Amendment A002 makes changes to the Bid Date, the traffic closure's, and the biological/archaeological requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6816B00031
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
11/23/2016
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
CFL16HFPM387
6. PROJECT NO.
CA FTBL 67110(1) & 67113(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Sheri Muehl, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 12/22/2016 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53-236-1(e)
X
X
Amendment A002 12/19/2016
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text 01/05/2017
Jeremiah.Rogers Typewritten Text
E-23
CA FTBL 67110(1) & 67113(1)
Gecko Road and Grays Well Road
(i) Delete the text and substitute the following:
Full road closures will be allowed for the entire Gecko Road network and the entire Grays Well Road network from April 15, 2017 to September 15, 2017. Notify the CO and the BLM 2 weeks in advance prior to closure for approval.
Closure of the road networks are the responsibility of the contractor.
When the full closure is not utilized, limit construction-caused delays to public traffic to a maximum of 15 minutes per passage through the project.
Alternate one-way traffic control may be established on State Route 78 at Gecko Road Mondays through Fridays from 7:00 am to 6:00 pm. Limit construction-caused delays to public traffic on SR 78 to a maximum of 10 minutes per passage through the project. The maximum length of one-way traffic control on SR 78 is 0.25 miles.
Add the following:
(k) Limit the length of area affected as approved by the CO. See Subsection 108.01 for limitations on work.
Section 201. — CLEARING AND GRUBBING
Measurement
201.08 Add the following:
Schedule A: When measuring clearing and grubbing by the acre (hectare) or square yard (square meter), measure on a plane parallel to the ground surface.
Option X: Do not measure clearing and grubbing for payment. This work is subsidiary to roadway excavation.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Construction Requirements
203.04 Removing Material.
(c) Concrete removal in repair areas. Add the following to the second paragraph:
Use hand tools (hammers and chisels) to remove final particles of concrete or to achieve the required depth.
203.05 Disposing of Material.
(a) Remove from Project. Add the following:
Remove and dispose of the following items as identified on the plans for removal:
Existing delineators
Amendment A002 12/19/2016
E-23a
Existing signs
Concrete foundations with metal posts
Post and cable fence
E-33
CA FTBL 67110(1) & 67113(1)
Gecko Road and Grays Well Road supporting tools and equipment (e.g., calculator, computer, and software, and appropriate and commonly-used drafting tools for the assigned task).
All calculations, notes, and supporting documentation become the property of the government upon completion of the work.
623.05 Biological Services. Furnish personnel, equipment, and material to perform biological monitoring for the Flat Tail Horned Lizard during ground disturbing construction activities. Furnish a resume including qualifications of a qualified biologist, for biological monitoring, to the CO for BLM approval. Allow 5 working days for BLM approval of proposed personnel. Furnish a qualified biologist with a Bachelor’s Degree in the biological sciences at a minimum and previous experience performing similar surveys.
Flat Tail Horned Lizard monitors will be approved by the Authorized Biologist (BLM) to monitor activities within Flat Tail Horned Lizard habitat as described in Section 107, ensure proper implementation of protective measures, and record and report Flat Tail Horned Lizard observations. Monitors should have sufficient Flat Tail Horned Lizard training and field experience to detect the presence of Flat Tail Horned Lizard through observations of animals and sign including scat. Review of credentials is at the discretion of the BLM. Monitors are authorized to move Flat Tail Horned Lizard.
Prepare field notes in an approved format. All field notes become the property of the Government upon completion of the work.
623.06 Archeological Services. Furnish personnel, equipment, and material meeting the secretary of interior standards for archeology and historic preservation during ground disturbing construction activities on Option X between Stations 205+00 to 207+00. Furnish a resume including qualifications of a qualified archeologist, for archeological monitoring, to the CO for BLM approval. Allow 5 working days for BLM approval of proposed personnel. Furnish a qualified archaeologist, meeting the Secretary of Interior's Professional Qualifications Standards for Archeology (48 FR 44738-39).
Prepare field notes in an approved format. All field notes become the property of the Government upon completion of the work.
623.07 Acceptance. General labor work will be evaluated under Subsection 106.02.
Additional surveying services will be evaluated under Section 152.
Hired technical services, biological services, and archeological services will be evaluated under Subsections
106.02 and 106.04
Measurement
623.07 Measure the Section 623 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Round portions of an hour up to the nearest half hour. Measure time in excess of 40 hours per week at the same rate as the first 40 hours.
E-33a
For surveying services, the minimum field survey crew is two persons. Measure surveying service by the crew hour. Do not measure time spent in making preparations, performing calculations, plotting cross-sections,
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 6 |
| Text3: |
| 0: A002 |
| 1: 12/19/2016 |
| 2: |
| 0: |
| 1: CA FTBL 67110(1)/67113(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: SHERI MUEHL
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH68-16-B-00031 |
| 1: 11/23/2016 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Off |
| 1: |
| 0: |
| 0: Yes |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: INVITATION FOR BID- A-Section |
Remove and replace page A-1 with new A-1. The bid date is extended.
INVITATION FOR BID- E-Section
Remove and replace page E-23 with new page E-23 and new page E-23a. Language was added concerning road closures.
Remove and replace page E-33 with new page E-33 and new page E-33a. Biological and Archaelogical services were clarified.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .