Bid_Tabs.pdf
PDF 43 KB Posted
- Attached to
- SD FLAP CR223801(1), Norris Peak Road
- Solicitation number
- DTFH6815B00031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| Q-A _12-17.pdf | ||
| 215-096_Norris_Peak_Road_Geotechnical_Report_11.02.15-final.pdf | ||
| DTFH6815B00031.pdf | ||
| Norris_Peak_Road_Realignment_Hydraulics_Report_08-18-2015_Signed.pdf | ||
| Plan_Sheets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S
Schedule A Total of Bid Items: 1,789,750.00$ 30.3% 2,331,953.35$ 82.5% 3,265,419.00$ 86.3% 3,333,775.00$ 112.9% 3,809,616.51$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 188,725.00$ 188,725.00$ 512,000.00$ 400,000.00$ 330,000.00$ 1,145,000.00$
15206-0000 Line A0040 0.742 MILE 15,000.00$ 11,130.00$ 9,275.00$ 11,130.00$ 25,970.00$ 12,391.40$
15215-3000 Line A0060 6 EACH 1,600.00$ 9,600.00$ 1,080.00$ 6,000.00$ 24,000.00$ 7,740.00$
15216-2000 Line A0080 1.484 MILE 15,000.00$ 22,260.00$ 16,175.60$ 16,324.00$ 59,360.00$ 3,620.96$
15301-0000 Line A0100 ALL LPSM 25,000.00$ 25,000.00$ 74,000.00$ 250,000.00$ 75,000.00$ 71,635.00$
15401-0000 Line A0120 ALL LPSM 25,000.00$ 25,000.00$ 40,000.00$ 145,000.00$ 40,000.00$ 66,730.00$
15501-0000 Line A0140 ALL LPSM 10,000.00$ 10,000.00$ 6,000.00$ 42,000.00$ 10,000.00$ 20,125.00$
15705-1400 Line A0160 5,000 LNFT 10.00$ 50,000.00$ 25,000.00$ 15,000.00$ 25,000.00$ 51,500.00$
15706-0200 Line A0180 40 EACH 150.00$ 6,000.00$ 22,400.00$ 10,000.00$ 20,000.00$ 22,800.00$
15706-1600 Line A0200 2 EACH 3,000.00$ 6,000.00$ 16,000.00$ 3,600.00$ 15,000.00$ 5,100.00$
15802-0000 Line A0220 ALL LPSM 20,000.00$ 20,000.00$ 16,000.00$ 100,000.00$ 55,000.00$ 25,750.00$
20102-0000 Line A0240 ALL LPSM 40,000.00$ 40,000.00$ 65,000.00$ 150,000.00$ 200,000.00$ 51,500.00$
20304-1000 Line A0260 ALL LPSM 10,000.00$ 10,000.00$ 13,000.00$ 35,000.00$ 4,000.00$ 5,150.00$
20401-0000 Line A0280 37,800 CUYD 11.00$ 415,800.00$ 453,600.00$ 945,000.00$ 1,323,000.00$ 856,170.00$
20402-0000 Line A0300 1,000 CUYD 20.00$ 20,000.00$ 70,000.00$ 1,000.00$ 50,000.00$ 25,750.00$
21101-1000 Line A0320 1,325 SQYD 4.00$ 5,300.00$ 728.75$ 5,300.00$ 39,750.00$ 13,647.50$
25101-2200 Line A0340 85 CUYD 110.00$ 9,350.00$ 6,375.00$ 14,450.00$ 13,175.00$ 17,510.00$
25101-2300 Line A0360 75 CUYD 130.00$ 9,750.00$ 5,625.00$ 13,125.00$ 11,625.00$ 15,450.00$
25101-2400 Line A0380 105 CUYD 125.00$ 13,125.00$ 6,825.00$ 19,950.00$ 16,275.00$ 21,630.00$
30101-0000 Line A0400 8,200 TON 25.00$ 205,000.00$ 229,600.00$ 262,400.00$ 262,400.00$ 380,070.00$
SURVEY AND STAKING, GRADE FINISHING STAKES
10,900.00$ 11,000.00$ 40,000.00$ 2,440.00$
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
SURVEY AND STAKING, DRAINAGE STRUCTURE
