RFI RESPONSE 5.doc

DOC document 27 KB Posted

Attached to
MAJOR MECHANICAL MODERNIZATION, OAKLAND, CA ZOA
Solicitation number
DTFAWN-16-R-01856
Issued by

About this file

RFI RESPONSE 5 (doc)

View the file

Other files

File Type Posted
ZOA_CWB_MAJOR_MECHANICAL - Specs.pdf PDF
SF-30 AMENDMENT.doc DOC document
1442-modernization at OAKLAND.pdf PDF
RFI RESPONSE 1 Controls Amendment part 1 REF drawings.pdf PDF
Site Visit prebid jobwalk.pdf PDF
SF-30 AMENDMENT 4.doc DOC document
FAA Response Ecorp RFI 2.docx DOCX document
SF-30 AMENDMENT 3.doc DOC document
SF-30 AMENDMENT 2.doc DOC document
Amendment 0002 Honeywell software upgrade.pdf PDF
customer satisfaction survey.docx DOCX document
DTFAWN-16-R-01856.pdf PDF
ZOA_CWB_MAJOR_MECHANICAL - Preliminary_Commissioning_Plan.pdf PDF
Site Visit (sol)revised.sol —
RFI RESPONSE 3 RFI 3 FAA response.doc DOC document
ZOA_CWB_MAJOR_MECHANICAL - Dr Signed.pdf PDF
RFI RESPONSE 2 Controls Amendment part 2 REF drawings.pdf PDF
Question.doc DOC document
revised SF-30 AMENDMENT 5.doc DOC document
RFI 4 Oakland ARTCC CWB CCTR_Pre-Bid RFI 001 FAA Response Honeywell.pdf PDF
FAA Response RFI 6.doc DOC document
ZOA CWB MMS Hazmat.pdf PDF
SF-30 AMENDMENT 6.doc DOC document
DTFAWN-16-R-01856.pdf PDF
wage rates.txt TXT text file
RFI RESPONSE 4 Abide RFI.rtf RTF text file
FAA response RFI Ecorp 1.docx DOCX document
FAA Response Ecorp RFI 2.docx DOCX document
DTFAWN-16-R-01856.pdf PDF
RFI 4 Oakland ARTCC CWB CCTR_Pre-Bid RFI 001 FAA Response Honeywell.pdf PDF
customer satisfaction survey.docx DOCX document
RFI RESPONSE 1 Controls Amendment part 1 REF drawings.pdf PDF
DTFAWN-16-R-01856.pdf PDF
wage rates.txt TXT text file
SF-30 AMENDMENT 4.doc DOC document
ZOA_CWB_MAJOR_MECHANICAL - Dr Signed.pdf PDF
SF-30 AMENDMENT 3.doc DOC document
revised SF-30 AMENDMENT 5.doc DOC document
Site Visit prebid jobwalk.pdf PDF
Site Visit (sol)revised.sol —
FAA Response RFI 6.doc DOC document
Amendment 0002 Honeywell software upgrade.pdf PDF
RFI RESPONSE 2 Controls Amendment part 2 REF drawings.pdf PDF
Question.doc DOC document
RFI RESPONSE 3 RFI 3 FAA response.doc DOC document
RFI RESPONSE 4 Abide RFI.rtf RTF text file
ZOA_CWB_MAJOR_MECHANICAL - Specs.pdf PDF
1442-modernization at OAKLAND.pdf PDF
SF-30 AMENDMENT 2.doc DOC document
ZOA_CWB_MAJOR_MECHANICAL - Preliminary_Commissioning_Plan.pdf PDF
Show 40 more

Latest 50 of 235 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF: Oakland ZOA ARTCC Major Mechanical Sustain and Control Wing Basement Project- Honeywell

RFI #5.

Question:

The FAA Preliminary Commissioning Plan – Final Design Appendix B lists the Fire Alarm System as being the Systems and equipment to be commissioned.

Would you please request from the Engineer, the expected list of tasks from the CxA (Commissioning Agent) in regards to the fire alarm system?

The Specification 28 31 00 requires

1. pretests the fire alarm system

2. Provide a report of the Pretesting

3. Final Test with COR

4. Provide documentation of the final test, retesting, and inspections.

Exactly what additional work than the 28 31 00 specified testing is required for the CxA??

The Commissioning plan indicates all HVAC testing matrix.

FAA Response to RFI #4 from Honeywell, Mac Parfet on Oct 12.

All fire alarm testing requirements are included in the Fire Alarm Specification. Once all other systems are commissioned and no changes are made, then there is no additional fire alarm work. However, if interfaces with the fire alarm system are affected after the fire alarm test has been completed and accepted those components shall be retested. This was the purpose for including it in the commissioning plan.

File details come from the government source that posted it. Updated .