Construction Waste Management Plan
Contractor: ____________________________________________________________________________________________________ Project Title: __________________________________________________________________________________________________ Contract Number: ____________________________________________________________________________________________ In performance of this contract, the Contractor must establish a program to minimize waste generation, as well as recycle, reuse, and salvage construction and demolition (C&D) debris generated to the maximum extent possible. See Contract Clause 3.6.3-22 Construction Waste Management, for full text.
Contractor must divert at least 50% weight of the total non-hazardous solid waste generated by the work from landfills and incinerators.
1) Provide an overall strategy for managing C&D debris associated with the project:
2) Waste Identification:
Anticipated types and quantities by weight of demolition, site-clearing and construction waste generated by the project. Include estimated quantities by weight and assumptions for estimates:
| Type |
| Weight |
| Assumption |
3) Waste Reduction Work Plan:
List each type of waste and whether it will be salvaged, recycled, or disposed of in a landfill or incinerator. Include points of waste generation, estimated total weight of each waste type, final disposition for each waste type, and handling and transportation procedures.
Type of Waste Salvaged, Recycled, or Disposed of?
Est. total weight
Handling & Transportation Procedures
4) Salvaged Materials:
For each type of material that is salvaged or recycled, describe the type of material, source, estimated quantity, and receiving entity. Include names, addresses, and telephone numbers for the receiving individuals and/or organizations.
Material Type
Source
Est. Quantity
Receiving Entity (name, address, ph#)
5) Disposed Materials:
Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and/or incinerator facility.
How ?
Where (include name, address, ph#)
6) Handling and Transportation Procedures:
Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on project site where material separation will be located.
This plan must be found acceptable by the FAA Contracting Officer’s Representative (COR) or the COR’s designated representative prior to the contractor receiving a Notice-to-Proceed. The plan’s acceptability will be promptly determined by the FAA based on knowledge of the site(s) covered under the plan. The contractor must implement the approved Waste Management Plan during the term of the contract.
Submitted by:
Contractor Printed Name & Title
Contractor Signature Date
Approved by:
Contracting Officer Date
Note: A Construction & Demolition Report detailing your disposal activities is required to be submitted to the Contracting Officer on a monthly basis. A copy of this report is attached for your convenience.
Monthly Construction & Demolition Report
1) Project title: ___________________________________________________________________________________________
Contractor name: _____________________________________________________________________________________
Dates covered in report: ______________________________________________________________________________
2) Total quantity by weight (in tons) of waste generated from the project: _________________________
3) The total quantity by weight (in tons) of construction waste material landfilled from the project, the identity of the landfill, the total amount of tipping fees paid, transportation costs (if separate), and the total disposal cost. Attach manifests, weight tickets, receipts, and invoices, as applicable.
Total quantity by weight (in tons): _______________________________________________________________________
Landfilled used (name, address, ph#): ___________________________________________________________________
Tipping fees paid:
Transportation costs (if separate):
Total disposal costs:
4) The total quantity by weight (in tons or cubic yards) of each material type recycled, reused, or salvaged from the project, the date removed from the jobsite, the receiving party, the transportation costs, the amount of any money paid or received for the recycled or salvaged material, and the net total cost or savings of salvage or recycling each material. Attach manifests, weight tickets, receipts, and invoices, as applicable.
Material
Weight (ton/CY) Recycled, Reused, or Salvaged
Date Removed
Receiving Party Amount received or paid
Transp.
Costs
Net total cost
5) The Contractor must ensure that facilities used for recycling, reuse, and disposal are authorized for the intended use to the required extent by federal, state, and local regulations.
Contractor Name/Title: _______________________________________________________________________
Contractor Signature: _________________________________________________________________________