Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M C
R B
U C
K S .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
Bucks Lake Road
CA FLAP PLU CR411(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M C
R B
U C
K S .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
SURVEY CONTROL
A4
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts A G e n s h t\
C T
L C
R B
U C
K S
U S .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
TOTALS (ft)
(ft)
Roadway
2%2% first asphalt lift)
(applied prior to
Prime coat
See plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
and seeding limits
Topsoil and seeding limits
Topsoil
SubgradeSubgrade
Traveled way Traveled wayShldr.
NO SCALE
NOTE:
Min. superelevation 2%
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for pavement)
(top of
Profile grade
Shldr.
1.
1:4
DETAIL A
See Detail A
MAINLINE
TYPICAL SECTIONSbase
Aggregate
30° - 35° sides of roadway)
(Detail applies to both right and left
Shoulder up with aggregate base
Construct 30° - 35° pavement edge (safety edge)
Asphalt concrete pavement
Placed in two lifts concrete pavement
4" Asphalt
4' 4'
8% Max. superele vation
12' 12'4.33'
20.33' 20.33'
9" Aggregate base
4.33'
356+14 to 373+50
356+14 to 372+25
TYPICAL SECTION
356+14 to 373+50
EXISTING TYPICAL SECTION
0.329
A5
Clearing and construction limits
Hinge point
1:4
(va ria ble )Fill sl op e2.
limit stake
Slope
(v ar ia bl e)
Cu t s lo pe
2.
2'B=2'
F= 2' limit
Slope stake cut slope
Rounded
3.
Existing ground asphalt lifts)
(applied between
Tack coat
2'
Varies Clear zoneClear zone
8.33'
Station to Station
Graded Ditch Width
(ft)
W
Ditch
Graded
W
367+50 to 372+25
366+50 to 367+50
365+50 to 366+50
364+50 to 365+50
362+00 to 364+50
361+00 to 362+00
356+14 to 361+00 transition transition transition
Varies 2.
Average width 32 ft first asphalt lift)
(applied prior to
Prime coat
Traveled way Traveled wayShldr.
pavement)
(top of
Profile grade
Shldr.
See Detail A
Placed in two lifts concrete pavement
4" Asphalt
4' 4'12' 12'Varies Varies
372+25 to 373+50
TYPICAL SECTION
Existing ground asphalt lifts)
(applied between
Tack coat
Construction limits
Varies Varies
Ex ist ing Sl op e
Va ria ble
Ex ist in g
Sl op e
V ar ia bl e foreslope as necessary, but not steeper than 1:2, to stay on the existing bench.
Construct a 1:4 foreslope unless otherwise directed by the CO. Steepen the reduce the B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, See the cross sections for cut and fill slope ratios, and ditch widths.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
4.
3.
2.
1.
4.
varies
Clear zone varies
Clear zone
Subgrade varies Subgrade varies
Hinge point
6' steel post
4'-0" (min.)
1V:3H or flatter
Face of RSS grade finished
Proposed
9 1/4" post
Backup Plate at each
12" long, 12-guage
Non-Blocked MGS at RSS
1'16' to s h o u ld e r o f p a v d
N o r m a l e d g e
9" Aggregate base
Subsidiary to 204 items
Excavate 13" depth
Existing aggregate base depth equals 12"
Existing asphalt pavement depth equals 3" or more
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P C
R B
U C
K S .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
Sheet and Description
B4 B5 B6 B7
Grading Summary
Misc Summary
Misc Summary
Misc Summary ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 2 2
A0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0100 15401-0000 CONTRACTOR TESTING LPSM ALL
A0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 1,251 59 1,310
A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 60 60
A0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 22 3 25
A0200 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0220 20101-0000 CLEARING AND GRUBBING ACRE 2.9 0.2 3.1
A0240 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 16 4 20
A0260 20301-0200 REMOVAL OF BOULDER EACH 35 5 40
A0280 20301-0700 REMOVAL OF DELINEATOR EACH 16 4 20
A0300 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
A0320 20301-2400 REMOVAL OF SIGN EACH 4 1 5
A0340 20302-1200 REMOVAL OF GUARDRAIL LNFT 1,166 34 1,200
A0360 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE
BARRIER LNFT 440
A0380 20401-0000 ROADWAY EXCAVATION CUYD 3,853 247 4,100
A0400 20420-0000 EMBANKMENT CONSTRUCTION (RSS) CUYD 22,490 1,310 23,800
A0420 20720-0300 REINFORCEMENT GEOSYNTHETIC, TYPE
3 SQYD 23,018 1,482 24,500
A0440 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 CUYD 8 2 10
A0460 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 3,517 83 3,600
A0480 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,376 44 1,420
A0500 41102-1000 PRIME COAT, METHOD 1 SQYD 6,300 200 6,500
A0520 41105-0000 BLOTTER TON 10
A0540 41201-0000 TACK COAT TON 3 0 3
A0560 60201-0800 24-INCH PIPE CULVERT LNFT 195 10 205
A0580 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT EACH 4 4
A0600 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A STEEL POSTS (NON-BLOCKED) LNFT 1,313 1,313
A0620 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 2 2
8- Ju l-
:2
PM
N
C A \p lu cr
1(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
C A F
LA
P
PL
U
C R
1( 1)
E st im at e-
.x ls x]
Sh ee t
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B1FLAP PLU CR411(1) CA
SHEET
NUMBER
Grading Summary
Misc Summary
Misc Summary
Misc Summary ALLOWANCE Bid
Schedule
A0640 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM
CAPACITY HOUR 10
A0660 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 10
