Q A.pdf

PDF 95 KB Posted

Attached to
AZ FLAP 89(1) Flagstaff-Vista Overlook
Solicitation number
DTFH6816B00002
Issued by

About this file

Responses to Questions (RFI's)

View the file

Other files

File Type Posted
Bid_Tabs_Summary.pdf PDF
Bid_Opening_Summary.pdf PDF
Q A_12-17-15.pdf PDF
A001_SF30.pdf PDF
Q A_12-10-15.pdf PDF
Appendix_D_401_Certification.pdf PDF
Appendix_E_404_Permit.pdf PDF
Appendix_G_Sample_Subcontracting_Plan.pdf PDF
Appendix_C_Plans.pdf PDF
DTFH6816B00002.pdf PDF
Appendix_B_USFS_Fire_Plan.pdf PDF
Appendix_F_Encroachment_Permit.pdf PDF
Physical_Data_-_Pavements_ _Materials_Report.pdf PDF
Appendix_A_Utilities.pdf PDF
Physical_Data_-_Final_Hydraulic_Report.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTFH6816B00002

AZ FLAP 89(1)

FLAGSTAFF – VISTA OVERLOOK

11/23/15 Question 1:

Note #3 on Sheet B13 of the plans for the DTFH6816B00002 Flagstaff Overlook project references a Geotech Report, there was not a report posted on the FBO website, will one be made available?

Response: All information is located in the Pavement & Materials Report attached in FBO.

Question 2:

I have a question regarding Line Item 24 –“Roadway Excavation 145,000 CUYD”.

I find no Embankment Line Item in the Bid schedule, nor directions for what you desire done with the excavated materials.

How do you want to pay for embankment work? Your clarification is appreciated.

Response: Please refer to FP-03 Section 204.10 “Incorporate only suitable roadway excavation material into the embankment.

12/01/15 Question 3:

Please clarify completion time. Per Section 108.01, page E-21, “The contract completion date for Schedule A is September 30, 2016”. What is the completion date if Schedule A and Options X & Y are awarded?

Response: If awarded, options will be exercised in time frame provided in the solicitation. The Option work is to be completed within the same completion time as the Schedule A as this is all concurrent work that can be performed within the overall schedule A. Changes to the completion date will be evaluated after NTP.

12/02/15 Question 4:

Please provide and estimated date for NTP?

Response: Estimated NTP date is early January.

Question 5:

Please provide the contract time and completion date for options X and Y respectively. Only Schedule “A” is currently listed.

Response: The contract completion date includes and assumes that all options will be awarded. Work for the options is staggered within the overall Schedule A completion time frame.