Section B Bid Schedule (pdf)

View the file

Other files

File Type Posted
DTFAEN 16 C 00186 Amendment 0005.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
DTFAEN 16 C 00186 Amendment 0006.pdf PDF
BOS RTR-2016-final cnstrct drwgs.pdf PDF
DTFAEN 16 C 00186 Amendment 0004.pdf PDF
DTFAEN 16 C 00186 Amendment 0007.pdf PDF
DTFAEN-16-R-00186 SIR final copy (2).2 —
DTFAEN-16-R-00186 Amendment 0002.pdf PDF
BusinessDeclaration May 2016.pdf PDF
DTFAEN 16 C 00186 Amendment 0008.pdf PDF
Section B Bid Schedule.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
DTFAEN 16 C 00186 Amendment 0003.pdf PDF
MASSPORT Contractor Requirements as of August 2006.pdf PDF
BOS RTR Final Specs 28July16 - JT (2) (3).2 —
BOS RTR- wage determination.pdf PDF
BusinessDeclaration May 2016.pdf PDF
BOS RTR- wage determination.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
DTFAEN 16 C 00186 Amendment 0004.pdf PDF
Section B Bid Schedule.pdf PDF
DTFAEN 16 C 00186 Amendment 0003.pdf PDF
DTFAEN 16 C 00186 Amendment 0005.pdf PDF
DTFAEN 16 C 00186 Amendment 0007.pdf PDF
DTFAEN-16-R-00186 SIR final copy (2).2 —
DTFAEN-16-R-00186 Amendment 0002.pdf PDF
BOS RTR-2016-final cnstrct drwgs.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
BOS RTR Final Specs 28July16 - JT (2) (3).2 —
MASSPORT Contractor Requirements as of August 2006.pdf PDF
DTFAEN 16 C 00186 Amendment 0006.pdf PDF
BOS RTR Final Specs 28July16 - JT (2) (3).2 —
BusinessDeclaration May 2016.pdf PDF
MASSPORT Contractor Requirements as of August 2006.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
BOS RTR-2016-final cnstrct drwgs.pdf PDF
DTFAEN 16 C 00186 Amendment 0005.pdf PDF
DTFAEN 16 C 00186 Amendment 0003.pdf PDF
DTFAEN 16 C 00186 Amendment 0004.pdf PDF
DTFAEN-16-R-00186 Amendment 0002.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
BOS RTR- wage determination.pdf PDF
DTFAEN-16-R-00186 SIR final copy (2).2 —
DTFAEN 16 C 00186 Amendment 0006.pdf PDF
BOS RTR PAST PERF SURVEY.doc DOC document
DTFAEN-16-R-00186 Amendment 0002.pdf PDF
Section B Bid Schedule.pdf PDF
MASSPORT Contractor Requirements as of August 2006.pdf PDF
BusinessDeclaration May 2016.pdf PDF
DTFAEN-16-R-00186 Amendment 0001 signed.pdf PDF
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIR

Boston Logan Main Receiver Site - Shelter & Tower

PRICE

1216SO0084/4040A.WB4050 - CONSTRUCTION- ANTENNA TOWER

One self supporting 12ft high, 16ft x 24ft steel platform with 11 antenna mounts (equipped with; stairs, waveguide, OB light, lightning protc, grounding, foundation design, freight, off-loading,etc.)

Electrical power feed from shelter to tower for OB lights and convenience outlet

Tower foundation

Tower Assembly / Erection

1 tower junction box with ground bars, #4/0 grnd, fittings, etc (material & labor)

1216SO0084/2000A.WB4050 - CONSTRUCTION - BUILDING

Tower and Shelter counterpoise systems

21ft x 21ft Concrete shelter building fully equipped with; cable tray, grounding, electrical, etc.

Shelter foundation

Electrical Transformer with pad and feeders to Manual disconnects and to RVR and RTR shelters one shetler junction box with ground bar, surge suppressors, #4/0.

1216SO0084/4400B.WB4060 - INSTALL/ CHECKOUT NEXCOM ELECTRONIC EQUIPMENT

Heliax cable

Heliax connectors, hangers, etc

Install and terminate Heliax cables from tower junction box to shelter junction box surege suppressors

CC.WB4050 -CONSTRUCTION

ice bridge cable tray from shelter to tower for comm cables & power

Ground penetrating Radar Study to identify cables and utilities

Soil borings & analysis required for foundation designs

Site work site trailer / storage conex box / porta potty

CC.WB4060 - INSTALL AND CHECKOUT

Telco / fiber feed to Shelter

Red badge Escorts (Massport requirement)

Massport badging costs for contractors

Sub Total----------------------------------------------------------------------------------------------- $

Overhead

Sub Total $

Profit

Bonding fee $

Grand Total this estimate -------------------------------------------------------------------------------------------------------------------- $

Sheet1