Q-A _12-17.pdf

PDF 106 KB Posted

Attached to
SD FLAP CR223801(1), Norris Peak Road
Solicitation number
DTFH6815B00031
Issued by

About this file

Q-A revised 12/17

View the file

Other files

File Type Posted
Bid_Tabs.pdf PDF
Bid_Opening_Summary.pdf PDF
A002.pdf PDF
A001.pdf PDF
215-096_Norris_Peak_Road_Geotechnical_Report_11.02.15-final.pdf PDF
DTFH6815B00031.pdf PDF
Norris_Peak_Road_Realignment_Hydraulics_Report_08-18-2015_Signed.pdf PDF
Plan_Sheets.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTFH6815B00031 Revised 12/17/15

SD FLAP CR223801(1)

12/8/15

QUESTION #1

What is the warranty period for this project?

Response: No warranty period on this project.

12/14/15

QUESTION #2

Are there any plan sheets for Option Y or Option Z?

Response: Options Y and Z are the T sheets of the plan package.

QUESTION #3

Will a construction traffic light system be permissible in lieu of a pilot car?

Response: A traffic light system would be allowable if the delays to pubic traffic meet the maximum 30 minutes per passage through the project as required by the contract.

QUESTION #4

Will Contractor ever be allowed a full road closure of Norris Peak Road?

Response: A full road closure is not assumed to be permissible at this time.

QUESTION #5

On the Option Z bid schedule, the “Roadway Aggregate, Method 2” bid item has Cubic Yards for the unit of measure. On all other bid schedules, roadway aggregate has a unit of measure in tons. Please verify the unit of measure for roadway aggregate on Option Z.

Response: There was an error in the unit of measure on Option Z, see amendment A001.

QUESTION #6

Do you have a table of cut and fill volumes (or end-areas) available for each cross-section in the plans?

Response: Unfortunately we do not.

QUESTION #7

Are there any water sources that has been permitted and or approved for the Norris Peak Road project?

For all parts: A, X,Y, and Z. If so what are their locations and will there be a fee associated with it.

Response: No there are no water sources that have been permitted or approved for the project.