SIR
Boston Logan Main Receiver Site - Shelter & Tower
1216SO0084/4040A.WB4050 - CONSTRUCTION- ANTENNA TOWER PRICE
One self supporting 12ft high, 16ft x 24ft steel platform with 11 antenna mounts (equipped with; stairs, waveguide, OB light, lightning protc, grounding, foundation design, freight, off-loading,etc.)
Electrical power feed from shelter to tower for OB lights and convenience outlet
Tower foundation
Tower Assembly / Erection
1 tower junction box with ground bars, #4/0 grnd, fittings, etc (material & labor)
1216SO0084/2000A.WB4050 - CONSTRUCTION - BUILDING
Tower and Shelter counterpoise systems
21ft x 21ft Concrete shelter building fully equipped with; cable tray, grounding, electrical, etc.
Shelter foundation
Electrical Transformer with pad and feeders to Manual disconnects and to RVR and RTR shelters one shetler junction box with ground bar, surge suppressors, #4/0.
1216SO0084/4400B.WB4060 - INSTALL/ CHECKOUT NEXCOM ELECTRONIC EQUIPMENT
Heliax cable
Heliax connectors, hangers, etc
Install and terminate Heliax cables from tower junction box to shelter junction box surege suppressors
CC.WB4050 -CONSTRUCTION
ice bridge cable tray from shelter to tower for comm cables & power
Ground penetrating Radar Study to identify cables and utilities
Soil borings & analysis required for foundation designs
Site work site trailer / storage conex box / porta potty
CC.WB4060 - INSTALL AND CHECKOUT
Telco / fiber feed to Shelter
Red badge Escorts (Massport requirement)
Massport badging costs for contractors
Sub Total----------------------------------------------------------------------------------------------- -$
10% Overhead
Sub Total -$
10% Profit
5% Bonding fee -$
Grand Total this estimate -------------------------------------------------------------------------------------------------------------------- -$