ZOA_CWB_MAJOR_MECHANICAL - Preliminary_Commissioning_Plan.pdf

PDF 25 MB Posted

Attached to
MAJOR MECHANICAL MODERNIZATION, OAKLAND, CA ZOA
Solicitation number
DTFAWN-16-R-01856
Issued by

About this file

ZOA_CWB_MAJOR_MECHANICAL - Preliminary_Commissioning_Plan (pdf)

View the file

Other files

File Type Posted
ZOA_CWB_MAJOR_MECHANICAL - Specs.pdf PDF
SF-30 AMENDMENT.doc DOC document
1442-modernization at OAKLAND.pdf PDF
RFI RESPONSE 1 Controls Amendment part 1 REF drawings.pdf PDF
Site Visit prebid jobwalk.pdf PDF
SF-30 AMENDMENT 4.doc DOC document
FAA Response Ecorp RFI 2.docx DOCX document
SF-30 AMENDMENT 3.doc DOC document
SF-30 AMENDMENT 2.doc DOC document
Amendment 0002 Honeywell software upgrade.pdf PDF
customer satisfaction survey.docx DOCX document
DTFAWN-16-R-01856.pdf PDF
Site Visit (sol)revised.sol —
RFI RESPONSE 5.doc DOC document
RFI RESPONSE 3 RFI 3 FAA response.doc DOC document
ZOA_CWB_MAJOR_MECHANICAL - Dr Signed.pdf PDF
RFI RESPONSE 2 Controls Amendment part 2 REF drawings.pdf PDF
Question.doc DOC document
revised SF-30 AMENDMENT 5.doc DOC document
RFI 4 Oakland ARTCC CWB CCTR_Pre-Bid RFI 001 FAA Response Honeywell.pdf PDF
FAA Response RFI 6.doc DOC document
ZOA CWB MMS Hazmat.pdf PDF
SF-30 AMENDMENT 6.doc DOC document
DTFAWN-16-R-01856.pdf PDF
wage rates.txt TXT text file
RFI RESPONSE 4 Abide RFI.rtf RTF text file
FAA response RFI Ecorp 1.docx DOCX document
FAA Response Ecorp RFI 2.docx DOCX document
DTFAWN-16-R-01856.pdf PDF
RFI 4 Oakland ARTCC CWB CCTR_Pre-Bid RFI 001 FAA Response Honeywell.pdf PDF
customer satisfaction survey.docx DOCX document
RFI RESPONSE 1 Controls Amendment part 1 REF drawings.pdf PDF
DTFAWN-16-R-01856.pdf PDF
wage rates.txt TXT text file
SF-30 AMENDMENT 4.doc DOC document
ZOA_CWB_MAJOR_MECHANICAL - Dr Signed.pdf PDF
SF-30 AMENDMENT 3.doc DOC document
revised SF-30 AMENDMENT 5.doc DOC document
Site Visit prebid jobwalk.pdf PDF
Site Visit (sol)revised.sol —
FAA Response RFI 6.doc DOC document
Amendment 0002 Honeywell software upgrade.pdf PDF
RFI RESPONSE 2 Controls Amendment part 2 REF drawings.pdf PDF
Question.doc DOC document
RFI RESPONSE 3 RFI 3 FAA response.doc DOC document
RFI RESPONSE 4 Abide RFI.rtf RTF text file
ZOA_CWB_MAJOR_MECHANICAL - Specs.pdf PDF
1442-modernization at OAKLAND.pdf PDF
SF-30 AMENDMENT 2.doc DOC document
ZOA_CWB_MAJOR_MECHANICAL - Preliminary_Commissioning_Plan.pdf PDF
Show 40 more

Latest 50 of 235 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oakland ARTCC (ZOA)

Fremont, California

Control Wing Basement Renovation and Chillers/Cooling Tower Replacement (Major Mechanical) Project

Final Design Submittal Preliminary Commissioning Plan

July 8, 2015

Oakland ARTCC (ZOA) Control Wing Basement Renovation & Chillers/Cooling Tower Replacement (Major Mechanical) Project - Commissioning Plan
Table of Contents
1 Introduction
1.1 Commissioning Overview
1.2 Commissioning Authority (CxA)
1.3 Commissioning Plan
1.4 Project Description
1.5 Abbreviations
2 Roles and Responsibilities
2.1 FAA Owner / Operator Responsibilities
2.2 Project Design Manager (DM) Responsibilities
2.3 Resident Engineer (RE) Responsibilities
2.4 General Contractor (GC) Responsibilities
2.5 Commissioning Authority (CxA) Responsibilities
2.6 Subcontractors Commissioning Responsibilities
3 Commissioning Process
3.1 Commissioning Specifications
3.2 Review of the Commissioning Plan
3.3 Support for Commissioning
3.4 Commissioning Meetings
3.5 Coordination Planning
3.6 Submittal Review
3.7 Installation Monitoring
3.8 Construction Issues Tracking
3.9 Project Schedule Updates
3.10 CxA Site Visits
3.11 Pre-Functional Verification Checklists (PFVCs)
3.12 Functional Performance Test (FPTs)
3.13 Review of Test and Balance (TAB) Procedures
3.14 HVAC Controls Installation
3.15 HVAC System Start-Ups
3.16 Deficiencies & Re-Test
3.17 Acceptance
4 Commissioning Protocols
5 Appendices
Appendix A - Participants Involved in the Cx Process
Appendix B - Systems and Equipment to be Commissioned
Appendix C - Pre-Functional Verification Checklists - Samples
Appendix D - Functional Performance Tests - Samples

File details come from the government source that posted it. Updated .