A0680 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 10
A0700 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 10
A0720 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 10
A0740 62301-0000 GENERAL LABOR HOUR 40
A0760 62302-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES HOUR 20
A0780 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A0800 62401-0300 FURNISHING AND PLACING TOPSOIL,
4-INCH DEPTH SQYD 2,170 110 2,280
A0820 62405-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH SQYD 7,814 386 8,200
A0840 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 7,814 386 8,200
A0860 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 4,397 203 4,600
A0880 62901-1100 ROLLED EROSION CONTROL PRODUCT,
TYPE 4 SQYD 2,634 116 2,750
A0900 63301-0000 SIGN SYSTEM EACH 4 4
A0920 63308-2000 OBJECT MARKER, TYPE 2 EACH 4 4
A0940 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 2.6 0.1 2.7
A0960 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM ALL ALL
A0980 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 50 50
A1000 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 100 100
A1020 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 4 4
A1040 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 1,050 50 1,100
A1060 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS LNFT 1,736 1,736
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
8- Ju l-
:2
PM
N
C A \p lu cr
1(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
C A F
LA
P
PL
U
C R
1( 1)
E st im at e-
.x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B2FLAP PLU CR411(1) CA
Grading Summary
Misc Summary
Misc Summary
Misc Summary ALLOWANCE Bid
Schedule
A1080 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 2,000 2,000
A1100 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 158 7 165
A1120 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 700 700
A1140 63610-2800 CONDUIT, 4-INCH, PVC LNFT 1,473 77 1,550
A1160 63621-1000 UTILITY BOX, PULLBOX EACH 3 3
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
8- Ju l-
:2
PM
N
C A \p lu cr
1(
1) \R oa dw ay \E st im at es
_S ch ed ul es \E ng in ee r
Es tim at es
C A F
LA
P
PL
U
C R
1( 1)
E st im at e-
.x ls x]
Sh ee t (3
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B3FLAP PLU CR411(1) CA
GRADING SUMMARY
B4
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts B S u m m S
U M E
W K P
L U
C R .d
U s e r C h r is ti n e .B la c k
NUMBER
SHEET
CA
Sheet 1 of 3
SUMMARY
MISCELLANEOUS
B5
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts B S u m m S
U M
M I S
C P
L U
C R .d
U s e r C h r is ti n e .B la c k
NUMBER
SHEET
CA
Sheet 2 of 3
MISCELLANEOUS
B6
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts B S u m m S
U M
M I S
C P
L U
C R .d
U s e r C h r is ti n e .B la c k
NUMBER
SHEET
CA
Sheet 3 of 3
MISCELLANEOUS
B7
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts B S u m m S
U M
M I S
C P
L U
C R .d
U s e r C h r is ti n e .B la c k
NUMBER
SHEET
CA
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C
R B
U C
K S
C .d g n
U s e r L e s li e .D e W it t_
NUMBER
SHEET
Superelevation Diagram
CA
Bucks Lake Road
CA FLAP PLU CR411(1)
,6
.0
VPI 357+14
EL 3,607.93
+4.
1%
6.
6%
200' VC
K = 104
VPI 364+40
EL 3,657.04
6.
6%
-2.543%
685' VC
K = 74
SSD = 398'
-2.543%
SSD = 1329'
3570357
357535
358035
37303735
SH
O
TG
U N
3598.4
3603.0
18 IN
CM
P PO
O
R CO
N D
ITIO
N
.9
I
N C
M P S
H O
T G
U N40
S1
.6
D A
M A
G E
D
S1
STEEL W
TYPE
RAIN
GAUGE O
N 6
FT
T-
POST
P A I N
T M
A R
K S
03STEEL W TYPE-NO END PIECE
PAINT ON ROAD
P O
T
.0
P C
.2
P T
.2
P C
.7
P T
.9
P O
T
.5
TP
TP
358+09-2.0%
359+12 -8.0% -8.0%
360+66 363+84 368+31
360+66 363+84 368+31
8.0% 8.0%
356+00 357+00 358+00 359+00 360+00 361+00 362+00 363+00 364+00 365+00 366+00 367+00 368+00 369+00 370+00
3630 3660
C1
CA FLAP PLU CR411(1)
Begin Project
E=6833312.058 N=1866279.698 Station 356+14.00
Existing ground
Profile grade
Profile grade
Existing ground
200'100'0
Scale in Feet
-10%
10% 10%
-10%
Remove existing guardrail
Sta. 358+00 to 362+73, Lt.
Curve = CR411-1
PI 362+65.92
R = 475.00'
T = 268.68'
L = 489.04'
D
Curve = CR411-2
PI 369+36.16
D
R = 500.00'
T = 207.43'
L = 393.25'
Axis of rotation
Profile grade &
LT EOP RT EOP
Remove tree as directed by CO
Sta. 365+00, Lt.
Install telephone pullbox
Sta. 365+00, Rt.
See Standard 617-A
Install terminal section, tangent
Sta. 358+00 to 358+37.50, Lt.
pavement existing
Match as directed by CO.
to 10' back from top of existing cut slope
Remove trees from top of existing cut slope
Sta. 356+14 to 357+00, Rt.
See Special 636-A
Install 4" PVC Conduit
Sta. 357+12 to 372+00, Rt.
Install utility pullbox
Sta. 357+12, Rt.
See Special 261-A
Construct Reinforced Soil Slope
Sta. 360+00 to 363+00, Lt.
Remove trees as directed by CO
Sta. 360+25 to 360+50, Rt.
as directed by CO and stockpile on site
Remove boulders lining pullout
Sta. 363+00 to 364+80, Lt.
See Special 261-A
Construct Reinforced Soil Slope
Sta. 365+00 to 370+50, Lt.
limits.
do not disturb outside of construction the left clearing limits. Sensitive area, Place construction fencing along
356+14 - 372+25, Lt.1.
NOTE:
See Special 617-A
Install Non-Blocked MGS Guardrail
Sta. 358+37.5 to 371+41.5, Lt.
R ip r a p a p r o n
L t.
E n d S e c ti o n
L t.
a n d R t.
S k e w
L t.
I n s ta ll x
C M
P
R e m o v e e x is ti n g c u lv e r t according to SCR's subsection 203.04.
Remove and salvage existing concrete barrier
Sta. 362+17 to 366+62, Rt.
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C
R B
U C
K S
C .d g n
U s e r L e s li e .D e W it t_
NUMBER
SHEET
Superelevation Diagram
CA
Bucks Lake Road
CA FLAP PLU CR411(1)
V P I
E L
,6
.5
-2.543%
-3.458%
300' VC
K = 328
SSD = 1329'
,6
.3
5 3
.9
I
N C
M P S
H O
T G
U N
.6
D A
M A
G E
D
S1000
STEEL W TYPE RAIN GAUGE ON 6 FT T-POST
P A I N
T M
A R
K S
BOULDERS
P T
.9
P O
T
.5
TP
-8.0% 372+07
-2.0%
370+54
372+28
1.17%
370+54
370+00 371+00 372+00 373+00
C2
CA FLAP PLU CR411(1)
End Project
E=6834870.370 N=1865844.257 Sta. 373+50
200'100'0
Scale in Feet
-10%
Remove existing guardrail
Sta. 364+78 to 371+79, Lt.
Profile grade
10% 10%
-10%
-8.0%
Axis of rotation
Profile grade &
LT EOP
RT EOP8.0%
374+00
Install telephone pullbox
Sta. 372+00, Rt.
See Standard 617-A
Install terminal section, tangent
Sta. 371+41.50 to 371+79, Lt.
Match existing ground
Station 372+25 - 373+50 ground
Existing
Match existing pavement
See Special 636-A
Install 4" PVC Conduit
Sta. 357+12 to 372+00, Rt.
limits.
do not disturb outside of construction the left clearing limits. Sensitive area, Place construction fencing along
356+14 - 372+25, Lt.1.
NOTE:
-2.543%
See Special 617-A
Install Non-Blocked MGS Guardrail
Sta. 358+37.5 to 371+41.5, Lt.
li n e
S h o r te n r ip r a p t o R
O W
R ip r a p a p r o n
L t.
E n d S e c ti o n
L t.
a n d R t.
S k e w
R t.
I n s ta ll x
C M
P
R e m o v e e x is ti n g c u lv e r t
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts E E
C P C
R .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
Bucks Lake Road
CA FLAP PLU CR411(1)
36653665
375037 553760
N E
W A
S P
H A
L T
N E
W A
S P
H A
L T
K -R
A
IL
Station 373+50
CA FLAP PLU CR411(1)
End Project
200'100'0
Scale in Feet
Station 356+14
CA FLAP PLU CR411(1)
Begin Project
See Special 157-A
Install check dams (typical)
Sta. 357+00 to 371+00, Rt.
See Detail C157-55
Install fiber rolls at culvert inlet
Sta. 356+79, Rt.
See Detail C157-55
Install fiber rolls at culvert inlet
Sta. 371+78, Rt.
See Detail C157-50
Install silt fence
Sta. 359+00 to 371+00, Lt.
E1
356+14 TO 373+50
CONTROL
EROSION AND SEDIMENT
and Special 261-A
See Detail C629-50
Install Rolled Erosion Control Product, Type 4
Sta. 360+00 to 363+00, Lt.
and Special 261-A
See Detail C629-50
Install Rolled Erosion Control Product, Type 4
Sta. 365+00 to 370+50, Lt.
SILT FENCE
6" min. trench
6" min.
18" min.
30" min.
24" min.
C157-50
NOTE:
4.
3.
2.
1.
6 ft. (max.)
fence support mesh = withoutPost spacing
10 ft. (max.)
fence support mesh =withPost spacing running around the ends.
fence up the slope to prevent water from
As the slope is constructed, curve the silt contours as closely as possible.
Install silt fence to follow the ground manufacturer's recommendations.
machine-sliced silt fence according to the slicing as approved by the CO. Install
Silt fence may be installed using machine
REVISED: 08/2014
E2
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow Fi ll slo pe
Flow
T o e o f s lo p e
Flow
(undisturbed)
Existing ground
END POSTS DETAIL
PLAN
PLAN
END DETAIL
ELEVATION
Fi ll sl op e
Steel or wood post
Backfilled and compacted soil
Limits of clearing
Steel or wood post
Varies
See Note 3 for spacing
See Note 4
Fasten fabric to posts.
around each post one full turn.
Fold geotextile fabric
NO SCALE
PLAN
T o e o f s lo p
Note 3See
Staple or tie
Top of posts tied together.
Posts driven tightly together.
Steel or wood posts
POSTS AT JOINTS
See End Posts Detail
End posts
Geotextile fabric
Staple or tie
SILT FENCE AS PERIMETER CONTROL
Fill
Existing ground
Sheet flow Silt fence
PLAN
SECTION A-A
A
A
Roadway
Edge of shoulder
Edge of shoulder
Toe of slope
Toe of slope
Posts Detail
See End
End posts
Silt fence
Fence support mesh (optional)
Section A fabric
Geotextile
Section B
Geotextile fabric
Geotextile
See Typical Section Sheet
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
REVISED:
DETAIL
U.S. CUSTOMARY DETAIL
DETAIL APPROVED FOR USE
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
12" min.
12" max.
Trench 2" min.
12" min.
See Note 3
Stake Spacing
DETAIL APPROVED FOR USE 01/2011
C157-55
6.
5.
4.
3.
2.
1.
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
Spacing Table
See Fiber Roll manufacturer's recommendations.
Fiber rolls may be overlapped according to the fiber roll rather than under it.
roll to ensure storm water is forced to flow through
Tamp soil backfill against upstream side of fiber continuous contact with trench bottom and sides.
parallel to the contour. Place fiber rolls in
For fiber rolls on bare soil, construct trenches of fiber roll.
12" deep. Expose stakes 2" above top
Drive stakes into undisturbed soil at least
Stake fiber rolls at each end.
1" Ø wood stakes. Space stakes 4' o.c. max.
Stake fiber rolls in place with 1" x 1" or roll to vary more than 5% from level.
20' section of fiber roll, do not allow the fiber
Install fiber rolls along slope contours. For any prior to installation.
