T A B U L A T I O N O F B I D S Schedule X
Project No : HI SR 200(3)
Project Name : Saddle Road East Side Solcitation No:
State : HI County : Hawaii Federal Location : Hawaii County, HI
Opened at: FHWA HI Office Opened by: Clifford Chew Date: 12/14/2015
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date: 12/14/2015
Contract Awarded to: Award Date: 12/23/2015
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 5,890,570.60$
Road & Highway Builde 6,102,777.00$
Kiewit Infrastructure W 5,084,582.00$
Goodfellow Bros., Inc. 7,280,141.00$
Jas W. Glover, Ltd. 5,629,187.00$
DTFH6816C00008
X=90 days
X= 140 days
X=90 days
X= 90 days
DTFH6815B00006
Jeremiah Rogers
Road & Highway Builders, LLC.
Contract Specialist
12/14/2015 FHWA Confidential Page 1 of 1
Schedule X Total of Bid Items: 5,890,570.60$ 3.6% 6,102,777.00$ Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
15101-0000 Line X0020 ALL LPSM 401,706.60$ 401,706.60$ 659,939.80$
15301-0000 Line X0040 ALL LPSM 300,000.00$ 300,000.00$ 600,000.00$
15401-0000 Line X0060 ALL LPSM 30,000.00$ 30,000.00$ 650,000.00$
30301-2000 Line X0080 331.000 STA 300.00$ 99,300.00$ 662,000.00$
40101-0500 Line X0100 23,800 TON 165.00$ 3,927,000.00$ 2,856,000.00$
40105-3000 Line X0120 238 TON 1,300.00$ 309,400.00$ 190,400.00$
41201-1000 Line X0140 86 TON 2,520.00$ 216,720.00$ 68,800.00$
62201-0300 Line X0160 5 HOUR 205.00$ 1,025.00$ 700.00$
62201-0550 Line X0180 5 HOUR 151.00$ 755.00$ 750.00$
62201-1000 Line X0200 5 HOUR 244.00$ 1,220.00$ 750.00$
62201-1400 Line X0220 5 HOUR 354.00$ 1,770.00$ 850.00$
62201-2850 Line X0240 5 HOUR 235.00$ 1,175.00$ 750.00$
62201-3350 Line X0260 5 HOUR 237.00$ 1,185.00$ 750.00$
SHOULDER RECONDITIONING
2,000.00$
MOBILIZATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
BULLDOZER, 250HP MINIMUM FLYWHEEL POWER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Road & Highway Builders, LLC.
600,000.00$
659,939.80$
120.00$
650,000.00$
140.00$
800.00$
800.00$
150.00$
150.00$
150.00$
170.00$
150.00$
Engineer's Estimate
12/14/2015 Page 1 of 6
Schedule X Total of Bid Items: 5,890,570.60$ 3.6% 6,102,777.00$ Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount
Road & Highway Builders, LLC.Engineer's Estimate
62202-1000 Line X0280 ALL LPSM 60,000.00$ 60,000.00$ 120,000.00$
62301-0000 Line X0300 20 HOUR 65.00$ 1,300.00$ 1,100.00$
63313-0000 Line X0320 240,872 LNFT 0.75$ 180,654.00$ 24,087.20$
63313-1000 Line X0340 28,400 LNFT 0.75$ 21,300.00$ 28,400.00$
63401-1700 Line X0360 147,600 LNFT 1.50$ 221,400.00$ 147,600.00$
63401-1800 Line X0380 2,500 LNFT 1.50$ 3,750.00$ 2,500.00$
63405-0050 Line X0400 20 EACH 50.00$ 1,000.00$ 10,000.00$
63405-3300 Line X0420 20 EACH 180.00$ 3,600.00$ 10,000.00$
63405-3350 Line X0440 70 EACH 180.00$ 12,600.00$ 14,000.00$
63405-3500 Line X0460 2 EACH 180.00$ 360.00$ 3,000.00$
63406-0000 Line X0480 9,800 EACH 7.00$ 68,600.00$ 29,400.00$
63502-2000 Line X0500 3 EACH 5,000.00$ 15,000.00$ 6,000.00$
63506-0500 Line X0520 150 HOUR 65.00$ 9,750.00$ 15,000.00$
RUMBLE STRIP (CENTERLINE)
RUMBLE STRIP, SHOULDER
PAVEMENT MARKINGS, TYPE I, SOLID
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
PAVEMENT MARKINGS, TYPE I, BROKEN
PAVEMENT MARKINGS, SYMBOLS (YIELD LINE MARKINGS)
PAVEMENT MARKINGS, TYPE I, TURN ARROW
PAVEMENT MARKINGS, TYPE I, STRAIGHT ARROW
PAVEMENT MARKINGS, TYPE I, "STOP" WORD MESSAGE
RAISED PAVEMENT MARKER
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
120,000.00$
0.10$
55.00$
1.00$
1.00$
500.00$
1.00$
200.00$
500.00$
3.00$
1,500.00$
100.00$
2,000.00$
12/14/2015 Page 2 of 6
Schedule X Total of Bid Items:
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15301-0000 Line X0040 ALL LPSM
15401-0000 Line X0060 ALL LPSM
30301-2000 Line X0080 331.000 STA
40101-0500 Line X0100 23,800 TON
40105-3000 Line X0120 238 TON
41201-1000 Line X0140 86 TON
62201-0300 Line X0160 5 HOUR
62201-0550 Line X0180 5 HOUR
62201-1000 Line X0200 5 HOUR
62201-1400 Line X0220 5 HOUR
62201-2850 Line X0240 5 HOUR
62201-3350 Line X0260 5 HOUR
SHOULDER RECONDITIONING
MOBILIZATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPAC
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATE
BULLDOZER, 250HP MINIMUM FLYWHEEL POWE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
ANTISTRIP ADDITIVE, TYPE 3
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
-13.7% 5,084,582.00$ 23.6% 7,280,141.00$
Unit Price Amount Unit Price Amount
1.00$ 900,000.00$
150,000.00$ 680,000.00$
45,000.00$ 600,000.00$
72,820.00$ 132,400.00$
3,831,800.00$ 4,069,800.00$
182,070.00$ 209,440.00$
153,510.00$ 75,680.00$
625.00$ 820.00$
900.00$ 690.00$
1,110.00$ 920.00$
1,625.00$ 1,515.00$
1,215.00$ 1,000.00$
850.00$ 1,330.00$
220.00$ 400.00$
1.00$ 900,000.00$
Kiewit Infrastructure West Co. Goodfellow Bros., Inc.
161.00$ 171.00$
150,000.00$ 680,000.00$
45,000.00$ 600,000.00$
125.00$ 164.00$
1,785.00$ 880.00$
765.00$ 880.00$
222.00$ 184.00$
180.00$ 138.00$
243.00$ 200.00$
325.00$ 303.00$
170.00$ 266.00$
12/14/2015 Page 3 of 6
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line X0280 ALL LPSM
62301-0000 Line X0300 20 HOUR
63313-0000 Line X0320 240,872 LNFT
63313-1000 Line X0340 28,400 LNFT
63401-1700 Line X0360 147,600 LNFT
63401-1800 Line X0380 2,500 LNFT
63405-0050 Line X0400 20 EACH
63405-3300 Line X0420 20 EACH
63405-3350 Line X0440 70 EACH
63405-3500 Line X0460 2 EACH
63406-0000 Line X0480 9,800 EACH
63502-2000 Line X0500 3 EACH
63506-0500 Line X0520 150 HOUR
RUMBLE STRIP (CENTERLINE)
RUMBLE STRIP, SHOULDER
PAVEMENT MARKINGS, TYPE I, SOLID
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, FLAGGER
PAVEMENT MARKINGS, TYPE I, BROKEN
PAVEMENT MARKINGS, SYMBOLS (YIELD LINE M
PAVEMENT MARKINGS, TYPE I, TURN ARROW
PAVEMENT MARKINGS, TYPE I, STRAIGHT ARRO
PAVEMENT MARKINGS, TYPE I, "STOP" WORD M
RAISED PAVEMENT MARKER
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
-13.7% 5,084,582.00$ 23.6% 7,280,141.00$
Unit Price Amount Unit Price Amount
Kiewit Infrastructure West Co. Goodfellow Bros., Inc.
127,000.00$ 110,000.00$
1,400.00$ 1,380.00$
120,436.00$ 120,436.00$
19,880.00$ 14,200.00$
191,880.00$ 221,400.00$
7,500.00$ 10,000.00$
1,520.00$ 1,800.00$
3,840.00$ 4,500.00$
15,540.00$ 18,200.00$
1,010.00$ 1,180.00$
53,900.00$ 63,700.00$
90,000.00$ 30,000.00$
9,150.00$ 9,750.00$
127,000.00$ 110,000.00$
0.50$ 0.50$
70.00$ 69.00$
1.30$ 1.50$
0.70$ 0.50$
76.00$ 90.00$
3.00$ 4.00$
222.00$ 260.00$
192.00$ 225.00$
5.50$ 6.50$
505.00$ 590.00$
61.00$ 65.00$
30,000.00$ 10,000.00$
12/14/2015 Page 4 of 6
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
15101-0000 Line X0020 ALL LPSM
15301-0000 Line X0040 ALL LPSM
15401-0000 Line X0060 ALL LPSM
30301-2000 Line X0080 331.000 STA
40101-0500 Line X0100 23,800 TON
40105-3000 Line X0120 238 TON
41201-1000 Line X0140 86 TON
62201-0300 Line X0160 5 HOUR
62201-0550 Line X0180 5 HOUR
62201-1000 Line X0200 5 HOUR
62201-1400 Line X0220 5 HOUR
62201-2850 Line X0240 5 HOUR
62201-3350 Line X0260 5 HOUR
SHOULDER RECONDITIONING
MOBILIZATION
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR S
DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPAC
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RA
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATE
BULLDOZER, 250HP MINIMUM FLYWHEEL POWE
MOTOR GRADER, 12 FOOT MINIMUM BLADE
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAX
ANTISTRIP ADDITIVE, TYPE 3
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMU
-4.4% 5,629,187.00$
Unit Price Amount
100,800.00$
228,000.00$
150,000.00$
244,940.00$
3,760,400.00$
178,500.00$
150,500.00$
1,100.00$
725.00$
1,750.00$
1,750.00$
1,080.00$
1,750.00$
740.00$
100,800.00$
Jas W. Glover, Ltd.
158.00$
228,000.00$
150,000.00$
220.00$
1,750.00$
750.00$
350.00$
145.00$
216.00$
350.00$
350.00$
12/14/2015 Page 5 of 6
Project No: HI SR 200(3)
Project Name: Saddle Road East Side CQ = "Contract Quantity"
Item No. Quantity Unit
62202-1000 Line X0280 ALL LPSM
62301-0000 Line X0300 20 HOUR
63313-0000 Line X0320 240,872 LNFT
63313-1000 Line X0340 28,400 LNFT
63401-1700 Line X0360 147,600 LNFT
63401-1800 Line X0380 2,500 LNFT
63405-0050 Line X0400 20 EACH
63405-3300 Line X0420 20 EACH
63405-3350 Line X0440 70 EACH
63405-3500 Line X0460 2 EACH
63406-0000 Line X0480 9,800 EACH
63502-2000 Line X0500 3 EACH
63506-0500 Line X0520 150 HOUR
RUMBLE STRIP (CENTERLINE)
RUMBLE STRIP, SHOULDER
PAVEMENT MARKINGS, TYPE I, SOLID
TEMPORARY TRAFFIC CONTROL, PORTABLE CHA
TEMPORARY TRAFFIC CONTROL, FLAGGER
PAVEMENT MARKINGS, TYPE I, BROKEN
PAVEMENT MARKINGS, SYMBOLS (YIELD LINE M
PAVEMENT MARKINGS, TYPE I, TURN ARROW
PAVEMENT MARKINGS, TYPE I, STRAIGHT ARRO
PAVEMENT MARKINGS, TYPE I, "STOP" WORD M
RAISED PAVEMENT MARKER
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
-4.4% 5,629,187.00$
Unit Price Amount
Jas W. Glover, Ltd.
125,000.00$
1,640.00$
240,872.00$
44,020.00$
214,020.00$
8,500.00$
1,680.00$
4,260.00$
17,220.00$
1,120.00$
60,760.00$
78,000.00$
10,800.00$
125,000.00$
1.00$
82.00$
1.45$
1.55$
84.00$
3.40$
246.00$
213.00$
6.20$
560.00$
72.00$
26,000.00$
12/14/2015 Page 6 of 6