ROADWAY OBLITERATION, METHOD 1
PLACED RIPRAP, METHOD B, CLASS 2
PLACED RIPRAP, METHOD B, CLASS 3
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
SOIL EROSION CONTROL, CHECK DAM (RIPRAP)
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
PLACED RIPRAP, METHOD B, CLASS 4
AGGREGATE BASE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
SUBEXCAVATION
400,000.00$ 330,000.00$ 1,145,000.00$
Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SD
12,500.00$
512,000.00$
74,000.00$ 250,000.00$ 75,000.00$ 71,635.00$
15,000.00$ 35,000.00$ 16,700.00$
180.00$ 1,000.00$ 4,000.00$ 1,290.00$
5.00$ 3.00$ 5.00$ 10.30$
6,000.00$ 42,000.00$ 10,000.00$ 20,125.00$
40,000.00$ 145,000.00$ 40,000.00$ 66,730.00$
8,000.00$ 1,800.00$ 7,500.00$ 2,550.00$
560.00$ 250.00$ 500.00$ 570.00$
65,000.00$ 150,000.00$ 200,000.00$ 51,500.00$
16,000.00$ 100,000.00$ 55,000.00$ 25,750.00$
12.00$ 25.00$ 35.00$ 22.65$
13,000.00$ 35,000.00$ 4,000.00$ 5,150.00$
0.55$ 4.00$ 30.00$ 10.30$
70.00$ 1.00$ 50.00$ 25.75$
75.00$ 175.00$ 155.00$ 206.00$
75.00$ 170.00$ 155.00$ 206.00$
28.00$ 32.00$ 32.00$ 46.35$
65.00$ 190.00$ 155.00$ 206.00$
Engineer's Estimate
12/31/2015
Schedule A Total of Bid Items: 1,789,750.00$ 30.3% 2,331,953.35$ 82.5% 3,265,419.00$ 86.3% 3,333,775.00$ 112.9% 3,809,616.51$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SDEngineer's Estimate
40301-0100 Line A0420 3,650 TON 95.00$ 346,750.00$ 503,700.00$ 467,200.00$ 438,000.00$ 638,750.00$
41101-1000 Line A0440 20 TON 900.00$ 18,000.00$ 32,000.00$ 36,000.00$ 40,000.00$ 30,000.00$
41201-0000 Line A0460 7 TON 800.00$ 5,600.00$ 9,100.00$ 8,400.00$ 10,500.00$ 7,875.00$
60201-0600 Line A0480 55 LNFT 100.00$ 5,500.00$ 2,860.00$ 7,700.00$ 2,200.00$ 5,665.00$
60201-1000 Line A0500 320 LNFT 140.00$ 44,800.00$ 19,840.00$ 48,000.00$ 20,800.00$ 32,960.00$
60201-1200 Line A0520 270 LNFT 170.00$ 45,900.00$ 22,950.00$ 51,300.00$ 18,900.00$ 44,550.00$
60210-0600 Line A0540 2 EACH 500.00$ 1,000.00$ 250.00$ 1,200.00$ 1,000.00$ 1,648.00$
60210-1000 Line A0560 6 EACH 600.00$ 3,600.00$ 3,000.00$ 6,000.00$ 4,500.00$ 6,798.00$
60210-1200 Line A0580 4 EACH 1,750.00$ 7,000.00$ 5,000.00$ 8,000.00$ 6,000.00$ 6,592.00$
62201-0300 Line A0600 40 HOUR 110.00$ 4,400.00$ 4,000.00$ 3,400.00$ 2,000.00$ 4,520.00$
62201-0400 Line A0620 40 HOUR 120.00$ 4,800.00$ 4,000.00$ 3,600.00$ 2,400.00$ 4,080.00$
62201-0900 Line A0640 40 HOUR 130.00$ 5,200.00$ 4,600.00$ 3,800.00$ 3,600.00$ 3,680.00$
62201-1400 Line A0660 20 HOUR 190.00$ 3,800.00$ 3,200.00$ 3,600.00$ 2,500.00$ 3,900.00$
62201-2850 Line A0680 40 HOUR 160.00$ 6,400.00$ 6,800.00$ 7,400.00$ 5,000.00$ 4,160.00$
62201-3350 Line A0700 30 HOUR 160.00$ 4,800.00$ 4,500.00$ 5,700.00$ 3,750.00$ 3,960.00$
62301-0000 Line A0720 40 HOUR 50.00$ 2,000.00$ 2,400.00$ 2,000.00$ 1,000.00$ 1,640.00$
62302-1000 Line A0740 40 HOUR 120.00$ 4,800.00$ 10,400.00$ 4,400.00$ 6,000.00$ 5,160.00$
62302-1100 Line A0760 40 HOUR 180.00$ 7,200.00$ 7,400.00$ 5,000.00$ 6,000.00$ 4,960.00$
62407-0000 Line A0780 2,700 CUYD 13.00$ 35,100.00$ 18,900.00$ 37,800.00$ 48,600.00$ 55,620.00$
62510-2000 Line A0800 10.0 ACRE 2,000.00$ 20,000.00$ 5,250.00$ 9,000.00$ 20,000.00$ 10,300.00$
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL
SEEDING, HYDRAULIC METHOD
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
BULLDOZER, 250HP MINIMUM FLYWHEEL POWER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
END SECTION FOR 18-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
ASPHALT CONCRETE PAVEMENT, TYPE 1
PRIME COAT, METHOD 1
TACK COAT
18-INCH PIPE CULVERT
1,600.00$ 1,800.00$ 2,000.00$ 1,500.00$
138.00$ 128.00$ 120.00$ 175.00$
52.00$ 140.00$ 40.00$ 103.00$
1,300.00$ 1,200.00$ 1,500.00$ 1,125.00$
85.00$ 190.00$ 70.00$ 165.00$
62.00$ 150.00$ 65.00$ 103.00$
500.00$ 1,000.00$ 750.00$ 1,133.00$
125.00$ 600.00$ 500.00$ 824.00$
100.00$ 85.00$ 50.00$ 113.00$
1,250.00$ 2,000.00$ 1,500.00$ 1,648.00$
115.00$ 95.00$ 90.00$ 92.00$
100.00$ 90.00$ 60.00$ 102.00$
170.00$ 185.00$ 125.00$ 104.00$
160.00$ 180.00$ 125.00$ 195.00$
60.00$ 50.00$ 25.00$ 41.00$
150.00$ 190.00$ 125.00$ 132.00$
185.00$ 125.00$ 150.00$ 124.00$
260.00$ 110.00$ 150.00$ 129.00$
525.00$ 900.00$ 2,000.00$ 1,030.00$
7.00$ 14.00$ 18.00$ 20.60$
Schedule A Total of Bid Items: 1,789,750.00$ 30.3% 2,331,953.35$ 82.5% 3,265,419.00$ 86.3% 3,333,775.00$ 112.9% 3,809,616.51$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SDEngineer's Estimate
62515-3000 Line A0820 10.0 ACRE 3,000.00$ 30,000.00$ 31,000.00$ 50,000.00$ 50,000.00$ 61,800.00$
62901-0800 Line A0840 4,800 SQYD 6.00$ 28,800.00$ 8,640.00$ 14,400.00$ 9,600.00$ 24,720.00$
63301-0000 Line A0860 1 EACH 2,000.00$ 2,000.00$ 3,300.00$ 3,400.00$ 4,500.00$ 3,400.00$
63301-0000 Line A0880 10 EACH 650.00$ 6,500.00$ 4,500.00$ 3,500.00$ 6,000.00$ 3,850.00$
63309-0200 Line A0900 100 EACH 70.00$ 7,000.00$ 4,900.00$ 4,000.00$ 7,500.00$ 4,120.00$
63401-0300 Line A0920 31,100 LNFT 0.50$ 15,550.00$ 4,043.00$ 12,440.00$ 4,665.00$ 4,043.00$
63403-0200 Line A0940 110 SQFT 10.00$ 1,100.00$ 99.00$ 330.00$ 55.00$ 81.40$
63502-0500 Line A0960 2 EACH 200.00$ 400.00$ 120.00$ 30.00$ 150.00$ 103.00$
63502-1300 Line A0980 20 EACH 40.00$ 800.00$ 740.00$ 440.00$ 1,000.00$ 618.00$
63504-1000 Line A1000 170 SQFT 23.00$ 3,910.00$ 527.00$ 1,700.00$ 850.00$ 527.00$
63505-1000 Line A1020 0.75 MILE 10,000.00$ 7,500.00$ 2,250.00$ 1,500.00$ 1,500.00$ 1,931.25$
63506-0500 Line A1040 100 HOUR 40.00$ 4,000.00$ 6,000.00$ 3,300.00$ 2,500.00$ 4,100.00$
63506-0600 Line A1060 70 HOUR 50.00$ 3,500.00$ 7,000.00$ 5,600.00$ 3,150.00$ 4,235.00$
MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX
ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
SIGN SYSTEM (WITH SOLAR BEACON)
SIGN SYSTEM
DELINEATOR, TYPE 2
PAVEMENT MARKINGS, TYPE B, SOLID
PAVEMENT MARKINGS, TYPE B
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
1.80$ 3.00$ 2.00$ 5.15$
3,100.00$ 5,000.00$ 5,000.00$ 6,180.00$
450.00$ 350.00$ 600.00$ 385.00$
3,300.00$ 3,400.00$ 4,500.00$ 3,400.00$
0.13$ 0.40$ 0.15$ 0.13$
49.00$ 40.00$ 75.00$ 41.20$
60.00$ 15.00$ 75.00$ 51.50$
0.90$ 3.00$ 0.50$ 0.74$
3.10$ 10.00$ 5.00$ 3.10$
37.00$ 22.00$ 50.00$ 30.90$
60.00$ 33.00$ 25.00$ 41.00$
3,000.00$ 2,000.00$ 2,000.00$ 2,575.00$
100.00$ 80.00$ 45.00$ 60.50$
Option X Total of Bid Items: 650,543.75$ -11.4% 576,085.00$ 0.8% 655,490.00$ -8.9% 592,945.00$ 23.1% 800,621.75$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line X0020 ALL LPSM 70,428.75$ 70,428.75$ 56,500.00$ 65,000.00$ 25,000.00$ 165,000.00$
15201-0000 Line X0040 ALL LPSM 15,000.00$ 15,000.00$ 4,200.00$ 5,000.00$ 8,000.00$ 9,015.00$
15301-0000 Line X0060 ALL LPSM 16,000.00$ 16,000.00$ 24,700.00$ 35,000.00$ 12,000.00$ 21,530.00$
15401-0000 Line X0080 ALL LPSM 16,000.00$ 16,000.00$ 9,800.00$ 20,000.00$ 10,000.00$ 15,755.00$
15501-0000 Line X0100 ALL LPSM 10,000.00$ 10,000.00$ 3,150.00$ 10,000.00$ 2,000.00$ 14,385.00$
15705-1400 Line X0120 1,000 LNFT 7.00$ 7,000.00$ 6,000.00$ 3,000.00$ 3,000.00$ 10,300.00$
15802-0000 Line X0140 ALL LPSM 20,000.00$ 20,000.00$ 2,650.00$ 15,000.00$ 5,000.00$ 5,150.00$
20102-0000 Line X0160 ALL LPSM 8,000.00$ 8,000.00$ 12,000.00$ 20,000.00$ 4,000.00$ 12,360.00$
20304-1000 Line X0180 ALL LPSM 8,000.00$ 8,000.00$ 3,200.00$ 5,000.00$ 5,000.00$ 2,060.00$
20401-0000 Line X0200 2,700 CUYD 11.00$ 29,700.00$ 37,800.00$ 64,800.00$ 48,600.00$ 69,525.00$
25302-1000 Line X0220 8 CUYD 400.00$ 3,200.00$ 8,320.00$ 4,000.00$ 3,600.00$ 4,944.00$
30101-0000 Line X0240 1,965 TON 25.00$ 49,125.00$ 56,985.00$ 60,915.00$ 74,670.00$ 91,077.75$
40301-0100 Line X0260 775 TON 95.00$ 73,625.00$ 116,250.00$ 112,375.00$ 116,250.00$ 155,000.00$
41101-1000 Line X0280 5 TON 900.00$ 4,500.00$ 9,000.00$ 9,000.00$ 10,000.00$ 10,000.00$
41105-0000 Line X0300 20 TON 10.00$ 200.00$ 440.00$ 1,700.00$ 2,000.00$ 2,000.00$
41201-0000 Line X0320 1.1 TON 800.00$ 880.00$ 1,430.00$ 1,430.00$ 1,650.00$ 2,475.00$
60201-0800 Line X0340 73 LNFT 120.00$ 8,760.00$ 4,745.00$ 8,760.00$ 14,600.00$ 7,519.00$
60210-0800 Line X0360 2 EACH 800.00$ 1,600.00$ 1,300.00$ 1,300.00$ 4,000.00$ 4,120.00$
61701-1250 Line X0380 1,275 LNFT 50.00$ 63,750.00$ 51,000.00$ 51,000.00$ 76,500.00$ 42,712.50$
61702-0800 Line X0400 8 EACH 3,000.00$ 24,000.00$ 29,600.00$ 28,000.00$ 32,000.00$ 24,720.00$
Engineer's Estimate
3,700.00$ 3,500.00$ 4,000.00$ 3,090.00$
40.00$ 40.00$ 60.00$ 33.50$
650.00$ 650.00$ 2,000.00$ 2,060.00$
65.00$ 120.00$ 200.00$ 103.00$
1,300.00$ 1,300.00$ 1,500.00$ 2,250.00$
22.00$ 85.00$ 100.00$ 100.00$
1,800.00$ 1,800.00$ 2,000.00$ 2,000.00$
150.00$ 145.00$ 150.00$ 200.00$
29.00$ 31.00$ 38.00$ 46.35$
1,040.00$ 500.00$ 450.00$ 618.00$
14.00$ 24.00$ 18.00$ 25.75$
3,200.00$ 5,000.00$ 5,000.00$ 2,060.00$
12,000.00$ 20,000.00$ 4,000.00$ 12,360.00$
2,650.00$ 15,000.00$ 5,000.00$ 5,150.00$
6.00$ 3.00$ 3.00$ 10.30$
3,150.00$ 10,000.00$ 2,000.00$ 14,385.00$
5,000.00$ 8,000.00$ 9,015.00$
24,700.00$ 35,000.00$ 12,000.00$ 21,530.00$
Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SD
4,200.00$
56,500.00$ 65,000.00$ 25,000.00$ 165,000.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
TACK COAT
24-INCH PIPE CULVERT (CONCRETE)
END SECTION FOR 24-INCH PIPE CULVERT (CONCRETE)(WITH SAFETY BARS)
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
GABIONS, GALVANIZED OR ALUMINIZED COATED
AGGREGATE BASE
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A WOOD POSTS
TERMINAL SECTION TYPE TANGENT
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, FIBER ROLL
ASPHALT CONCRETE PAVEMENT, TYPE 1
PRIME COAT, METHOD 1
BLOTTER
CONTRACTOR TESTING
9,800.00$ 20,000.00$ 10,000.00$ 15,755.00$
Option X Total of Bid Items: 650,543.75$ -11.4% 576,085.00$ 0.8% 655,490.00$ -8.9% 592,945.00$ 23.1% 800,621.75$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SD
61708-1000 Line X0420 1,475 LNFT 50.00$ 73,750.00$ 45,725.00$ 44,250.00$ 44,250.00$ 37,981.25$
62201-0300 Line X0440 20 HOUR 110.00$ 2,200.00$ 2,500.00$ 1,800.00$ 1,000.00$ 2,260.00$
62201-0400 Line X0460 20 HOUR 120.00$ 2,400.00$ 2,000.00$ 1,800.00$ 1,200.00$ 2,040.00$
62201-0900 Line X0480 20 HOUR 130.00$ 2,600.00$ 2,300.00$ 1,900.00$ 1,800.00$ 1,840.00$
62201-2850 Line X0500 20 HOUR 160.00$ 3,200.00$ 3,500.00$ 3,600.00$ 2,500.00$ 2,080.00$
62301-0000 Line X0520 20 HOUR 50.00$ 1,000.00$ 1,200.00$ 800.00$ 600.00$ 820.00$
62302-1000 Line X0540 20 HOUR 120.00$ 2,400.00$ 2,600.00$ 2,400.00$ 4,000.00$ 2,580.00$
62302-1100 Line X0560 20 HOUR 180.00$ 3,600.00$ 3,700.00$ 2,400.00$ 4,000.00$ 2,480.00$
62407-0000 Line X0580 475 CUYD 13.00$ 6,175.00$ 3,800.00$ 6,650.00$ 8,550.00$ 12,231.25$
62510-2000 Line X0600 1.5 ACRE 2,800.00$ 4,200.00$ 975.00$ 1,350.00$ 3,000.00$ 2,317.50$
62515-3000 Line X0620 1.5 ACRE 4,000.00$ 6,000.00$ 5,700.00$ 7,500.00$ 10,500.00$ 10,815.00$
62520-0000 Line X0640 1.5 ACRE 2,000.00$ 3,000.00$ 465.00$ 1,350.00$ 1,500.00$ 1,545.00$
62901-0800 Line X0660 1,110 SQYD 6.00$ 6,660.00$ 2,220.00$ 3,330.00$ 2,220.00$ 5,716.50$
63301-0000 Line X0680 65 EACH 650.00$ 42,250.00$ 20,150.00$ 21,450.00$ 16,250.00$ 16,900.00$
63308-2000 Line X0700 5 EACH 170.00$ 850.00$ 215.00$ 300.00$ 200.00$ 180.00$
63309-0000 Line X0720 60 EACH 80.00$ 4,800.00$ 1,500.00$ 1,500.00$ 1,800.00$ 1,545.00$
63309-0200 Line X0740 5 EACH 70.00$ 350.00$ 185.00$ 200.00$ 175.00$ 154.50$
63316-1000 Line X0760 15 EACH 300.00$ 4,500.00$ 2,250.00$ 1,950.00$ 2,250.00$ 1,935.00$
63401-0300 Line X0780 3,200 LNFT 0.50$ 1,600.00$ 480.00$ 1,280.00$ 4,480.00$ 416.00$
63502-1300 Line X0800 100 EACH 40.00$ 4,000.00$ 1,800.00$ 2,100.00$ 2,000.00$ 1,545.00$ 18.00$ 21.00$ 20.00$ 15.45$
0.15$ 0.40$ 1.40$ 0.13$
150.00$ 130.00$ 150.00$ 129.00$
37.00$ 40.00$ 35.00$ 30.90$
25.00$ 25.00$ 30.00$ 25.75$
43.00$ 60.00$ 40.00$ 36.00$
310.00$ 330.00$ 250.00$ 260.00$
2.00$ 3.00$ 2.00$ 5.15$
310.00$ 900.00$ 1,000.00$ 1,030.00$
3,800.00$ 5,000.00$ 7,000.00$ 7,210.00$
650.00$ 900.00$ 2,000.00$ 1,545.00$
8.00$ 14.00$ 18.00$ 25.75$
185.00$ 120.00$ 200.00$ 124.00$
130.00$ 120.00$ 200.00$ 129.00$
60.00$ 40.00$ 30.00$ 41.00$
175.00$ 180.00$ 125.00$ 104.00$
115.00$ 95.00$ 90.00$ 92.00$
100.00$ 90.00$ 60.00$ 102.00$
125.00$ 90.00$ 50.00$ 113.00$
31.00$ 30.00$ 30.00$ 25.75$
MOTOR GRADER, 12 FOOT MINIMUM BLADE
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL
REMOVE AND RESET, GUARDRAIL
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
SEEDING, HYDRAULIC METHOD
DELINEATOR, TYPE 2
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
TEMPORARY TRAFFIC CONTROL, DRUM
MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX
FERTILIZER
ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
SIGN SYSTEM
OBJECT MARKER, TYPE 2
DELINEATOR (GUARDRAIL)
Option X Total of Bid Items: 650,543.75$ -11.4% 576,085.00$ 0.8% 655,490.00$ -8.9% 592,945.00$ 23.1% 800,621.75$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SD
63504-1000 Line X0820 880 SQFT 23.00$ 20,240.00$ 2,200.00$ 8,800.00$ 8,800.00$ 1,804.00$
63505-1000 Line X0840 0.5 MILE 10,000.00$ 5,000.00$ 1,550.00$ 1,000.00$ 1,500.00$ 1,287.50$
63506-0500 Line X0860 500 HOUR 40.00$ 20,000.00$ 30,000.00$ 16,500.00$ 12,500.00$ 20,500.00$ 60.00$ 33.00$ 25.00$ 41.00$
3,100.00$ 2,000.00$ 3,000.00$ 2,575.00$
2.50$ 10.00$ 10.00$ 2.05$
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Option Y Total of Bid Items: 355,000.00$ 124.1% 795,660.00$ 46.6% 520,300.00$ 49.2% 529,500.00$ 151.9% 894,158.50$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line Y0020 ALL LPSM 34,020.00$ 34,020.00$ 150,000.00$ 50,000.00$ 10,000.00$ 220,000.00$
