T A B U L A T I O N O F B I D S Schedule A
Project No : HI SR 200(3)
Project Name : Saddle Road East Side Solcitation No:
State : HI County : Hawaii Federal Location :
Opened at: FHWA HI Office Opened by: Clifford Chew Date: 12/8/2015
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date: 12/14/2015
Contract Awarded to: Award Date: 12/23/2015
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 43,231,540.62$
Road and Highway Bui 50,698,611.00$
Kiewit Infrastructure W 57,780,195.00$
Goodfellow Bro., Inc. 58,659,995.00$
Jas W. Glover, Ltd. 60,007,890.00$
DTFH6815B00006
Jeremiah Rogers
Road and Highway Builders, LLC
Contract Specialist
A=455 days
DTFH6816C00008
A=455 days
A=560 days
A=730 days
12/14/2015 FHWA Confidential Page 1 of 1
Schedule A Total of Bid Items: 43,231,540.62$ 17.3% 50,698,611.00$ Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line A0020 ALL LPSM 2,518,633.62$ 2,518,633.62$ 7,085,107.00$
15206-0000 Line A0040 331.000 STA 192.00$ 63,552.00$ 165,500.00$
15210-4000 Line A0060 331.000 STA 125.00$ 41,375.00$ 99,300.00$
15215-1000 Line A0080 32 EACH 2,700.00$ 86,400.00$ 32,000.00$
15215-3000 Line A0100 23 EACH 500.00$ 11,500.00$ 23,000.00$
15215-4500 Line A0120 43 EACH 500.00$ 21,500.00$ 12,900.00$
15216-1000 Line A0140 331.000 STA 142.00$ 47,002.00$ 132,400.00$
15216-2000 Line A0160 662.000 STA 159.00$ 105,258.00$ 264,800.00$
15301-0000 Line A0180 ALL LPSM 483,000.00$ 483,000.00$ 2,000,000.00$
15401-0000 Line A0200 ALL LPSM 100,000.00$ 100,000.00$ 2,000,000.00$
15501-0000 Line A0220 ALL LPSM 65,000.00$ 65,000.00$ 200,000.00$
15705-0100 Line A0240 21,340 LNFT 8.00$ 170,720.00$ 256,080.00$
15705-1300 Line A0260 2,310 LNFT 46.00$ 106,260.00$ 23,100.00$
Engineer's Estimate
10.00$
12.00$
200,000.00$
2,000,000.00$
2,000,000.00$
400.00$
400.00$
300.00$
1,000.00$
300.00$
Road and Highway Builders, LLC
500.00$
7,085,107.00$
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
CENTERLINE, ESTABLISHMENT
SURVEY AND STAKING, ROADWAY CROSS-SECTIONS
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, RELOCATE CONTROL POINT
SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
SURVEY AND STAKING, APPROACH ROAD
1,000.00$
12/14/2015 Page 1 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Road and Highway Builders, LLC
15705-1400 Line A0280 5,180 LNFT 22.00$ 113,960.00$ 155,400.00$
15706-0200 Line A0300 460 EACH 200.00$ 92,000.00$ 230,000.00$
15801-0000 Line A0320 4,000 MGAL 65.00$ 260,000.00$ 720,000.00$
20101-0000 Line A0340 116.0 ACRE 6,000.00$ 696,000.00$ 4,060,000.00$
20301-1100 Line A0360 4 EACH 600.00$ 2,400.00$ 4,000.00$
20301-2400 Line A0380 16 EACH 280.00$ 4,480.00$ 16,000.00$
20302-0700 Line A0400 1,420 LNFT 5.00$ 7,100.00$ 14,200.00$
20302-1200 Line A0420 740 LNFT 50.00$ 37,000.00$ 5,920.00$
20401-0000 Line A0440 733,000 CUYD 12.00$ 8,796,000.00$ 5,864,000.00$
20402-0000 Line A0460 74,000 CUYD 12.00$ 888,000.00$ 740,000.00$
20420-0000 Line A0480 467,000 CUYD 8.00$ 3,736,000.00$ 6,071,000.00$
20441-0000 Line A0500 157,000 CUYD 10.00$ 1,570,000.00$ 942,000.00$
20441-0000 Line A0520 55,000 CUYD 10.00$ 550,000.00$ 385,000.00$ 7.00$
6.00$
13.00$
10.00$
8.00$
8.00$
10.00$
1,000.00$
1,000.00$
35,000.00$
180.00$
500.00$
30.00$
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF GATE
WASTE (DISPOSAL ON EMBANKMENT SLOPE)
WASTE
REMOVAL OF SIGN
REMOVAL OF FENCE
REMOVAL OF GUARDRAIL
ROADWAY EXCAVATION
SUBEXCAVATION
EMBANKMENT CONSTRUCTION
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, CHECK DAM (RIPRAP)
12/14/2015 Page 2 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Road and Highway Builders, LLC
21101-1000 Line A0540 8,370 SQYD 2.50$ 20,925.00$ 251,100.00$
21201-0000 Line A0560 155.000 STA (CQ) 3,400.00$ 527,000.00$ 4,650,000.00$
25101-3000 Line A0580 21,450 CUYD 100.00$ 2,145,000.00$ 643,500.00$
25110-3000 Line A0600 973 CUYD 600.00$ 583,800.00$ 77,840.00$
