSTEM
FOG SEAL
TACK COAT
BOLLARD POST
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
ROADWAY OBLITERATION, METHOD 1
KEYED RIPRAP, METHOD A, CLASS 3
ROADWAY AGGREGATE, METHOD 1
CONTRACTOR QUALITY CONTROL
50,000.00$ 40,000.00$ 105,000.00$ 175,000.00$ 85,000.00$ 187,000.00$ 210,000.00$ 150,000.00$
DELINEATOR, TYPE 2
SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, BROKEN
PAVEMENT MARKINGS, TYPE D
PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
TEMPORARY TRAFFIC CONTROL
1/24/2017 Page 1 of 1