ZOA_CWB_MAJOR_MECHANICAL - Preliminary_Commissioning_Plan.pdf
PDF 25 MB Posted
- Attached to
- MAJOR MECHANICAL MODERNIZATION, OAKLAND, CA ZOA
- Solicitation number
- DTFAWN-16-R-01856
About this file
ZOA_CWB_MAJOR_MECHANICAL - Preliminary_Commissioning_Plan (pdf)
View the file
Other files
Show 40 more
Latest 50 of 235 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oakland ARTCC (ZOA)
Fremont, California
Control Wing Basement Renovation and Chillers/Cooling Tower Replacement (Major Mechanical) Project
Final Design Submittal Preliminary Commissioning Plan
July 8, 2015
| Oakland ARTCC (ZOA) Control Wing Basement Renovation & Chillers/Cooling Tower Replacement (Major Mechanical) Project - Commissioning Plan |
| Table of Contents |
| 1 Introduction |
| 1.1 Commissioning Overview |
| 1.2 Commissioning Authority (CxA) |
| 1.3 Commissioning Plan |
| 1.4 Project Description |
| 1.5 Abbreviations |
| 2 Roles and Responsibilities |
| 2.1 FAA Owner / Operator Responsibilities |
| 2.2 Project Design Manager (DM) Responsibilities |
| 2.3 Resident Engineer (RE) Responsibilities |
| 2.4 General Contractor (GC) Responsibilities |
| 2.5 Commissioning Authority (CxA) Responsibilities |
| 2.6 Subcontractors Commissioning Responsibilities |
| 3 Commissioning Process |
| 3.1 Commissioning Specifications |
| 3.2 Review of the Commissioning Plan |
| 3.3 Support for Commissioning |
| 3.4 Commissioning Meetings |
| 3.5 Coordination Planning |
| 3.6 Submittal Review |
| 3.7 Installation Monitoring |
| 3.8 Construction Issues Tracking |
| 3.9 Project Schedule Updates |
| 3.10 CxA Site Visits |
| 3.11 Pre-Functional Verification Checklists (PFVCs) |
| 3.12 Functional Performance Test (FPTs) |
| 3.13 Review of Test and Balance (TAB) Procedures |
| 3.14 HVAC Controls Installation |
| 3.15 HVAC System Start-Ups |
| 3.16 Deficiencies & Re-Test |
| 3.17 Acceptance |
| 4 Commissioning Protocols |
| 5 Appendices |
| Appendix A - Participants Involved in the Cx Process |
| Appendix B - Systems and Equipment to be Commissioned |
| Appendix C - Pre-Functional Verification Checklists - Samples |
| Appendix D - Functional Performance Tests - Samples |
File details come from the government source that posted it. Updated .