30101-0000 Line A0620 71,100 TON 35.00$ 2,488,500.00$ 1,422,000.00$
30110-0000 Line A0640 40 TON 35.00$ 1,400.00$ 4,800.00$
30608-0000 Line A0660 3,000 GAL 8.00$ 24,000.00$ 45,000.00$
30608-0000 Line A0680 2,000 GAL 15.00$ 30,000.00$ 20,000.00$
31101-0000 Line A0700 7,560 TON 15.00$ 113,400.00$ 189,000.00$
40201-1300 Line A0720 36,200 TON 150.00$ 5,430,000.00$ 4,344,000.00$
40205-3000 Line A0740 362 TON 1,300.00$ 470,600.00$ 289,600.00$
40920-1000 Line A0760 87 TON 1,750.00$ 152,250.00$ 17,400.00$
41105-0000 Line A0780 1,553 TON 70.00$ 108,710.00$ 31,060.00$ 20.00$
200.00$
800.00$
120.00$
25.00$
10.00$
15.00$
120.00$
20.00$
80.00$
30.00$
30,000.00$
30.00$
ROADWAY OBLITERATION, METHOD 1
LINEAR GRADING
PLACED RIPRAP, CLASS 3
GROUTED RIPRAP, CLASS 3
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
BLOTTER
AGGREGATE BASE
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION (FOR QUARRY HAUL ROAD)
DUST PALLIATIVE APPLICATION (FOR PROJECT DETOURS/ROADS)
STOCKPILED AGGREGATE (1-1/2 INCH)
HOT ASPHALT CONCRETE PAVEMENT, MARSHALL TEST, CLASS A, GRADING E
12/14/2015 Page 3 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Road and Highway Builders, LLC
60103-0220 Line A0800 4 EACH 5,000.00$ 20,000.00$ 160,000.00$
60103-0240 Line A0820 2 EACH 5,500.00$ 11,000.00$ 90,000.00$
60103-0260 Line A0840 2 EACH 7,000.00$ 14,000.00$ 100,000.00$
60201-0800 Line A0860 519 LNFT 200.00$ 103,800.00$ 103,800.00$
60201-1200 Line A0880 364 LNFT 280.00$ 101,920.00$ 91,000.00$
60201-1300 Line A0900 186 LNFT 320.00$ 59,520.00$ 50,220.00$
60201-1400 Line A0920 208 LNFT 400.00$ 83,200.00$ 60,320.00$
60221-1950 Line A0940 137 LNFT 2,300.00$ 315,100.00$ 753,500.00$
60222-1200 Line A0960 307 LNFT 2,800.00$ 859,600.00$ 767,500.00$
60222-1900 Line A0980 213 LNFT 3,800.00$ 809,400.00$ 532,500.00$
60225-1722 Line A1000 196 LNFT 7,500.00$ 1,470,000.00$ 490,000.00$
60225-1725 Line A1020 192 LNFT 7,600.00$ 1,459,200.00$ 480,000.00$
60226-0000 Line A1040 12 EACH 60,000.00$ 720,000.00$ 30,000.00$ 2,500.00$
2,500.00$
2,500.00$
2,500.00$
2,500.00$
5,500.00$
290.00$
270.00$
250.00$
200.00$
50,000.00$
45,000.00$
40,000.00$
8 FEET SPAN, 6 FEET RISE REINFORCED CONCRETE BOX CULVERT, DOUBLE BARREL
7 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, QUINTUPLE BARREL
7 FEET SPAN, 6 FEET RISE REINFORCED CONCRETE BOX CULVERT, QUINTUPLE BARREL
END SECTION FOR REINFORCED CONCRETE BOX CULVERT
24-INCH PIPE CULVERT
48-INCH PIPE CULVERT
54-INCH PIPE CULVERT
60-INCH PIPE CULVERT
8 FEET SPAN, 7 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL
6 FEET SPAN, 4 FEET RISE REINFORCED CONCRETE BOX CULVERT, DOUBLE BARREL
CONCRETE, HEADWALL FOR 48-INCH PIPE CULVERT (AND WINGWALLS)
CONCRETE, HEADWALL FOR 54-INCH PIPE CULVERT (AND WINGWALLS)
CONCRETE, HEADWALL FOR 60-INCH PIPE CULVERT (AND WINGWALLS)
12/14/2015 Page 4 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Road and Highway Builders, LLC
61101-0000 Line A1060 ALL LPSM 30,000.00$ 30,000.00$ 800,000.00$
61701-1350 Line A1080 1,350 LNFT 80.00$ 108,000.00$ 94,500.00$
61702-0800 Line A1100 6 EACH 6,500.00$ 39,000.00$ 24,000.00$
61901-0200 Line A1120 3,080 LNFT 15.00$ 46,200.00$ 27,720.00$
61902-1400 Line A1140 3 EACH 3,950.00$ 11,850.00$ 9,000.00$
62011-0500 Line A1160 26 EACH 2,000.00$ 52,000.00$ 130,000.00$
62101-0000 Line A1180 47 EACH 1,200.00$ 56,400.00$ 47,000.00$
62201-0300 Line A1200 200 HOUR 205.00$ 41,000.00$ 27,000.00$
62201-0550 Line A1220 200 HOUR 151.00$ 30,200.00$ 28,000.00$
62201-1000 Line A1240 200 HOUR 244.00$ 48,800.00$ 30,000.00$
62201-1400 Line A1260 200 HOUR 354.00$ 70,800.00$ 36,000.00$
62201-2850 Line A1280 200 HOUR 235.00$ 47,000.00$ 30,000.00$
62201-3350 Line A1300 200 HOUR 237.00$ 47,400.00$ 30,000.00$
140.00$
135.00$
1,000.00$
5,000.00$
3,000.00$
9.00$
4,000.00$
70.00$
800,000.00$
TERMINAL SECTION TYPE TANGENT
FENCE, WOVEN WIRE, 48-INCH HEIGHT
GATE, METAL, 16 FEET WIDTH
STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT (AND WINGWALLS)
MONUMENT
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
WATER SYSTEM
GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEEL POSTS
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
BULLDOZER, 250HP MINIMUM FLYWHEEL POWER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
150.00$
150.00$
180.00$
150.00$
12/14/2015 Page 5 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Road and Highway Builders, LLC
62202-1000 Line A1320 ALL LPSM 125,000.00$ 125,000.00$ 100,000.00$
62301-0000 Line A1340 300 HOUR 65.00$ 19,500.00$ 15,000.00$
62302-1000 Line A1360 50 HOUR 150.00$ 7,500.00$ 7,500.00$
62302-1100 Line A1380 150 HOUR 175.00$ 26,250.00$ 22,500.00$
62535-0000 Line A1400 370 GAL 50.00$ 18,500.00$ 29,600.00$
62901-1000 Line A1420 174,800 SQYD 8.00$ 1,398,400.00$ 174,800.00$
63301-0000 Line A1440 80 EACH 600.00$ 48,000.00$ 80,000.00$
63308-0000 Line A1460 100 EACH 70.00$ 7,000.00$ 20,000.00$
63401-0300 Line A1480 147,600 LNFT 1.00$ 147,600.00$ 20,664.00$
63401-0400 Line A1500 30,300 LNFT 0.75$ 22,725.00$ 3,030.00$
63405-0050 Line A1520 20 EACH 50.00$ 1,000.00$ 1,400.00$
63405-0500 Line A1540 20 EACH 120.00$ 2,400.00$ 1,400.00$
63405-0550 Line A1560 70 EACH 120.00$ 8,400.00$ 5,600.00$
MATERIALS TRANSFER VEHICLE
OBJECT MARKER
PAVEMENT MARKINGS, TYPE B, SOLID (4-inch width)
PAVEMENT MARKINGS, TYPE B, BROKEN (4-inch width)
PAVEMENT MARKINGS, SYMBOLS (yield line markings)
PAVEMENT MARKINGS, TYPE B, TURN ARROW
PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
HERBICIDE
ROLLED EROSION CONTROL PRODUCT, TYPE 3.B
SIGN SYSTEM
100,000.00$
150.00$
50.00$
80.00$
150.00$
1,000.00$
1.00$
0.14$
200.00$
70.00$
0.10$
80.00$
70.00$
12/14/2015 Page 6 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Road and Highway Builders, LLC
63405-0700 Line A1580 2 EACH 120.00$ 240.00$ 100.00$
63501-0000 Line A1600 ALL LPSM 27,000.00$ 27,000.00$ 300,000.00$
63501-1000 Line A1620 ALL LPSM 75,000.00$ 75,000.00$ 600,000.00$
63502-0500 Line A1640 10 EACH 117.00$ 1,170.00$ 1,000.00$
63502-0600 Line A1660 20 EACH 400.00$ 8,000.00$ 2,000.00$
63502-1050 Line A1680 400 EACH 41.00$ 16,400.00$ 20,000.00$
63502-1300 Line A1700 20 EACH 127.00$ 2,540.00$ 2,000.00$
63502-1500 Line A1720 15 EACH 40.00$ 600.00$ 1,500.00$
63502-1600 Line A1740 4 EACH 50.00$ 200.00$ 800.00$
63502-1700 Line A1760 50 EACH 60.00$ 3,000.00$ 2,500.00$
63502-2000 Line A1780 3 EACH 25,000.00$ 75,000.00$ 30,000.00$
63503-0450 Line A1800 4,000 LNFT 90.00$ 360,000.00$ 80,000.00$
63503-0700 Line A1820 46,500 LNFT 1.00$ 46,500.00$ 18,600.00$
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, WATER-FILLED BARRIER
PAVEMENT MARKINGS, TYPE B, "STOP" WORD MESSAGE
TEMPORARY TRAFFIC CONTROL (For existing Saddle connector transition)
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
300,000.00$
50.00$
100.00$
600,000.00$
50.00$
100.00$
100.00$
100.00$
50.00$
200.00$
20.00$
10,000.00$
0.40$
12/14/2015 Page 7 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Engineer's Estimate Road and Highway Builders, LLC
63503-0800 Line A1840 46,500 LNFT 1.00$ 46,500.00$ 4,650.00$
63503-1000 Line A1860 6,000 LNFT 6.00$ 36,000.00$ 18,000.00$
63504-1000 Line A1880 1,140 SQFT 50.00$ 57,000.00$ 39,900.00$
63506-0400 Line A1900 2,500 HOUR 63.00$ 157,500.00$ 100,000.00$
63506-0500 Line A1920 5,000 HOUR 65.00$ 325,000.00$ 325,000.00$
63506-0600 Line A1940 1,600 HOUR 500.00$ 800,000.00$ 152,000.00$
63508-1000 Line A1960 50 TON 750.00$ 37,500.00$ 10,000.00$
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, POLICE OFFICER
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, MAINTENANCE OF TRAFFIC, PAVEMENT PATCH
0.10$
35.00$
3.00$
65.00$
40.00$
200.00$
95.00$
12/14/2015 Page 8 of 24
Schedule A Total of Bid Items:
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15206-0000 Line A0040 331.000 STA