Repair all rills or gullies and properly compact flared end section
Culvert inlet with
2" min.
Trench
AT CULVERT INLET
FIBER ROLL
inlets fiber rolls around culvert
Install 3 - 9" Ø min. x 10'
See Note 3
See Note 3
Flow
12" min.
Fill slope
C le a r in g
L im it
S lo
S ta k e
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
Trench 2" min.
uphill side of fiber roll
Place excavated material on
E3
Flow
NO SCALE
1V:4H or flatter
1V:4H to 1V:3H
1V:3H to 1V:2H
Slope Gradient
1V:2H or steeper
Stagger joints (typ.)
STAKE DETAIL
uphill side of fiber roll
Place excavated material on
Fiber roll
Install fiber rolls along contour
SLOPE LAYOUT
FIBER ROLL
uphill side of fiber roll
Place excavated material on gaps. See Note 6.
Tie ends if necessary to eliminate
Abut fiber roll ends tightly together.
FIBER ROLL JOINT DETAIL
Tightly abut joints (typ.)
Fill or cut slope
FIBER ROLL SPACING TABLE*
project-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
CHECK DAM
6"
6''
(ft)
12" (min.)
12" (min.)
E4
157-A
Adjust check dam spacing based on site-specific conditions.
Install check dams in ditches perpendicular to the flowline.
Repair all rills or gullies and properly compact prior to installation.
3.
2.
1.
RIPRAP CHECK DAM
NO SCALE
CROSS SECTION
V-DITCH
Class 1 riprap
Class 1 riprap
(See Note 7)
CHECK DAM SPACING
RIPRAP
CROSS SECTION
FLAT-BOTTOM DITCH
SPACING (max.)
CHECK DAM
GRADE
DITCH
6%>
5%
4%
3%
2%
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts E S p l1
A .d
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
AND FURROW DITCH
EMBANKMENT BENCHING
F1
204-A
NOTE:
2.
1.
m in
8' ±
Existing ground
FURROW DITCH
EMBANKMENT BENCHING
6' bench height (typ.)
Top of subgrade bench height.
meet 12' minimum bench width and 6' typical
Bench into existing slope as necessary to
1V:3H or flatter.
Benching is not required for ground sloped at
12' (min.)
See Note 2
Proposed em bankm ent slope
Existing ground
Height varies pattern benching
Typical
Proposed cut slope the Typical Section sheet
Slope rounding as shown on
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts F s p l2
A .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
C251-50
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITHOUT DITCH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITH DITCH
AT CULVERT OUTLETS
PLACED RIPRAP
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
2'
49.8
38.7
18.5
13.3
5.2
3.2
1.7
44.5
34.1
15.6
10.9
3.9
2.2
2'
38.6
29.9
15.2
10.8
4.5
2.7
1.4
35.6
27.3
13.4
9.3
3.6
0.9
DETAIL APPROVED FOR USE
G1
C
PLAN VIEW PLAN VIEW
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION C-C
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r m in
S p a n
D ia o r
L
A A
B B
PLAN VIEW
Variable slope ground Original
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION B-BSECTION A-A
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r
S p a n
D ia o r m in
Geotextile
Variable slope ground Original m in
L
D D
D
H
H
D D
D
WITHOUT DITCH
PROTECTIVE APRON AT CULVERT OUTLET
WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET
L
C C
C
NOTE:
H
D
Geotextile
SECTION E-ESECTION D-D
Geotextile ground Original m in ditch slope
Match existing
D
H m in ground Original m in
D m in
H ditch slope
Match existing
D D EE
ground
Original
D
D it c h B o tt o m
W id th
D it c h B o tt o m
W id t h
D
4D
PLAN VIEW
or flatter
Sloped 1V:2H will not be measured for payment.
3. Excavation for placement of riprap
Subsection 714.01(a).
2. Furnish geotextile conforming to slopes of less than 10%.
1. Use for aprons serving culverts with
D
D D
Flowline
D
D D
(min.)
(min.)
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts G C .d
FEDERAL LANDS HIGHWAY OFFICE
STANDARD
U.S. CUSTOMARY STANDARD
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
261-A
TYPICAL SECTION
RSS DRAINAGE DETAIL
NO SCALE
SOIL SLOPE (RSS)
REINFORCED
REINFORCEMENT PLACEMENT DETAIL
G2
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
S lo p e f a ce
V :H
Finished ground
Embankment construction
See RSS Drainage Detail (this sheet) sheet) placement detail this
(See reinforcement
Geotextile wrapped face
(See table this sheet) reinforcement
Geogrid
(See table this sheet)
(L) Length of reinforcement
S lo p e h e ig h t
Existing ground
Proposed roadway surface
2.
lo p e f a c e
V :H
(L) Length of reinforcement (min.)
m a x
.5 ty overlap
4' min.
overlap
4' min.
(wrapped face) geotextile, Class 1, Type C
Separation-Stabilization 2% min.
6" max.
10"
2"
12"
Geogrid reinforcement
S lo p e f a ce
Granular backfill
Slope to the drain
24"
12"
4" diameter perforated collector pipe
Geocomposite sheet drain
See note 11
Class 1, Type C
Separation-Stabilization geotextile, in the direction of flow as appropriate).
Drain to outboard side of road (skew
4" diameter non-perforated outlet pipe.
embankment benching
See Special 204-A for control product, type 4
Place rolled erosion
See table this sheet
(geogrid reinforcement)
Type III
Reinforcement Geosynthetic, 1.5' max.
704.03(b)
Material
Backfill
Backfill Material 704.03(b) marker. Place post within 12" of the end of the pipe.
Mark the outlet of the outlet pipe with a 4' long post or other suitable
Geosynthetic, Type III (geogrid reinforcement).
Embankment Construction and 20720-0300, Reinforcement
Pay for Reinforced Soil Slope using pay items 20420-0000, pipes will not be measured seperately for payment.
Geotextile, Geocomposite sheet drain, granular backfill, and drainage reinforced soil slopes.
Refer to Section 261 for more information on constructing
Use granular backfill conforming to Subsection 703.03(a).
fittings conforming to Subsection 708.05(d).
Subsection 714.02. Furnish collector pipe, outlet pipe, and
Furnish geocomposite sheet drain meeting the requirements of coupling bands or as directed by CO.
Subsection 605.03. Secure the screen in place with standard
Cover the end of the outlet pipe with a screen according to spacing. Stagger outlet pipes between rows.
Outlet geocomposite drainage at low points at 50' max for a 5' wide strip) according to Subsection 605.05.
spacing X to achieve a 25%-35% coverage (example: X = 11.5'
Place geocomposite sheet drains in 3' minimum wide strips with to the far edge of subgrade of the roadway.
Extend top 3 layers of primary reinforcement from the face of slope
Face of slope may be adjusted by the CO to suit field conditions.
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts G s p A .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
4.
3.
2.
1.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
SPAN x RISE
SIZE
PIPE ARCH
SIZE
PIPE ARCH
SPAN x RISE DIAMETER
VALENT
EQUI-
RADIUS
CORNER
MINIMUM
COVER
MINIMUM
COVER
MINIMUM
DIAMETER
SIZE
PIPE
SIZE
PIPE
DIAMETER COVER
MINIMUM
ALUMINUMSTEEL
of camber or increase the pipe culvert gradient.
elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet
When directed, camber pipe culverts upward pavement for both flexible and rigid pavement.
from the top of the pipe to the top of the rigid pavements. Measure maximum fill height pavements, and to the top of the pavement for pipe culvert to the subgrade for flexible
Measure minimum cover from the top of the corrugation pipe.
Obtain approval before furnishing annular of helical lockseam and welded seam pipe.
corrugations are more restrictive than those
Fill heights for culvert pipe with annular lockseam and welded seam pipe only.
The fill heights in the table are for helical special analysis by the CO.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
T1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Bucks Lake Road
CA FLAP PLU CR411(1)
CA
U
C
A p lu c r R o a d w a y C
A D
D S h e e ts T S td
.d g n
P
M
J u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
2.
1.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Stab type joint
Smoother sleeve with center stop.
DIAMETER
ROUND PIPE
SPAN × RISE
PIPE ARCH
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge be used.
Highway Bridges, Division II Section 26 may criteria of AASHTO Standard specifications for devices that comply with the joint performance
Other types of coupling bands or fastening specified in the Special Contract Requirements.
Watertight pipe joints are not required unless of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as [1]
For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the [2] dimension of the end corrugation in the pipe.
[1]COUPLING BANDS FOR METAL PIPE CULVERT
Use annular corrugated bands with pipes having annular corrugations or with helical pipe [3] the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
CORRUGATED
ANNULAR
CORRUGATED
HELICALLY
[4]BANDS
CORRUGATED
SEMI-
[2]SIZE
[3]BANDS [5]BANDS
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
602-2
REVISED: 4/1994 6/2005
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
STATE PROJECT
NUMBER
SHEET
T2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Bucks Lake Road
CA FLAP PLU CR411(1)
CA
U
C
A p lu c r R o a d w a y C
A D
D S h e e ts T S td
.d g n
J u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
[6]underdrain
Use helical corrugated bands with pipes having helically corrugated ends.[4]
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
See Section 704 for bedding and backfill requirements.
dimension of all pipe arch culverts.
H equals the diameter of all round pipe culverts or the rise amount of camber or increase the pipe culvert gradient.
designed exceeds the elevation of the inlet invert, reduce the curve. If the midpoint elevation on the parabolic curve as to 1% of the pipe length. Develop camber on a parabolic through the inlet and outlet inverts an ordinate amount equal
When directed, camber pipe culverts upward from a chord
3.
2.
1.
be adjusted to tie into impervious material.
granular material is used for backfill. Width may material at the pipe culvert inlet where
Construct piping plug of impermeable backfill
MULTIPLE PIPE INSTALLATION
PIPING PLUG
TRENCH EXCAVATION IN EMBANKMENT
BELOW NATURAL GROUND OR
ON UNSTABLE MATERIAL
NATURAL GROUND
ABOVE AND BELOW
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
or SPAN
DIAMETER
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H whichever is less
Half diameter or
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2014
REVISED: 4/1994 6/2005
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth. Or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
STATE PROJECT
NUMBER
SHEET
T3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Bucks Lake Road
CA FLAP PLU CR411(1)
CA
U
C
A p lu c r R o a d w a y C
A D
D S h e e ts T S td
.d g n
J u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
DRAFT: 10/2007
REVISED: 4/1994 6/2005
602-4
METAL END SECTIONS
" bolts8 3spacing for " bolts8
3spacing for
35" x 24" thru 66" x 51" pipe arch
For 30" thru 60" round pipe and
17" x 13" thru 28" x 20" pipe arch
For 12" thru 24" round pipe and
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
0.060
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
INCHES
SPAN x RISE
PIPE SIZE METAL THICKNESS
STEEL ALUMINUM
INCHES GAGE INCHES GAGE
INCHES
DIMENSIONS
L (±2")
" rivets or bolts. Fabricate end section 8 3joined by
On end section center panels for 66" and larger
0.135 inch aluminum.
and equivalent pipe arch from 0.138 inch steel or center panels for 60" and larger diameter pipe
" angle4 1" x 2
1" x 22 1equivalent pipe arch provide 2
60" and larger diameter pipe and 66" and larger
" stiffener 4 1" x 2
1" x 22 1equivalent pipe arch with 2
(INCHES)
DIAM.
VALENT
EQUI-
INCHES
DIAMETER
PIPE SIZE
STEEL
METAL THICKNESS
INCHES GAGE
ALUMINUM
INCHES GAGE
INCHES
DIMENSIONS
L (±2") m in
" 2
12" (max.) hole m in
12" (max.) hole lap after expansion
1" Minimum
13" for 30" dia. and over.
culvert less than 30" dia.
