Attachment 5 - Construction Waste Management Plan.docx

DOCX document 18 KB Posted

Attached to
AMENDMENT 1 - ROOF REPLACEMENT PROJECT AT THE FAA'S SEATTLE ARTCC LOCATED IN AUBURN, WA
Solicitation number
DTFASA-17-R-00631
Issued by

About this file

Attachment 5 - Construction Waste Management Plan (docx)

View the file

Other files

File Type Posted
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Construction Waste Management Plan.docx DOCX document
Question 4 - Detail 1-A003 Amendment.pdf PDF
Rev Sec B.pdf PDF
Question 8 - Sheet A039.pdf PDF
Attachment 4 - DB Wage Determination No. WA170036 dated 5 19 2017.pdf PDF
Question 6 - OSW Main Roof Level detail.pdf PDF
Question 6 - PENTHOUSE TPO Amendment.pdf PDF
Attachment 1a - Drawings.pdf PDF
Question 2 - OSW Roof As-Builts for Reference.pdf PDF
Attachment 2 - Customer Satisfaction Survey.doc DOC document
RFO DTFASA-17-R-00631.pdf PDF
Attachment 3 - SF-1413 Sub-Contractor.pdf PDF
Amendment 1.pdf PDF
Question 1 - OSW Elevations.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 2 - Customer Satisfaction Survey.doc DOC document
RFO DTFASA-17-R-00631.pdf PDF
Attachment 3 - SF-1413 Sub-Contractor.pdf PDF
Attachment 5 - Construction Waste Management Plan.docx DOCX document
Attachment 4 - DB Wage Determination No. WA170036 dated 5 19 2017.pdf PDF
Attachment 1a - Drawings.pdf PDF
Attachment 3 - SF-1413 Sub-Contractor.pdf PDF
RFO DTFASA-17-R-00631.pdf PDF
Attachment 2 - Customer Satisfaction Survey.doc DOC document
Attachment 1a - Drawings.pdf PDF
Attachment 4 - DB Wage Determination No. WA170036 dated 5 19 2017.pdf PDF
Attachment 1 - Specifications.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Waste Management Plan

Contractor: ____________________________________________________________________________________________________ Project Title: __________________________________________________________________________________________________ Contract Number: ____________________________________________________________________________________________ In performance of this contract, the Contractor must establish a program to minimize waste generation, as well as recycle, reuse, and salvage construction and demolition (C&D) debris generated to the maximum extent possible. See Contract Clause 3.6.3-22 Construction Waste Management, for full text.

Contractor must divert at least 50% weight of the total non-hazardous solid waste generated by the work from landfills and incinerators.

1) Provide an overall strategy for managing C&D debris associated with the project:

2) Waste Identification:

Anticipated types and quantities by weight of demolition, site-clearing and construction waste generated by the project. Include estimated quantities by weight and assumptions for estimates:

Type
Weight
Assumption

3) Waste Reduction Work Plan:

List each type of waste and whether it will be salvaged, recycled, or disposed of in a landfill or incinerator. Include points of waste generation, estimated total weight of each waste type, final disposition for each waste type, and handling and transportation procedures.

Type of Waste Salvaged, Recycled, or Disposed of?

Est. total weight

Handling & Transportation Procedures

4) Salvaged Materials:

For each type of material that is salvaged or recycled, describe the type of material, source, estimated quantity, and receiving entity. Include names, addresses, and telephone numbers for the receiving individuals and/or organizations.

Material Type

Source

Est. Quantity

Receiving Entity (name, address, ph#)

5) Disposed Materials:

Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and/or incinerator facility.

How ?

Where (include name, address, ph#)

6) Handling and Transportation Procedures:

Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on project site where material separation will be located.

This plan must be found acceptable by the FAA Contracting Officer’s Representative (COR) or the COR’s designated representative prior to the contractor receiving a Notice-to-Proceed. The plan’s acceptability will be promptly determined by the FAA based on knowledge of the site(s) covered under the plan. The contractor must implement the approved Waste Management Plan during the term of the contract.

Submitted by:

Contractor Printed Name & Title

Contractor Signature Date

Approved by:

Contracting Officer Date

Note: A Construction & Demolition Report detailing your disposal activities is required to be submitted to the Contracting Officer on a monthly basis. A copy of this report is attached for your convenience.

Monthly Construction & Demolition Report

1) Project title: ___________________________________________________________________________________________

Contractor name: _____________________________________________________________________________________

Dates covered in report: ______________________________________________________________________________

2) Total quantity by weight (in tons) of waste generated from the project: _________________________

3) The total quantity by weight (in tons) of construction waste material landfilled from the project, the identity of the landfill, the total amount of tipping fees paid, transportation costs (if separate), and the total disposal cost. Attach manifests, weight tickets, receipts, and invoices, as applicable.

Total quantity by weight (in tons): _______________________________________________________________________

Landfilled used (name, address, ph#): ___________________________________________________________________

Tipping fees paid:

Transportation costs (if separate):

Total disposal costs:

4) The total quantity by weight (in tons or cubic yards) of each material type recycled, reused, or salvaged from the project, the date removed from the jobsite, the receiving party, the transportation costs, the amount of any money paid or received for the recycled or salvaged material, and the net total cost or savings of salvage or recycling each material. Attach manifests, weight tickets, receipts, and invoices, as applicable.

Material

Weight (ton/CY) Recycled, Reused, or Salvaged

Date Removed

Receiving Party Amount received or paid

Transp.

Costs

Net total cost

5) The Contractor must ensure that facilities used for recycling, reuse, and disposal are authorized for the intended use to the required extent by federal, state, and local regulations.

Contractor Name/Title: _______________________________________________________________________

Contractor Signature: _________________________________________________________________________

File details come from the government source that posted it. Updated .