Q-A _12-17.pdf
PDF 106 KB Posted
- Attached to
- SD FLAP CR223801(1), Norris Peak Road
- Solicitation number
- DTFH6815B00031
About this file
Q-A revised 12/17
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| 215-096_Norris_Peak_Road_Geotechnical_Report_11.02.15-final.pdf | ||
| DTFH6815B00031.pdf | ||
| Norris_Peak_Road_Realignment_Hydraulics_Report_08-18-2015_Signed.pdf | ||
| Plan_Sheets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTFH6815B00031 Revised 12/17/15
SD FLAP CR223801(1)
12/8/15
QUESTION #1
What is the warranty period for this project?
Response: No warranty period on this project.
12/14/15
QUESTION #2
Are there any plan sheets for Option Y or Option Z?
Response: Options Y and Z are the T sheets of the plan package.
QUESTION #3
Will a construction traffic light system be permissible in lieu of a pilot car?
Response: A traffic light system would be allowable if the delays to pubic traffic meet the maximum 30 minutes per passage through the project as required by the contract.
QUESTION #4
Will Contractor ever be allowed a full road closure of Norris Peak Road?
Response: A full road closure is not assumed to be permissible at this time.
QUESTION #5
On the Option Z bid schedule, the “Roadway Aggregate, Method 2” bid item has Cubic Yards for the unit of measure. On all other bid schedules, roadway aggregate has a unit of measure in tons. Please verify the unit of measure for roadway aggregate on Option Z.
Response: There was an error in the unit of measure on Option Z, see amendment A001.
QUESTION #6
Do you have a table of cut and fill volumes (or end-areas) available for each cross-section in the plans?
Response: Unfortunately we do not.
QUESTION #7
Are there any water sources that has been permitted and or approved for the Norris Peak Road project?
For all parts: A, X,Y, and Z. If so what are their locations and will there be a fee associated with it.
Response: No there are no water sources that have been permitted or approved for the project.