Amendment_A001.pdf
PDF 1 MB Posted
- Solicitation number
- DTFH6815B00006
About this file
Amendment A001. Delete duplicate plans page C1.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C5 C8 C9-C10 C11-C13 C14-C15
HI HI SR 200(3) C1 C15
15101-0000 Mobilization LPSM ALL ALL 15206-0000 Slope, reference, and clearing and grubbing stakes Sta 331 331 includes new connector roads 15210-4000 Centerline, establishment Sta 331 331 includes new connector roads 15215-1000 Survey and staking, approach road Each 32 32 15215-3000 Survey and staking, drainage structure Each 23 23 23 15215-4500 Survey and staking, relocate existing control points Each 43 43 see shts. A4-A5 15216-1000 Survey and staking, roadway cross-sections Sta 331 331 includes new connector roads 15216 2000 S d ki d fi i hi k S 662 662 i l d d
Grading Summary
Sheet Number and Description
Surfacing Summary
ESTIMATED
QUANTITIES
BID
ITEM NO. ITEM DESCRIPTION UNIT Drainage
Summary
SHEET
NO.
TOTAL
SHEETS
Permanent Sign/Pave Markings Summary
Misc Summaries
REMARKS AND/OR
DETERMINATION OF
ESTIMATED QUANTITY
PLAN
SADDLE ROAD
PROJECT
STATE
15216-2000 Survey and staking, grade finishing stakes Sta 662 662 includes new connector roads 15301-0000 Contractor quality control LPSM ALL ALL 15401-0000 Contractor testing LPSM ALL ALL 15501-0000 Construction schedule LPSM ALL ALL 1.5% of cons est-CPM 15705-0100 Soil erosion control, silt fence LNFT 20,320 20,320 21,340 15705-1300 Soil erosion control, temporary diversion channel LNFT 2,200 2,200 2,310 for box culvert construction 15705-1400 Soil erosion control, sediment log LNFT 4,170 760 4,930 5,180 15706-0200 Soil erosion control, check dam (riprap) Each 438 438 460 15801-0000 Watering for dust control MGAL 30,000 1 Mgal = 1,000 gallons 20101-0000 Clearing and grubbing Acre 110 110 116 20301-1100 Removal of gate Each 4 4 4 20301-2400 Removal of sign Each 16 16 16 20302-0700 Removal of fence LNFT 1,343 1,343 1,420 20302-1200 Removal of guardrail LNFT 700 700 74020302-1200 Removal of guardrail LNFT 700 700 740 20401-0000 Roadway excavation CuYd 666,628 666,628 733,000 does not include water 20402-0000 Subexcavation CuYd 67,341 67,341 74,000 20420-0000 Embankment construction CuYd 424,304 424,304 467,000 does not include water 20441-0000 Waste (disposal on embankment slope) CuYd 142,560 142,560 157,000 20441-0000 Waste CuYd 49,606 49,606 55,000 21101-1000 Roadway obliteration, method 1 SqYd 7,974 7,974 8,370 21201-0000 Linear grading Sta 155 155 contract quantity 25101-3000 Placed riprap, class 3 CuYd 1,604 18,820 20,424 21,450 25110-3000 Grouted riprap, class 3 CuYd 927 927 973 for culvert inlet protection 30101-0000 Aggregate base Ton 66,071 66,071 71,100 6" pavement section 30110-0000 Aggregate surface course Ton 29 40 vehicle washdown pad 30608-0000 Dust palliative application (for project detours/roads) Gal 2,000 2,000 0.25-0.40 gal/yd2
30608-0000 Dust palliative application (for quarry haul road) Gal 3,000 3,000 0.25-0.40 gal/yd2
0(
3) s um .x ls ]S
U M
M A
R Y
(1 p pp ( q y ) , , 0 5 0 0 ga /yd 31101-0000 Stockpiled aggregate (1-1/2 inch) Ton 7,201 7,560 1.55 tons = 1 cu yd 40201-1300 Hot asphalt concrete pavement, marshall test, class A, grading E Ton 34,785 34,785 36,200 3" pavement section 40205-3000 Antistrip additive, type 3 Ton 348 362 1% of mix by weight 40920-1000 Fog seal, emulsified asphalt grade CSS-1 or CSS-1h, SS-1, or SS-1h Ton 82 82 87 0.10 gal/yd2
41105-0000 Blotter Ton 1,478 1,478 1,553 60103-0220 Concrete, headwall (and wingwalls) for 48-inch pipe culvert Each 4 4 4 60103-0240 Concrete, headwall (and wingwalls) for 54-inch pipe culvert Each 2 2 2 60103-0260 Concrete, headwall (and wingwalls) for 60-inch pipe culvert Each 2 2 2 60201-0800 24-inch pipe culvert LNFT 494 494 519 60201-1200 48-inch pipe culvert LNFT 346 346 364 60201-1300 54-inch pipe culvert LNFT 176 176 186
14.75 gal/yd2
SUMMARY OF QUANTITIES
SCHEDULE A (Sheet 1 of 3)\M pr oj
\L en ni e\
S ad dl e
E as t 1 1-
6\ su m m ar ie s\ [1
The following quantities are approximate unless noted as a contract quantity. Payment will be made for the actual quantities of work performed and accepted or for materials furnished according to the contract.
C1 SCHEDULE A (Sheet 1 of 3)M
:\ quantities of work performed and accepted or for materials furnished according to the contract.
Michael.Will Line
Michael.Will Line
Michael.Will Text Box
1 AMMENDMENT 1 DELETES DUPLICATE PAGE C1
Michael.Will Polygonal Line
Jeremiah.Rogers Highlight
Jeremiah.Rogers Typewritten Text Amendment A001, 11/18/2015
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Amendment AA01 NV FTNP LAKE 114(1) Plan Sheets.pdf |
| A01_TTL w-DDR-006.pdf |
| A05_TYP_01-001.pdf |
| A06_TYP_02-002.pdf |
| A07_TYP_03-003.pdf |
| A08_TYP_04-004.pdf |
| A09_TYP_05-005.pdf |
| NM FLAP 11299(1) Sheets A6_A7_B1_B4 for A001.pdf |
| TYP(DSBC)_01_A001 |
| TYP(DSBC)_02_A001 |
| SUM(DSBC)_03_A001 |
| b4.pdf |
| SUM(DSBC)_03_A001 |
| NM FLAP 11299(1) Sheets A6_A7_B1_B4 for A001.pdf |
| TYP(DSBC)_01_A001 |
| TYP(DSBC)_02_A001 |
| SUM(DSBC)_03_A001 |
| b4.pdf |
| SUM(DSBC)_03_A001 |
File details come from the government source that posted it. Updated .