A001.pdf

PDF 1 MB Posted

Attached to
SD FLAP CR223801(1), Norris Peak Road
Solicitation number
DTFH6815B00031
Issued by

About this file

Amendment A001

View the file

Other files

File Type Posted
Bid_Tabs.pdf PDF
Bid_Opening_Summary.pdf PDF
A002.pdf PDF
Q-A _12-17.pdf PDF
215-096_Norris_Peak_Road_Geotechnical_Report_11.02.15-final.pdf PDF
DTFH6815B00031.pdf PDF
Norris_Peak_Road_Realignment_Hydraulics_Report_08-18-2015_Signed.pdf PDF
Plan_Sheets.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

aaron.sanford Typewritten Text

A - 16

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

Z0004 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

Z0014 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

Z0024 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

Z0034 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

Z0044 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

Z0054 15802-0000 WATERING FOR DUST CONTROL

ALL LPSM $___LPSM_____ $____________

Z0064 20301-1900 REMOVAL OF PIPE CULVERT

1 EACH $____________ $____________

Z0074 20402-0000 SUBEXCAVATION

100 CUYD $____________ $____________

Z0084 30202-2000 ROADWAY AGGREGATE, METHOD 2

17,000 TON $____________ $____________

Z0094 30301-4000 ROADBED RECONDITIONING

6.600 MILE $____________ $____________

Z0104 60201-0800 24-INCH PIPE CULVERT

100 LNFT $____________ $____________

Z0114 60201-1000 36-INCH PIPE CULVERT

50 LNFT $____________ $____________

Z0124 62201-0400 BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET,

12-INCH WIDTH

10 HOUR $____________ $____________

Bid Schedule Schedule:Z Schedule Type:Options

Project No:SD FLAP CR223801(1)

Project Name:Norris Peak Road

Joe.Wilson Typewritten Text Amendment A001 December 17, 2015

Joe.Wilson Typewritten Text Amendment A001 December 17, 2015

Untitled

Text1:
Text2:
0: 1
1: 3
Text3:
0: A001
1: 12/17/2015
2:
0:
1: SD FLAP CR223801 (1)
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: Joe Wilson 1:

1:
0:
Text6:
0: DTFH6815B00031
1: November 23, 2015
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Off
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 0 *
Text11:
0:
1:
Text12: See Below *
Text13: Invitation for Bid

Remove Page A-16 and replace with attached Page A-16 dated December 17, 2015.

Plan Sheets Remove Plan Sheet B6 and replace with attached Plan Sheet B6 dated December 17, 2015.

NOTE: When printing revised sheets, turn on 'Document and Markups' in the Print Properties menu to illustrate changes on hard copy print.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN ITEM 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .