SOLICITATION, OFFER
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED BID (RFP)
WS-17-02536
FEDERAL AVIATION ADMINISTRATION
WESTERN SERVICE AREA
1601 LIND AVE SW
AAQ-530-ANM ACQUISITION GROUP
AAQ530ANM-AFN
RENTON WA 98057
cindi.tjelde@faa.gov
Cynthia Tjelde 425-227-2690 x
05/25/2017 59
PURCHASE REQUEST NO.
DTFASA-17-R-00631
10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
See Attachment 1 - Specifications.
11. The Contractor shall begin performance within
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and is not required.is, B. An offer guarantee
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.
D. Offers providing less than
12B. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in item 12B.)
5 60 calendar days and complete it within ________________ ________________ calendar days after receiving
1 1700
06/21/2017 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.
SF-1442 FORM
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (MUST BE FULLY COMPLETED BY OFFEROR)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Contract Authority)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE
BY
2PAGE OF
FEDERAL AVIATION ADMINISTRATION
WESTERN SERVICE AREA
1601 LIND AVE SW
AAQ-530-ANM ACQUISITION GROUP
AAQ530ANM-AFN
RENTON WA 98057
Cynthia A. Tjelde
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
Continued...
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 59
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
DTFASA-17-R-00631
(A) (B) (C) (D) (E) (F)
Delivery: 60 Days After Notice to Proceed
Delivery Location Code: S690530F
S690530F
690530 DOT FAA AJW 2W12
ENROUTE FSS ENG NM8GH5
3101 AUBURN WAY S F
AUBURN WA 980927950 US
Period of Performance: 07/01/2017 to 09/30/2017
0001 Operational Support Wing Roof Replacement at
Seattle ARTCC
Electronic & IT: 03
Section B - Supplies or Services/Prices
B001. PRICE/COST: The Contractor is required to furnish all labor, tools, materials, services, equipment, transportation, insurance, bonds, security notifications, submittals, supervision, licenses, permits, state sales taxes and fees in accordance with applicable federal, state, and local regulatory requirements for the replacement of the Operational Support Wing Roof at the Seattle Air Route Traffic Control Center (ARTCC) located in Auburn, WA, in accordance with the contract clauses, specifications, drawings, and applicable wage rates.
PHASE/Contract Line Item
Description Materials Labor Total
001 Roof Replacement Project
The offered price must encompass all costs related to (a) direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, freight, handling, transportation, inspection, testing, operation and maintenance manuals, bonds, etc., (b) federal, state, and local taxes, (c) all applicable fees permits, licenses, and (d) any miscellaneous charges.
The offeror is required to provide a price for each Contract Line Item (CLIN). Failure to comply may result in the rejection of the subject offer. A single award will be made. There will be no split award. In the event that the CLIN price for any line item is materially unbalanced, the entire offer may be rejected without discussion with the offeror.
In the event of any disparity between the CLIN price and the total offered price, the CLIN price will be deemed correct, and the total offered amount will be revised accordingly, unless available information indicates otherwise.
Effective April 1, 1996, the Federal Aviation Administration (FAA) began operating under the new FAA Acquisition Management System. The 1996 DOT Appropriation Act, Public Law 104-50, mandated that the FAA rewrite its acquisition regulations and granted legislative relief from certain laws. The Federal Acquisition Regulations (FAR), Federal Acquisition Streamlining Act of 1994, Small Business Act, and Competition in Contracting Act, are three of these laws.
B002. FAA INSURANCE REQUIREMENTS: Worker’s compensation and employer’s liability.
a. The Contractor is to procure and maintain during the entire period of performance under this contract the following minimum insurance.
Type Amount
Automobile Liability $ 200,000 per person
Bodily Injury Liability $ 500,000 per occurrence
Property Damage $ 200,000 per occurrence
Comprehensive General Liability
Bodily Injury $100,000/$500,000
Workers’ Compensation and Employers’ Liability
Workers’ Compensation and Occupational Disease Statutory
Employer’s Liability $100,000
B003. SET-ASIDE DETERMINATION:
This procurement is being set aside exclusively for competition among ALL Small Business Concerns. Small businesses competing for this acquisition must certify their status on the Business Declaration form inserted following Part IV, Section K. SBA Socially and Economically Disadvantaged Businesses (SEDB 8(a)) and Service Disabled Veteran Owned Small Businesses (SDVOSB) are encouraged to submit an offer.
APPLICABLE NAICS CODE: 238160 – Roofing Contractors with a size standard of $15.0 Million.
B004. PERIOD OF PERFORMANCE. All work must be completed within 60 calendar days after issuance of Notice to Proceed (NTP).
B005. SITE VISIT. A site visit for this project is scheduled for Tuesday, June 6, 2017, at 10:00 a.m. Attendance is not mandatory to submit an offer, but is highly encouraged so that the Contractor can verify existing conditions, quantities of materials required, and amount of work required. The Contractor is responsible for insuring that their offer reflects all work required to accomplish this project. The dimensions, measurements, and quantities of materials list in the specifications and on the construction drawings are estimated and are presented to give the Contractor an idea of the total scope of work. Please contact Engineer Ken Bloom at (253)351-3776 or ken.bloom@faa.gov by 3:00 p.m. on Friday, June 2, 2017, to RSVP for the site visit.
B006. Per clause 3.2.2.3-41 Performing Work (July 2004), the Prime Contractor is required to perform 15% of the work with their own forces. See Section I for the complete details.
THE ESTIMATED PRICE RANGE FOR THIS PROJECT IS BETWEEN $200,000.00 AND
$300,000.00.
The remainder of this page has been intentionally left blank.
mailto:ken.bloom@faa.gov
Section C - Description/Specifications
See Attachment 1 – Specifications.
Section D - Packaging and Marking
Not used.
Section E - Inspection and Acceptance
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at: http://conwrite.faa.gov.
(End of clause)
3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)
3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS
(APR 1996)
Section F - Deliveries or Performance
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at: http://conwrite.faa.gov.
(End of clause)
3.10.1-11 GOVERNMENT DELAY OF WORK (APR 1996)
Section G - Contract Administration Data
Clause List
3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR
2012)
(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 5 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:
(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.
(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.
(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:
(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;
(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;
(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and
(4) final acceptance under the contract.
(End of clause)
G001. Correspondence
Proper routing and distribution of correspondence is required to insure that the Contracting Officer has knowledge of pertinent actions taken relating to the contract. The Contractor must cc:
cindi.tjelde@faa.gov on ALL written correspondence provided to the Contracting Officer’s Representative (COR), including transmittal letters. Submittals accompanying transmittal letter to the COR need not be forwarded to the Contracting Officer.
G002. Invoice Submission
Partial payments based on actual project completion are authorized under this contract. Payment will be made at a rate of 100% of progress, without retainage, until the project has reached 90% of the project value. The remainder will be paid upon project completion and acceptance.
Payrolls must be submitted along with any application for payment. Any fringe benefits paid must be clearly identified.
G003. Subcontract Acknowledgement
Within ten (10) calendar days after contract award of any tier subcontract for performance or work at the construction site, the contractor must deliver to the Contacting Officer an executed SF 1413, Statement and Acknowledgement form by which the contactor and the subcontractor acknowledges that the labor standard clauses of this contract have been included in the subcontract and in any lower tier subcontract awarded by her/him for work under this contract (also reference contract clause 3.6.2-22 Subcontracts (Labor standards)). The Contracting Officer will furnish copies of the form to the contractor. Nothing contained in this contract creates any contractual relationship between a subcontractor and the Government.
G004. Bond Requirement:
Performance and Payment bonds are required and shall be submitted within ten (10) calendar days of written notice of contract award. The penal sums are as follows:
a. The contractor is required to submit a performance bond in a penal amount equal to 100% of the contract price within the time stated above.
b. The contractor is required to submit a payment bond in a penal amount equal to 100% of the contract price within the time stated above.
Section H - Special Contract Requirements
Clause List
3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2013)
(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:
(1) Contracts written on paper and contracts in electronic form;
(2) Pen-and-ink signatures and electronic signatures; and
(3) Other legally-required written records and the same information in electronic form.
(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.
(c) Certain documents may need to be provided or maintained in original form, such as large scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.
(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract. Contractors may use the following means of electronic signature technology: email only.
(End of Clause)
3.8.2-17 KEY PERSONNEL AND FACILITIES (MAY 1997)
(a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.
(b) Prior to removing, replacing, or diverting any of the specified personnel and/or facilities, the Contractor shall notify in writing, and receive consent from, the Contracting Officer reasonably in advance of the action and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.
(c) No diversion shall be made by the Contractor without the written consent of the Contracting Officer.
(d) The key personnel and/or facilities under this contract are:
On-site Superintendent
(End of clause)
H001. Clean Up and Waste Disposal
The work site, including storage areas, must be kept clean and orderly during the progress of this project. The Contractor must collect all waste materials, debris, and rubbish and dispose of them in an on-site enclosed container, supplied by the contractor. See section 01 77 00 – Closeout Procedures in the attached Specifications for additional information regarding additional clean up and was disposal requirements.
H002. Applicable Minimum Hourly Rates of Wage
(a) The wage determination decision of the Secretary of Labor in this contract specifies the minimum hourly rates of wages which shall be paid to laborers and mechanics employed or working upon the site of the work. These rates have been determined by the Secretary of Labor in accordance with the provisions of the Davis-Bacon Act, as amended, to be the prevailing rates for the corresponding classes of laborers employed on contracts of a similar character in the locality where this work is to be performed.
(b) While the wage rates given in the decision are the minimum rates required to be paid during the life of the contract, it is the responsibility of bidders to inform themselves as to local labor conditions such as the prevailing wage rates, the length of the work day and work week, overtime compensation fringe benefit payments, available labor supply, and prospective changes or adjustment to wage rates. The contractor shall abide by and conform to all applicable laws, Executive Orders, and rules, regulations and orders of the Secretary of Labor. No increase in the contract price shall be allowed or authorized on account of the payment of wage rates in excess of those listed in the contract wage determination decision.
(c) The wage determination decision of the Secretary of Labor in the contract is solely for the purpose of setting forth the minimum hourly wage rates required to be paid during the life of the contract is not to be accepted as a guarantee, warranty or representation as the wage rates indicated.
NOTE: THE DAVIS-BACON ACT IS APPLICABLE (SEE CONTRACT CLAUSES). REFERENCE THE
ATTACHED GENERAL WAGE DECISION NO. WA170036, DATED 5/19/2017, FOR KING
COUNTY IN THE STATE OF WASHINGTON (SEE SECTION “J”). THIS WAGE DECISION IS HEREBY
INCORPORATED INTO THIS SCREENING INFORMATION REQUEST (SIR) AND WILL BE A PART OF
ANY RESULTANT CONTRACT.
H004. Submittals
See the Scope of Work for required submittals.
Section I - Contract Clauses
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at: http://conwrite.faa.gov.
(End of clause)
3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (AUG 1997)
3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)
3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)
3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)
3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2004)
3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)
3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2004)
3.2.2.3-48 OTHER CONTRACTS (MAR 2009)
3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (JUL 2004)
3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)
3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)
3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)
3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)
3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2004)
3.2.2.3-59 ORGANIZATION AND DIRECTION OF THE WORK (JUL 2004)
3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)
3.2.2.3-66 CONTRACTOR'S DAILY LOG (JUL 2004)
3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)
3.2.2.3-69 SUBCONTRACTS - CONSTRUCTION (JUL 2004) - ALTERNATE I (JUL 2004)
3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (OCT 2015)
3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)
3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)
3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 1996)
3.2.5-3 GRATUITIES OR GIFTS (JAN 1999)
3.2.5-4 CONTINGENT FEES (OCT 1996)
3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2010)
3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)
3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (APR 1996)
3.3.1-9 INTEREST (SEP 2009)
3.3.1-15 ASSIGNMENT OF CLAIMS (APR 1996)
3.3.1-17 PROMPT PAYMENT (JAN 2017)
3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (OCT
2012)
3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD MANAGEMENT
(AUG 2012)
3.3.2-1 FAA COST PRINCIPLES (JAN 2016)
3.4.1-6 ADDITIONAL BOND SECURITY (APR 1996)
3.4.1-7 NOTICE TO PROCEED (APR 1996)
3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (JUL 1996)
3.4.1-12 INSURANCE (JUL 1996)
3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (APR 2013)
3.5-1 AUTHORIZATION AND CONSENT (JAN 2009)
3.5-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (JAN 2009)
3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JAN 2010)
3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME COMPENSATION
(JAN 2012)
3.6.2-2 CONVICT LABOR (APR 1996)
3.6.2-9 EQUAL OPPORTUNITY (AUG 1998)
3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (JAN 2011)
3.6.2-13 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)
3.6.2-18 DAVIS BACON ACT (OCT 2010)
3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (APR 1996)
3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2011)
3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (OCT 2010)
3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (OCT 2010)
3.6.2-23 CERTIFICATION OF ELIGIBILITY (APR 1996)
3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (AUG 1998)
3.6.2-39 TRAFFICKING IN PERSONS (OCT 2015)
3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (OCT 2016)
3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (OCT 2016)
3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)
3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (OCT 2016)
3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)
3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)
3.9.1-1 CONTRACT DISPUTES (OCT 2011)
3.9.1-2 PROTEST AFTER AWARD (AUG 1997)
3.10.1-7 BANKRUPTCY (APR 1996)
3.10.1-8 SUSPENSION OF WORK (SEP 1998)
3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF
IMPROVEMENTS (JUL 1996)
3.10.1-16 CHANGES AND CHANGED CONDITIONS (APR 1996)
3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)
3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)
3.10.1-26 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (APR 2013)
3.10.2-1 SUBCONTRACTS (FIXED-PRICE CONTRACTS) (APR 1996)
3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT
1996)
3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)
3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)
3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)
3.14-3 FOREIGN NATIONALS AS CONTRACTOR EMPLOYEES (APR 2014)
3.2.2.3-41 PERFORMING WORK (JUL 2004)
The Contractor (you) must perform, using your own organization, work equivalent to at least 15 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.
(End of clause)
3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009) - ALTERNATE I
(MAR 2009)
(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor (you) must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify you in writing. Any adjustment you make without the CO's determination is at your own risk and expense. From time to time the CO will provide necessary detailed drawings and other information, unless otherwise provided.
(b) Wherever in the specifications or the drawings FAA (we, our) uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements.
Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. You must have a complete set of plans and specifications on site and available for our use.
(c) Where we use "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."
(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve you from performing those omitted or erroneously described details of the work. You must perform them as if fully and correctly set forth and described in the drawings and specifications.
(e) You must check all drawings we provide to you before starting work and must promptly notify the CO of any discrepancies. In general you should follow figures marked on drawings, rather than scale measurements. In general, large scale drawings have precedence over small scale drawings.
You must compare all drawings and verify the figures before laying out the work. If you do not verify the figures, you will be responsible for any errors you might have avoided had you verified them.
(f) "Shop drawings" means drawings, you or any subcontractor submit to us under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials you provided to explain in detail specific portions of the work the contract requires.
FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.
(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), you must coordinate all of your offers, and review them for accuracy, completeness, and compliance with contract requirements. You must provide evidence that you approve the submittals. If you submit materials to us without this evidence, we may return them and ask you to resubmit them. The CO will indicate whether he or she approves or disapproves your offer, and if the CO does not approve it as submitted, will indicate our reasons for rejecting it. Any work done before the CO's approval is at your risk. The CO's approval does not relieve you from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).
(h) If you submittals vary from the contract requirements, you must describe the variations in writing, separate from the submittal, when you submit them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.
(i) You must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to you.
(j) You must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.
(k) When you finish the work under this contract, you must provide 4 complete reproducible sets of all shop drawings as we finally approve them. These drawings must show all changes and revisions made up to the time you finish the work and we accept it.
(End of clause)
3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2004)
The successful offeror must attend a pre-construction conference at a site the Contracting Officer designates before starting the work.
(End of clause)
3.2.2.3-68 SAFETY AND HEALTH (OCT 2014) - ALTERNATE I (JUL 2004)
(a) Before beginning work, the Contractor (you) must:
(1) Perform a hazards analysis of the work specified in this contract. Consider both the site and adjacent conditions. Identify all significant hazards. Some of the hazards you might encounter are falls, power tools, etc.
(2) Submit a safety plan for dealing with each specific hazard identified, whether you or FAA identified it.
(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding about the content and implementation of the plan.
(4) The CO or her or his representatives may require other hazards to be added to the plan. If the CO determines that your planned hazard avoidance measures are insufficient, the CO or a designated representative may require you to revise the plan. You may not begin work involving identified hazards unless you have submitted adequate plans to the CO and the CO has reviewed them. This approval does not relieve you of your liability for safe performance.
3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004)
The Contractor (you) must
(a) begin work under this contract within 5 calendar days after the date you receive the notice to proceed,
(b) perform the work diligently, and
(c) complete the entire work ready for use not later than 60. The time allowed for completion must include final cleanup of the premises.
(End of clause)
3.3.1-31 PROGRESS PAYMENTS (NOV 2000)
Progress payments shall be made to the Contractor when requested as work progresses, but not more frequently than monthly in amounts approved by the Contracting Officer, under the following conditions:
(a) Computation of amounts.
(1) Unless the Contractor requests a smaller amount, each progress payment shall be computed as:
(i) 80 percent of the Contractor's cumulative total costs under this contract, whether or not actually paid plus financing payments to subcontractors (see paragraph (j)), as shown by records maintained by the Contractor for the purpose of obtaining payment under Government contracts, plus
(ii) progress or financing payments to subcontractors (see paragraph (j) below), all less the sum of all previous progress payments made by the Government under this contract.
(iii) Cost of money is allowable subject to the requirements of clause 3.3.2-1, "FAA Cost Principles".
(2) The following conditions apply to the timing of including costs in progress payment requests:
(i) The costs of supplies and services purchased by the Contractor from subcontractors directly for this contract may be included whether or not actually paid.
(ii) Costs for the following may be included when incurred, even if before payment, when the Contractor is not delinquent in payment of the costs of contract performance in the ordinary course of business: In support of this, the Contractor shall include a certification in its request for progress payment indicating that it is not delinquent in payment of costs of contract performance in the ordinary course of business.
(A) Materials issued from the Contractor's stores and placed in the production process for use on this contract.
(B) Direct labor, direct travel, and other direct in-house costs.
(C) Properly allocable and allowable indirect costs.
(iii) Accrued costs of Contractor contributions under employee pension or other postretirement benefit, profit sharing, and stock ownership plans shall be excluded until actually paid unless---
(A) The Contractor's practice is to contribute to the plans quarterly or more frequently; and
(B) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contributions remaining unpaid shall be excluded from the Contractor's total costs for progress payments until paid).
(iv) If the contract is subject to the special transition method authorized in Cost Accounting Standard (CAS) 410, Allocation of Business Unit General and Administrative Expense to Final Cost Objective, General and Administrative expenses (G&A) shall not be included in progress payment requests until the suspense account prescribed in CAS 410 is less than--
(A) Five million dollars; or
(B) The value of the work-in-process inventories under contracts entered into after the suspense account was established (only a pro rata share of the G&A allocable to the excess of the inventory over the suspense account value is includable in progress payment requests under this contract).
(3) The Contractor shall not include the following in total costs for progress payment purposes in subparagraph (a)(1)(i) above:
(i) Costs that are not reasonable, allocable to this contract, and consistent with sound and generally accepted accounting principles and practices.
(ii) Costs incurred by subcontractors or suppliers.
(iii) Costs ordinarily capitalized and subject to depreciation or amortization except for the properly depreciated or amortized portion of such costs.
(iv) Payments made or amounts payable to subcontractors or suppliers, except for--
(A) Completed work, including partial deliveries, to which the Contractor has acquired title; and
(B) Work under cost-reimbursement or time-and-material subcontracts to which the Contractor has acquired title.
(4) The amount of unliquidated progress payments may exceed neither (i) the progress payments made against incomplete work (including allowable unliquidated progress payments to subcontractors) nor (ii) the value, for progress payment purposes, of the incomplete work.
Incomplete work shall be considered to be the supplies and services required by this contract, for which delivery and invoicing by the Contractor and acceptance by the Government are incomplete.
(5) The total amount of progress payments shall not exceed 80 percent of the total contract price.
(6) If a progress payment or the unliquidated progress payments exceed the amounts permitted by subparagraphs (a)(4) or (a)(5) above, the Contractor shall repay the amount of such excess to the
Government on demand subject to an interest rate based on the current US Treasury rate calculated from the time the excess payment was received by the contractor until such time as the reimbursement is received by the Government
(b) Liquidation. Except as provided in termination clauses of the contract, all progress payments shall be liquidated by deducting from any payment under this contract, other than advance or progress payments, the unliquidated progress payments, or 80 percent of the amount invoiced, whichever is less. The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated progress payments accordingly. The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.
(c) Reduction or suspension. The Contracting Officer may reduce or suspend progress payments, increase the rate of liquidation, or take a combination of these actions, after finding on substantial evidence any of the following conditions:
(1) The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (f) and (g) below).
(2) Performance of this contract is endangered by the Contractor's (i) failure to make progress or
(ii) unsatisfactory financial condition.
(3) Inventory allocated to this contract substantially exceeds reasonable requirements.
(4) The Contractor is delinquent in payment of the costs of performing this contract in the ordinary course of business.
(5) The unliquidated progress payments exceed the fair value of the work accomplished on the undelivered portion of this contract.
(6) The Contractor is realizing less profit than that reflected in the establishment of any alternate liquidation rate in paragraph (b) above, and that rate is less than the progress payment rate stated in subparagraph (a)(1) above.
(d) Title.
(1) Title to the property described in this paragraph (d) shall vest in the Government. Vestiture shall be immediately upon the date of this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.
' (2) Property,' as used in this clause, includes all of the below-described items acquired or produced by the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices.
(i) Parts, materials, inventories, and work in process;
(ii) Special tooling and special test equipment to which the Government is to acquire title under any other clause of this contract;
(iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment, and other similar manufacturing aids, title to which would not be obtained as special tooling under subparagraph (ii) above; and
(iv) Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other clauses of this contract.
(3) Although title to property is in the Government under this clause, other applicable clauses of this contract; e.g., the termination or special tooling clauses, shall determine the handling and disposition of the property.
(4) The Contractor may sell any scrap resulting from production under this contract without requesting the Contracting Officer's approval, but the proceeds shall be credited against the costs of performance.
(5) To acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain the Contracting Officer's advance approval of the action and the terms. The Contractor shall (i) exclude the allocable costs of the property from the costs of contract performance, and (ii) repay to the Government any amount of unliquidated progress payments allocable to the property. Repayment may be by cash or credit memorandum.
(6) When the Contractor completes all of the obligations under this contract, including liquidation of all progress payments, title shall vest in the Contractor for all property (or the proceeds thereof) not-
(i) Delivered to, and accepted by, the Government under this contract; or
(ii) Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the Government under this clause.
(7) The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the Government acquired title solely under this clause.
(e) Risk of loss. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. The Contractor shall repay the Government an amount equal to the unliquidated progress payments that are based on costs allocable to property that is damaged, lost, stolen, or destroyed.
(f) Control of costs and property. The Contractor shall maintain an accounting system and controls adequate for the proper administration of this clause.
(g) Reports and access to records. The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information reasonably requested by the Contracting Officer for the administration of this clause. Also, the Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's books, records, and accounts.
(h) Special terms regarding default. If this contract is terminated under the contract default clause,
(1) The Contractor shall, on demand, repay to the Government the amount of unliquidated progress payments and
(2) Title shall vest in the Contractor, on full liquidation of progress payments, for all property for which the Government elects not to require delivery under the contract default clause. The Government shall be liable for no payment except as provided by the contract default clause.
(i) Reservations of rights.
(1) No payment or vesting of title under this clause shall
(i) excuse the Contractor from performance of obligations under this contract or
(ii) constitute a waiver of any of the rights or remedies of the parties under the contract.
(2) The Government's rights and remedies under this clause
(i) shall not be exclusive but rather shall be in addition to any other rights and remedies provided by law or this contract and
(ii) shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
(j) Finance payments to subcontractors. The amounts mentioned in (a)(1)(ii) above shall be all financing payments to subcontractors or divisions, if the following conditions are met:
(1) The amounts included are limited to (i) the unliquidated remainder of progress payments made plus (ii) for small business concerns any unpaid subcontractor requests for progress payments that the Contractor has approved for current payment in the ordinary course of business.
(2) The subcontract or interdivisional order is expected to involve a minimum of approximately 6 months between the beginning of work and the first delivery, or, if the subcontractor is a small business concern, 4 months.
(3) If the financing payments are in the form of progress payments, the terms of the subcontract or interdivisional order concerning progress payments--
(i) Are substantially similar to the terms of this clause at 3.3.1-31, Progress Payments, for any subcontractor that is a large business concern;
(ii) Are at least as favorable to the Government as the terms of this clause;
(iii) Are not more favorable to the subcontractor or division than the terms of this clause are to the Contractor;
(iv) Shall indicate that the Contractor, and not the Government, awards the subcontract and administers the progress payments. (v) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's right to require delivery of the property to the Government for valid reasons not limited to (A) default of the Contractor, or
(B) bankrupcy or or insolvency of the subcontractor.
(4) If the financing payments are in the form of performance-based payments, the terms of the subcontract or interdivisional order concerning payments--
(i) Are substantially similar to clause 3.3.1-32 -Performance-Based Payments;
(ii) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's right to require delivery of the property to the Government for valid reasons, not limited to --
(A) the default of the Contractor; or
(B) The bankruptcy or insolvency of the subcontractor.
(5) If the financing payments are in the form of commercial item financing payments, the subcontract or interdivisional order concerning payments subordinates all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's right to require delivery of the property to the Government if--
(i) The Contractor defaults; or
(ii) The subcontractor becomes bankrupt or insolvent.
(6) The progress payment rate in the subcontract is 80% unless the subcontractor specifies a lesser amount. If the subcontractor is a small business concern, the progress payment rate may be up to 85%.
(7) The parties agree concerning any proceeds received by the Government for property to which title has vested in the Government under the subcontract terms, that the proceeds shall be applied to reducing any unliquidated progress payments by the Government to the Contractor under this contract.
(8) If no unliquidated progress payments to the Contractor remain, but there are unliquidated progress payments that the Contractor has made to any subcontractor, the Contractor shall be subrogated to all the rights the Government obtained through the terms required by this clause to be in any subcontract, as if all such rights had been assigned and transferred to the Contractor.
(9) The Contractor shall pay the subcontractor's progress payment request under subdivision (j)(1)(ii) above, within a reasonable time after receiving the Government progress payment covering those amounts.
(10) To facilitate small business participation in subcontracting under this contract, the Contractor agrees to provide progress payments to small business concerns of up to 85%. The Contractor further agrees that the need for such progress payments shall not be considered as a handicap or adverse factor in the award of subcontracts.
(k) Limitations on Undefinitized Contract Actions.
Notwithstanding any other progress payment provisions in this contract, progress payments may not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions. A contract action' is any action resulting in a contract, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. This limitation shall apply to the costs incurred, as computed in accordance with paragraph (a) of this clause, and shall remain in effect until the contract action is definitized. Costs incurred which are subject to this limitation shall be segregated on Contractor progress payment requests and invoices from those costs eligible for higher progress payment rates. For purposes of progress payment liquidation, as described in paragraph (b) of this clause, progress payments for undefinitized contract actions shall be liquidated at 80 percent of the amount invoiced for work performed under the undefinitized contract action as long as the contract action remains undefinitized. The amount of unliquidated progress payments for undefinitized contract actions shall not exceed 80 percent of the maximum liability of the Government under the undefinitized contract action or such lower limit specified elsewhere in the contract. Separate limits may be specified for separate actions.
(End of clause)
3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
(a) Definitions. As used in this clause
"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the SAM database.
"System for Award Management (SAM) Database" means the primary Government repository for Contractor information required for the conduct of business with the Government.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number
(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705-5711 or via the Internet at http://fedgov.dnb.com/webform; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company…