15201-0000 Line Y0040 ALL LPSM 10,000.00$ 10,000.00$ 15,000.00$ 20,000.00$ 15,000.00$ 6,440.00$
15301-0000 Line Y0060 ALL LPSM 5,000.00$ 5,000.00$ 8,000.00$ 25,000.00$ 10,000.00$ 27,980.00$
15401-0000 Line Y0080 ALL LPSM 5,000.00$ 5,000.00$ 6,200.00$ 15,000.00$ 15,000.00$ 25,030.00$
15501-0000 Line Y0100 ALL LPSM 2,000.00$ 2,000.00$ 4,700.00$ 5,000.00$ 3,000.00$ 14,385.00$
15802-0000 Line Y0120 ALL LPSM 10,000.00$ 10,000.00$ 10,600.00$ 15,000.00$ 10,000.00$ 9,130.00$
20402-0000 Line Y0140 100 CUYD 20.00$ 2,000.00$ 12,500.00$ 5,000.00$ 2,000.00$ 6,560.00$
30202-2000 Line Y0160 8,500 TON 30.00$ 255,000.00$ 510,000.00$ 340,000.00$ 365,500.00$ 425,000.00$
30301-5000 Line Y0180 7.100 MILE 2,000.00$ 14,200.00$ 59,640.00$ 31,950.00$ 85,200.00$ 145,301.50$
62201-0400 Line Y0200 10 HOUR 120.00$ 1,200.00$ 1,000.00$ 900.00$ 600.00$ 1,020.00$
62201-2850 Line Y0220 10 HOUR 160.00$ 1,600.00$ 1,750.00$ 1,800.00$ 1,250.00$ 940.00$
62301-0000 Line Y0240 10 HOUR 50.00$ 500.00$ 600.00$ 400.00$ 300.00$ 410.00$
63502-1300 Line Y0260 20 EACH 40.00$ 800.00$ 800.00$ 400.00$ 2,200.00$ 720.00$
63504-1000 Line Y0280 160 SQFT 23.00$ 3,680.00$ 1,120.00$ 1,600.00$ 3,200.00$ 992.00$
63506-0500 Line Y0300 250 HOUR 40.00$ 10,000.00$ 13,750.00$ 8,250.00$ 6,250.00$ 10,250.00$
CONTRACTOR TESTING
6,200.00$ 15,000.00$ 15,000.00$ 25,030.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
SUBEXCAVATION
ROADWAY AGGREGATE, METHOD 2
AGGREGATE SURFACE RECONDITIONING
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH
MOTOR GRADER, 12 FOOT MINIMUM BLADE
GENERAL LABOR
CONSTRUCTION SCHEDULE
WATERING FOR DUST CONTROL
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
50,000.00$ 10,000.00$ 220,000.00$
Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SD
15,000.00$
150,000.00$
4,700.00$ 5,000.00$ 3,000.00$ 14,385.00$
20,000.00$ 15,000.00$ 6,440.00$
8,000.00$ 25,000.00$ 10,000.00$ 27,980.00$
60.00$ 40.00$ 43.00$ 50.00$
125.00$ 50.00$ 20.00$ 65.60$
10,600.00$ 15,000.00$ 10,000.00$ 9,130.00$
100.00$ 90.00$ 60.00$ 102.00$
8,400.00$ 4,500.00$ 12,000.00$ 20,465.00$
60.00$ 40.00$ 30.00$ 41.00$
175.00$ 180.00$ 125.00$ 94.00$
7.00$ 10.00$ 20.00$ 6.20$
40.00$ 20.00$ 110.00$ 36.00$
55.00$ 33.00$ 25.00$ 41.00$
Engineer's Estimate
Option Z Total of Bid Items: 645,000.00$ 99.2% 1,284,820.00$ 46.4% 944,550.00$ 45.9% 941,050.00$ 86.7% 1,204,068.00$ Project No: SD FLAP CR223801(1)
Project Name: Norris Peak Road CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000 Line Z0020 ALL LPSM 38,170.00$ 38,170.00$ 119,000.00$ 90,000.00$ 10,000.00$ 150,000.00$
15201-0000 Line Z0040 ALL LPSM 10,000.00$ 10,000.00$ 14,000.00$ 15,000.00$ 15,000.00$ 6,440.00$
15301-0000 Line Z0060 ALL LPSM 5,000.00$ 5,000.00$ 8,000.00$ 30,000.00$ 10,000.00$ 33,635.00$
15401-0000 Line Z0080 ALL LPSM 5,000.00$ 5,000.00$ 6,000.00$ 30,000.00$ 25,000.00$ 22,600.00$
15501-0000 Line Z0100 ALL LPSM 2,000.00$ 2,000.00$ 3,900.00$ 5,000.00$ 3,000.00$ 14,385.00$
15802-0000 Line Z0120 ALL LPSM 10,000.00$ 10,000.00$ 10,600.00$ 20,000.00$ 10,000.00$ 9,130.00$
20301-1900 Line Z0140 1 EACH 1,500.00$ 1,500.00$ 3,100.00$ 5,000.00$ 300.00$ 900.00$
20402-0000 Line Z0160 100 CUYD 20.00$ 2,000.00$ 15,000.00$ 4,000.00$ 2,000.00$ 6,600.00$
30202-2000 Line Z0180 17,000 TON 30.00$ 510,000.00$ 1,020,000.00$ 680,000.00$ 731,000.00$ 816,000.00$
30301-4000 Line Z0200 6.600 MILE 3,000.00$ 19,800.00$ 56,100.00$ 29,700.00$ 112,200.00$ 121,671.00$
60201-0800 Line Z0220 100 LNFT 150.00$ 15,000.00$ 6,000.00$ 14,000.00$ 5,000.00$ 5,310.00$
60201-1000 Line Z0240 50 LNFT 175.00$ 8,750.00$ 3,800.00$ 8,500.00$ 3,750.00$ 3,065.00$
62201-0400 Line Z0260 10 HOUR 120.00$ 1,200.00$ 1,200.00$ 900.00$ 600.00$ 1,020.00$
62201-2850 Line Z0280 10 HOUR 160.00$ 1,600.00$ 1,750.00$ 1,800.00$ 1,250.00$ 940.00$
62301-0000 Line Z0300 10 HOUR 50.00$ 500.00$ 700.00$ 400.00$ 300.00$ 410.00$
63502-1300 Line Z0320 20 EACH 40.00$ 800.00$ 800.00$ 400.00$ 2,200.00$ 720.00$
63504-1000 Line Z0340 160 SQFT 23.00$ 3,680.00$ 1,120.00$ 1,600.00$ 3,200.00$ 992.00$
63506-0500 Line Z0360 250 HOUR 40.00$ 10,000.00$ 13,750.00$ 8,250.00$ 6,250.00$ 10,250.00$
Engineer's Estimate
55.00$ 33.00$ 25.00$ 41.00$
7.00$ 10.00$ 20.00$ 6.20$
40.00$ 20.00$ 110.00$ 36.00$
70.00$ 40.00$ 30.00$ 41.00$
175.00$ 180.00$ 125.00$ 94.00$
120.00$ 90.00$ 60.00$ 102.00$
76.00$ 170.00$ 75.00$ 61.30$
60.00$ 140.00$ 50.00$ 53.10$
8,500.00$ 4,500.00$ 17,000.00$ 18,435.00$
60.00$ 40.00$ 43.00$ 48.00$
150.00$ 40.00$ 20.00$ 66.00$
3,100.00$ 5,000.00$ 300.00$ 900.00$
10,600.00$ 20,000.00$ 10,000.00$ 9,130.00$
3,900.00$ 5,000.00$ 3,000.00$ 14,385.00$
15,000.00$ 15,000.00$ 6,440.00$
8,000.00$ 30,000.00$ 10,000.00$ 33,635.00$
Rafter H Construction American Civil Constructors Dietzler Construction Simon Contractors of SD
14,000.00$
119,000.00$ 90,000.00$ 10,000.00$ 150,000.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
REMOVAL OF PIPE CULVERT
SUBEXCAVATION
ROADWAY AGGREGATE, METHOD 2
ROADBED RECONDITIONING
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
CONSTRUCTION SCHEDULE
WATERING FOR DUST CONTROL
BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH
MOTOR GRADER, 12 FOOT MINIMUM BLADE
GENERAL LABOR
CONTRACTOR TESTING
6,000.00$ 30,000.00$ 25,000.00$ 22,600.00$
File details come from the government source that posted it. Updated .