7" for concrete pipe
" bolts8 3flared end section with at 6" centers (max.) or equivalent
T4
8.
7.
6.
5.
3.
2.
1.
ROUND OR PIPE ARCH CULVERT
PIPE ARCH CULVERTROUND PIPE CULVERT
OR OUTLET END OF CONCRETE PIPE
CONNECTION TO METAL PIPE
DESIGN C
PIPE INLET END
CONNECTION TO CONCRETE
DESIGN B
CORRUGATED METAL PIPE
CONNECTION TO ANNULAR
DESIGN A
SECTION A-APLAN
ELEVATION ELEVATION
Slope
Toe plateToe plate riveted or welded connection
For all sizes of round pipe and pipe arch diameter
Span or
B
L
AWA
End Section
SpanR is e
Di am et er edge
Reinforced
Pay Limit
Pipe Culvert Toe plate extension
(min. width A+W)
Toe plate extension
Corner plate
(min. width A+W)
Toe plate extension
Corner plate
Reinforced edge
Pipe coupling band shop bolted to
End section
Pipe culvert
Expander lug End section steel or aluminum pipe
Smooth galvanized
Bolted or welded
Threaded rod
Rod holder connector
Flat strap Pipe culvert Pipe culvert
End section End section
Strap bolt
Pivot bolt
END SECTIONS FOR ROUND PIPE CULVERT
END SECTIONS FOR PIPE ARCH CULVERT
A (min) B (max) H (min) W (max) Approx.
SLOPE
A (min) B (max) H (min) W (max) Approx.
SLOPE
H H
NOTE:
NO SCALE
A
A
Fabricate multiple piece bodies with lap seams tightly acceptable type for the pipe culvert specified.
pipe culvert sizes. Coupling bands may be any
Design C may be used in lieu of design A for all metal match the inside diameter of the concrete pipe culvert.
Fabricate the diameter of the end section of Design B to allow for manufacturer's standards.
Variations in design and dimensions are permitted to
Supplement the reinforced edges of end sections for panel seam.
reinforcement bolted or riveted under the center flared end sections.
Warp embankment slopes to match the slope of the body. Use toe plate extension where shown on the plans.
extensions from the same metal thickness as the panel
Fabricate connector section, corner plate and toe plate angles attached with bolts or rivets.
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts T S td
.d
FEDERAL LANDS HIGHWAY OFFICE
U.S. CUSTOMARY STANDARD
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
ELEVATION
RAIL ELEMENT SPLICE DETAIL
2" 2"
ELEVATION
PLAN
c) b) a)
RAIL ELEMENT
SECTION THRU
SECTION A-A
TYPICAL STEEL LINE
POST INSTALLATION
10°
GROUND LINE
OR SHOULDER
SURFACING
Connect the over lapped end of the rail elements with are to be used at each rail splice connection.
The ends of the rail elements are to be overlapped in the direction of traffic (see details).
Where end cap is to be attached to the end of a rail element, a total of 4 of the above described splice bolts and nuts are to be used.
6'-3"
ABOUT
SYMMETRICAL
5/8" DIA. X 1-3/8" button head oval shoulder splice bolts
NOTCHED WOOD BLOCK OR NOTCHED
RAIL ELEMENTS SPLICED AT 12'-6" INTERVALS
inserted into the 29/32" x 1-1/8" slots and bolted together
S E
E
AND NOTCHED WOOD OR NOTCHED RECYCLED PLASTIC BLOCKS
POST
RAIL SPLICE
RAIL SPLICE
0.108" NOMINAL
TOP OF RAIL
BUTTON HEAD BOLT
TO POST AND BLOCK
TO CONNECT RAIL
ELEMENT TO WOOD BLOCK AND
STEEL POST WITH BOLT ON TRAFFIC
APPROACH SIDE OF POST WEB.
NO WASHER ON RAIL FACE FOR
TOP OF RAIL
BOLTED CONNECTION TO LINE POST
UNDER RAILING,
W6 x 8.5 OR W6 x 9
MIDWEST GUARDRAIL SYSTEM WITH STEEL POSTS
DIRECTION OF TRAFFIC
LAP RAIL ELEMENTS IN
6'-3"
SLOT PATTERN IN
• ƒ" x 2•" BOLT
RAIL ELEMENT
SLOT PATTERN IN
SLOT PATTERN IN
POST
POST
A
6" x 12" x 1'-2"
STEEL POST, 6'-0" LENGTH
T5
STANDARD RAILING SECTION
MIDWEST GUARDRAIL SYSTEM
Adapted from Caltrans plan A77L2
2"
3"
"4
NO SCALE
placed front and rear
Reflective sheeting
Notched face of block faces steel post.
3.
10.
NOTES:
see Revised Standard Plan RSP A77M1.
For details of standard hardware used to construct MGS, construct MGS, see Revised Standard Plan RSP A77N2.
For details of steel posts and notched wood blocks used to except as otherwise noted.
MGS post spacing to be 6'-3" center to center, A77R Series of Standard Plans.
For MGS typical layouts, see the A77P, A77Q and use 31" height terminal system end treatment.
If railing is connected to terminal system end treatment, Sheet 1 of 6
RSP A77S1.
For MGS end anchor details, see Revised Standard Plans and post. See "Section Thru Rail Element".
Slotted hole for bolted connection of rail element to block element. See "Section Thru Rail Element".
Slotted holes for splice bolts to overlap ends of rail post. Alternate reflector tab shapes are acceptable.
Install reflector tab between post bolt and rail, every fourth
REFLECTOR TAB
10.
C 3/4" X 2-1/2" BOLTL
LC
LC LC
C 3/4" X 2-1/2" BOLTL
RAIL ELEMENT LENGTH = 13'- 6-1/2"
3-1/4"
3-3/16"
1/16" TOLERANCE
1-1/16"
R=15/16"
1-17/32"
R=15/16"
LC
LC
RAIL SPLICE ANDLC
SLOT FOR 5/8" DIA.