15210-4000 Line A0060 331.000 STA
15215-1000 Line A0080 32 EACH
15215-3000 Line A0100 23 EACH
15215-4500 Line A0120 43 EACH
15216-1000 Line A0140 331.000 STA
15216-2000 Line A0160 662.000 STA
15301-0000 Line A0180 ALL LPSM
15401-0000 Line A0200 ALL LPSM
15501-0000 Line A0220 ALL LPSM
15705-0100 Line A0240 21,340 LNFT
15705-1300 Line A0260 2,310 LNFT
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBB
CENTERLINE, ESTABLISHMENT
SURVEY AND STAKING, ROADWAY CROSS-SECT
SURVEY AND STAKING, GRADE FINISHING STAK
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, RELOCATE CONTROL PO
SOIL EROSION CONTROL, TEMPORARY DIVERSI
SURVEY AND STAKING, APPROACH ROAD
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
25,535,873.00$ 8,500,000.00$
331,000.00$ 132,400.00$
331,000.00$ 66,200.00$
64,000.00$ 44,800.00$
230,000.00$ 36,800.00$
86,000.00$ 30,100.00$
165,500.00$ 99,300.00$
331,000.00$ 165,500.00$
1,500,000.00$ 1,500,000.00$
300,000.00$ 1,620,000.00$
300,000.00$ 100,000.00$
256,080.00$ 128,040.00$
113,190.00$ 184,800.00$ 49.00$ 80.00$
12.00$ 6.00$
300,000.00$ 100,000.00$
300,000.00$ 1,620,000.00$
1,500,000.00$ 1,500,000.00$
500.00$ 250.00$
500.00$ 300.00$
2,000.00$ 700.00$
10,000.00$ 1,600.00$
1,000.00$ 400.00$
1,000.00$ 200.00$
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
25,535,873.00$ 8,500,000.00$
2,000.00$ 1,400.00$
12/14/2015 Page 9 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
15705-1400 Line A0280 5,180 LNFT
15706-0200 Line A0300 460 EACH
15801-0000 Line A0320 4,000 MGAL
20101-0000 Line A0340 116.0 ACRE
20301-1100 Line A0360 4 EACH
20301-2400 Line A0380 16 EACH
20302-0700 Line A0400 1,420 LNFT
20302-1200 Line A0420 740 LNFT
20401-0000 Line A0440 733,000 CUYD
20402-0000 Line A0460 74,000 CUYD
20420-0000 Line A0480 467,000 CUYD
20441-0000 Line A0500 157,000 CUYD
20441-0000 Line A0520 55,000 CUYD
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF GATE
WASTE (DISPOSAL ON EMBANKMENT SLOPE)
WASTE
REMOVAL OF SIGN
REMOVAL OF FENCE
REMOVAL OF GUARDRAIL
ROADWAY EXCAVATION
SUBEXCAVATION
EMBANKMENT CONSTRUCTION
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, CHECK DAM (RIPRAP)
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
98,420.00$ 62,160.00$
75,900.00$ 138,000.00$
280,000.00$ 280,000.00$
719,200.00$ 1,183,200.00$
2,800.00$ 4,800.00$
4,800.00$ 9,600.00$
5,680.00$ 35,500.00$
18,500.00$ 18,500.00$
2,199,000.00$ 4,911,100.00$
518,000.00$ 1,850,000.00$
934,000.00$ 5,604,000.00$
1,570.00$ 942,000.00$
550.00$ 596,750.00$ 0.01$ 10.85$
0.01$ 6.00$
2.00$ 12.00$
7.00$ 25.00$
3.00$ 6.70$
25.00$ 25.00$
4.00$ 25.00$
300.00$ 600.00$
700.00$ 1,200.00$
6,200.00$ 10,200.00$
70.00$ 70.00$
165.00$ 300.00$
19.00$ 12.00$
12/14/2015 Page 10 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
21101-1000 Line A0540 8,370 SQYD
21201-0000 Line A0560 155.000 STA (CQ)
25101-3000 Line A0580 21,450 CUYD
25110-3000 Line A0600 973 CUYD
30101-0000 Line A0620 71,100 TON
30110-0000 Line A0640 40 TON
30608-0000 Line A0660 3,000 GAL
30608-0000 Line A0680 2,000 GAL
31101-0000 Line A0700 7,560 TON
40201-1300 Line A0720 36,200 TON
40205-3000 Line A0740 362 TON
40920-1000 Line A0760 87 TON
41105-0000 Line A0780 1,553 TON
ROADWAY OBLITERATION, METHOD 1
LINEAR GRADING
PLACED RIPRAP, CLASS 3
GROUTED RIPRAP, CLASS 3
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
BLOTTER
AGGREGATE BASE
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION (FOR QUARRY H
DUST PALLIATIVE APPLICATION (FOR PROJECT
STOCKPILED AGGREGATE (1-1/2 INCH)
HOT ASPHALT CONCRETE PAVEMENT, MARSHAL
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
20,925.00$ 125,550.00$
3,875,000.00$ 7,161,000.00$
1,287,000.00$ 1,394,250.00$
144,004.00$ 340,550.00$
1,493,100.00$ 3,555,000.00$
1,880.00$ 7,360.00$
30.00$ 45,000.00$
40,000.00$ 30,000.00$
756.00$ 264,600.00$
5,755,800.00$ 6,226,400.00$
272,948.00$ 318,560.00$
153,120.00$ 19,140.00$
116,475.00$ 77,650.00$ 75.00$ 50.00$
1,760.00$ 220.00$
754.00$ 880.00$
159.00$ 172.00$
0.10$ 35.00$
20.00$ 15.00$
0.01$ 15.00$
47.00$ 184.00$
21.00$ 50.00$
148.00$ 350.00$
60.00$ 65.00$
25,000.00$ 46,200.00$
2.50$ 15.00$
12/14/2015 Page 11 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
60103-0220 Line A0800 4 EACH
60103-0240 Line A0820 2 EACH
60103-0260 Line A0840 2 EACH
60201-0800 Line A0860 519 LNFT
60201-1200 Line A0880 364 LNFT
60201-1300 Line A0900 186 LNFT
60201-1400 Line A0920 208 LNFT
60221-1950 Line A0940 137 LNFT
60222-1200 Line A0960 307 LNFT
60222-1900 Line A0980 213 LNFT
60225-1722 Line A1000 196 LNFT
60225-1725 Line A1020 192 LNFT
60226-0000 Line A1040 12 EACH
8 FEET SPAN, 6 FEET RISE REINFORCED CONCR
7 FEET SPAN, 5 FEET RISE REINFORCED CONCR
7 FEET SPAN, 6 FEET RISE REINFORCED CONCR
END SECTION FOR REINFORCED CONCRETE BOX
24-INCH PIPE CULVERT
48-INCH PIPE CULVERT
54-INCH PIPE CULVERT
60-INCH PIPE CULVERT
8 FEET SPAN, 7 FEET RISE REINFORCED CONCR
6 FEET SPAN, 4 FEET RISE REINFORCED CONCR
CONCRETE, HEADWALL FOR 48-INCH PIPE CULV
CONCRETE, HEADWALL FOR 54-INCH PIPE CULV
CONCRETE, HEADWALL FOR 60-INCH PIPE CULV
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
200,000.00$ 100,000.00$
120,000.00$ 56,000.00$
140,000.00$ 64,000.00$
75,774.00$ 129,750.00$
215,488.00$ 127,400.00$
135,780.00$ 78,120.00$
152,880.00$ 195,520.00$
342,500.00$ 394,560.00$
669,260.00$ 813,550.00$
562,320.00$ 777,450.00$
929,040.00$ 1,254,400.00$
969,600.00$ 1,440,000.00$
1,200,000.00$ 864,000.00$ 100,000.00$ 72,000.00$
5,050.00$ 7,500.00$
4,740.00$ 6,400.00$
2,640.00$ 3,650.00$
2,180.00$ 2,650.00$
2,500.00$ 2,880.00$
735.00$ 940.00$
730.00$ 420.00$
592.00$ 350.00$
146.00$ 250.00$
70,000.00$ 32,000.00$
60,000.00$ 28,000.00$
50,000.00$ 25,000.00$
12/14/2015 Page 12 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
61101-0000 Line A1060 ALL LPSM
61701-1350 Line A1080 1,350 LNFT
61702-0800 Line A1100 6 EACH
61901-0200 Line A1120 3,080 LNFT
61902-1400 Line A1140 3 EACH
62011-0500 Line A1160 26 EACH
62101-0000 Line A1180 47 EACH
62201-0300 Line A1200 200 HOUR
62201-0550 Line A1220 200 HOUR
62201-1000 Line A1240 200 HOUR
62201-1400 Line A1260 200 HOUR
62201-2850 Line A1280 200 HOUR
62201-3350 Line A1300 200 HOUR
TERMINAL SECTION TYPE TANGENT
FENCE, WOVEN WIRE, 48-INCH HEIGHT
GATE, METAL, 16 FEET WIDTH
STONE MASONRY HEADWALL FOR 24-INCH PIPE
MONUMENT
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPAC
WATER SYSTEM
GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEE
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATE
BULLDOZER, 250HP MINIMUM FLYWHEEL POWE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
350,000.00$ 123,000.00$
89,100.00$ 95,850.00$
60,000.00$ 48,000.00$
64,680.00$ 77,000.00$
12,000.00$ 10,200.00$
520,000.00$ 260,000.00$
47,000.00$ 60,160.00$
25,000.00$ 32,800.00$
36,000.00$ 27,600.00$
44,400.00$ 36,800.00$
65,000.00$ 60,600.00$
48,600.00$ 40,000.00$
34,000.00$ 53,200.00$
180.00$ 138.00$
125.00$ 164.00$
1,000.00$ 1,280.00$
20,000.00$ 10,000.00$
4,000.00$ 3,400.00$
21.00$ 25.00$
10,000.00$ 8,000.00$
66.00$ 71.00$
350,000.00$ 123,000.00$
222.00$ 184.00$
243.00$ 200.00$
325.00$ 303.00$
170.00$ 266.00$
12/14/2015 Page 13 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line A1320 ALL LPSM
62301-0000 Line A1340 300 HOUR
62302-1000 Line A1360 50 HOUR
62302-1100 Line A1380 150 HOUR
62535-0000 Line A1400 370 GAL
62901-1000 Line A1420 174,800 SQYD
63301-0000 Line A1440 80 EACH
63308-0000 Line A1460 100 EACH
63401-0300 Line A1480 147,600 LNFT
63401-0400 Line A1500 30,300 LNFT
63405-0050 Line A1520 20 EACH
63405-0500 Line A1540 20 EACH
63405-0550 Line A1560 70 EACH
MATERIALS TRANSFER VEHICLE
OBJECT MARKER
PAVEMENT MARKINGS, TYPE B, SOLID (4-inch w
PAVEMENT MARKINGS, TYPE B, BROKEN (4-inch
PAVEMENT MARKINGS, SYMBOLS (yield line mar
PAVEMENT MARKINGS, TYPE B, TURN ARROW
PAVEMENT MARKINGS, TYPE B, STRAIGHT ARRO
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
HERBICIDE
ROLLED EROSION CONTROL PRODUCT, TYPE 3.B
SIGN SYSTEM
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
199,000.00$ 110,000.00$
21,000.00$ 20,700.00$
6,750.00$ 10,000.00$
29,250.00$ 37,500.00$
14,800.00$ 18,500.00$
524,400.00$ 690,460.00$
62,000.00$ 104,000.00$
9,300.00$ 25,000.00$
32,472.00$ 51,660.00$
6,666.00$ 10,605.00$
2,100.00$ 2,400.00$
2,160.00$ 2,500.00$
9,590.00$ 11,200.00$
199,000.00$ 110,000.00$
135.00$ 200.00$
70.00$ 69.00$
40.00$ 50.00$
195.00$ 250.00$
775.00$ 1,300.00$
3.00$ 3.95$
0.22$ 0.35$
93.00$ 250.00$
105.00$ 120.00$
0.22$ 0.35$
137.00$ 160.00$
108.00$ 125.00$
12/14/2015 Page 14 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
63405-0700 Line A1580 2 EACH
63501-0000 Line A1600 ALL LPSM
63501-1000 Line A1620 ALL LPSM
63502-0500 Line A1640 10 EACH
63502-0600 Line A1660 20 EACH
63502-1050 Line A1680 400 EACH
63502-1300 Line A1700 20 EACH
63502-1500 Line A1720 15 EACH
63502-1600 Line A1740 4 EACH
63502-1700 Line A1760 50 EACH
63502-2000 Line A1780 3 EACH
63503-0450 Line A1800 4,000 LNFT
63503-0700 Line A1820 46,500 LNFT
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, WATER-FILLED
PAVEMENT MARKINGS, TYPE B, "STOP" WORD M
TEMPORARY TRAFFIC CONTROL (For existing Sa
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND S
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, TUBULAR MARK
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
274.00$ 320.00$
50,000.00$ 490,000.00$
300,000.00$ 400,000.00$
1,000.00$ 1,000.00$
10,800.00$ 10,000.00$
200,000.00$ 20,000.00$
4,000.00$ 3,000.00$
1,770.00$ 750.00$
1,840.00$ 280.00$
5,000.00$ 4,250.00$
90,000.00$ 60,000.00$
620,000.00$ 720,000.00$
93,000.00$ 55,800.00$
50,000.00$ 490,000.00$
137.00$ 160.00$
100.00$ 100.00$
300,000.00$ 400,000.00$
500.00$ 50.00$
540.00$ 500.00$
118.00$ 50.00$
200.00$ 150.00$
100.00$ 85.00$
460.00$ 70.00$
155.00$ 180.00$
30,000.00$ 20,000.00$
2.00$ 1.20$
12/14/2015 Page 15 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
63503-0800 Line A1840 46,500 LNFT
63503-1000 Line A1860 6,000 LNFT
63504-1000 Line A1880 1,140 SQFT
63506-0400 Line A1900 2,500 HOUR
63506-0500 Line A1920 5,000 HOUR
63506-0600 Line A1940 1,600 HOUR
63508-1000 Line A1960 50 TON
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, POLICE OFFICE
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, MAINTENANCE
33.7% 57,780,195.00$ 35.7% 58,659,995.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bro., Inc.
93,000.00$ 46,500.00$
27,000.00$ 48,000.00$
114,000.00$ 57,000.00$
125,000.00$ 125,000.00$
305,000.00$ 325,000.00$
120,000.00$ 120,000.00$
27,500.00$ 50,000.00$
2.00$ 1.00$
100.00$ 50.00$
4.50$ 8.00$
61.00$ 65.00$
50.00$ 50.00$
550.00$ 1,000.00$
75.00$ 75.00$
12/14/2015 Page 16 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line A0020 ALL LPSM
15206-0000 Line A0040 331.000 STA
15210-4000 Line A0060 331.000 STA
15215-1000 Line A0080 32 EACH
15215-3000 Line A0100 23 EACH
15215-4500 Line A0120 43 EACH
15216-1000 Line A0140 331.000 STA
15216-2000 Line A0160 662.000 STA
15301-0000 Line A0180 ALL LPSM
15401-0000 Line A0200 ALL LPSM
15501-0000 Line A0220 ALL LPSM
15705-0100 Line A0240 21,340 LNFT
15705-1300 Line A0260 2,310 LNFT
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBB
CENTERLINE, ESTABLISHMENT
SURVEY AND STAKING, ROADWAY CROSS-SECT
SURVEY AND STAKING, GRADE FINISHING STAK
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, RELOCATE CONTROL PO
SOIL EROSION CONTROL, TEMPORARY DIVERSI
SURVEY AND STAKING, APPROACH ROAD
38.8% 60,007,890.00$
Unit Price Amount
4,750,073.00$
22,508.00$
22,508.00$
68,160.00$
23,230.00$
43,430.00$
22,508.00$
45,016.00$
385,000.00$
255,000.00$
125,000.00$
192,060.00$
367,290.00$ 159.00$
9.00$
125,000.00$
255,000.00$
385,000.00$
68.00$
68.00$
1,010.00$
1,010.00$
68.00$
68.00$
Jas W. Glover, Ltd.
4,750,073.00$
2,130.00$
12/14/2015 Page 17 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
15705-1400 Line A0280 5,180 LNFT
15706-0200 Line A0300 460 EACH
15801-0000 Line A0320 4,000 MGAL
20101-0000 Line A0340 116.0 ACRE
20301-1100 Line A0360 4 EACH
20301-2400 Line A0380 16 EACH
20302-0700 Line A0400 1,420 LNFT
20302-1200 Line A0420 740 LNFT
20401-0000 Line A0440 733,000 CUYD
20402-0000 Line A0460 74,000 CUYD
20420-0000 Line A0480 467,000 CUYD
20441-0000 Line A0500 157,000 CUYD
20441-0000 Line A0520 55,000 CUYD
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF GATE
WASTE (DISPOSAL ON EMBANKMENT SLOPE)
WASTE
REMOVAL OF SIGN
REMOVAL OF FENCE
REMOVAL OF GUARDRAIL
ROADWAY EXCAVATION
SUBEXCAVATION
EMBANKMENT CONSTRUCTION
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, CHECK DAM (RIPRAP)
38.8% 60,007,890.00$
Unit Price Amount
Jas W. Glover, Ltd.
121,730.00$
310,500.00$
360,000.00$
980,200.00$
2,580.00$
7,600.00$
11,644.00$
20,720.00$
6,303,800.00$
654,900.00$
10,344,050.00$
2,888,800.00$
1,446,500.00$ 26.30$
18.40$
22.15$
8.85$
8.60$
28.00$
8.20$
475.00$
645.00$
8,450.00$
90.00$
675.00$
23.50$
12/14/2015 Page 18 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
21101-1000 Line A0540 8,370 SQYD
21201-0000 Line A0560 155.000 STA (CQ)
25101-3000 Line A0580 21,450 CUYD
25110-3000 Line A0600 973 CUYD
30101-0000 Line A0620 71,100 TON
30110-0000 Line A0640 40 TON
30608-0000 Line A0660 3,000 GAL
30608-0000 Line A0680 2,000 GAL
31101-0000 Line A0700 7,560 TON
40201-1300 Line A0720 36,200 TON
40205-3000 Line A0740 362 TON
40920-1000 Line A0760 87 TON
41105-0000 Line A0780 1,553 TON
ROADWAY OBLITERATION, METHOD 1
LINEAR GRADING
PLACED RIPRAP, CLASS 3
GROUTED RIPRAP, CLASS 3
ANTISTRIP ADDITIVE, TYPE 3
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1
BLOTTER
AGGREGATE BASE
AGGREGATE SURFACE COURSE
DUST PALLIATIVE APPLICATION (FOR QUARRY H
DUST PALLIATIVE APPLICATION (FOR PROJECT
STOCKPILED AGGREGATE (1-1/2 INCH)
HOT ASPHALT CONCRETE PAVEMENT, MARSHAL
38.8% 60,007,890.00$
Unit Price Amount
Jas W. Glover, Ltd.
46,035.00$
1,193,500.00$
1,737,450.00$
705,425.00$
2,744,460.00$
2,120.00$
43,800.00$
5,719,600.00$
271,500.00$
152,250.00$
116,475.00$ 75.00$
1,750.00$
750.00$
158.00$
21.90$
53.00$
38.60$
725.00$
81.00$
7,700.00$
5.50$
12/14/2015 Page 19 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
60103-0220 Line A0800 4 EACH
60103-0240 Line A0820 2 EACH
60103-0260 Line A0840 2 EACH
60201-0800 Line A0860 519 LNFT
60201-1200 Line A0880 364 LNFT
60201-1300 Line A0900 186 LNFT
60201-1400 Line A0920 208 LNFT
60221-1950 Line A0940 137 LNFT
60222-1200 Line A0960 307 LNFT
60222-1900 Line A0980 213 LNFT
60225-1722 Line A1000 196 LNFT
60225-1725 Line A1020 192 LNFT
60226-0000 Line A1040 12 EACH
8 FEET SPAN, 6 FEET RISE REINFORCED CONCR
7 FEET SPAN, 5 FEET RISE REINFORCED CONCR
7 FEET SPAN, 6 FEET RISE REINFORCED CONCR
END SECTION FOR REINFORCED CONCRETE BOX
24-INCH PIPE CULVERT
48-INCH PIPE CULVERT
54-INCH PIPE CULVERT
60-INCH PIPE CULVERT
8 FEET SPAN, 7 FEET RISE REINFORCED CONCR
6 FEET SPAN, 4 FEET RISE REINFORCED CONCR
CONCRETE, HEADWALL FOR 48-INCH PIPE CULV
CONCRETE, HEADWALL FOR 54-INCH PIPE CULV
CONCRETE, HEADWALL FOR 60-INCH PIPE CULV
38.8% 60,007,890.00$
Unit Price Amount
Jas W. Glover, Ltd.
126,600.00$
70,200.00$
80,800.00$
200,853.00$
893,620.00$
914,190.00$
947,440.00$
871,320.00$
1,442,900.00$
1,980,900.00$
1,258,320.00$
2,169,600.00$
915,600.00$ 76,300.00$
11,300.00$
6,420.00$
9,300.00$
4,700.00$
6,360.00$
4,555.00$
4,915.00$
2,455.00$
387.00$
40,400.00$
35,100.00$
31,650.00$
12/14/2015 Page 20 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
61101-0000 Line A1060 ALL LPSM
61701-1350 Line A1080 1,350 LNFT
61702-0800 Line A1100 6 EACH
61901-0200 Line A1120 3,080 LNFT
61902-1400 Line A1140 3 EACH
62011-0500 Line A1160 26 EACH
62101-0000 Line A1180 47 EACH
62201-0300 Line A1200 200 HOUR
62201-0550 Line A1220 200 HOUR
62201-1000 Line A1240 200 HOUR
62201-1400 Line A1260 200 HOUR
62201-2850 Line A1280 200 HOUR
62201-3350 Line A1300 200 HOUR
TERMINAL SECTION TYPE TANGENT
FENCE, WOVEN WIRE, 48-INCH HEIGHT
GATE, METAL, 16 FEET WIDTH
STONE MASONRY HEADWALL FOR 24-INCH PIPE
MONUMENT
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPAC
WATER SYSTEM
GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEE
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATE
BULLDOZER, 250HP MINIMUM FLYWHEEL POWE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
38.8% 60,007,890.00$
Unit Price Amount
Jas W. Glover, Ltd.
178,000.00$
98,550.00$
52,200.00$
71,918.00$
20,100.00$
507,000.00$
72,380.00$
44,000.00$
29,000.00$
70,000.00$
70,000.00$
43,200.00$
70,000.00$
145.00$
220.00$
1,540.00$
19,500.00$
6,700.00$
23.35$
8,700.00$
73.00$
178,000.00$
350.00$
216.00$
350.00$
350.00$
12/14/2015 Page 21 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line A1320 ALL LPSM
62301-0000 Line A1340 300 HOUR
62302-1000 Line A1360 50 HOUR
62302-1100 Line A1380 150 HOUR
62535-0000 Line A1400 370 GAL
62901-1000 Line A1420 174,800 SQYD
63301-0000 Line A1440 80 EACH
63308-0000 Line A1460 100 EACH
63401-0300 Line A1480 147,600 LNFT
63401-0400 Line A1500 30,300 LNFT
63405-0050 Line A1520 20 EACH
63405-0500 Line A1540 20 EACH
63405-0550 Line A1560 70 EACH
MATERIALS TRANSFER VEHICLE
OBJECT MARKER
PAVEMENT MARKINGS, TYPE B, SOLID (4-inch w
PAVEMENT MARKINGS, TYPE B, BROKEN (4-inch
PAVEMENT MARKINGS, SYMBOLS (yield line mar
PAVEMENT MARKINGS, TYPE B, TURN ARROW
PAVEMENT MARKINGS, TYPE B, STRAIGHT ARRO
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
HERBICIDE
ROLLED EROSION CONTROL PRODUCT, TYPE 3.B
SIGN SYSTEM
38.8% 60,007,890.00$
Unit Price Amount
Jas W. Glover, Ltd.
195,000.00$
24,600.00$
22,750.00$
40,500.00$
51,800.00$
603,060.00$
68,160.00$
10,300.00$
35,424.00$
7,272.00$
2,340.00$
2,400.00$
10,710.00$
195,000.00$
455.00$
82.00$
140.00$
270.00$
852.00$
3.45$
0.24$
103.00$
117.00$
0.24$
153.00$
120.00$
12/14/2015 Page 22 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
63405-0700 Line A1580 2 EACH
63501-0000 Line A1600 ALL LPSM
63501-1000 Line A1620 ALL LPSM
63502-0500 Line A1640 10 EACH
63502-0600 Line A1660 20 EACH
63502-1050 Line A1680 400 EACH
63502-1300 Line A1700 20 EACH
63502-1500 Line A1720 15 EACH
63502-1600 Line A1740 4 EACH
63502-1700 Line A1760 50 EACH
63502-2000 Line A1780 3 EACH
63503-0450 Line A1800 4,000 LNFT
63503-0700 Line A1820 46,500 LNFT
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
TEMPORARY TRAFFIC CONTROL, WARNING LIGH
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, WATER-FILLED
PAVEMENT MARKINGS, TYPE B, "STOP" WORD M
TEMPORARY TRAFFIC CONTROL (For existing Sa
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND S
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, BARRICADE TY
TEMPORARY TRAFFIC CONTROL, TUBULAR MARK
38.8% 60,007,890.00$
Unit Price Amount
Jas W. Glover, Ltd.
306.00$
511,000.00$
292,500.00$
2,000.00$
18,000.00$
20,000.00$
3,800.00$
1,875.00$
480.00$
6,250.00$
126,000.00$
1,380,000.00$
53,475.00$
511,000.00$
153.00$
200.00$
292,500.00$
50.00$
900.00$
125.00$
190.00$
125.00$
120.00$
345.00$
42,000.00$
1.15$
12/14/2015 Page 23 of 24
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
63503-0800 Line A1840 46,500 LNFT
63503-1000 Line A1860 6,000 LNFT
63504-1000 Line A1880 1,140 SQFT
63506-0400 Line A1900 2,500 HOUR
63506-0500 Line A1920 5,000 HOUR
63506-0600 Line A1940 1,600 HOUR
63508-1000 Line A1960 50 TON
TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO
TEMPORARY TRAFFIC CONTROL, POLICE OFFICE
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, MAINTENANCE
38.8% 60,007,890.00$
Unit Price Amount
Jas W. Glover, Ltd.
39,525.00$
56,400.00$
45,600.00$
145,000.00$
350,000.00$
136,000.00$
39,250.00$
0.85$
40.00$
9.40$
70.00$
58.00$
785.00$
85.00$
12/14/2015 Page 24 of 24