1'- 1/2"
4-1/4"
4-1/4"
1-3/4"
3/4" x 2-1/2" SLOT
29/32" x 1-1/8" SLOTS toward rail element. A total of 8 bolts and nuts with 5/8" DIA. recessed hex nuts. Recess of hex nut points
WITH Hex NUT. ATTACH RAIL
5/8" DIA. BUTTON HEAD BOLT
6.
9.
SEE NOTE 8
SEE NOTE 9
SEE NOTE 9
SEE NOTE 8
SEE NOTE 9
N O
T E
PLASTIC BLOCK, SEE NOTES 2 AND 7
SURFACING UNDER RAIL ELEMENT,
GROUND LINE OR SHOULDER
617-A
11.
11.
FHWA Eligibility letter B-243-A.
Use non-blocked MGS with steel posts throughout project per
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts T s p A r s p a l2 .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
T6
Adapted from Caltrans plan A77M1
Sheet 2 of 6
ELEVATION
TAPER
2"
PLAN
(TYPE A)
END CAP
L
2"
10"
** For nested rail applications.
18"
20"
** 19"
22"
ABOUT
SYMMETRICAL
CL
6'-3"
2" Typ
ELEMENT SECTION
SAME SHAPE AS RAIL
NOMINAL THICKNESS
0.108"
1'-0"
1'-0"
9"
SEE NOTE 1
TYPICAL RAIL ELEMENT
26"
36"
4" Min THREAD LENGTH
2" Min THREAD LENGTH
4" Min THREAD LENGTH
4" Min THREAD LENGTH
4" Min THREAD LENGTH
4" Min THREAD LENGTH
4" Min THREAD LENGTH
4" Min THREAD LENGTH
FULL THREAD LENGTH
FULL THREAD LENGTH
THREAD LENGTH
BUTTON HEAD BOLT
STANDARD HARDWARE
MIDWEST GUARDRAIL SYSTEM
of rail element.
Slotted holes for splice bolts to overlap ends
13'- 6-1/2"
3'- 1-1/2" 3'- 1-1/2"
1'- 1/4"
SLOT Typ
3/4" X 2-1/2"
Typ
4-1/4"
Typ
4-1/4"
5/8" DIA. RECESS NUT 5/8" DIA. BUTTON HEAD BOLT
BOTH SIDES
DEEP RECESS ONE OR
15/16" DIA. X 1/16"
1-1/4" 5/8"
5/16"
7/32"
OR 1-7/16"
1-5/16"
15/16" [(+) 1/16" (-) 1/4"]
1-3/8"
** 2-3/4"
SLOTTED HOLES
1-1/4" X 2-1/4"
8-1/2"
SLOTTED HOLES, Typ
29/32" X 1-1/8"
617-A
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts T s p A r s p a
M .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
T7
Adapted from Caltrans plan A77N2
Sheet 3 of 6
STEEL POST
SIDE FRONT
TOP
CL
SIDE FRONT
TOP
NOTCHED WOOD BLOCK
STEEL POST
SIDE FRONT
TOP
SIDE FRONT
TOP
NOTCHED WOOD BLOCK
See Notes 2 and 3
6"
8"
W6 x 15
See Note 4
SEE NOTE 1
S
O
T
SEE NOTE 1
W6 x 9 OR W6 x 8.5
8" x 12"
12"
12"
6" x 12"
See Note 5 See Notes 2 and 3
SIDE FRONT
TOP
NOTCHED WOOD BLOCK
8"
6"
6" x 8"
SIDE FRONT
TOP
NOTCHED WOOD BLOCK
8" x 8"
8"
8"
BLOCK DETAILS
STEEL POST AND WOOD
MIDWEST GUARDRAIL SYSTEM
All holes in steel post shall be 13/16" Dia maximum.
Dimensions shown for wood block are nominal.
Notched face of block faces steel post.
shield fixed objects.
strengthened line post sections of MGS are warranted to line post sections of MGS on narrow roadways and where
This post and 8" x 12" block combination to be used for
1-1/8"
1-1/8"
1-3/4"
7/8" 4-1/4" 7/8"
BOLT HOLE
3/4" +/- 1/16"
7/8" 4-1/4" 7/8"
BOLT HOLE
3/4" +/- 1/16"
1-3/4"
7/8" 6-1/4" 7/8"
BOLT HOLE
3/4" +/- 1/16"
7/8" 6-1/4" 7/8"
BOLT HOLE
3/4" +/- 1/16"
2-3/4" 2-3/4"
CL
1-1/8"
1-1/8" installation.
6'-0" length posts to be used for typical roadway guard railing.
Only for use with metal beam guard railing.
Only for use with metal beam
617-A
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts T s p A r s p a
N .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
T8
Adapted from Caltrans plan A77P1
Sheet 4 of 6
W/16
W/16 W/4
W/4
TYPICAL PARABOLIC LAYOUT
Y
PARABOLIC FLARE OFFSETS
ES
POINT
HINGE
ES
POINT
HINGE Min
10'-0"
OFFSET LINE OF TRAVELED WAY
EDGE OF PAVED SHOULDER OR
•L
•L
L/4
LÄ
WXÄ
Y=
TYPICAL FLARE OFFSETS
6'-3" 6'-3" 6'-3" 6'-3"
6'-3" 6'-3" 6'-3" 6'-3"
6'-3" 6'-3" 6'-3" 6'-3"
6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3"
6'-3" POST SPACING
LENGTH OF FLARE
25'-0"
25'-0" PARABOLA
Min
10'-0"
Min
10'-0"
OF END POST
FRONT FACE
FLATTER SLOPE
10:1 OR
CENTER OF END POST
HINGE POINT 6:1 TAPER
FRONT FACE OF END POST
HINGE POINT
10:1 OR FLATTER SLOPE
6:1 TAPER
HINGE POINT
CENTER OF END POST
HINGE POINT
HINGE POINT
BEGIN 15:1 OR FLATTER FLARE
BEGIN PARABOLA
FOR 15:1 FLARE
1'-0" Max OFFSET
IN CUT SLOPE
BURY END OF RAIL
BASE LINE
BEGIN FLARE
BEGIN PARABOLA
3" OFFSET
END PARABOLA
BASE LINE
1'-0" OFFSET
FOR 1 FOOT Max END OFFSET
OFFSET LINE OF EDGE OF TRAVELED WAY)
BASE LINE (EDGE OF PAVED SHOULDER OR
L = LENGTH OF FLARE
X = DISTANCE ALONG BASE LINE
W = MAXIMUM OFFSET
Y = OFFSET FROM BASE LINE
T y p
ES
M i n
M i n
M i n
M i n
T y p
M i n
T y p
X
HINGE POINT OFFSET DETAILS
LINE POST EMBEDMENT AND
MIDWEST GUARDRAIL SYSTEM
Revised Standard Plan RSP A77T2.
For details of the buried post end anchor used with Type MGS-BAT Layout, see should be a length equal to multiples of 12'-6".
MGS within the 15:1 or flatter flare is based on site conditions and the paved shoulder or offset line of edge of the traveled way. The length of
The 15:1 or flatter flare used with buried end anchors is based on the edge of spacing) may be advisable.
of additional MGS (length equal to multiples of 12'-6" with 6'-3" post
Dependent on site conditions (embankment height and side slope), construction
Project Plans.
The type of 31" terminal system end treatment to be used will be shown on the will not accommodate a flared end treatment.
31" in-line terminal system end treatments are used where site conditions where applicable and when specified.
be used for 6" x 8" x 6'-0" wood post with 6" x 12" x 1'-2" wood blocks with 6" x 12" x 1'-2" notched wood blocks or recycled plastic blocks may
6" x 12" x 1'-2" wood blocks. W6 x 8.5 or W6 x 9 steel posts, 6'-0" in length, Except as noted, line posts are 6" x 8" x 6'-0" wood with otherwise noted.
MGS post spacing to be 6'-3" center to center, except as
Plans RSP A77L2, RSP A77M1 and RSP A77N2.
Line post, blocks and hardware to be used are shown on Revised Standard
6.
TERMINAL SECTION
TYPE MGS TANGENT
TERMINAL SECTION
TYPE MGS FLARED
TERMINAL SECTION
TYPE MGS-BAT
3/4" OFFSET
6-3/4" OFFSET
SEE NOTES 4 AND 5
CALTRANS APPROVED 31" IN-LINE TERMINAL SYSTEM END TREATMENT
at traffic approach end of railing)
(Embankment MGS installation with 31" in-line end treatment
(TYPE SFT)
END ANCHOR ASSEMBLY
(TYPE SFT)
END ANCHOR ASSEMBLY
(TYPE SFT)
END ANCHOR ASSEMBLY
SEE NOTE 6
SEE NOTE 6
SEE NOTE 5
CALTRANS APPROVED 31" FLARED TERMINAL SYSTEM END TREATMENT
NOTE 6
SEE
at traffic approach end of railing)
(Embankment MGS installation with 31" flared end treatment at traffic approach end of railing)
(Embankment MGS installation with buried end anchor treatment
SEE NOTE 7
15:1 OR FLATTER FLARE,
ANCHOR, SEE NOTE 8
BURIED POST END
617-A
STATE PROJECT
P
M N C
A p lu c r R o a d w a y C
A D
D S h e e ts T s p A r s p a P .d
U s e r L e s li e .D e W it t_
NUMBER
SHEET
CA
T9
Adapted from Caltrans plan A77S1
Sheet 5 of 6
CABLE CONNECTION
END PLATE
4"
PLAN
END PLATE
CONNECTION
CABLE
SOIL PLATE (WOOD POST SHOWN)
LINE POST
ELEVATION
A
A
RAIL
TOP OF
END ANCHOR
6"
1'-4" 1'-0"
6'-3"
PAVEMENT OR
GROUND LINE
SOIL PLATE
SECTION A-A
LINE
OR GROUND
PAVEMENT
WOOD POST
TOP OF
WOOD POST
ATTACH STEEL SOIL PLATE
TO STEEL FOUNDATION TUBE
HEAD BOLTS WITH Hex NUTS
(13/16" DIA, HOLES IN PLATE AND
IN TWO SIDES OF THE TUBE
DETAIL "A"
SEE DETAIL "A"
5/8" DIA, x 9-1/2" Hex HEAD
WITH 5/8" DIA, x 7-1/2" Hex
5‚"
ASSEMBLY (TYPE SFT)
MGS PAY LIMITEND ANCHOR ASSEMBLY (TYPE SFT) PAY LIMIT
RAIL ELEMENT
END ANCHOR ASSEMBLY
MIDWEST GUARDRAIL SYSTEM
P 8" x 8" x 5/8"L 1-1/8" DIA, HOLE
7-1/4" 7-1/4" x 5-1/4" x 3'- 6-5/8"
BOLTED CONNECTION TO POST
END. NO WASHER ON RAIL FACE FOR
Hex NUT AND WASHER ON THREADED
5/8" DIA, BUTTON HEAD BOLT WITH
3/4" +/- 1/16" HOLE IN
HEAD BOLT ATTACHMENT
WOOD POST FOR 5/8" DIA, Hex
PLATE, 18" x 24"
SOIL PLATE 1/4" THICK STEEL
TO ACCOMMODATE Hex BOLT)
SEE NOTE 1
TUBE TS 8 x 6 x 3/16
4'-6" STEEL FOUNDATION
5/8" DIA, Hex HEAD BOLTS
BOLT WITH Hex NUT AND WASHER
2-3/8" DIA, HOLE IN WOOD POST
2" DIA. Std Galv PIPE IN
3/4"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .